Session 2014 - 15
Internet Publications
Other Bills before Parliament


 
 

17

 

House of Commons

 
 

Tuesday 13 January 2015

 

Public Bill Committee Proceedings

 

Infrastructure Bill [Lords]


 

[Eighth and Ninth sittings]


 

Tom Greatrex

 

Negatived on division  67

 

Clause  37,  page  43,  line  31,  at end insert—

 

“(j)    

encouraging the development of CO2 storage potential.”

 

Clause Agreed to.

 

Schedule 6 Agreed to.

 

Caroline Lucas

 

Norman Baker

 

Not selected  31

 

Page  45,  line  12,  leave out Clauses 38 to 43.

 

Tom Greatrex

 

Withdrawn  68

 

Clause  38,  page  45,  line  13,  after “deep level land”, insert “subject to subsection

 

(5A),”

 

Dr Alan Whitehead

 

Tom Greatrex

 

Negatived on division  36

 

Clause  38,  page  45,  line  22,  leave out “300 metres” and insert “1000 metres”

 

Tom Greatrex

 

Withdrawn  1

 

Clause  38,  page  45,  line  22,  at end insert—

 

“(3A)    

The Secretary of State shall, before the award of licences in relation to the use of

 

deep-level land for onshore oil and gas exploration, issue additional planning

 

guidance introducing a presumption against such developments within or under

 

protected areas and functionally linked land.”


 
 

:                                             

18

 

, continued

 
 

Tom Greatrex

 

Withdrawn  69

 

Clause  38,  page  45,  line  25,  at end insert—

 

“(5A)    

The carrying out of hydraulic fracturing in connection with the exploitation of

 

unconventional petroleum in relevant land shall be prohibited.

 

(5B)    

In subsection (5A)—

 

“relevant land” means land which is located within the boundary of a

 

groundwater source protection zone as specified by the Environment

 

Agency from time to time;”

 

Dr Alan Whitehead

 

Withdrawn  37

 

Clause  38,  page  45,  line  25,  at end insert—

 

“(6)    

The Secretary of State shall be required to commission and consider reports on—

 

(a)    

the cumulative impacts of water use in fracking and refracking of

 

exploratory and productive gas wells;

 

(b)    

the cumulative impacts of flowback and waste water arising from

 

fracking and refracking activity; and

 

(c)    

the cumulative impacts on communities of road and vehicle movements

 

from fracking and refracking activity

 

    

before providing any permission for the exploitation of petroleum on deep level

 

land where one or more exploitation facility exists within one mile of a proposed

 

site.”

 

Clause Agreed to.

 

Tom Greatrex

 

Negatived on division  2

 

Clause  39,  page  45,  line  32,  leave out “any substance” and insert “substances

 

approved by the Environment Agency”

 

Tom Greatrex

 

Negatived on division  3

 

Clause  39,  page  46,  line  2,  after “use”, insert “, subject to the conditions laid out in

 

planning permission”

 

Tom Greatrex

 

Negatived on division  4

 

Clause  39,  page  46,  line  3,  at end insert—

 

“(3A)    

 

(a)    

The right of use shall be conditional on operators undertaking site-by-site

 

measurement, monitoring and public disclosure of existing and future

 

fugitive emissions.

 

(b)    

In this section, “fugitive emissions” shall mean releases arising from, but

 

not limited to, flaring, venting, storage and transportation leakages.”

 

Tom Greatrex

 

Withdrawn  5

 

Clause  39,  page  46,  line  3,  at end insert—


 
 

:                                             

19

 

, continued

 
 

“( )    

Before a well design is commenced or adopted in connection with the

 

exploitation of petroleum the right of use requires the Health and Safety

 

Executive to inspect the well so as to satisfy itself that—

 

(a)    

so far as is reasonably practicable, there can be no unplanned escape of

 

fluids from the well; and

 

(b)    

risks to the health and safety of persons from it or anything in it, or in

 

strata to which it is connected, are as low as is reasonably practicable.

 

( )    

Where the Health and Safety Executive is satisfied that a condition in subsection

 

( ) is met, it shall give notice to the Secretary of State.

 

( )    

The Secretary of State shall publish the information received from the Health and

 

Safety Executive in accordance with sub-paragraph ( ).”

 

Clause Agreed to.

 

Clauses 40 to 45 Agreed to.

 

New Clauses

 

Mr John Hayes

 

Agreed to  NC8

 

To move the following Clause

 

         

“Mayoral development orders

 

“(1)    

Schedule (Mayoral development orders) (Mayoral development orders) has

 

effect.

 

(2)    

The Secretary of State may by regulations make consequential provision in

 

connection with any provision made by that Schedule.

 

(3)    

Regulations under this section may amend, repeal, revoke or otherwise modify

 

the application of any enactment (but, in the case of an Act, only if the Act was

 

passed before the end of the Session in which this Act is passed).

 

(4)    

In this section “enactment” includes an enactment comprised in subordinate

 

legislation within the meaning of the Interpretation Act 1978.”

 


 

Mr John Hayes

 

Agreed to  NC9

 

To move the following Clause

 

         

“Reimbursement of persons who have met expenses of making electrical

 

connections

 

(1)    

The Electricity Act 1989 is amended in accordance with this section.

 

(2)    

In section 19 (power to recover expenditure)—

 

(a)    

omit subsections (2) and (3);

 

(b)    

after subsection (3) insert—

 

“(3A)    

Schedule 5B (reimbursement of persons who have met expenses)

 

has effect.”;


 
 

:                                             

20

 

, continued

 
 

(c)    

in subsection (4), after “this section” insert “and Schedule 5B”.

 

(3)    

After Schedule 5A insert—

 

“SCHEDULE 5B

 

Reimbursement of persons who have met expenses

 

Power to make regulations

 

1    (1)  

The Secretary of State may, by regulations, make provision entitling

 

the relevant electricity distributor to exercise the reimbursement

 

powers in cases where conditions A, B, C and D are met.

 

      (2)  

Condition A is met if any electric line or electrical plant is provided

 

for the purpose of making a connection (the “first connection”)—

 

(a)    

between premises and a distribution system, or

 

(b)    

between two distribution systems.

 

      (3)  

Condition B is met if a payment in respect of first connection expenses

 

is made by one or more of the following persons—

 

(a)    

a person requiring the first connection in pursuance of section

 

16(1);

 

(b)    

a person who otherwise causes the first connection to be made

 

(including by means of contractual arrangements).

 

      (4)  

Condition C is met if any electric line or electric plant provided for the

 

purpose of making the first connection is used for the purpose of

 

making another connection (the “second connection”)—

 

(a)    

between premises and a distribution system, or

 

(b)    

between two distribution systems.

 

      (5)  

Condition D is met if the second connection is made within the

 

prescribed period after the first connection was made.

 

      (6)  

“First connection expenses” are any expenses reasonably incurred by

 

a person in providing any electric line or electric plant for the purpose

 

of making the first connection.

 

      (7)  

It does not matter whether the first connection, or the second

 

connection, is made by an electricity distributor or a person of another

 

description.

 

The reimbursement powers

 

2    (1)  

The “reimbursement powers” are—

 

(a)    

the power to demand a reimbursement payment from—

 

(i)    

a person requiring the second connection in

 

pursuance of section 16(1), or

 

(ii)    

a person who otherwise causes the second connection

 

to be made (including by means of contractual

 

arrangements); and

 

(b)    

the power to apply the reimbursement payment in making

 

such payments as may be appropriate towards reimbursing

 

any persons for any payments they were previously required

 

to make in respect of first connection expenses (whether that

 

requirement arose by virtue of paragraph (a) or otherwise).


 
 

:                                             

21

 

, continued

 
 

      (2)  

A “reimbursement payment” is a payment, of such amount as may be

 

reasonable in all the circumstances, in respect of first connection

 

expenses.

 

Other provision about regulations under this Schedule

 

3    (1)  

The Secretary of State must consult the Authority before making

 

regulations under this Schedule.

 

      (2)  

Regulations under this Schedule may make provision requiring

 

relevant electricity distributors to exercise a reimbursement power

 

(whether in all cases or in cases provided for in the regulations).

 

      (3)  

Regulations under this Schedule may make provision for the relevant

 

electricity distributor to establish or estimate the amount of first

 

connection expenses — or an amount of any aspect of those expenses

 

— in cases where that distributor is not the person who made the first

 

connection.

 

      (4)  

Regulations under sub-paragraph (3) may not require any person to

 

supply the relevant electricity distributor with information about any

 

expenses incurred.

 

      (5)  

Regulations under sub-paragraph (3) may provide for an estimate of

 

an amount of first connection expenses to be calculated by a relevant

 

electricity distributor by reference only to a combination of—

 

(a)    

expenses which that distributor would incur if that distributor

 

were making the connection at the time of the estimate, and

 

(b)    

changes in prices since the time when the connection was

 

actually made.

 

Interpretation

 

4    (1)  

In this Schedule—

 

“first connection” has the meaning given in paragraph 1;

 

“first connection expenses” has the meaning given in paragraph 1;

 

“reimbursement payment” has the meaning given in paragraph 2;

 

“reimbursement powers” has the meaning given in paragraph 2;

 

“relevant electricity distributor”, in relation to the exercise of a

 

reimbursement power, means—

 

(a)    

in a case where the first connection was made between premises

 

and a distribution system, the electricity distributor that (at the

 

time of the exercise of the power) operates that distribution

 

system;

 

(b)    

in a case where the first connection was made between two

 

distribution systems, the electricity distributor that (at the time of

 

the exercise of the power) operates the distribution system into

 

which the first connection has been, or is expected to be,

 

incorporated.

 

      (2)  

A reference in this Schedule to a payment in respect of first connection

 

expenses includes a reference to such a payment made in pursuance of

 

section 19(1).”

 

(4)    

In section 16 (duty to connect on request), in subsection (4), after “23” insert “and

 

Schedule 5B”.

 

(5)    

In section 16A (procedure for requiring a connection), in subsection (5)(b)—


 
 

:                                             

22

 

, continued

 
 

(a)    

omit “or regulations under section 19(2)”;

 

(b)    

after “19(2)” insert “or regulations under Schedule 5B”.

 

(6)    

In section 23 (determination of disputes)—

 

(a)    

after subsection (1) insert—

 

“(1ZA)    

This section also applies to any dispute arising under regulations

 

under Schedule 5B between—

 

(a)    

an electricity distributor, and

 

(b)    

a person in respect of whom the electricity distributor

 

exercises the reimbursement powers conferred by the

 

regulations.”;

 

(b)    

after subsection (1C) insert—

 

“(1D)    

No dispute arising under regulations under Schedule 5B may be

 

referred to the Authority after the end of the period of 12 months

 

beginning with the time when the second connection (within the

 

meaning of Schedule 5B) is made.”;

 

(c)    

after subsection (2) insert—

 

“(2A)    

Where a dispute arising under regulations under Schedule 5B

 

falls to be determined under this section, the Authority may give

 

directions as to the circumstances in which, and the terms on

 

which, an electricity distributor is to make or (as the case may be)

 

to maintain the second connection (within the meaning of

 

Schedule 5B) pending the determination of the dispute.”;

 

(d)    

in subsection (4), after “(2)” insert “, (2A)”.”

 


 

Mr John Hayes

 

Agreed to  NC10

 

To move the following Clause

 

         

“Power to abolish Public Works Loan Commissioners

 

In the Public Bodies Act 2011, in Schedule 1 (power to abolish: bodies and

 

offices), after “Plant Varieties and Seeds Tribunal.” insert—

 

    

“Public Works Loan Commissioners.””

 

[Adjourned until Thursday at 11.30 am


 
contents
 

© Parliamentary copyright
Revised 14 January 2015