| | | The environmental impact assessment |
| A notice given by the local planning |
| | |
| | of the development, including a |
| authority that the environmental impact |
| | |
| | comprehensive environmental risk |
| assessment information was taken into |
| | |
| | assessment, and which includes the |
| account in deciding to grant the relevant |
| | |
| | relevant well, has been taken into |
| | | |
| | account by the local planning authority |
| | | |
| | | Appropriate arrangements have been |
| A certificate given by the Health and |
| | |
| | made for the independent inspection of |
| Safety Executive that it— |
| | |
| | the integrity of the relevant well |
| (a) | has received a well notification |
| | |
| | | under regulation 6 of the |
| | |
| | | Borehole Sites and Operations |
| | |
| | | | | |
| | | (b) | has received the information |
| | |
| | | required by regulation 19 of the |
| | |
| | | Offshore Installations and Wells |
| | |
| | | (Design and Construction, etc.) |
| | |
| | | | | |
| | | (c) | has visited the site of the |
| | |
| | | | | |
| | | The level of methane in groundwater |
| An environmental permit has been given |
| | |
| | has, or will have, been monitored in the |
| by the relevant environmental regulator |
| | |
| | period of 12 months before the |
| which contains a condition that requires |
| | |
| | associated hydraulic fracturing begins |
| compliance with a waste management |
| | |
| | | plan which provides for monitoring of |
| | |
| | | the level of methane in groundwater in |
| | |
| | | the period of 12 months before the |
| | |
| | | associated hydraulic fracturing begins |
| | |
| | | Appropriate arrangements have been |
| An environmental permit which |
| | |
| | made for the monitoring of fugitive |
| contains a condition requiring |
| | |
| | | compliance with a waste management |
| | |
| | | plan which provides for the monitoring |
| | |
| | | of emissions into the air, including after |
| | |
| | | the site has been decommissioned |
| | |
| | | The associated hydraulic fracturing will |
| A decision document given by the |
| | |
| | not take place within groundwater |
| relevant environmental regulator (in |
| | |
| | | connection with an environmental |
| | |
| | | permit) which indicates that the |
| | |
| | | associated hydraulic fracturing will not |
| | |
| | | take place under any groundwater |
| | |
| | | source protection zones, as defined by |
| | |
| | | the environmental regulator |
| | |
| | | The associated hydraulic fracturing will |
| A notice given by the local planning |
| | |
| | not take place within or under other |
| authority that the area in respect of |
| | |
| | | which the relevant planning permission |
| | |
| | | has been granted does not include any |
| | |
| | | land which is within or under any other |
| | |
| | | | | |
| | In considering an application for the |
| A notice given by the local planning |
| | |
| | relevant planning permission, the local |
| authority that it has taken into account |
| | |
| | planning authority has (where material) |
| | | |
| | taken into account the cumulative |
| | | |
| | | | | |
| | (a) | that application, and |
| | | |
| | (b) | other applications relating to |
| | | |
| | | | | |
| | | | | |
| | | | | |
| | The substances used, or expected to be |
| An environmental permit has been given |
| | |
| | used, in associated hydraulic |
| by the relevant environmental regulator |
| | |
| | | which contains a condition that requires |
| | |
| | | substances used in associated hydraulic |
| | |
| | (b) | are subject to approval, by the |
| fracturing to be approved by that |
| | |
| | | | | |
| | | | | |
| | | In considering an application for the |
| A notice given by the local planning |
| | |
| | relevant planning permission, the local |
| authority that it has considered whether |
| | |
| | planning authority has considered |
| to impose such a condition |
| | |
| | whether to impose a restoration |
| | | |
| | condition in relation to that development |
| | | |
| | The relevant undertaker has been |
| A notice given by the local planning |
| | |
| | consulted before grant of the relevant |
| authority that the relevant undertaker |
| | |
| | | | | |
| | Appropriate arrangements for |
| A notice given by the local planning |
| | |
| | notification of local residents |
| authority that provision has been made |
| | |
| | | by those undertaking associated |
| | |
| | | hydraulic fracturing to notify local |
| | |
| | | residents on an individual basis of |
| | |
| | | | | |