High Speed Rail (London - West Midlands) BillPage 120

(b) the structure of any tunnel carrying a highway under any such
railway.

(9) Nothing in this paragraph affects the operation of section 87 of the New
Roads and Street Works Act 1991.

15 5Where the nominated undertaker is responsible for maintaining a bridge
carrying either of the following over a railway—

(a) a new highway constructed under this Act, or

(b) a highway altered under this Act,

the nominated undertaker may, by agreement with the persons having the
10charge, management or control of the highway, delegate to them the
function of maintaining the bridge.

16 Section 58(1) and (2) of the Highways Act 1980 (special defence in action
against highway authority for damages for non-repair of highway) applies
to an action against the nominated undertaker in respect of damage
15resulting from its failure to maintain a highway under paragraph 14(2) or
14(3)(a) as it applies to an action against a highway authority as mentioned
in section 58(1) of that Act (and references in section 58(1) and (2) to the
highway authority are to be read accordingly).

17 Notwithstanding anything in section 46 of the Railways Clauses
20Consolidation Act 1845, as incorporated with this Act, the nominated
undertaker is not liable to maintain the surface of any highway under or
over which the scheduled works are constructed, or the immediate
approaches to any such highway.

Bridges carrying highways

18 25Each of sections 116 and 117 of the Transport Act 1968 (duties as respects
bridges carrying highways over railways) has effect as if the nominated
undertaker were one of the boards mentioned in the section in question.

Part 4 Tables relating to Part 2 of Schedule

30TABLE 1

50NOTE: References in column (3) of table 2 to a footpath or bridleway include
any highway over which members of the public have, or are to have, a right
of way on foot and (in the case of a bridleway) on horseback or leading a
horse, whether or not with any other public rights of way.

TABLE 3

Section 4(2)

SCHEDULE 5 15Acquisition of land for particular purposes

The purposes for which land specified in the following table may be
acquired under section 4(1) include (but are not limited to) the purpose
specified in relation to that land in the third column of the table.

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
20
London Borough
of Camden
4, 13, 79, 99 Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
68, 69, 87, 91, 93, 162,
163, 236, 369, 401 to
411, 508, 522, 665, 704,
721, 724, 727, 750, 791,
792, 794 to 796, 801 to
805, 807 to 811, 901, 912,
978, 1017, 1051, 1058 to
1061
Diversion or installation of, or works to,
25utilities apparatus




30
78, 110, 372, 816, 817,
819, 820, 822, 829, 834,
847, 848, 849, 852, 854,
855, 856
Provision of worksite and access for
construction

35

High Speed Rail (London - West Midlands) BillPage 181

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
89, 140, 142 Provision of worksite and access for
construction Diversion or installation of, or works to
5utilities apparatusInstallation of ground anchors
90, 151 to 154, 157, 159,
177, 180, 181
Installation of ground anchors
363 Provision of electricity supply system and
access
373, 374, 375, 835, 841,
860, 863, 874, 905, 906,
908, 920, 933, 940, 942,
958, 959, 960, 970, 971,
977, 982, 984, 992, 994,
996, 1000, 1001, 1003 to
1005, 1009, 1010, 1016,
1019, 1023, 1024, 1030,
1031, 1033 to 1035,
1038, 1040, 1048, 1057
10Provision of worksite and access for
construction and maintenance



15



434, 830 20Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
831 Provision of environmental mitigationProvision of worksite and access for
construction
838, 839 Provision of worksite and access for
25construction and maintenance
Provision of new public right of way
973, 974, 1018, 1050 Diversion or installation of, or works to,
utilities apparatus
Provision of worksite and access for
30construction and maintenance
London Borough
of Islington
1, 3 Provision of worksite and access for
construction
London Borough
of Brent
28, 29, 48, 50, 52 to 55,
58, 78, 87, 185, 374
Diversion or installation of, or works to,
utilities apparatus
Royal Borough of
Kensington @AMP@amp;
Chelsea
1 to 3, 9 35Provision of worksite and access for
construction Provision and renewal of railway systems
for operational purposes and drainage
16, 19 Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 182

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
London Borough
of Hammersmith
@AMP@amp; Fulham
5, 6, 67 Provision of worksite and access for
construction
5
12, 13, 21, 28, 29, 37, 48,
50, 63, 66, 71, 73, 75, 76
Diversion or installation of, or works to,
utilities apparatus
77 Provision of environmental mitigation
London Borough
of Ealing
5, 7, 8, 9, 12, 13, 29, 30,
132, 156, 223, 229, 233,
265, 562, 787 to 790, 946
to 949
Provision of worksite and access for
10construction Diversion or installation of, or works to,
utilities apparatus
20, 21, 35, 36, 40, 41, 44,
45, 48, 49, 52, 53, 56, 57,
60, 61, 64, 65, 68, 69, 72,
73, 76, 77, 80, 81, 84, 85,
111, 114, 125 to 127, 142,
144, 145, 152, 176, 190,
193, 194, 196, 200, 202,
204 to 206, 209, 214, 216
to 219, 221, 222, 228,
231, 232, 235, 237, 240,
242, 251, 254 to 257, 259,
267, 269, 271, 272, 274,
277, 282 to 289, 438, 439
Provision of worksite and access for
construction
15




20




25
103, 106 Provision of worksite and access for
construction Provision and renewal of railway systems
for operational purposes and drainageDiversion or installation of, or works to,
utilities apparatus
116 to 124, 150, 151, 157,
158, 165, 187, 188
30Provision of worksite and access for
construction Reinstatement of businesses or facilities Diversion or installation of, or works to,
utilities apparatus
133 to 139, 295, 297, 298,
314, 315, 322 to 324, 396,
406, 408, 445, 456 to 461,
471, 579, 580, 716, 770,
771, 798, 799, 805 to 807,
842 to 844, 849, 867, 898,
922, 925, 926, 942, 944,
945, 957 to 964, 973 to
975, 977, 985, 987
Diversion or installation of, or works to,
utilities apparatus
35




40
213 Provision and renewal of railway systems
for operational purposes and drainage

High Speed Rail (London - West Midlands) BillPage 183

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
453, 454 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
5utilities apparatus
London Borough
of Hillingdon
1 to 16, 26 to 28, 39, 40,
68, 84, 85, 106, 107, 128
to 139, 175, 176, 190,
202, 203, 219, 224, 229 to
239, 371, 384, 387, 390,
447, 449, 452, 454, 463,
464, 476 to 478, 492, 515,
517 to 525
Diversion or installation of, or works to,
utilities apparatus


10


25, 441, 442, 458, 459,
469, 471, 483 to 485, 494
to 496, 537, 713, 720
Provision of environmental mitigation
15
25a, 470, 494a Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
50, 51 Provision of access for construction and
20maintenance of utility diversions
101 to 103 420, 422, 423,
426, 427 to 429, 466, 467,
482, 487, 488, 502, 504,
506
Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatus
377, 379, 411, 414, 415,
535
25Provision of worksite and access for
construction
412, 413, 416 to 419 Provision of worksite and access for
construction and maintenance
424, 425, 460, 536, 540 Provision of worksite and access for
30construction Diversion or installation of, or works to,
utilities apparatus
465, 511 Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
474 35Provision of worksite and access for
construction and maintenanceProvision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 184

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
496a, 498, 499, 526 to
534
Provision of worksite and access for
construction and maintenanceProvision of environmental mitigationDiversion and installation of overhead
5electric lines
501, 507 Diversion and installation of overhead
electric linesProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatus
510 10Provision of worksite and access for
construction Provision of environmental mitigation
545 Diversion and installation of overhead
electric lines
Provision of worksite and access for
15construction and maintenance
548, 550, 556 to 558, 563 Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
electric lines
562 20Provision of worksite and access for
construction Diversion and installation of overhead
electric lines
564 Diversion and installation of overhead
electric lines
606, 614, 615, 618 25Provision of worksite and access for
construction and maintenance Provision and renewal of railway systems
for operational purposes and drainageProvision of new public right of wayDiversion and installation of overhead
electric lines Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 185

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
611, 613 Provision of worksite and access for
construction and maintenanceProvision and renewal of railway systems
5for operational purposes and drainage Provision of new public right of wayDiversion or installation of, or works to,
utilities apparatus
612 Provision of worksite and access for
construction and maintenanceProvision and renewal of railway systems
for operational purposes and drainage Diversion or installation of, or works to,
10utilities apparatus
616 Provision of worksite and access for
construction and maintenanceProvision and renewal of railway systems
for operational purposes and drainage Diversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
15electric lines
496, 654, 655 Provision of environmental mitigationProvision of flood mitigation measures
496a, 498 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion and installation of overhead
electric lines
557, 560, 561, 570 to 580,
583, 584, 588, 590, 591,
593, 594, 707, 714, 719,
720c
20Diversion and installation of overhead
electric lines

558, 559 Provision of worksite and access for
25construction and maintenanceDiversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 186

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
565, 569 Diversion and installation of overhead
electric linesProvision of electricity supply system and
5access
566 to 568, 569a Provision of access for construction and
maintenance of utility diversionsProvision of electricity supply system and
access
603, 604, 643 to 645, 657
to 659, 665, 683, 693,
694, 698a, 720d, 723,
724, 728, 729, 736, 737,
739, 741, 742, 748, 749,
753, 767, 768, 770, 784,
786, 787, 789
Provision of environmental mitigation
10




15
621 Provision of balancing pond and associated
works and access for maintenanceProvision of electricity supply system and
accessProvision of new public right of way
622, 624, 625, 627, 628,
630 to 632, 636, 666, 669,
671, 738
Diversion or installation of, or works to,
20utilities apparatus
633, 676, 677, 679, 697,
741a, 747, 747a, 747b,
747d, 756, 756a, 761,
762a, 763 to 765, 771,
772, 774 to 778, 780 to
783
Provision of worksite and access for
construction and maintenance

25

642, 758 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
30utilities apparatus
663, 672 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 187

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
692 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceProvision of electricity supply system and
5accessProvision of flood mitigation measuresProvision of new public right of wayDiversion and installation of overhead
electric lines
726, 731, 734, 740, 745,
746
Provision of worksite and access for
construction
751, 755 Provision of worksite and access for
10construction and maintenanceProvision of environmental mitigation
759 Provision of worksite and access for
construction and maintenanceProvision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
County of
BuckinghamshireDistrict of South
BucksParish of Denham
1, 2 Provision of flood mitigation measures
15
1d, 1f Diversion and installation of overhead
electric lines
11, 17, 19, 32 Provision of environmental mitigation
25, 26, 28 to 31, 33, 46,
52
20Provision of worksite and access for
construction
14, 15, 23, 27 Provision of balancing pond and associated
works and access for maintenance
26 Provision of worksite and access for
25construction
34 Provision of environmental mitigationProvision of worksite and access for
construction
42, 43 Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 188

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
37 to 39, 47 to 49 Provision of access for construction and
maintenance
County of
HertfordshireDistrict of Three
Rivers
5 5Provision of environmental mitigationProvision of worksite and access for
constructionProvision of drainage and associated works
6, 7, 13, 15, 17 to 19, 21,
22, 24, 25, 27, 31, 38, 41,
44, 48, 54, 58, 65, 69, 104
Provision of worksite and access for
construction
10
12 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatus
23, 53, 80 Provision of balancing pond and associated
15works and access for maintenance
32, 36, 37 Provision of worksite and access for
constructionProvision of drainage and associated works
40, 46, 61, 63, 64 Provision of drainage and associated works
49, 55, 80a, 84, 90, 94,
97, 120
Provision of environmental mitigation
20
75 Provision of environmental mitigation Provision of worksite and access for
construction
107, 109 Provision of environmental mitigation Provision of worksite and access for
constructionProvision of electricity supply system and
25accessDiversion and installation of overhead
electric lines
116 Provision of worksite and access for
constructionDiversion and installation of overhead
electric lines
10 30Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 189

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
County of
BuckinghamshireDistrict of ChilternParish of Chalfont
St Peter
1, 7, 21, 30, 31, 35 Provision of worksite and access for
construction
5
16 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
19 Diversion and installation of overhead
10electric lines
70, 75, 76, 83, 85 Provision of environmental mitigation
Parish of Chalfont
St Giles
4 to 6 Provision of environmental mitigation
131 Provision of worksite and access for
15construction
134, 135, 139, 141, 142,
147
Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
Parish of
Amersham
6 Provision of environmental mitigation
7, 22, 24, 28, 34, 37 20Diversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
construction and maintenance
10, 11 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
27 25Diversion or installation of, or works to,
utilities apparatus
31 Provision of environmental mitigationProvision of worksite and access for
construction
59, 66, 67, 74, 76, 77 Provision of protective works to
30watercourse
Parish of Coleshill 4 Provision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 190

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
8 Diversion or installation of, or works to,
utilities apparatus
Parish of Little
Missenden
2 to 4 5Provision of protective works to
watercourse
11, 16 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
14 Diversion or installation of, or works to,
10utilities apparatusProvision of worksite and access for
construction and maintenance
15, 17, 19, 20 Diversion or installation of, or works to,
utilities apparatus
34, 44, 47, 63 Provision of environmental mitigationProvision of drainage and associated works
48, 50, 56, 60, 69, 78 15Provision of environmental mitigation
61, 76 Provision of worksite and access for
construction
64 Provision of environmental mitigationProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
Parish of Great
Missenden
3, 6, 14, 54, 60, 61, 66,
71, 72, 79, 83, 87, 89, 94,
142, 158, 174, 178
20Provision of environmental mitigation

4, 5, 8, 133, 135 to 137 Provision of drainage and associated works
12, 17, 19, 32, 37, 42, 55,
155, 184
Provision of environmental mitigationProvision of drainage and associated works
25
11, 151, 153 Provision of environmental mitigationProvision of new public right of way
16, 18, 20, 27, 40, 41, 85 Provision of worksite and access for
construction
23, 24, 29, 33, 75, 77, 90,
102, 114, 170, 171
Provision of environmental mitigationProvision of worksite and access for
30construction
25, 56 Diversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 191

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
30 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
31 5Provision of environmental mitigationProvision of drainage and associated worksProvision of new public right of way
50, 51, 96, 173, 179, 188,
189
Diversion or installation of, or works to,
utilities apparatus
67 Provision of environmental mitigationRemoval of utility apparatus
78, 82, 140 Provision of environmental mitigationProvision of worksite and access for
10constructionDiversion and installation of overhead
electric lines
107, 120 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
112, 117 15Provision of environmental mitigationDiversion and installation of overhead
electric linesDiversion or installation of, or works to,
utilities apparatus
115, 157, 159 to 161, 163,
167
Provision of worksite and access for
construction
123, 124 20Provision of worksite and access for
construction and maintenanceDiversion and installation of overhead
electric lines
128, 131, 139 Provision of worksite and access for
constructionDiversion and installation of overhead
25electric lines

High Speed Rail (London - West Midlands) BillPage 192

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
126 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion and installation of overhead
5electric linesProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
138, 147 Diversion and installation of overhead
electric lines
134 Provision of environmental mitigationDiversion or installation of, or works to,
10utilities apparatusProvision of new public right of way
145, 166 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion and installation of overhead
electric lines
162 Provision of environmental mitigationProvision of balancing pond and associated
15works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
electric lines
180 Provision of environmental mitigationDiversion and installation of overhead
electric lines
Parish of The Lee 2, 42 to 45 20Provision of environmental mitigation
5, 22, 24, 28, 34 Reprofiling of ground
8, 9, 26 Provision of worksite and access for
constructionReprofiling of ground

High Speed Rail (London - West Midlands) BillPage 193

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
11, 12, 18, 19, 31 Provision of environmental mitigationDiversion and installation of overhead
electric lines
16 5Diversion and installation of overhead
electric lines
27 Provision of environmental mitigationReprofiling of ground Diversion or installation of, or works to,
utilities apparatus
32 Provision of environmental mitigationReprofiling of ground
36 10Reprofiling of ground Provision of worksite and access for
construction and maintenance
39, 40 Provision of environmental mitigationProvision of worksite and access for
construction
District of
Aylesbury ValeParish of
Wendover
1, 3, 14, 48, 150, 153, 233 Provision of environmental mitigationDiversion and installation of overhead
15electric lines
5, 8, 15, 19, 59, 66 to 71,
74, 76 to 78, 80, 81, 123,
143, 147, 220
Provision of drainage and associated works

7, 251 20Provision of environmental mitigationProvision of drainage and associated works
9, 11, 23, 25, 50, 57, 65,
97, 98, 127, 129, 132,
146, 222, 232, 236, 238,
239, 243, 248, 250, 257
Provision of environmental mitigation


18, 42, 45, 46, 60, 120,
126, 149, 151, 182, 187,
190, 192, 224
25Provision of worksite and access for
construction
24 Provision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 194

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
29 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
5utilities apparatus
31 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceProvision of drainage and associated works
32, 58, 108, 109, 142,
212, 214, 223, 241
Diversion and installation of overhead
electric lines
34, 55, 94, 124, 204 10Provision of environmental mitigationDiversion and installation of overhead
electric linesProvision of worksite and access for
construction
35, 169, 172, 185, 205,
206
Diversion or installation of, or works to,
utilities apparatus
38 to 41, 52, 96, 103, 110,
111
15Provision of environmental mitigationProvision of worksite and access for
construction
47, 56, 62, 63, 165, 211,
235
Provision of worksite and access for
constructionDiversion and installation of overhead
electric lines
54 20Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
61, 221 Provision of worksite and access for
constructionProvision of drainage and associated works
64 Provision of worksite and access for
25constructionDiversion and installation of overhead
electric linesProvision of drainage and associated works

High Speed Rail (London - West Midlands) BillPage 195

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
91, 213, 215 Provision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
95 5Provision of worksite and access for
construction and maintenance
100 Provision of environmental mitigationProvision of drainage and associated worksDiversion and installation of overhead
electric lines
135, 136 Provision of balancing pond and associated
10works and access for maintenanceDiversion and installation of overhead
electric lines
156, 159, 217 Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
171 15Provision of worksite and access for
constructionProvision of new public right of way
173 Installation of ground anchors
203 Provision of worksite and access for
constructionProvision of new public right of wayDiversion and installation of overhead
20electric lines
219 Provision of worksite and access for
constructionProvision of environmental mitigationProvision of drainage and associated worksDiversion and installation of overhead
electric lines
230 Diversion or installation of, or works to,
25utilities apparatusDiversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 196

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
District of
WycombeParish of
Ellesborough
2 Provision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
5
4, 15, 74 Provision of worksite and access for
construction
5 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
10 10Provision of environmental mitigationProvision of drainage and associated works
13, 17, 32, 33 Diversion or installation of, or works to,
utilities apparatus
34, 44, 66, 70 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
22, 23, 30, 35, 36, 38, 41,
47, 48
15Provision of environmental mitigation
50, 51, 54 to 57 Provision of flood mitigation measures
52 Provision of worksite and access for
construction and maintenance
53, 61 to 64, 71, 72 20Provision of drainage and associated works
69, 80 Diversion and installation of overhead
electric lines
11, 12 Provision of worksite and access for
constructionDiversion or installation of, or works to,
25utilities apparatus
District of
Aylesbury ValeParish of Stoke
Mandeville
4, 21, 23, 26, 33, 34, 38,
81, 90, 100 to 102, 108,
112, 155, 157, 158, 161
Provision of environmental mitigation

6, 69, 113 Provision of worksite and access for
30construction and maintenance
8, 9, 94, 95, 120 Provision of flood mitigation measures

High Speed Rail (London - West Midlands) BillPage 197

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
10 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
5utilities apparatus
Provision of new public right of way
18 Provision of worksite and access for
construction and maintenanceProvision of new public right of way
22, 48, 56, 122, 132, 144 Provision of environmental mitigationDiversion or installation of, or works to,
10utilities apparatus
24, 59, 63, 116, 149, 151 Provision of worksite and access for
construction
25, 72, 75, 76, 78 to 80,
87, 88, 91, 98, 109, 117,
138, 141
Diversion or installation of, or works to,
utilities apparatus
15
28 Provision of balancing pond and associated
works and access for maintenance
43, 84, 103, 129 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
20utilities apparatus
61 Diversion or installation of, or works to,
utilities apparatusProvision of new public right of way
62 Provision of drainage and associated works
74, 92, 93, 152 Provision of drainage and associated worksProvision of environmental mitigation
83 25Provision of new public right of wayDiversion or installation of, or works to,
utilities apparatusProvision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 198

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
118 Provision of worksite and access for
constructionDiversion or installation of, or works to,
5utilities apparatus
119 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of drainage and associated works
123, 131, 134, 136, 140,
150
Provision of environmental mitigationProvision of worksite and access for
construction
126 10Provision of environmental mitigationProvision of worksite and access for
constructionProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
146 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
15construction and maintenance
District of
WycombeParish of Great
and Little Kimble
cum Marsh
1 Provision of drainage and associated works


3, 7, 9 20Provision of worksite and access for
construction
District of
AylesburyParish of Stone
with Bishopstone
and Hartwell
6, 65, 86 Diversion or installation of, or works to,
utilities apparatus

25
17, 18, 23, 32 Provision of environmental mitigationDiversion and installation of overhead
electric lines
27, 29, 30, 37, 69, 79, 81 Provision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 199

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
28, 28a Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance
33 5Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of drainage and associated worksProvision of worksite and access for
construction
35 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
10utilities apparatus
36 Provision of environmental mitigationProvision of access for construction and
maintenance
39 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of drainage and associated worksProvision of access for construction and
15maintenance
40 Provision of worksite and access for
construction and maintenance
44, 46, 53, 57, 59 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
45 20Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
construction and maintenance
47 Provision of worksite and access for
constructionProvision of a turning head
48, 85, 90 25Provision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 200

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
51, 55 Provision of worksite and access for
constructionProvision of environmental mitigationDiversion or installation of, or works to,
5utilities apparatus
60 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of a turning head
61, 72 Provision of environmental mitigationProvision of worksite and access for
10construction
66 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of environmental mitigationProvision of drainage and associated worksProvision of flood mitigation measures
74, 75, 89 Provision of flood mitigation measures
76 15Provision of environmental mitigationProvision of drainage and associated works
87 Provision of environmental mitigation
Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatusProvision of flood mitigation measures
88 20Provision of flood mitigation measuresProvision of drainage and associated works

High Speed Rail (London - West Midlands) BillPage 201

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
Parish of
Aylesbury
1 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
5electric lines
6, 18 Provision of environmental mitigationDiversion and installation of overhead
electric lines
20 to 22, 24 Provision of environmental mitigation
Parish of
Coldharbour
2 to 7, 10, 11 Provision of environmental mitigation
10
Parish of Fleet
Marston
4 Provision of worksite and access for
construction and maintenance
5, 11 Provision of environmental mitigationProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
6, 7 15Diversion or installation of, or works to,
utilities apparatus
8, 9 Provision of flood mitigation measures
10 Provision of worksite and access for
constructionProvision of environmental mitigationDiversion or installation of, or works to,
20utilities apparatus
13, 26 Provision of environmental mitigation
14, 18, 30 Provision of drainage and associated works
15, 21 Provision of worksite and access for
construction
16, 19 25Provision of environmental mitigationProvision of new public right of way
20 Provision of environmental mitigationProvision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 202

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
23 Provision of worksite and access for
constructionProvision of drainage and associated works
25 5Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
12 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
10utilities apparatus
Parish of
Waddesdon
1, 16 Provision of flood mitigation measures
2, 73, 79 Provision of environmental mitigationProvision of new public right of way
3, 32, 45, 107, 128, 129 Provision of drainage and associated works
6 15Provision of environmental mitigationProvision of drainage and associated worksProvision of new public right of way
7, 9, 113, 120, 126, 127 Provision of environmental mitigationProvision of worksite and access for
construction
8, 10, 11, 13, 34, 36, 41,
42, 49, 51, 53, 59, 60, 67,
69, 74, 76, 81 to 83, 85,
100, 103
Provision of environmental mitigation

20
17, 46, 52, 56, 66, 72, 78,
84, 106, 114
Provision of worksite and access for
construction
18 Provision of environmental mitigationProvision of worksite and access for
25constructionProvision of electricity supply system and
access
31, 54, 109, 112 Provision of worksite and access for
construction and maintenance
33, 40, 58 Provision of balancing pond and associated
30works and access for maintenance

High Speed Rail (London - West Midlands) BillPage 203

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
68, 93, 110, 111 Diversion or installation of, or works to,
utilities apparatus
91 5Provision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatus
94 Provision of new public right of way
97 Provision of environmental mitigationProvision of worksite and access for
10constructionDiversion or installation of, or works to,
utilities apparatus
105 Provision of drainage and associated worksProvision of worksite and access for
construction and maintenance
123 Provision of environmental mitigationProvision of worksite and access for
15constructionProvision of flood mitigation measures
Parish of
Quainton
3, 35, 61, 66 Provision of environmental mitigationProvision of flood mitigation measures
8, 23, 59, 74, 88, 115 Provision of balancing pond and associated
works and access for maintenance
9, 12, 14, 24, 92, 98 to
100, 133, 138, 142, 177,
182, 191, 194, 199, 203,
216, 218, 248 to 250
20Provision of worksite and access for
construction

11, 20, 27, 53, 56, 58, 62,
64, 65, 122, 125, 128,
141, 195, 206a, 222, 223,
225, 226, 232, 240, 253,
254, 261, 264, 270, 271,
273
Provision of environmental mitigation
25



17, 75, 127, 210, 212 30Diversion or installation of, or works to,
utilities apparatus
19 Provision of worksite and access for
constructionRemoval of utility apparatus

High Speed Rail (London - West Midlands) BillPage 204

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
21 Provision of environmental mitigationProvision of worksite and access for
constructionRemoval of utility apparatus
31 5Provision of balancing pond and associated
works and access for maintenanceRemoval of utility apparatus
32, 50, 68, 151, 219, 220,
224
Provision of flood mitigation measures
33, 72, 274 Provision of worksite and access for
10construction and maintenance
87 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
54, 71, 89, 104, 110, 113,
118a, 119
Provision of environmental mitigationProvision of worksite and access for
15construction
38 Provision of environmental mitigationProvision of diversion or installation of, or
works to, utilities apparatus
40 Provision of environmental mitigationProvision of drainage and associated works
46, 107, 109, 131, 146,
149, 159, 197, 244
Provision of drainage and associated works
20
47 Provision of a turning headProvision of environmental mitigation
49 Provision of a turning headDiversion or installation of, or works to,
utilities apparatus
93 Provision of balancing pond and associated
25works and access for maintenanceProvision of flood mitigation measures

High Speed Rail (London - West Midlands) BillPage 205

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
118, 176 Provision of environmental mitigationDiversion and installation of overhead
electric lines
124 5Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
135, 150, 155, 157, 158,
161, 164, 168, 170, 184,
233
Diversion and installation of overhead
electric lines
136 10Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated worksProvision of new public right of wayProvision of electricity supply system and
access
143 Diversion and installation of overhead
electric linesProvision of access for construction and
15maintenance
160 Provision of access for construction and
maintenance
166 Provision of electricity supply system and
access
173 20Provision of environmental mitigationDiversion and installation of overhead
electric linesProvision of drainage and associated works
174, 175 Provision of worksite and access for
constructionDiversion and installation of overhead
electric lines
204 25Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of flood mitigation measures

High Speed Rail (London - West Midlands) BillPage 206

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
206, 207 Provision of environmental mitigationProvision of electricity supply system and
access
243 5Provision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
251 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
Parish of Grendon
Underwood
3, 5, 10, 28, 30 Provision of environmental mitigation
10
20, 23, 26 Provision of worksite and access for
construction
4 Provision of environmental mitigationProvision of drainage and associated works
21 and 24 Provision of environmental mitigationProvision of worksite and access for
15construction
9 Provision of worksite and access for
construction and maintenance
12 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
14 20Provision of worksite and access for
construction and maintenanceProvision of new public right of way
16 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceProvision of new public right of way
29 Provision of balancing pond and associated
25works and access for maintenance
Parish of Middle
Claydon
1, 2 Provision of environmental mitigation
Parish of East
Claydon
4, 4a, 5, 7 Diversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 207

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
Parish of Calvert
Green
1, 9, 11 Provision of environmental mitigation
2 5Provision of environmental mitigationProvision of new public right of way
17 Provision of new public right of way
6 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of flood mitigation measuresProvision of new public right of way
8 Provision of flood mitigation measures
23 10Diversion or installation of, or works to,
utilities apparatus
24 Diversion or installation of, or works to,
utilities apparatusProvision of access for construction and
maintenance
25 15Provision of worksite and access for
construction
18 Provision of access for construction and
maintenanceProvision of new public right of way
Parish of Steeple
Claydon
3, 4, 6, 12, 41, 78, 80,
110, 111
Provision of environmental mitigation
20
24, 26, 27, 31, 33, 40, 97 Provision of worksite and access for
construction
8, 56, 72 Provision of environmental mitigationProvision of access for construction and
maintenance
9 25Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of access for construction and
maintenance
9a, 100, 117, 119, 120 Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 208

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
9b Provision of balancing pond and associated
works and access for maintenance
21 5Provision of worksite and access for
constructionProvision of balancing pond and associated
works and access for maintenance
46, 49, 52, 76 Provision of environmental mitigationProvision of worksite and access for
construction
51 10Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance
60 Provision of a turning head
75 Diversion or installation of, or works to,
utilities apparatusProvision of new public right of way
98, 99, 112 15Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
109 Provision of flood mitigation measures
124, 125 Provision of drainage and associated works
69, 71 20Provision of new public right of way
102, 103 Provision of worksite and access for
construction and maintenance
Parish of
Charndon
2, 3 Diversion or installation of, or works to,
utilities apparatus
Parish of Twyford 5, 6, 13, 62, 67, 92, 101 25Provision of worksite and access for
construction
14 Provision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated worksProvision of new public right of way
24, 26, 44, 49, 54 Provision of environmental mitigationDiversion or installation of, or works to,
30utilities apparatus

High Speed Rail (London - West Midlands) BillPage 209

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
27, 48 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance
38, 60, 81, 82, 89, 90 5Provision of flood mitigation measures
39 Provision of balancing pond and associated
works and access for maintenanceProvision of worksite and access for
construction
47, 63, 64, 69 Provision of environmental mitigationProvision of worksite and access for
10construction
52 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of access for construction and
maintenance
53, 76 Provision of worksite and access for
15construction and maintenance
58, 88 Provision of environmental mitigationProvision of new public right of way
71, 75, 77, 83, 84, 95, 97,
99, 100
Provision of environmental mitigation
72 Provision of balancing pond and associated
20works and access for maintenanceProvision of drainage and associated works
78 Provision of drainage and associated works
80 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
87 Diversion or installation of, or works to,
25utilities apparatus
91 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 210

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
94 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of access for construction and
5maintenanceProvision of new public right of way
Parish of Preston
Bissett
1 to 4 Provision of flood mitigation measures
6, 13, 22, 27, 30, 31, 44,
45, 54 to 56, 58, 62
Provision of environmental mitigation
8, 15, 28, 29, 52 10Provision of worksite and access for
construction
12 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
20, 21 Provision of environmental mitigationProvision of drainage and associated works
23 15Provision of environmental mitigationProvision of new public right of wayProvision of drainage and associated worksProvision of worksite and access for
construction and maintenance
37 Provision of environmental mitigationProvision of drainage and associated worksProvision of worksite and access for
construction and maintenance
41, 47 to 51 Provision of environmental mitigationProvision of worksite and access for
20construction
40, 42, 43, 61 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance

High Speed Rail (London - West Midlands) BillPage 211

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
County of
OxfordshireDistrict of
CherwellParish of
Godington
5, 12 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
5
6 Provision of worksite and access for
construction
8, 14, 15 Provision of flood mitigation measures
County of
BuckinghamshireDistrict of
Aylesbury ValeParish of
Chetwode
1 to 3, 8, 9 10Provision of flood mitigation measures


5, 12 to 14, 22 to 24, 28,
31, 35, 42, 45, 52, 53, 55,
64, 84, 87, 92
Provision of environmental mitigation
15
17 Provision of balancing pond and associated
works and access for maintenanceProvision of environmental mitigationProvision of drainage and associated works
19 to 21, 95, 96 Provision of environmental mitigationProvision of worksite and access for
20construction and maintenance
25, 27, 34, 91 Provision of worksite and access for
construction
30 Provision of environmental mitigationProvision of drainage and associated works
41, 86, 88 Diversion or installation of, or works to,
25utilities apparatus
51 Diversion or installation of, or works to,
utilities apparatusProvision of new public right of way
54 Provision of drainage and associated worksRemoval of utility apparatus
63 Provision of drainage and associated works
65 30Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance

High Speed Rail (London - West Midlands) BillPage 212

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
71, 90 Provision of environmental mitigationProvision of new public right of way
76 Provision of worksite and access for
5constructionRemoval of utility apparatus
Parish of Barton
Hartshorn
2 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
6 Provision of environmental mitigation
7, 16 Provision of worksite and access for
10construction
9, 10, 22 Provision of flood mitigation measures
13 Provision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
14 Provision of worksite and access for
15constructionProvision of drainage and associated works
19, 24 Provision of drainage and associated works
25, 26 Provision of environmental mitigationProvision of new public right of way
County of
OxfordshireDistrict of
CherwellParish of Newton
Purcell with
Shelswell
1, 8, 17, 39, 49, 66 Provision of environmental mitigationProvision of worksite and access for
construction
20

4, 6, 15, 16, 19, 23, 31,
34, 36, 46, 54, 86
Provision of environmental mitigation
10, 22, 27, 55, 69, 75, 82,
83
25Provision of worksite and access for
construction
21, 26, 63, 67, 74, 76 Provision of drainage and associated works
32 Diversion or installation of, or works to,
utilities apparatusRemoval of utility apparatusProvision of worksite and access for
30construction

High Speed Rail (London - West Midlands) BillPage 213

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
37, 59 Provision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
30, 56, 58 5Provision of worksite and access for
construction and maintenance
57, 62 Provision of flood mitigation measuresProvision of drainage and associated works
61 Provision of worksite and access for
construction and maintenanceProvision of new public right of way
64 10Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
72 Provision of worksite and access for
constructionProvision of flood mitigation measures
85, 88 Diversion or installation of, or works to,
15utilities apparatus
92 Provision of worksite and access for
constructionProvision of new public right of way
Parish of Finmere 5, 9, 31, 54 Provision of environmental mitigation
7, 15 Provision of environmental mitigationProvision of new public right of way
8, 12 20Provision of environmental mitigationProvision of worksite and access for
construction
24, 33, 36, 37 Provision of worksite and access for
construction
18 Diversion or installation of, or works to,
25utilities apparatusProvision of new public right of way
18a, 25, 40, 42 Diversion or installation of, or works to,
utilities apparatus
48 Provision of access for utility works

High Speed Rail (London - West Midlands) BillPage 214

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
52 Provision of environmental mitigationRemoval of utility apparatus
Parish of Mixbury 7, 24, 26, 40 Diversion or installation of, or works to,
5utilities apparatus
8, 13 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
12, 17, 20, 45, 46, 57 Provision of environmental mitigation
15, 18 10Provision of environmental mitigationDiversion and installation of overhead
electric lines
19, 34, 43, 51 Provision of worksite and access for
construction
28, 37, 38 Diversion or installation of, or works to,
15utilities apparatusDiversion and installation of overhead
electric lines
31 Provision of balancing pond and associated
works and access for maintenanceProvision of electricity supply system and
access
31a 20Provision of environmental mitigationRemoval of utility apparatusDiversion or installation of, or works to,
utilities apparatus
39 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
40a, 49 Provision of environmental mitigationProvision of worksite and access for
25construction
41, 63 Provision of drainage and associated works
44 Provision of balancing pond and associated
works and access for maintenance

High Speed Rail (London - West Midlands) BillPage 215

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
48 Provision of environmental mitigationProvision of new public right of way
53, 54 Provision of balancing pond and associated
5works and access for maintenanceProvision of new public right of wayProvision of drainage and associated works
52 Provision of balancing pond and associated
works and access for maintenanceProvision of new public right of wayProvision of drainage and associated worksRemoval of utility apparatus
62 Provision of flood mitigation measuresRemoval of utility apparatus
66 Removal of utility apparatus
County of
BuckinghamshireDistrict of
Aylesbury ValeParish of
Westbury
1 10Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusRemoval of utility apparatusProvision of drainage and associated works

1a Provision of balancing pond and associated
15works and access for maintenanceProvision of drainage and associated worksProvision of new public right of way
5, 6 Provision of drainage and associated works
7 Provision of environmental mitigationProvision of drainage and associated worksProvision of new public right of wayProvision of worksite and access for
construction and maintenance
14 Provision of flood mitigation measures
19, 21 to 25, 27 20Provision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 216

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
28 Provision of environmental mitigationProvision of new public right of way
29 Provision of worksite and access for
5constructionProvision of new public right of way
30, 33 to 35, 38 Provision of worksite and access for
construction
18, 20 Diversion or installation of, or works to,
utilities apparatus
Parish of
Turweston
3, 4, 45, 46 10Provision of new public right of way
11 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
8, 13, 20, 27, 50, 68, 71,
72, 76 to 79, 83, 85, 99,
100
Provision of worksite and access for
15construction
18, 21, 89, 91 Provision of environmental mitigation
29 Diversion or installation of, or works to,
utilities apparatus
62, 73 20Provision of worksite and access for
constructionDiversion and installation of overhead
electric linesRemoval of utility apparatus
81 Provision of worksite and access for
construction and maintenance
37 25Diversion and installation of overhead
electric lines
38, 104, 106 Provision of environmental mitigationProvision of worksite and access for
construction
40, 57 Provision of worksite and access for
30constructionDiversion and installation of overhead
electric lines
42, 61, 67 Diversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 217

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
43, 48 Diversion and installation of overhead
electric linesProvision of new public right of way
49 5Provision of worksite and access for
constructionProvision of new public right of way
65 Provision of worksite and access for
constructionRemoval of utility apparatusProvision of balancing pond and associated
works and access for maintenance
84 10Provision of worksite and access for
constructionProvision of balancing pond and associated
works and access for maintenance
88 Provision of environmental mitigationDiversion and installation of overhead
electric lines
90 15Provision of environmental mitigationProvision of worksite and access for
constructionProvision of balancing pond and associated
works and access for maintenance
102, 110 Provision of drainage and associated works
109 Provision of environmental mitigationProvision of flood mitigation measures
County of
NorthamptonshireDistrict of South
NorthamptonshireParish of
Whitfield
1 20Provision of balancing pond and associated
works and access for maintenanceDiversion and installation of overhead
electric lines
4, 9, 13, 14 Provision of drainage and associated works

High Speed Rail (London - West Midlands) BillPage 218

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
6 Provision of environmental mitigationDiversion and installation of overhead
electric linesProvision of worksite and access for
5constructionProvision of drainage and associated worksProvision of electricity supply system, and
access
10 Provision of environmental mitigationProvision of flood mitigation measuresProvision of new public rights of wayProvision of drainage and associated works
16 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
20, 35 10Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatus
26 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
15utilities apparatus
30 Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
17 Diversion or installation of, or works to,
20utilities apparatusDiversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 219

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
25 Provision of flood mitigation measuresProvision of new public right of way
27 Provision of flood mitigation measures
28 5Provision of environmental mitigation
29, 37, 40, 42, 48 to 50 Provision of worksite and access for
construction
41 Provision of balancing pond and associated
works and access for maintenance
44 10Provision of environmental mitigationProvision of worksite and access for
construction
Parish of Brackley 1 Provision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
4, 6 15Provision of worksite and access for
construction and maintenance
7 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
9 Provision of worksite and access for
20construction
12 Provision of environmental mitigationProvision of worksite and access for
construction
13 Provision of worksite and access for
constructionDiversion or installation of, or works to,
25utilities apparatus
14, 15 Diversion or installation of, or works to,
utilities apparatus
Parish of Radstone 1, 2, 22 Provision of worksite and access for
construction
5, 7a 30Provision of worksite and access for
constructionProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 220

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
6, 20 Provision of environmental mitigationProvision of worksite and access for
construction
9 5Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
7 Diversion or installation of, or works to,
utilities apparatusRemoval of utility apparatus
8, 40, 41, 47 10Provision of environmental mitigation
10, 17, 21, 23, 38 Provision of environmental mitigationProvision of drainage and associated works
19, 26, 32, 33 Provision of environmental mitigationProvision of drainage and associated worksProvision of balancing pond and associated
works and access for maintenance
27, 37a, 41a Provision of balancing pond and associated
15works and access for maintenance
28, 29 Provision of flood mitigation measures
30 Provision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated worksProvision of environmental mitigationProvision of new public right of wayRemoval of utility apparatus
36 Provision of environmental mitigationRemoval of utility apparatus
37, 39 20Provision of new public right of way
46 Provision of flood mitigation measures
Parish of
Greatworth
1 Provision of new public right of way

High Speed Rail (London - West Midlands) BillPage 221

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
3 Provision of drainage and associated worksProvision of flood mitigation measures
4 Provision of environmental mitigationProvision of drainage and associated works
5 5Provision of flood mitigation measures
8, 11, 15, 75, 76 Provision of environmental mitigation
9 Provision of worksite and access for
constructionProvision of new public right of way
12 Provision of worksite and access for
10constructionProvision of new public right of wayRemoval of utility apparatus
13 Provision of environmental mitigationProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatusRemoval of utility apparatusProvision of worksite and access for
construction
19 Provision of environmental mitigationProvision of new public right of wayDiversion or installation of, or works to,
15utilities apparatus
15a Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
16, 17, 17a, 38 Diversion or installation of, or works to,
utilities apparatus
18, 48, 59, 60, 63, 64, 66,
67, 71, 72, 74, 77, 80, 82,
84 to 86, 90, 91, 98
20Provision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 222

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
10 Provision of environmental mitigationProvision of new public right of way
20, 21 Provision of drainage and associated works
23 5Provision of worksite and access for
constructionProvision of drainage and associated worksRemoval of utility apparatus
30, 70, 73 Provision of worksite and access for
constructionRemoval of utility apparatus
24 Provision of balancing pond and associated
10works and access for maintenanceProvision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusRemoval of utility apparatus
25 Diversion or installation of, or works to,
utilities apparatusRemoval of utility apparatus
39 Provision of balancing pond and associated
15works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusRemoval of utility apparatus
26 Diversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
construction
28, 31, 32, 34, 52, 56, 83,
99
20Provision of worksite and access for
constructionProvision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 223

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
29 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
5Removal of utility apparatusProvision of drainage and associated worksProvision of balancing pond and associated
works and access for maintenance
33 Provision of balancing pond and associated
works and access for maintenance
43 Provision of flood mitigation measuresDiversion or installation of, or works to,
10utilities apparatus
44 Provision of worksite and access for
construction and maintenance
57, 61 Provision of worksite and access for
construction and maintenanceProvision of new public right of way
Parish of Marston
St Lawrence
4, 23 15Provision of environmental mitigation
5, 8, 11, 14 Provision of worksite and access for
construction
7, 9 Provision of environmental mitigationProvision of worksite and access for
20construction
15 Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
17 Provision of environmental mitigationProvision of drainage and associated works
Parish of Sulgrave 1 25Provision of environmental mitigationProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 224

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
Parish of Thorpe
Mandeville
3 Provision of new public right of wayProvision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
4, 16, 48, 54 5Provision of worksite and access for
construction
18, 47 Diversion or installation of, or works to,
utilities apparatus
15, 31, 35 Provision of environmental mitigation
25, 41, 42 10Provision of drainage and associated works
26 Provision of environmental mitigationProvision of drainage and associated worksProvision of balancing pond and associated
works and access for maintenanceRemoval of utility apparatus
28, 33, 36, 40, 43 Provision of flood mitigation measures
29, 51 Provision of environmental mitigationProvision of worksite and access for
15construction
60, 62 Provision of balancing pond and associated
works and access for maintenance
69 Provision of environmental mitigationProvision of drainage and associated worksRemoval of utility apparatusDiversion or installation of, or works to,
utilities apparatus
71 20Provision of balancing pond and associated
works and access for maintenanceProvision of environmental mitigation
Parish of
Culworth
1 Diversion or installation of, or works to,
utilities apparatus
7, 8, 13, 16 Provision of environmental mitigation
25Provision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 225

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
11 Provision of environmental mitigationProvision of drainage and associated works
12, 20, 23, 42 Provision of environmental mitigation
17 5Provision of worksite and access for
constructionProvision of electricity supply system and
access
18 Provision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated worksProvision of new public right of way
19 10Provision of balancing pond and associated
works and access for maintenance
21 Provision of worksite and access for
construction and maintenance
22, 25, 44 Provision of worksite and access for
15construction
29 Provision of drainage and associated works
34 Provision of worksite and access for
constructionProvision of drainage and associated works
39 Provision of flood mitigation measures
Parish of
Chipping Warden
and Edgcote
2, 4, 9, 28, 32, 33, 95, 96,
105
20Provision of environmental mitigation

35, 36, 39 Diversion or installation of, or works to,
utilities apparatus
11 25Provision of worksite and access for
constructionProvision of flood mitigation measures
3, 14, 41 Provision of flood mitigation measures
15, 16, 24, 27, 38, 43, 48
to 50, 62, 84, 86, 87, 90,
91, 93, 97, 104, 107
Provision of worksite and access for
construction
30

High Speed Rail (London - West Midlands) BillPage 226

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
18 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
25 5Provision of worksite and access for
construction and maintenance
47 Provision of balancing pond and associated
works and access for maintenance
58 Provision of environmental mitigationProvision of new public right of way
65 10Provision of environmental mitigationProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatus
71 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
72 15Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
94, 99 Provision of worksite and access for
constructionProvision of new public right of way
Parish of Aston Le
Walls
1 to 3, 32 20Provision of worksite and access for
construction
9 Diversion or installation of, or works to,
utilities apparatus
10 Provision of worksite and access for
25constructionDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 227

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
17 Provision of worksite and access for
constructionProvision of new public right of way
20 5Provision of environmental mitigation
23, 25 Provision of environmental mitigationProvision of worksite and access for
construction
28, 31 Provision of balancing pond and associated
works and access for maintenance
35, 39 10Provision of drainage and associated works
Parish of
Boddington
1, 4, 11, 29, 39, 52, 54, 66 Provision of drainage and associated works
3, 23, 26, 27, 42, 47, 48,
50, 51, 89, 108, 109
Provision of worksite and access for
construction
2, 40, 87, 96, 98, 114 15Provision of environmental mitigationProvision of worksite and access for
construction
18 Provision of environmental mitigation Provision of new public right of wayProvision of worksite and access for
construction
97, 100a Provision of environmental mitigationProvision of worksite and access for
20constructionProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatus
103 Provision of environmental mitigationProvision of drainage and associated works
85 Diversion or installation of, or works to,
utilities apparatus
16, 56, 86 25Provision of flood mitigation measures
91 Diversion or installation of, or works to,
utilities apparatusProvision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 228

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
25, 30, 57, 62, 63, 71, 72,
80, 93, 115, 116, 119,
121, 124, 125
Provision of environmental mitigation

5
97a and 99 Diversion or installation of, or works to,
utilities apparatusRemoval of utility apparatus
101 Provision of worksite and access for
construction and maintenance
14 10Provision of balancing pond and associated
works and access for maintenanceProvision of flood mitigation measures
22 Provision of environmental mitigationProvision of new public right of wayProvision of worksite and access for
construction
28 Provision of environmental mitigationProvision of worksite and access for
15constructionProvision of balancing pond and associated
works and access for maintenance
61 Provision of environmental mitigationRemoval of utility apparatus
69 Provision of balancing pond and associated
works and access for maintenance
74 20Provision of environmental mitigationProvision of worksite and access for
constructionRemoval of utility apparatus
81 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
County of
WarwickshireDistrict of
Stratford-on-AvonParish of Stoneton
4, 5, 7, 8, 13, 14, 16a, 28 Provision of environmental mitigation
25

High Speed Rail (London - West Midlands) BillPage 229

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
15 Diversion or installation of, or works to,
utilities apparatus
16, 18 5Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
19 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
22, 24 10Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
Parish of
Wormleighton
2, 9, 21, 35 Provision of environmental mitigation
5, 12 Provision of environmental mitigationProvision of worksite and access for
15construction and maintenance
11, 15, 17, 18, 20 Provision of worksite and access for
construction and maintenance
13 Diversion or installation of, or works to,
utilities apparatus
23, 25 20Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
construction
26 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
25construction Provision of access for construction and
maintenance of utility diversions
28 Provision of environmental mitigationProvision of access for construction and
maintenance of utility diversions

High Speed Rail (London - West Midlands) BillPage 230

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
31 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of worksite and access for
5construction Diversion or installation of, or works to,
utilities apparatus
34, 47 Provision of environmental mitigationProvision of worksite and access for
construction
50 Diversion or installation of, or works to,
10utilities apparatusProvision of environmental mitigation
52 Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatusProvision of new public right of way
55 Provision of worksite and access for
15construction
Parish of
Radbourn
2, 19, 28 Provision of worksite and access for
construction
3 Provision of worksite and access for
constructionReprofiling of ground Provision of drainage and associated works
6 20Provision of balancing pond and associated
works and access for maintenanceProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 231

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
7 Provision of worksite and access for
constructionReprofiling of ground Diversion or installation of, or works to,
5utilities apparatusProvision of new public right of way
8, 8c Provision of flood mitigation measures
8b Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusReprofiling of ground Provision of new public right of way
9 10Diversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
constructionProvision of new public right of wayProvision of environmental mitigation
11 Diversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
15construction and maintenanceProvision of new public right of way
13 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
15 Provision of environmental mitigation
16 Provision of worksite and access for
20constructionDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 232

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
5 Diversion or installation of, or works to,
utilities apparatusProvision of flood mitigation measuresProvision of access for construction and
5maintenance of utility diversions
8d Provision of environmental mitigationProvision of worksite and access for
construction
Parish of
Ladbroke
5, 19, 20, 25 to 27, 31 Diversion or installation of, or works to,
utilities apparatus
7, 12, 15, 39, 41, 42, 52 10Provision of environmental mitigation
8, 18 Reprofiling of ground Provision of drainage and associated worksProvision of worksite and access for
construction
24, 28, 32 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
15Provision of worksite and access for
construction
29, 33, 71, 72 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
35, 56, 62, 63, 76 Provision of environmental mitigationProvision of drainage and associated works
36, 61 20Provision of worksite and access for
construction
37 Provision of new public right of way
53, 59, 69 Provision of environmental mitigationProvision of drainage and associated worksProvision of worksite and access for
construction
66 25Provision of balancing pond and associated
works and access for maintenance
Parish of Southam 5, 31, 63, 65, 70, 72, 90,
93
Provision of environmental mitigation

High Speed Rail (London - West Midlands) BillPage 233

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
54, 56, 58, 60 to 62, 87 Diversion or installation of, or works to,
utilities apparatus
6, 9, 111 5Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
13, 94, 95 Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatus
8, 14, 103 10Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatus
24, 32 Provision of environmental mitigationProvision of drainage and associated worksProvision of worksite and access for
constructionDiversion or installation of, or works to,
15utilities apparatus
34, 39, 55, 68, 80 Provision of environmental mitigationProvision of worksite and access for
construction
16, 41, 53, 91 Provision of worksite and access for
construction
28, 29 20Provision of drainage and associated works
45 Provision of environmental mitigation Provision of balancing pond and associated
works and access for maintenance
47 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of drainage and associated works
49, 51, 52 25Provision of new public right of way

High Speed Rail (London - West Midlands) BillPage 234

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
75 Provision of environmental mitigationProvision of access for construction and
maintenance of utility diversions
100 5Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatusProvision of flood mitigation measures
107 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
10utilities apparatusProvision of flood mitigation measures
112, 118 Provision of worksite and access for
construction and maintenance
Parish of Long
Itchington
1, 15, 19, 30, 35, 37, 47 Provision of environmental mitigation
2 15Provision of worksite and access for
construction and maintenance
6 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
7 Provision of environmental mitigationProvision of balancing pond and associated
20works and access for maintenanceProvision of drainage and associated worksDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
7a Provision of drainage and associated works

High Speed Rail (London - West Midlands) BillPage 235

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
9 Provision of environmental mitigationProvision of worksite and access for
construction Provision of access for construction and
5maintenance of utility diversions
12, 49, 50, 52, 63, 64 Diversion or installation of, or works to,
utilities apparatus
20, 22, 31, 32 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
53 10Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of worksite and access for
construction and maintenance
48, 57 Provision of worksite and access for
construction
58 15Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
59, 61 Provision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
20utilities apparatus
Parish of Ufton 2 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
8, 21, 23, 24 Diversion or installation of, or works to,
utilities apparatus
9 25Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatusProvision of drainage and associated works

High Speed Rail (London - West Midlands) BillPage 236

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
15 Provision of environmental mitigationProvision of worksite and access for
construction Drainage and associated work
11, 18 5Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of drainage and associated worksProvision of flood mitigation measures
District of
WarwickParish of
Offchurch
4, 6, 32, 49, 50, 51a, 54a Provision of environmental mitigation

10
7, 10, 95, 98, 100 Provision of worksite and access for
construction and maintenance
11 Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
12 15Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceProvision of drainage and associated works
13, 19, 28, 36, 42 to 44,
53
Provision of environmental mitigationProvision of worksite and access for
construction
15 Provision of environmental mitigationProvision of balancing pond and associated
20works and access for maintenanceProvision of drainage and associated works
18 Provision of environmental mitigationMinor highway alterations
21, 45, 58, 60, 62 Provision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 237

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
23 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
5utilities apparatusProvision of drainage and associated works
24 Provision of worksite and access for
constructionDiversion or installation of, or works to,
utilities apparatusProvision of drainage and associated works
27 Provision of environmental mitigationProvision of worksite and access for
10construction Provision of drainage and associated works
29, 66, 89 Diversion or installation of, or works to,
utilities apparatus
37, 73 Provision of balancing pond and associated
works and access for maintenance
57 15Provision of worksite and access for
construction Provision of drainage and associated works
68, 70, 84 Reprofiling of groundProvision of worksite and access for
construction
69 Diversion or installation of, or works to,
20utilities apparatusProvision of worksite and access for
construction
71, 75 Provision of new public right of way
78, 79, 87 Provision of environmental mitigationProvision of worksite and access for
construction Provision of drainage and associated worksDiversion or installation of, or works to,
25utilities apparatus

High Speed Rail (London - West Midlands) BillPage 238

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
80 Provision of environmental mitigationProvision of worksite and access for
construction Provision of new public right of wayProvision of access for construction and
5maintenance of utility diversions
91 Provision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of flood mitigation measures
92 Provision of worksite and access for
10construction and maintenanceDiversion or installation of, or works to,
utilities apparatus
47a Provision of a turning head
51b Provision of a turning headProvision of environmental mitigation
Parish of
Cubbington
1 Provision of balancing pond and associated
15works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of environmental mitigationProvision of worksite and access for
construction and maintenance
19, 21, 41, 46, 49, 53, 57,
61, 65
Provision of worksite and access for
construction
23, 27, 28, 50, 52, 67 20Provision of environmental mitigation
4 Diversion or installation of, or works to,
utilities apparatus
5, 6 Provision of access for construction and
maintenanceProvision of access for construction and
25maintenance of utility diversions

High Speed Rail (London - West Midlands) BillPage 239

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
9 Provision access for construction and
maintenanceDiversion or installation of, or works to,
5utilities apparatus
11, 14, 15 Provision of environmental mitigationDrainage and associated worksProvision of worksite and access for
construction
32 Provision of drainage and associated worksProvision of worksite and access for
construction
35 10Provision of environmental mitigationProvision of drainage and associated worksInstallation of ground anchors
39, 48 Provision of environmental mitigationProvision of worksite and access for
construction
44 Provision of new public right of way
47 Provision of access for construction and
15maintenance
Parish of Weston
Under Wetherley
1, 2 Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
4, 5 Provision of environmental mitigation
Parish of
Stoneleigh
1, 5, 7, 10, 13, 18, 44,
119, 123, 124, 126, 129,
130, 142a, 147, 148, 152,
152a, 155
20Provision of worksite and access for
construction

8, 27, 50, 52, 54, 94, 117,
122, 164, 165, 167, 179
Provision of environmental mitigation
25
21, 24, 28, 29, 31, 34, 43,
77, 83
Diversion or installation of, or works to,
utilities apparatus
22, 42, 144, 158, 163 Provision of environmental mitigationProvision of drainage and associated worksProvision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 240

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
33, 62 Provision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
5utilities apparatus
48, 66, 75, 96, 127, 128,
137, 138, 151, 170, 173,
174, 177
Provision of environmental mitigationProvision of worksite and access for
construction
55 Provision of environmental mitigationProvision of balancing pond and associated
10works and access for maintenanceDiversion or installation of, or works to,
utilities apparatus
63 Provision of balancing pond and associated
works and access for maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of drainage and associated works
73 15Provision of drainage and associated works
79, 87, 112, 139 Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
84 Provision of environmental mitigation Provision of worksite and access for
20construction and maintenanceDiversion or installation of, or works to,
utilities apparatus
136, 141 Provision of environmental mitigation Diversion or installation of, or works to,
utilities apparatus
97, 100, 143 Provision of worksite and access for
25construction and maintenance
99 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 241

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
104 Provision of balancing pond and associated
works and access for maintenance
105 5Provision of environmental mitigation Provision of flood mitigation measures
132 Provision of flood mitigation measures
133 Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus
146 10Provision of environmental mitigationProvision of worksite and access for
construction and maintenance
166, 182 Provision of environmental mitigationProvision of new public right of way
171 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of drainage and associated works
178 15Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
184 Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way
Parish of
Kenilworth
12, 30 Provision of environmental mitigation
20
13, 16, 21 Provision of worksite and access for
construction
5, 6, 23, 25 Provision of environmental mitigationProvision of worksite and access for
construction

High Speed Rail (London - West Midlands) BillPage 242

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
9, 11, 15 Provision of environmental mitigationProvision of worksite and access for
constructionDiversion or installation of, or works to,
5utilities apparatus
20 Provision of worksite and access for
constructionProvision of new public right of way
Parish of Burton
Green
4, 6, 9, 13, 14, 23, 37, 43,
48, 65, 73, 75, 82, 97
Provision of environmental mitigationProvision of worksite and access for
construction
7, 19, 59, 63 10Provision of environmental mitigation
11, 21 Provision of worksite and access for
construction
28 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceProvision of new public right of way
29, 31 15Provision of environmental mitigation Provision of worksite and access for
construction and maintenance
32 Provision of worksite and access for
construction and maintenance
33 Provision of environmental mitigationDiversion or installation of, or works to,
20utilities apparatusProvision of drainage and associated worksProvision of new public right of way
35 Reinstatement of businesses or facilities
72 Provision of environmental mitigationProvision of new public right of way
77, 80 Provision of new public right of way
98 Provision of worksite and access for
25constructionProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 243

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
District of North
WarwickshireParish of Great
Packington
1, 6 Provision of worksite and access for
construction
5
7, 8 Provision of balancing pond and associated
works and access for maintenance
Parish of Little
Packington
2 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance
4 10Provision of worksite and access for
constructionDiversion and installation of overhead
electric lines
10, 12, 15, 16 Diversion and installation of overhead
electric lines
17, 19 15Provision of worksite and access for
constructionDiversion and installation of overhead
electric lines
Parish of Coleshill 1c Provision of environmental mitigationDiversion and installation of overhead
electric lines
1f, 1g, 1r 20Provision of balancing pond and associated
works and access for maintenance
1, 2 to 5, 7, 12, 13, 112,
127, 134, 136, 139, 145,
148, 150, 156, 160, 204,
272, 304, 306, 397, 408,
410, 435, 445, 479, 514
Diversion and installation of overhead
electric lines

25
33, 35 to 37, 40, 41, 85,
288, 381, 433, 454, 455,
482a, 540, 556, 558, 560,
561, 565, 567, 585, 587
Diversion or installation of, or works to,
utilities apparatus

30
38 Provision of balancing pond and associated
works and access for maintenance
48, 52, 58, 59, 63, 68,
101, 102, 106, 278, 295,
296, 365, 371, 413, 420,
569, 571, 578, 581, 584,
589, 591
Provision of worksite and access for
construction
35

High Speed Rail (London - West Midlands) BillPage 244

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
50 Diversion and installation of overhead
electric linesProvision of worksite and access for
5constructionDiversion or installation of, or works to,
utilities apparatusProvision of balancing pond and associated
works and access for maintenance
116, 124, 162, 174, 176,
177, 179, 181, 240, 241,
244, 248, 300, 302, 309,
320, 325, 326, 357, 367,
372, 428, 484, 509, 510,
519
Provision of environmental mitigation

10


51, 440, 477, 495 Provision of environmental mitigationProvision of worksite and access for
15constructionDiversion or installation of, or works to,
utilities apparatus
73 Provision of environmental mitigationRemoval of existing utilities
546 Provision of worksite and access for
constructionDiversion or installation of, or works to,
20utilities apparatus
Diversion and installation of overhead
electric lines
74, 321, 452, 546 Provision of worksite and access for
constructionDiversion or installation of, or works to,
25utilities apparatus
75, 312, 322, 377, 391,
396
Provision of environmental mitigationProvision of worksite and access for
constructionProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 245

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
77, 87, 90, 91, 152, 157,
548
Provision of environmental mitigationProvision of worksite and access for
constructionDiversion and installation of overhead
5electric lines
103, 112b Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion and installation of overhead
electric linesProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatus
92 10Provision of environmental mitigationProvision of worksite and access for
constructionDiversion and installation of overhead
electric linesProvision of new public right of way
127a Provision of worksite and access for
construction Diversion and installation of overhead
15electric linesProvision of new public right of wayDiversion or installation of, or works to,
utilities apparatus
108a, 310, 315, 354, 501,
506 to 508, 580
Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
100, 427 Provision of worksite and access for
20construction and maintenance

High Speed Rail (London - West Midlands) BillPage 246

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
108 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of new public right of wayProvision of balancing pond and associated
5works and access for maintenance
164 Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenanceDiversion and installation of overhead
electric lines
283, 289, 297, 335, 346,
366, 369
Provision of environmental mitigationProvision of worksite and access for
10construction
188 Provision of balancing pond and associated
works and access for maintenanceProvision of worksite and access for
construction
195, 196 Provision of worksite and access for
15constructionDiversion and installation of overhead line
equipment
199 Provision of balancing pond and associated
works and access for maintenanceDiversion and installation of overhead line
equipment
247, 257 20Provision of balancing pond and associated
works and access for maintenanceProvision of environmental mitigationProvision of new public right of way
253, 388, 416, 451, 459,
460, 502
Provision of environmental mitigationDiversion and installation of overhead line
equipment
308, 318, 467 Provision of environmental mitigationProvision of worksite and access for
25construction and maintenance

High Speed Rail (London - West Midlands) BillPage 247

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
488, 490, 493, 497, 499 Protective measures for properties beneath
overhead line works
358 5Diversion and installation of overhead line
equipmentProvision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of balancing pond and associated
works and access for maintenance
404, 409 Provision of environmental mitigationProvision of worksite and access for
10constructionDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
432 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
412 15Provision of environmental mitigationDiversion and installation of overhead line
equipment
419, 517 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of new public right of way
481 Provision of environmental mitigationProvision of new public right of way

High Speed Rail (London - West Midlands) BillPage 248

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
491 Provision of environmental mitigationProvision of new public right of wayProvision of worksite and access for
construction Diversion or installation of, or works to,
5utilities apparatus
511, 559 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatusProvision of balancing pond and associated
works and access for maintenance
526 Provision of environmental mitigationDiversion or installation of, or works to,
10utilities apparatusDiversion and installation of overhead
electric lines
593 Provision of environmental mitigationProvision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead line
15equipment
439, 485, 486, 554 Diversion or installation of, or works to,
utilities apparatus
Diversion and installation of overhead
electric lines
492, 500 20Provision of worksite and access for
construction
Diversion and installation of overhead
electric lines
Parish of Water
Orton
6, 132 Provision of worksite and access for
25construction and maintenanceDiversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 249

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
9, 10, 27, 28, 37, 40, 43a,
82
Provision of environmental mitigationProvision of worksite and access for
construction Diversion or installation of, or works to,
5utilities apparatus
12, 13, 42, 50, 57, 64, 65,
67 to 69, 74
Provision of environmental mitigation
23, 34, 35, 38, 39, 41, 77a Provision of environmental mitigationProvision of worksite and access for
construction
43 10Reinstatement of businesses or facilities
44, 89, 126, 130, 142 Provision of worksite and access for
construction
48 Provision of environmental mitigationProvision of worksite and access for
construction Provision of balancing pond and associated
15works and access for maintenance
52 Provision of environmental mitigationDiversion or installation of, or works to,
utilities apparatus
53, 54, 56 Provision of balancing pond and associated
works and access for maintenance
76 20Provision of environmental mitigationProvision of balancing pond and associated
works and access for maintenance
100, 118 Provision of worksite and access for
construction and maintenanceDiversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
25electric lines
119, 123 Provision of worksite and access for
construction Diversion or installation of, or works to,
utilities apparatus

High Speed Rail (London - West Midlands) BillPage 250

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
124, 129, 139 Diversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
5electric lines
131, 145, 146, 149 Diversion and installation of overhead
electric lines
138 Diversion or installation of, or works to,
utilities apparatus
133, 140, 143 10Provision of worksite and access for
construction and maintenance
155 Diversion or installation of, or works to,
utilities apparatusDiversion and installation of overhead
electric linesProvision of balancing pond and associated
15works and access for maintenance
Parish of
Curdworth
1, 49, 67, 70, 72, 77, 78,
80, 106, 215
Diversion or installation of, or works to,
utilities apparatus
2 Provision of worksite and access for
construction and maintenanceProvision of environmental mitigation
3, 6, 7, 113, 201, 202,
223, 241, 244
20Provision of worksite and access for
construction
5, 8, 9, 11, 15, 37, 39, 40,
43, 51, 58, 59, 61, 96,
102, 153a, 168, 170, 174,
186, 187
Diversion and installation of overhead
electric lines

25
13 Provision of worksite and access for
constructionProvision of environmental mitigation
16, 21 to 23, 34, 38, 57,
81, 114, 117, 118, 121,
128, 137, 140, 141, 142,
149, 152, 155, 156, 160,
192, 200
Provision of environmental mitigation

30

10, 25 to 28, 31, 32, 45,
48, 69
Provision of environmental mitigationDiversion and installation of overhead
electric lines

High Speed Rail (London - West Midlands) BillPage 251

Area Number of land shown on
deposited plans
Purpose for which land may be acquired or used
35, 191, 194 Provision of worksite and access for
constructionDiversion and installation of overhead
5electric lines
50, 210, 216, 219, 220 to
222, 225 to 227, 229, 231,
235, 236, 238, 240, 243,
245, 246
Provision of worksite and access for
construction and maintenance

51a, 68 10Provision of balancing pond and associated
works and access for maintenance
Diversion and installation of overhead
electric lines
65, 66