High Speed Rail (London - West Midlands) BillPage 30
(d)
a reference in any description of works, powers or land to area,
distance, length or direction, or to a particular location, is to be read as
if qualified by the words “or thereabouts”;
(e)
a reference to distance, in relation to points on a road or railway, is to
5distance measured along the centre line of the road or railway.
(6) For the purposes of this Act, the level of the surface of land is to be taken—
(a)
in the case of land on which a building is erected, to be the level of the
surface of the ground adjoining the building, and
(b)
in the case of a watercourse or other area of water, to be the level of the
10surface of the adjoining ground which is at all times above water level.
Final
64 Financial provision
There is to be paid out of money provided by Parliament—
(a)
any expenditure incurred by the Secretary of State in consequence of this Act,
15and
(b)
any increase attributable to this Act in the sums payable out of money so
provided under any other enactment.
65 Commencement and short title
(1) This Act comes into force on the day on which it is passed.
(2)
20This Act may be cited as the High Speed Rail (London - West Midlands) Act
2015.
High Speed Rail (London - West Midlands) BillPage 31
SCHEDULES
Section 1(1)
SCHEDULE 1 Scheduled works
Construction requirements
1 (1) 5The scheduled works must be constructed—
(a) in the lines or situations shown on the deposited plans,
(b) in accordance with the levels shown on the deposited sections, and
(c)
in the case of any station, depot or shaft for which an upper limit is
shown on the deposited sections, within the limit so shown.
10This is subject to sub-paragraph (2).
(2)
In constructing or maintaining any of the scheduled works, the nominated
undertaker may deviate—
(a)
laterally to any extent from the lines or situations shown on the
deposited plans, within the limits of deviation so shown,
(b)
15vertically downwards to any extent from the level shown for that
work on the deposited sections, and
(c)
vertically upwards to any extent not exceeding 3 metres from the
level shown for that work on the deposited sections, but doing so in
a case mentioned in sub-paragraph (1)(c) does not increase the limit
20referred to in that sub-paragraph.
Description of scheduled works
London Borough of Camden, City of Westminster, London Borough of
Brent, Royal Borough of Kensington & Chelsea, London Boroughs of
Hammersmith & Fulham, Ealing and Hillingdon-—
-
25Work No. 1/1 - A railway (23.48 kilometres in length) partly in tunnel,
commencing at a point 235 metres east of the junction of North
Gower Street with Drummond Street passing north-westwards and
terminating beneath a point 80 metres north-west of the bridge
carrying Ickenham Road over the Marylebone to Aylesbury Railway.
30Work No. 1/1 includes shafts at Cobourg Street, Parkway, Adelaide
Road, Alexandra Place, Salusbury Road and Greenpark Way, a
station at Old Oak Common and a Crossover Box at Victoria Road.
London Borough of Camden—
-
Work No. 1/2 - A railway (2.16 kilometres in length) being a
35realignment of the West Coast Main Line Railway, partly in tunnel,
commencing within Euston Station at a point 139 metres south of the
junction of Eversholt Street with Drummond Crescent, passing
north-westwards and terminating at a point 68 metres east of theHigh Speed Rail (London - West Midlands) BillPage 32
eastern face of the bridge carrying Regents Park Road over the West
Coast Main Line Railway; -
Works Nos. 1/1 and 1/2 include the reconfiguration and enlargement
of Euston Mainline Station and London Underground Euston Station
5ticket hall; -
Work No. 1/3 - A passenger subway, linking the proposed London
Underground Euston Station ticket hall to the London Underground
Metropolitan Line platforms at Euston Square Station and
incorporating a new passenger access in Gordon Street commencing
10beneath a point in Gordon Street 55 metres south-east of the junction
of that road with Euston Road and terminating beneath a point 90
metres north of the junction of Euston Road with Gordon Street; -
Work No. 1/4 - A passenger subway commencing by a junction with
the London Underground Metropolitan Line platforms at Euston
15Square Station beneath a point in Euston Road 85 metres north-east
of the junction of that road with Gower Street and terminating by a
junction with Work No. 1/3 beneath a point 5 metres south-east of
the junction of Euston Road with Gordon Street; -
Work No. 1/4A - A passenger subway commencing by a junction with
20the London Underground Metropolitan Line platforms at Euston
Square Station beneath a point in Euston Road 85 metres north-east
of the junction of that road with Gower Street and terminating by a
junction with Work No. 1/3 beneath a point 10 metres north-west of
the junction of Euston Road with Gordon Street; -
25Work No. 1/4B - A passenger subway linking the proposed London
Underground Euston Station ticket hall to the London Underground
Northern Line and Victoria Line platforms at Euston Station
commencing beneath a point 100 metres west of the junction of
Grafton Place and Eversholt Street, and terminating beneath a point
3060 metres north east of the junction of Doric Way and Eversholt
Street; -
Work No. 1/4C - A passenger subway linking the proposed London
Underground Euston Station ticket hall to the London Underground
Northern Line and Victoria Line platforms commencing beneath a
35point 125 metres west of the junction of Grafton Place and Eversholt
Street, and terminating beneath a point 82 metres north east of the
junction of Doric Way and Eversholt Street; -
Work No. 1/5 - An access road commencing by a junction with Euston
Road at a point 10 metres north-east of the junction of that road with
40Gordon Street and terminating at a point at the junction of Eversholt
Street and Grafton Place; -
Work No. 1/6 - A sewer forming a diversion of sewers in Cardington
Street, Melton Street, Drummond Street, Euston Street and
Stephenson Way commencing by a junction with Work No. 1/9B
45beneath a point in Euston Road 25 metres north-east of the junction
of that road with Gordon Street, and terminating by a junction with
a sewer in Robert Street beneath a point 20 metres west of the
junction of that road with Hampstead Road; -
Work No. 1/7 - A diversion of Cobourg Street commencing at a point
5070 metres south-east of its junction with Euston Street and
terminating in Robert Street at a point 24 metres west of the junction
of that street with Hampstead Road; -
Work No. 1/7A - An access road to Regnart Buildings, commencing at
a point 40 metres south-east of the junction of Euston Street with
Cobourg Street and terminating at a point 42 metres north-west of
the point of commencement; -
5Work No. 1/8 - A cycle track commencing at a point 50 metres south of
the junction of Melton Street with Euston Street and terminating at a
point 65 metres north-east of the junction of Robert Street with
Hampstead Road; -
Work No. 1/8A - A cycle track, commencing by a junction with Work
10No. 1/11 at a point 8 metres east of the junction of Hampstead Road
with Varndell Street and terminating in Varndell Street at a point 32
metres west of that junction; -
Work No. 1/9 - A sewer forming a diversion of sewers in Chalton Street
and Phoenix Road, commencing in Chalton Street beneath a point at
15the junction of Chalton Street with Euston Road and terminating by
a junction with the termination of Work No. 1/9A beneath a point 3
metres west of the junction of Phoenix Road with Eversholt Street; -
Work No. 1/9A - A diversion of a sewer in Doric Way and Eversholt
Street, commencing beneath a point 15 metres north-east of the
20junction of Doric Way with Eversholt Street and terminating by a
junction with the termination of Work No. 1/9 beneath a point 3
metres west of the junction of Phoenix Road with Eversholt Street; -
Work No. 1/9B - A diversion of the Fleet Sewer in Euston Road,
commencing beneath a point 30 metres north-east of the junction of
25Euston Road with Gower Street and terminating by a junction with
that sewer beneath a point 18 metres west of the junction of Euston
Road with Upper Woburn Place; -
Work No. 1/9C - A diversion of a sewer commencing beneath a point
90 metres north of the junction of Euston Road with Gordon Street
30and terminating by a junction with that sewer in Euston Square
beneath a point 55 metres north-west of the junction of Euston Road
with Upper Woburn Place; -
Work No. 1/10 - A cycletrack and footpath commencing at a point 60
metres east of the junction of Varndell Street with Hampstead Road
35and terminating at the junction of Eversholt Street with Barnby
Street. Work No. 1/10 includes a bridge over Works Nos. 1/1 and 1/
2 and the West Coast Main Line Railway; -
Work No. 1/10A - An access road commencing in Euston Station at a
point 200 metres east of the junction of Varndell Street with
40Hampstead Road and terminating in Eversholt Street at a point 28
metres south-east of the junction of that street with Barnby Street.
Work No 1/10A includes a bridge over Work No. 1/2 and the West
Coast Main Line Railway; -
Work No. 1/11 - A realignment of Hampstead Road commencing at a
45point 65 metres south of its junction with Robert Street and
terminating at a point 53 metres south of its junction with Harrington
Square. Work No 1/11 includes a bridge over Works Nos. 1/1 and
1/2 and the West Coast Main Line Railway; -
Work No. 1/11A - A temporary cycle track commencing by a junction
50with Work No.1/11 at a point 108 metres south-east of the junction
of Mackworth Street with Harrington Street and terminating by a
junction with Work No. 1/14 at a point 58 metres south-west of the
junction of Harrington Square with Lidlington Place. Work No. 1/High Speed Rail (London - West Midlands) BillPage 34
11A includes a bridge over Works Nos. 1/1 and 1/2 and the West
Coast Main Line Railway; -
Work No. 1/11B - A temporary bridge over Work No. 1/2 and the West
Coast Main Line Railway commencing at a point 108 metres north-
5east of the junction of Mackworth Street with Harrington Street and
terminating at a point 60 metres south-east of the junction of Granby
Terrace with Hampstead Road; -
Work No. 1/11C - A temporary bridge over Work No. 1/2 and the West
Coast Main Line Railway commencing at a point 90 metres south-
10east of the junction of Granby Terrace with Harrington Street and
terminating at a point 25 metres south-west of the junction of
Hampstead Road with Granby Terrace; -
Work No. 1/12 - A diversion of a sewer in Hampstead Road
commencing beneath a point 5 metres north-west of the junction of
15Hampstead Road with Robert Street and terminating beneath a point
57 metres north of the junction of Hampstead Road with Varndell
Street; -
Work No. 1/12A - A diversion of a sewer in Varndell Street and
Harrington Street commencing by a junction with Work No. 1/12
20beneath a point 4 metres east of the junction of Hampstead Road
with Varndell Street and terminating beneath a point 50 metres north
of the junction of Mackworth Street with Harrington Street; -
Work No. 1/12B - A diversion of a sewer in Mackworth Street,
commencing beneath a point 16 metres east of the junction of
25Mackworth Street with Harrington Street and terminating beneath a
point 37 metres east of the junction of Stanhope Street with
Mackworth Street; -
Work No. 1/12C - A diversion of a sewer in Granby Terrace,
commencing beneath a point 9 metres west of the junction of
30Stanhope Street with Granby Terrace and terminating beneath a
point 30 metres west of the junction of Granby Terrace with
Harrington Street; -
Work No. 1/12D - A diversion of a sewer in Mornington Terrace,
commencing beneath a point 53 metres south east of the junction of
35Mornington Terrace with Mornington Street and terminating
beneath a point 85 metres north-east of the junction of Park Village
East with Mornington Street; -
Work No. 1/13 - A diversion of Granby Terrace commencing by a
junction with Work No. 1/11 at a point 30 metres north of the
40junction of that road with Hampstead Road and terminating at a
point 4 metres south-west of the junction of Granby Terrace with
Stanhope Street. Work No. 1/13 includes a bridge over Works Nos.
1/1, 1/2 and the West Coast Main Line Railway; -
Work No. 1/14 - A realignment of parts of Harrington Square and
45Mornington Crescent, commencing at a point 40 metres south-west
of the junction of Harrington Square with Lidlington Place and
terminating at a point 48 metres north-west of the junction of
Hampstead Road with Mornington Crescent.
High Speed Rail (London - West Midlands) BillPage 33
London Borough of Camden, City of Westminster, London Borough of
50Brent, Royal Borough of Kensington & Chelsea, London Boroughs of
Hammersmith and Fulham, Ealing and Hillingdon—
-
Work No. 1/15 - A railway (22.77 kilometres in length) partly in tunnel
commencing by a junction with Works Nos. 1/1 and 1/16 at a pointHigh Speed Rail (London - West Midlands) BillPage 35
40 metres north-east of the junction of Stanhope Street with Granby
Terrace passing north westwards and terminating at a point 84
metres north-west of the bridge carrying Ickenham Road over the
Marylebone to Aylesbury Line, and including shafts at Salusbury
5Road, Westgate, Greenpark Way, Mandeville Road and South
Ruislip, a station at Old Oak Common and a crossover box at Victoria
Road.
London Borough of Camden—
-
Work No. 1/16 - A railway (0.57 kilometres in length) partly in tunnel
10commencing by a junction with Works Nos. 1/1 and 1/15 at a point
40 metres north-east of the junction of Stanhope Street with Granby
Terrace passing north westwards and terminating at a point 52
metres south-west of the junction of Delancey Street with
Mornington Terrace; -
15Work No. 1/17 - A railway siding (0.50 kilometres in length)
commencing at a point 81 metres north-east of the junction of
Stanhope Street with Granby Terrace passing north westwards and
terminating at a point 60 metres south-east of the junction of
Delancey Street with Mornington Terrace; -
20Work No. 1/18 -A water main commencing in Euston Road beneath a
point 43 metres east of the junction of that road with Gordon Street
and terminating at a point 270 metres to the north-west of the
junction of Albany Street with Redhill Street; -
Work No. 1/18A - A water main commencing by a junction with the
25termination of Work No. 18 beneath a point 270 metres to the north-
west of the junction of Albany Street with Redhill Street, and
terminating beneath a point 105 metres south-west of the junction of
Gloucester Avenue with Regent’s Park Road; -
Work No. 1/19 - A reconstruction of the bridge carrying Mornington
30Street over Works Nos. 1/1, 1/2, 1/15, 1/16 and 1/17 and the West
Coast Main Line Railway commencing at the junction of Park Village
East with Mornington Street and terminating at the junction of
Mornington Street with Mornington Terrace; -
Work No. 1/19A - A temporary bridge over Works Nos. 1/1, 1/2, 1/15,
351/16 and 1/17 and the West Coast Main Line Railway commencing
on Park Village East at a point 152 metres south-east of the junction
of that road with Mornington Street and terminating on Mornington
Terrace at a point 160 metres south-east of the junction of that road
with Mornington Street; -
40Work No. 1/20 - A railway (90 metres in length), forming the HS1 Link
Silo Curve connection commencing by a junction with the HS1 link
to the North London Line at a point 180 metres south east of the
junction of Camley Street with Cedar Way and terminating by a
junction with Work No. 1/21 at a point 115 metres east of the
45junction of Camley Street with Cedar Way.
City of Westminster, Royal Borough of Kensington & Chelsea, London
Boroughs of Islington, Camden, Brent and Hammersmith and Fulham—
-
Work No. 1/21 - A railway (9.25 kilometres in length), partly in tunnel,
commencing by a junction with the North London Line to HS1 at a
50point 70 metres north east of the bridge carrying York Way over that
railway, passing westwards and terminating in sidings at the North
Pole Depot at a point 230 metres east of the junction of Old OakHigh Speed Rail (London - West Midlands) BillPage 36
Common Lane with Wells House Road. Work No. 1/21 includes the
alteration and partial widening of the viaduct carrying the North
London Line, shafts at the HS1-HS2 Link, Alexandra Place and
Salusbury Road and a station at Old Oak Common.
5London Borough of Camden—
-
Work No. 1/22 - A realignment of the North London Line Incline (0.25
kilometres in length) commencing by a junction with that railway at
a point 130 metres east of the junction of Camley Street with Cedar
Way and terminating at a point 130 metres north-west of the junction
10of Camley Street with Cedar Way; -
Work No. 1/23 - A realignment of the North London Line (2.09
kilometres in length) commencing by a junction with that railway at
a point 184 metres west of the bridge carrying York Way over that
railway and terminating at a point 168 metres east of the junction of
15Eton Road with Adelaide Road. Work No. 1/23 includes the
alteration and partial widening of the viaduct carrying the North
London Line; -
Work No. 1/24 - A realignment of the North London Line (1.30
kilometres in length) commencing by a junction with that railway at
20a point 55 metres west of the bridge carrying York Way over that
railway and terminating at a point 20 metres south east of the bridge
carrying that railway over Castlehaven Street. Work No. 1/24
includes the alteration and partial widening of the viaduct carrying
the North London Line; -
25Work No. 1/25 - A footbridge over the Midland Main Line and
Thameslink Line commencing on the west side of those railways at a
point 100 metres north east of the junction of Camley Street with
Cedar Way and terminating on the east side of those railways at a
point 120 metres north east of that junction; -
30Work No. 1/26 - A diversion of a sewer commencing in Parkway
beneath a point 45 metres south west of the junction of Gloucester
Avenue with Delancey Street and terminating beneath a point 25
metres west of that junction; -
Work No. 1/27 - A railway siding (0.89 kilometres in length), partly in
35tunnel, commencing by a junction with carriage siding and the West
Coast Main Line at a point 22 metres south-east of the junction of
Gloucester Avenue with Parkway and terminating at a point 44
metres east of the junction of King Henry’s Road with Regent’s Park
Road; -
40Work No. 1/28 - A diversion of a sewer commencing in Gloucester
Avenue beneath a point 66 metres east of the junction of Regent’s
Park Road with Gloucester Avenue and terminating beneath a point
10 metres east of the junction of Oval Road with Gloucester Crescent; -
Work No. 1/29 - A diversion of a sewer in Princess Road and St Mark’s
45Square commencing beneath the junction of Prince Albert Road with
St Mark’s Square and terminating in Gloucester Avenue beneath a
point 48 metres east of the junction of Gloucester Avenue with Edis
Street; -
Work No. 1/30 - An accommodation access road commencing by a
50junction with the roundabout at Juniper Crescent and terminating at
a point 132 metres north west of its commencement; -
Work No. 1/31 - A diversion of a water main in Avenue Road
commencing beneath a point 10 metres south-east of the junction ofHigh Speed Rail (London - West Midlands) BillPage 37
Avenue Road and Adelaide Road and terminating in Avenue Road
beneath a point 174 metres north-west of that junction.
City of Westminster and London Borough of Camden—
-
Work No. 1/32 - A diversion of a water main in Abbey Road
5commencing beneath the junction of Abbey Road with Boundary
Road and terminating beneath a point 33 metres south-east of the
junction of Abbey Road with Belsize Road.
London Borough of Camden—
-
Work No. 1/33 - A diversion of a sewer commencing beneath a point
10118 metres north-east of the junction of Langtry Road with Kilburn
Priory and terminating in Belsize Road beneath a point 10 metres
north-east of its junction with Priory Terrace.
London Borough of Brent—
-
Work No. 1/34 - A diversion of a sewer commencing beneath a point
15130 metres north of the junction of Gorefield Place with Chichester
Road and terminating on Brondesbury Villas beneath a point 85
metres north-east of the junction of Hazelmere Road with
Brondesbury Villas.
Royal Borough of Kensington and Chelsea and London Borough of
20Hammersmith and Fulham—
-
Work No. 1/35 - A railway siding (0.95 kilometres in length)
commencing by a junction with the Great Western Main Line at a
point 240 metres north-west of the bridge carrying Ladbroke Grove
over that railway and terminating in North Pole Depot at a point 65
25metres east of the termination of Mitre Way. Work No. 1/35 includes
a depot at North Pole sidings.
Royal Borough of Kensington and Chelsea—
-
Work No. 1/36 - A railway siding (0.30 kilometres in length)
commencing in North Pole Depot at a point 344 metres west of the
30bridge carrying Ladbroke Grove over the Great Western Main Line
and terminating at a point 170 metres north-east of the junction of
Sutton Way with Dalgarno Way. Work No. 1/36 includes a depot at
North Pole sidings.
London Boroughs of Hammersmith and Fulham and Ealing—
-
35Work No. 1/37 - A realignment of the Great Western Main Line (2.66
kilometres in length) commencing by a junction with that railway at
a point 140 metres north east of the termination of Mitre Way and
terminating at a point 35 metres east of the bridge carrying Horn
Lane over the Great Western Main Line.
40London Borough of Hammersmith and Fulham—
-
Work No. 1/38 - A diversion of a sewer commencing beneath a point
90 metres south-east of the bridge carrying Scrubs Lane over the
Great Western Main Line and terminating in Scrubs Lane beneath a
point 34 metres north of the bridge carrying that road over the Grand
45Union Canal; -
Work No. 1/39 - A diversion of a sewer commencing beneath railway
sidings at a point 227 metres north-west of the north-east corner of
North Pole Depot and terminating beneath a point 20 metres west of
the north west corner of North Pole Depot.
High Speed Rail (London - West Midlands) BillPage 38
London Borough of Ealing—
-
Work No. 1/40 - A realignment of Old Oak Common Lane
commencing at a point 100 metres north-west of its junction with
Wulfstan Street and terminating at a point 184 metres north east of
5its junction with Wells House Road.
London Boroughs of Hammersmith and Fulham and Ealing—
-
Work No. 1/41 - A realignment of an access road commencing on that
road at a point 60 metres south-east of the bridge carrying Old Oak
Common Lane over the Great Western Main Line and terminating by
10a junction with Work No. 1/40 at a point 185 metres north west of the
junction of Old Oak Common Lane with Wolfstan Street.
London Borough of Ealing—
-
Work No. 1/42 - An accommodation access road commencing on Old
Oak Common Lane at a point 205 metres south of its junction with
15Wells House Road and terminating at a point 90 metres south west
of its commencement; -
Work No. 1/43 - A temporary bridge over the London Underground
Central Line commencing at a point 120 metres west of the bridge
carrying the Great Western Main Line over Old Oak Common Lane
20and terminating at a point 134 metres west of that bridge; -
Work No. 1/44 - A diversion of a sewer commencing beneath a point
50 metres north of the junction of Uneeda Drive with Greenford
Road and terminating in Greenford Road beneath a point 100 metres
north of the junction of Greenford Road with Rockware Avenue; -
25Work No. 1/45 - An improvement of Wales Farm Road, Victoria Road
and Old Oak Lane commencing at the junction of the A4000 with
Wales Farm Road and terminating in Old Oak Lane at a point 96
metres north-east of the junction of Victoria Road with Old Oak
Lane; -
30Work No. 1/46 - A temporary conveyor for construction purposes
commencing at a point 100 metres west of the junction of Bethune
Road with Victoria Road and terminating in Willesden Euroterminal
at a point 190 metres south of the junction of Bramshill Road with
Harley Road; -
35Work No. 1/47 - A temporary conveyor for construction purposes
commencing by a junction with Work No. 1/46 at a point 275 metres
north west of the junction of Victoria Road and Old Oak Lane and
terminating in Willesden Euroterminal at a point 300 metres south
east of the bridge carrying the Cricklewood Line over the Grand
40Union Canal (Paddington Branch); -
Work No. 1/48 - A temporary bridge over the Grand Union Canal
(Paddington Branch) commencing at a point 230 metres south-east of
the bridge carrying the Cricklewood Line over that Canal and
terminating at a point 45 metres north east of its commencement; -
45Work No. 1/49 - A temporary conveyor for construction purposes
commencing in Willesden Euroterminal at a point 410 metres east of
the bridge carrying the Cricklewood Line over the Grand Union
Canal (Paddington Branch) and terminating by a junction with Work
No. 1/46 at a point 84 metres north-east of that bridge.
50London Boroughs of Ealing and Brent—
-
Work No. 1/50 - A realignment of a railway siding (1.08 kilometres in
length) commencing at a point 388 metres south-east of the bridge
carrying the Station Road over the West Coast Main Line and
terminating in Willesden Euroterminal at a point 205 metres north of
5the bridge carrying the Cricklewood Line over the Grand Union
Canal (Paddington Branch); -
Work No. 1/51 - A temporary conveyor for construction purposes
commencing in Willesden Euroterminal at a point 155 metres south
of the junction of Bramshill Road with Harley Road and terminating
10at a point 100 metres south east of the bridge carrying the
Cricklewood Line over the Grand Union Canal (Paddington Branch).
High Speed Rail (London - West Midlands) BillPage 39
London Borough of Brent—
-
Work No. 1/52 - A railway siding (0.89 kilometres in length)
commencing by a junction with the Willesden Relief Line at a point
15265 metres north east of the termination of Waxlow Road and
terminating at a point 60 metres south east of the bridge carrying the
West Coast Main Line over the North Circular Road.
London Boroughs of Ealing and Brent—
-
Work No. 1/53 - A diversion of a sewer commencing in Alperton Lane
20beneath a point 18 metres west of the junction of Alperton Lane with
Manor Farm Road and terminating in Western Avenue beneath a
point 62 metres west of the junction of Western Avenue with
Alperton Lane.
London Borough of Ealing—
-
25Work No. 1/54 - A temporary realignment of the Wycombe Single Line
(0.81 kilometres in length), commencing at a point 213 metres south-
east of the termination of Rockware Avenue passing westwards and
terminating at a point 10 metres west of the bridge carrying
Greenford Road over that railway; -
30Work No. 1/55 - A diversion of a sewer beneath the London
Underground Central Line and the Wycombe Single Line
commencing beneath a point 314 metres east of the junction of
Belvue Road with Rowdell Road and terminating beneath a point
130 metres south-east of the junction of Carr Road with Cherry
35Gardens.
London Borough of Hillingdon—
-
Work No. 1/56 - A diversion of a sewer beneath the London
Underground Central Line, the Wycombe Single Line and the
Marylebone to Aylesbury Line commencing in Great Central
40Avenue beneath a point 11 metres east of the junction of that road
with Cedar Avenue and terminating beneath a point 185 metres
north-east of that junction; -
Work No. 1/57 - A diversion of a sewer beneath the London
Underground Central Line and the Marylebone to Aylesbury Line
45commencing in Bridgewater Road beneath a point 10 metres north-
east of the junction of that road with Carmichael Close and
terminating beneath a point 165 metres north of the bridge carrying
that railway over Bridgwater Road; -
Work No. 1/58 - A diversion of a sewer commencing beneath a point
5066 metres north-east of the junction of Bedford Road with West EndHigh Speed Rail (London - West Midlands) BillPage 40
Road and terminating beneath a point 35 metres north of its
commencement; -
Work No. 1/59 - A diversion of a sewer commencing beneath a point
60 metres south of the junction of West End Road with Bedford Road
5and terminating in West End Road beneath a point 5 metres south
east of its junction with Sidmouth Drive; -
Work No. 1/60 - A realignment of a railway siding (0.30 kilometres in
length) at West Ruislip Station commencing at a point 53 metres west
of the bridge carrying Ickenham Road over the Marylebone to
10Aylesbury Line and terminating at a point 300 metres west of its
commencement; -
Work No. 1/61 - A railway (2.27 kilometres in length), partly in tunnel
commencing by a junction with the termination of Works Nos. 1/15
and 1/1 passing north westwards and terminating at a point 225
15metres north of the junction of Harvil Road with Skip Lane. Work
No. 1/61 includes a shaft at West Ruislip and bridges over the River
Pinn and Breakspear Road South; -
Work No. 1/62 - A footbridge with ramps over Works Nos. 1/60, 1/61
and 1/63 commencing at a point 102 metres east of the junction of
20The Greenway with footpath U81 and terminating at a point 140
metres north-east of that junction; -
Work No. 1/63 - A temporary conveyor for construction purposes
commencing at a point 150 metres north east of the junction of The
Greenway with footpath U81 and terminating at a point 400 metres
25north west of the bridge carrying the Marylebone to Aylesbury Line
over Breakspear Road South; -
Work No. 1/64 - A diversion of a watercourse in Ruislip Golf Course
commencing at a point 80 metres north-east of the bridge carrying
the Marylebone to Aylesbury Line over Ickenham Stream and
30terminating in the River Pinn at a point 52 metres north-east of the
bridge carrying that railway over the River Pinn; -
Work No. 1/65 - A diversion of a sewer in Ruislip Golf Course
commencing beneath a point 26 metres south west of the bridge
carrying the Marylebone to Aylesbury Line over Ickenham Stream
35and terminating beneath a point 230 metres north-east of the
termination of The Greenway; -
Work No. 1/66 - A temporary railway siding (1.87 kilometres in length)
commencing by a junction with the Marylebone to Aylesbury Line at
a point 36 metres east of the bridge carrying that railway over
40Ickenham Stream passing in a north-westerly direction and
terminating at a point 196 metres north east of the bridge carrying
Harvil Road over that railway. Work No. 1/66 includes bridges over
the River Pinn and Work No. 1/67; -
Work No. 1/67 - A regrading of Breakspear Road South commencing
45at a point 8 metres west of the junction of that road with footpath U43
and terminating at a point 60 metres north of the junction of that road
with Copthall Road West; -
Work No. 1/68 - An access road commencing on Breakspear Road
South at a point 90 metres north-east of the junction of that road with
50footpath U46 and terminating on bridleway U42 at a point 124
metres north west of the junction of that road with footpath U46; -
Work No. 1/69 - A temporary conveyor for construction purposes
commencing by a junction with Work No. 1/63 at a point 200 metresHigh Speed Rail (London - West Midlands) BillPage 41
north west of the bridge carrying the Marylebone to Aylesbury Line
over Breakspear Road South and terminating by a junction with the
commencement of Work No. 1/71 at a point 220 metres west of that
bridge; -
5Work No. 1/70 - A temporary conveyor for construction purposes
commencing by a junction with the termination of Work No. 1/63 at
a point 400 metres north west of the bridge carrying the Marylebone
to Aylesbury Line over Breakspear Road South and terminating by a
junction with Work No. 1/71 at a point 430 metres west of that
10bridge; -
Work No. 1/71 - A temporary conveyor for construction purposes
commencing by a junction with the termination of Work No. 1/69
and terminating by a junction with the commencement of Work No.
1/73 at a point 444 metres east of the bridge carrying Harvil Road
15over the Marylebone to Aylesbury Line; -
Work No. 1/72 - A diversion of a gas main commencing beneath a point
480 metres west of the bridge carrying the Marylebone to Aylesbury
Line over Breakspear Road South and terminating beneath a point
600 metres north east of the bridge carrying Harvil Road over the
20Marylebone to Aylesbury Line; -
Work No. 1/73 - A temporary conveyor for construction purposes
commencing by a junction with the termination of Work No. 1/71
and terminating at a point 448 metres south east of the bridge
carrying Harvil Road over the Marylebone to Aylesbury Line; -
25Work No. 1/74 - A temporary bridge commencing at a point 436 metres
south east of the bridge carrying Harvil Road over the Marylebone
to Aylesbury Line and terminating at a point 436 metres east of that
bridge; -
Work No. 1/75 - A temporary railway siding (0.38 kilometres in
30length), commencing by a junction with Work No. 1/66 at a point 338
metres east of the bridge carrying Harvil Road over the Marylebone
to Aylesbury Line and terminating at a point 40 metres west of that
bridge; -
Work No. 1/76 - A realignment (part) of Harvil Road commencing at a
35point 230 metres south-east of the junction of that road with Skip
Lane and terminating at a point 223 metres north of that junction.
Work No. 1/76 includes a bridge over the Aylesbury to Marylebone
Line; -
Work No. 1/77 - An access road commencing by a junction with Work
40No. 1/76 at a point 190 metres south-east of the junction of Harvil
Road with Skip Lane and terminating on Harvil Road at a point 77
metres south-east of that junction; -
Work No. 1/78 - A realignment of Newyears Green Lane commencing
at a point 456 metres west of the junction of that road with bridleway
45U42 and terminating at a point 114 metres west of its
commencement.
London Borough of Hillingdon, County of Buckinghamshire, District of
South Bucks, Parish of Denham, District of Chiltern, Parishes of Chalfont St.
Peter, Chalfont St. Giles, Amersham, Coleshill and Little Missenden, County
50of Hertfordshire, District of Three Rivers—
-
Work No. 2/1 - A railway (19.27 kilometres in length), partly on viaduct
and partly in tunnel, commencing by a junction with Work No. 1/61
at its termination, continuing north-westwards and terminating at aHigh Speed Rail (London - West Midlands) BillPage 42
point 530 metres north of the junction of footpath LMI/17/2 with
footpath LMI/17/1; -
Work No. 2/1 includes viaducts over Newyears Green Bourne,
Harefield No.2 Lake, the Grand Union Canal, Savay Lake, Moorhill
5Road, Kroda Lake, Long Lake, the River Colne and the A412
Denham Way (North Orbital Road) and shafts at Chalfont St. Peter,
Chalfont St. Giles, Amersham and Little Missenden.
London Borough of Hillingdon—
-
Work No. 2/1A - A diversion of the Newyears Green Bourne
10commencing at a point 320 metres south west of the junction of
Harvil Road with Dews Lane and terminating 130 metres west of its
commencement; -
Work No. 2/1B - A realignment of railway sidings (0.36 kilometres in
length), commencing at a point 587 metres south of the junction of
15Harvil Road with Dews Lane and terminating at a point 597 metres
south-west of that junction; -
Work No. 2/1C - A diversion of Harvil Road, commencing on that road
at a point 434 metres south-east of the junction of that road with
Dews Lane and terminating at a point 44 metres south of that
20junction. Work No. 2/1C includes a bridge over Work No. 2/1; -
Work No. 2/1D - A diversion of a gas main commencing at a point 515
metres south- west of the junction of New Years Green Lane and
footpath U42 and terminating at a point 585 metres north-west of the
junction of Harvil Road with Skip Lane; -
25Work No. 2/2 - A realignment of Dews Lane, forming an access to
Hillingdon Outdoor Activities Centre commencing by a junction of
that road with Harvil Road and terminating at the entrance to the
Hillingdon Outdoor Activity Centre; -
Work No. 2/2A - An accommodation road, forming an access to the
30electricity supply facility, commencing on Harvil Road at a point 390
metres north-west of its junction with New Years Green Lane and
terminating at a point 297 metres south-west of its commencement; -
Work No. 2/2B - A temporary access road beneath Work No. 2/1
commencing by a junction with Work No.2/2 at a point 36 metres
35north-east of the entrance to the Hillingdon Outdoor Activities
Centre and terminating in the grounds of the Hillingdon Outdoor
Activities Centre at a point 177 metres west of its commencement; -
Work No. 2/3 - A temporary bridge over the Grand Union Canal
commencing on the western towpath of that canal at a point 38
40metres north-west of the viaduct carrying the Chiltern Main Line
over that canal and terminating on the eastern towpath at a point 128
metres north of that viaduct; -
Work No. 2/4 - A temporary bridge over the Grand Union Canal
commencing at a point on the western towpath of that canal at a
45point 495 metres south of the viaduct carrying the Chiltern Main Line
over that canal and terminating on the eastern towpath 57 metres
north-east of its commencement.
London Borough of Hillingdon, County of Buckinghamshire, District of
South Bucks, Parish of Denham—
-
50Work No. 2/4A - A temporary bridge over the River Colne
commencing at a point on the eastern bank of that river 689 metres
north-west of the junction of footpath U75 with footpath U50 andHigh Speed Rail (London - West Midlands) BillPage 43
terminating on the western bank 46 metres south-west of its
commencement; -
Work No. 2/5 - A diversion of the River Colne commencing at a point
644 metres north-west of the bridge carrying Moorfield Road over
5that river and terminating at a point 156 metres north of its
commencement.
County of Buckinghamshire, District of South Bucks, Parish of Denham—
-
Work No. 2/6 - A diversion of a gas main commencing at a point 350
metres south of the junction of bridleway DEN/3/1 with Denham
10Way (North Orbital Road), extending north-eastwards beneath that
road and terminating 98 metres north-east of its commencement.
County of Hertfordshire, District of Three Rivers—
-
Work No. 2/7 - A diversion of Tilehouse Lane commencing at a point
16 metres north-east of the junction of that road with bridleway Ricks
15002/Shire Lane and terminating on Tilehouse Lane at a point 92
metres south-west of the junction of that road with Denham Way
(North Orbital Road). Work No. 2/7 includes a bridge over Work
No. 2/1; -
Work No. 2/7A - An accommodation access road commencing by a
20junction with Work No. 2/7 at a point 350 metres south-west of the
junction of Tilehouse Lane with Denham Way (North Orbital Road)
and terminating on bridleway Ricks 004 at a point 280 metres west of
that junction; -
Work No. 2/7B - An accommodation access road commencing by a
25junction with Work No. 2/7 at a point 562 meters north-west of the
commencement of Work No. 2/7 and terminating on bridleway
Ricks 004 at a point 68 metres south-west of the junction of that
bridleway with bridleway 002/Shire Lane; -
Work No. 2/7C - An accommodation access road, commencing by a
30junction with Work No. 2/7 at a point 548 metres north west of the
commencement of Work No.2/7 and terminating at the junction of
bridleway Ricks 004 with bridleway Ricks 002/Shire Lane; -
Work No. 2/7D - A temporary accommodation access road, being a
diversion of bridleway Ricks 004, commencing on bridleway Ricks
35004 at a point 633 metres south- west of its junction with Denham
Way (North Orbital Road) and terminating 364 metres north-east of
its commencement; -
Work No. 2/7E - A temporary accommodation access road
commencing on Tilehouse Lane at a point 20 metres north of the
40junction of that road with bridleway Ricks 002/Shire Lane and
terminating by junction with Work No. 2/7C at a point 54 metres east
of the junction of bridleway Ricks 004 with bridleway Ricks 002/
Shire Lane.
County of Buckinghamshire, District of South Bucks, Parish of Denham—
-
45Work No. 2/7F - A temporary accommodation access road
commencing at the junction of Shire Lane/Ricks 002/DEN2/1 with
footpath CSP/43/2 and terminating at a point 366 metres south-west
of its commencement.
County of Hertfordshire, District of Three Rivers —
-
50Work No. 2/8 - A realignment of Chalfont Lane, commencing at the
junction of that road with Denham Way (North Orbital Road) andHigh Speed Rail (London - West Midlands) BillPage 44
terminating in that road at a point 90 metres south-east of the
junction of Shire Lane over the M25 Motorway; -
Work No. 2/8A - A temporary slip road commencing by a junction
with Work No. 2/8 at a point 40 metres east of its termination and
5terminating on the southbound carriageway of the M25 Motorway at
a point 202 metres south-east of the bridge carrying Hornhill Road
over that motorway; -
Work No. 2/8B - An accommodation road, commencing on Chalfont
Lane at a point 865 metres west of its junction with A412 Denham
10Way (North Orbital Road) and terminating at a point 78 metres north
of its commencement.
County of Buckinghamshire, District of Chiltern, Parish of Chalfont St.
Peter, County of Hertfordshire, District of Three Rivers—
-
Work No. 2/9 - A temporary slip road commencing on Shire Lane at a
15point 220 metres south-east of the junction of that road with West
Hyde Lane and terminating on the northbound carriageway of the
M25 Motorway, 196 metres south of the bridge carrying Hornhill
Road over that motorway; -
Work No. 2/10 - An accommodation access road commencing on an
20access road at a point 50 metres west of the bridge carrying Shire
Lane over the M25 Motorway and terminating on Shire Lane at a
point 180 metres south-east of its junction with West Hyde Lane; -
Work No. 2/10A - A temporary road commencing by a junction with
Work No. 2/10 at its termination and terminating by a junction with
25Hornhill Road at a point 94 metres west of the bridge carrying
Hornhill Road over the M25 Motorway.
Parishes of Chalfont St. Giles, Amersham and Coleshill—
-
Work No. 2/11 - A realignment of Bottom House Farm Lane
commencing at a point 48 metres north-east of Hobbs Hole Cottage
30and terminating at the junction of that lane with Amersham Road.
Parish of Amersham—
-
Work No. 2/12 - A diversion of a cycle track, commencing at a point 20
metres south-east of the junction of the A404 Whielden Lane and
terminating on that cycle track at a point 70 metres east of the
35junction of the A404 with the A413.
Parish of Little Missenden—
-
Work No. 2/13 - An accommodation access road being a diversion of a
farm track commencing on that farm track at a point 146 metres
north of Mantle’s Farm and terminating at the junction of that track
40with Hyde Heath Road; -
Work No. 2/13A - An accommodation access road commencing by a
junction with Work No. 2/13 at a point 54 metres north of its
commencement and terminating on footpath LMI/17/2 at a point 90
metres north-east of its junction with footpath LMI/17/1.
45County of Buckinghamshire, District of Chiltern, Parishes of Little
Missenden, Great Missenden and The Lee, District of Aylesbury Vale, Parish
of Wendover—
-
Work No. 2/14 - A railway (8.3 kilometres in length) partly in tunnel
and partly on viaduct commencing by a junction with Work No. 2/
501, at its termination, continuing north-westwards, and terminating atHigh Speed Rail (London - West Midlands) BillPage 45
a point 240 metres north-west of the roundabout joining the A413
London Road with Small Dean Lane; Work No. 2/14 includes a
viaduct over the A413 London Road, the Marylebone to Aylesbury
Line and Small Dean Lane.
5Parish of Great Missenden—
-
Work No. 2/15 - An accommodation access road, commencing on
Hyde Lane at its junction with footpath GMI/27/1 and terminating
at a point 12 metres east of the junction of footpaths GMI/27/1 and
GMI/26/1 with footpath GMI/23/6. Work No. 2/15 includes a
10bridge over Work No. 2/14; -
Work No. 2/15A - An accommodation access road commencing by a
junction with Work No. 2/15 at a point 176 metres west of the
junction of footpaths GMI/27/1 and GMI/26/1 with footpath GMI/
23/6 and terminating at a point 64 metres north of its
15commencement; -
Work No. 2/16 - A realignment of Hyde Lane commencing on that road
at a point 10 metres north of its junction with footpath GMI/27/1
and terminating on that road at a point 270 metres south-west of its
junction with Chesham Road. Work No. 2/16 includes a bridge over
20Work No. 2/14; -
Work No. 2/17 - A diversion of Chesham Road, commencing at a point
180 metres west of the junction of that road with Kings Lane and
terminating at a point 130 metres north-east of that junction; -
Work No. 2/17A - A diversion of King’s Lane, commencing on King’s
25Lane at a point 410 metres north of the junction of that road with
Chesham Road and terminating by a junction with Work No. 2/17 at
a point 124 metres north-east of the junction of that road with
Chesham Road; -
Work No. 2/17B - A diversion of Chesham Road, commencing on
30Chesham Road at a point 112 metres west of the junction of that road
with Hyde Lane and terminating by a junction with Work No. 2/17
at its junction with the termination of Work No. 2/17A; -
Work No. 2/18 - A footbridge over Work No. 2/14, being a diversion
of footpath GMI/12/1, commencing on that footpath at a point 378
35metres south-west of the junction of that footpath with Potter Row
and terminating at a point 168 metres south-west of that junction; -
Work No. 2/18A - A realignment of Frith Hill commencing on that road
at a point 350 metres south-west of its junction with Kings Lane and
Potter Row and terminating on that road at a point 132 metres north-
40east of its commencement; -
Work No. 2/18B - An accommodation access road over Work No. 2/14,
commencing at a point 460 metres west of the junction of Frith Hill
with Potter Row, and terminating at a point 370 metres north-west of
that junction; -
45Work No. 2/19 - An accommodation access road, commencing on the
access road to Havenfield Lodge, at a point 618 metres south-west of
the junction of that road with Potter Row and terminating on that
road at a point 137 metres south-west of that junction. Work No. 2/
19 includes a bridge over Work No. 2/14.
50Parishes of Great Missenden and The Lee—
-
Work No. 2/20 - A diversion of Leather Lane commencing on that road
at a point 720 metres west of the junction of that road with King’sHigh Speed Rail (London - West Midlands) BillPage 46
Lane and Potter Row and terminating on that road at a point 116
metres west of that junction. Work No. 2/20 includes a bridge over
Work No. 2/14.
Parish of The Lee—
-
5Work No. 2/21 - An accommodation access road, being a realignment
of a track to Cottage Farm, commencing on that track at a point 665
metres south-west of the junction of that road with King’s Lane and
terminating on that track at a point 159 metres south-west of that
junction. Work No. 2/21 includes a bridge over Work No. 2/14.
10District of Aylesbury Vale, Parish of Wendover—
-
Work No. 2/22 - A footbridge over Work No. 2/14, being a realignment
of footpaths WEN/38/1 and TLE/2/2 commencing on footpath
WEN/38/1 at a point 494 metres south-west of the junction of King’s
Lane with Bowood Lane and terminating on footpath TLE/2/2 at a
15point 12 metres west of its junction with Kings Lane; -
Work No. 2/23 - A realignment of Bowood Lane commencing on that
road at a point 487 metres west of its junction with King’s Lane and
terminating on that road at a point 201 metres west of that junction.
Work No. 2/23 includes a bridge over Work No. 2/14.
20District of Aylesbury Vale, Parish of Wendover—
-
Work No. 2/23A - An accommodation access road, being a realignment
of a track, commencing at a point 312 metres south-east of the
junction of Bowood Lane with footpath WEN/39/2 and terminating
on that track at a point 130 metres north-east of its commencement; -
25Work No. 2/23B - An accommodation access road, being a realignment
of a track, commencing on footpath WEN/39/2 and access track at a
point 140 metres north of the junction of that access with Bowood
Lane and terminating on footpath WEN/39/1 and that track at a
point 280 metres east of its commencement; -
30Work No. 2/24 - A diversion of Rocky Lane under Work No. 2/14,
commencing at a point 390 metres north-west of the junction of that
road with footpath WEN/39/1 and terminating on that road at a
point 158 metres east of its junction with the A413 London Road; -
Work No. 2/24A - An accommodation access road commencing by a
35junction with Work No. 2/24 at a point 223 metres east of the
junction of Rocky Lane with the A413 London Road and terminating
at a point 75 metres south of its commencement; -
Work No. 2/25 - An accommodation access road, being a realignment
of a track, commencing on the A413 London Road at a point 460
40metres south-east of the junction of that road with Hale Road and
terminating on that track at a point 38 metres north-east of its
commencement; -
Work No. 2/25A - A temporary road being a diversion of the A413
London Road commencing at a point 450 metres south of the
45roundabout with London Road and Small Dean Lane and
terminating 316 metres south of that roundabout; -
Work No. 2/26 - A realignment of Small Dean Lane, commencing at a
point 368 metres south of the roundabout joining that road with the
A413 London Road and terminating at a point 36 metres south-west
50of that roundabout; -
Work No. 2/27 - An accommodation road commencing on bridleway
WEN/57/1 and access track at a point 180 metres north-west of the
roundabout joining the A413 London Road with Small Dean Lane
and terminating on the access to Grove Farm at a point 70 metres
5south-west of its junction with footpath WEN/57/1.
High Speed Rail (London - West Midlands) BillPage 47
County of Buckinghamshire, District of Aylesbury Vale, Parishes of
Wendover, Stoke Mandeville and Stone with Bishopstone and Hartwell,
District of Wycombe, Parish of Ellesborough—
-
Work No. 2/28 - A railway (8.98 kilometres in length) partly in tunnel,
10commencing by a junction with Work No. 2/14 at its termination and
terminating at a point 540 metres south-west of the roundabout
junction of the A418 Oxford Road with Coldharbour Way; Work No.
2/28 includes bridges over Chalkshire Stream, Stoke Brook and
Sedrup Ditch.
15District of Aylesbury Vale, Parish of Wendover—
-
Work No. 2/29 - A temporary road, being a diversion of Bacombe Lane,
commencing on Ellesborough Road at a point 305 metres south-west
of the bridge carrying that road over the A413 London Road and
terminating on Bacombe Lane at a point 325 metres south-west of the
20bridge carrying that road over the A413 London Road; -
Work No. 2/29A -A diversion of Bacombe Lane, commencing on that
road at a point 242 metres south-west of the bridge carrying that road
over the A413 London Road and terminating on that bridge; -
Work No. 2/30 - A realignment of Ellesborough Road commencing on
25that road at a point 438 metres south-west of the bridge carrying that
road over the A413 London Road and terminating on that road at a
point 60 metres south-west of that bridge; -
Work No. 2/31 - A temporary road being a diversion of Ellesborough
Road commencing by a junction with the commencement of Work
30No. 2/30 and terminating by a junction with the termination of Work
No. 2/30; -
Work No. 2/33 - An accommodation access road, being a realignment
of a track, commencing on footpath WEN/55/1 and access track at a
point 67 metres north-east of the junction of that footpath with
35footpath WEN/6/2 and terminating on that footpath and
accommodation track at a point 5 metres south-west of the bridge
carrying that footpath over the A413 Wendover Bypass.
District of Aylesbury Vale, Parish of Wendover, District of Wycombe, Parish
of Ellesborough—
-
40Work No. 2/34 - A diversion of Nash Lee Road, commencing on the
roundabout at the junction of that road with the A413 Wendover
Bypass and terminating on that road at a point 230 metres west of the
junction of that road with Nash Lee Lane. Work No. 2/34 includes a
bridge over Work No. 2/28.
45District of Aylesbury Vale, Parish of Wendover—
-
Work No. 2/34A - A spur road, commencing by a junction with Work
No. 2/34 at a point 178 metres west of the roundabout at the junction
of Nash Lee Road with the A413 Wendover Bypass and terminating
on Nash Lee Lane at a point 114 metres north-east of the junction of
50that road with Nash Lee Road.
High Speed Rail (London - West Midlands) BillPage 48
District of Aylesbury Vale, Parish of Stoke Mandeville, District of Wycombe,
Parish of Ellesborough—
-
Work No. 2/35 - A footbridge over Work No. 2/28, being a diversion
of footpath ELL/20/1, commencing on that footpath at a point 377
5metres north of the junction of that footpath with Nash Lee Road and
terminating by a junction with footpath SMA/6/1 at a point 136
metres west of the junction of that footpath with footpath ELL/20/1; -
Work No. 2/36 - A diversion of the A4010 Risborough Road,
commencing on that road at a point 360 metres south-east of the
10junction of that road with Old Risborough Road and terminating by
a junction with the B4443 Lower Road at a point 584 metres south-
east of the junction of that road with Kynaston Avenue. Work No. 2/
36 includes a bridge over Work No. 2/28.
District of Aylesbury Vale, Parish of Stoke Mandeville—
-
15Work No. 2/36A - An access road commencing by a junction with
Work No. 2/36 at a point 320 metres south-east of the junction of
footpaths SMA/16/2 and SMA/16/3 with the Princes Risborough to
Aylesbury Railway and terminating by a junction with footpath
SMA/11/2 at a point 164 metres south-east of its commencement; -
20Work No. 2/36B - A road commencing by a junction with Work No. 2/
36 at a point 164 metres south of the junction of the A4010
Risborough Road with Old Risborough Road and terminating on the
A4010 Risborough Road at a point 64 metres north-east of its
commencement; -
25Work No. 2/37 - An underpass beneath Work No. 2/28, being a
diversion of the footway/cycleway along the A4010 Risborough
Road commencing at a point 85 metres north of the junction of that
road with Old Risborough Road and terminating on that footway at
a point 144 metres north of its commencement.
30District of Aylesbury Vale, Parish of Stoke Mandeville, District of Wycombe,
Parish of Ellesborough—
-
Work No. 2/38 - An accommodation access road, being a diversion of
footpaths SMA/9/1 and SMA/8/2, commencing at a point 400
metres south-west of the junction of footpaths SMA/9/2 and SMA/
3510/1 with footpath SMA/15A/1 and terminating on footpath SMA/
15A/1 at the junction of that footpath with Marsh Lane. Work No.
2/38 includes a bridge over Work No. 2/28.
District of Wycombe, Parish of Great and Little Kimble cum Marsh, District
of Aylesbury Vale, Parish of Stoke Mandeville—
-
40Work No. 2/39 - A railway (1.47 kilometres in length) being a
realignment of the Princes Risborough to Aylesbury Line Railway,
commencing on that railway at a point 260 metres north of Marsh
Crossing and terminating on that railway at a point 110 metres
south-east of the junction of Batt Furlong with Westfield.
45District of Aylesbury Vale, Parishes of Stoke Mandeville and Stone with
Bishopstone and Hartwell—
-
Work No. 2/43 - An accommodation access road, being a diversion of
footpaths SMA/16/1, SBH/28/2 and SMA/16/2, commencing at a
point 131 metres south of the junction of footpaths SBH/17/3 and
50SBH/28/2 with footpath SMA/16/1 and terminating on footpath
SMA/16/2 at a point 197 metres north-east of the junction of thatHigh Speed Rail (London - West Midlands) BillPage 49
footpath with footpaths SBH/16/1 and SBH/17A/1. Work No. 2/
43 includes a bridge over Work No. 2/28.
Parish of Stone with Bishopstone and Hartwell—
-
Work No. 2/44 - A bridge over Work No. 2/28, being a diversion of
5bridleway SBH/19/7, commencing on that bridleway at a point 356
metres south-west of the junction of that bridleway with bridleway
SMA/22/1 and terminating on that bridleway at a point 50 metres
south of that junction; -
Work No. 2/45 - A footbridge commencing on footpath SBH/27/1 at a
10point 694 metres south-west of the junction of Welland Close with
Nene Close and terminating on that footpath at a point 424 metres
north-east of its commencement; -
Work No. 2/46 - A gas main diversion, commencing at a point 755
metres south-west of the junction of Primrose Drive with Foxglove
15and terminating at a point 440 metres south-west of that junction; -
Work No. 2/47 - An accommodation access road, commencing on
footpath SBH/34/1 at a point 744 metres south-west of the junction
of Primrose Drive with Foxglove and terminating on that footpath at
a point 404 metres west of that junction. Work No. 2/47 includes a
20bridge over Work No. 2/28; -
Work No. 2/48 - A diversion of the A418 Oxford Road, commencing at
a point 13 metres south-west of its junction with Meadoway and
terminating on the roundabout at its junction with Coldharbour
Way. Work No. 2/48 includes a bridge over Work No. 2/28.
25County of Buckinghamshire, District of Aylesbury Vale, Parishes of Stone
with Bishopstone and Hartwell, Fleet Marston, Waddesdon, Quainton,
Grendon Underwood, Calvert Green, Steeple Claydon, Twyford, Preston
Bissett, Chetwode, Barton Hartshorn, Westbury and Turweston, County of
Oxfordshire, District of Cherwell, Parishes of Godington, Newton Purcell
30with Shelswell, Finmere and Mixbury, County of Northamptonshire,
District of South Northamptonshire, Parish of Whitfield—
-
Work No. 2/49 - A railway (33.55 kilometres in length), partly in
tunnels and partly on viaducts, commencing by a junction with
Work No. 2/28 at its termination and terminating at a point 220
35metres north-west of the junction of The River Great Ouse with Well
Stream. Work No. 2/49 includes viaducts over the River Thame,
Padbury Brook and the River Great Ouse and bridges over Fleet
Marston Brook, the River Ray and Muxwell Brook.
County of Buckinghamshire, District of Aylesbury, Parish of Stone with
40Bishopstone and Hartwell—
-
Work No. 2/50 - A footbridge over Work No. 2/49, being a diversion
of footpath SBH/32/1, commencing on that footpath at a point 288
metres east of the junction of that footpath with the road leaving to
Lower Hartwell Farm and terminating on that footpath 180 metres
45north-west of its junction with footpath AYL/39/1; -
Work No. 2/51 - A bridge over Work No. 2/49, being a diversion of
bridleway SBH/2/4, commencing on that bridleway at a point 96
metres south-west of its junction with footpath CDH/1/1 and
bridleway CDH/3/1 and terminating on bridleway SBH/2/4 at a
50point 177 metres east of its junction with bridleways SBH/3/1 and
SBH/2/3; -
Work No. 2/51A - An accommodation access road, being a realignment
of a track, commencing at the junction of footpaths SBH/3/2 and
SBH/31/1 and terminating on bridleway SBH/2/4 at the
termination of Work No. 2/51; -
5Work No. 2/52 - A diversion of an oil pipeline, commencing beneath a
point 118 metres north-east of the junction of bridleways SBH/2/3,
SBH/2/4 and SBH/3/1 continuing north-eastwards beneath Work
No. 2/49 and terminating beneath a point 318 metres north-east of
that junction.
High Speed Rail (London - West Midlands) BillPage 50
10Parish of Fleet Marston—
-
Work No. 2/53 - An accommodation bridge over Work No. 2/49,
commencing at a point 372 metres south-west of the entrance to
Putlowes Farm from Putlowes Drive and terminating at a point 174
metres north-east of its commencement.
15Parishes of Waddesdon and Fleet Marston—
-
Work No. 2/54 - A footbridge over Work No. 2/49, commencing at a
point 308 metres north of the junction of footpath WAD/7A/5 with
bridleways FMA/1/1 and WAD/8/3 and terminating at a point 274
metres north of that junction; -
20Work No. 2/55 - A diversion of the A41 Bicester Road, commencing at
a point 412 metres east of the junction of that road with the access
road in Willow Cottage and terminating at a point 556 metres north
of the junction of that road with Blackgrove Road.
Parish of Waddesdon—
-
25Work No. 2/56 - An accommodation access road, commencing on the
access road to Cranwell Farm at a point 98 metres south of its
junction with the A41 Bicester Road and terminating on the A41
Bicester Road at a point 204 metres west of that junction; -
Work No. 2/57 - A diversion of the A41 Bicester Road, commencing at
30a point 772 metres west of the junction of that road with Blackgrove
Road and terminating by a junction with Work No. 2/55 at its
termination. Work No. 2/57 includes a bridge over Work No. 2/49; -
Work No. 2/58 - A diversion of Blackgrove Road, commencing at a
point 960 metres north of the junction of that road with the A41
35Bicester Road and terminating by a junction with Work No. 2/55 at
its termination; -
Work No. 2/59 - An accommodation access road, including a bridge
over Work No. 2/49, being a diversion of footpaths WAD/4A/2 and
WAD/4/2, commencing at a point 124 metres east of the junction of
40that access with footpath WAD/4A/1 and terminating on footpath
WAD/4/2 at a point 375 metres east of that junction; -
Work No. 2/60 - An accommodation underpass beneath Work No. 2/
49, commencing on the access track in Waddesdon Sewerage
Treatment Works at a point 350 metres east of the junction of that
45access track with Quainton Road and terminating at those Treatment
Works at a point 220 metres south-east of the junction of footpath
WAD/4A/1 with footpaths WAD/3/4 and WAD/3/5; -
Work No. 2/60A - An accommodation access road, commencing by a
junction with Work No. 2/60 at a point 200 metres south of the
50junction of footpath WAD/4A/1 with footpaths WAD/3/4 andHigh Speed Rail (London - West Midlands) BillPage 51
WAD/3/5 and terminating at a point 494 metres north-west of that
junction; -
Work No. 2/61 - A diversion of a gas main, beneath Work No. 2/49,
commencing at a point 200 metres north-west of the junction of
5footpath WAD/3/5 with footpath WAD/4A/1 and terminating at a
point 296 metres north of the junction of footpath WAD/24/1 with
Quainton Road.
Parishes of Waddesdon and Quainton—
-
Work No. 2/62 - A diversion of a gas main, beneath Work No. 2/49,
10commencing at a point 410 metres north-east of the bridge carrying
Quainton Road over the Fleet-Marston Brook and terminating at a
point 186 metres north-west of the junction of footpath QUA/29A/2
with Station Road; -
Work No. 2/63 - A diversion of a gas main, commencing at a point 420
15metres north-east of the bridge carrying Quainton Road over Fleet
Marston Brook and terminating at a point 330 metres north-west of
the junction of footpath QUA/29A/2 with Station Road.
Parish of Quainton—
-
Work No. 2/64 - An accommodation access road commencing on
20Quainton Road at a point 422 metres south-east of the junction of that
road with Station Road and terminating at a point 376 metres north-
west of the bridge carrying Quainton Road over Fleet Marston
Brook. Work No. 2/64 includes a bridge over Work No. 2/49; -
Work No. 2/66 - An access road commencing on Station Road at a point
25155 metres north-east of the junction of that road with Quainton
Road and terminating at a point 45 metres north-west of its
commencement; -
Work No. 2/67 - A diversion of Station Road, commencing at a point
416 metres south-west of its junction with Quainton Road and
30terminating on that road at a point 480 metres north-east of the
bridge carrying the Aylsbury Link over that road. Work No. 2/67
includes bridges over Work No. 2/49 and the Aylesbury Link; -
Work No. 2/67A - A spur road commencing by a junction with Work
No. 2/67 at a point 260 metres north-west of the junction of Quainton
35Road with Station Road and terminating on Quainton Road at a
point 33 metres north-west of its junction with Station Road; -
Work No. 2/67B - A road, commencing by a junction with Work No. 2/
67 at a point 416 metres north-west of the junction of Station Road
with Quainton Road and terminating on the access road leading to
40Doddershall House at a point 20 metres east of the junction of
footpath QUA/31/3 with that access road; -
Work No. 2/68 - A diversion of Fidlers Lane, commencing by a junction
with Work No. 2/67 at a point 160 metres east of the bridge carrying
that road over the Aylesbury Link and terminating on Fidlers Lane
45at a point 280 metres north of that bridge; -
Work No. 2/68A - An improvement of an access road commencing by
a junction with Work No. 2/68 at a point 194 metres north of the
bridge carrying Fidlers Lane over the Aylesbury Link and
terminating on that track at a point 150 metres west of its
50commencement; -
Work No. 2/69 - A bridge over Work No. 2/49, Bridleway QUA/28A/
1 and Bridleway QUA/28A/2 commencing at a point 230 metresHigh Speed Rail (London - West Midlands) BillPage 52
south-west of the junction of those bridleways and terminating at the
junction of bridleway QUA/28A/2 with footpath QUA/24A/1; -
Work No. 2/70 - An underpass beneath Work No. 2/49 commencing at
a point 648 metres north-west of the junction of bridleway QUA/
528A/2 with footpath QUA/24A/1 and terminating at a point 58
metres north-east of its commencement; -
Work No. 2/71 - A diversion of Edgcott Road commencing on that road
at a point 260 metres east of the bridge carrying that road over the
Aylesbury Link and terminating on that road at a point 140 metres
10west of its junction with the access to Woodlands Farm. Work No.
2/71 includes a bridge over Work No. 2/49; -
Work No. 2/71A - An access road commencing by a junction with
Work No. 2/71 on Edgcott Road at a point 230 metres east of the
bridge carrying that road over the Aylesbury Link and terminating
15at a point 30 metres north-east of that bridge; -
Work No. 2/72 - A bridge over Work No. 2/49 commencing on
bridleway QUA/36/2 at a point 86 metres south-west of the bridge
carrying that bridleway over the Aylesbury Link and terminating on
bridleway QUA/36/3 at a point 80 metres north-east of that bridge.
20Parish of Grendon Underwood—
-
Work No. 2/73 - A bridge over Work No. 2/49, commencing at a point
40 metres south of the junction of that bridleway with bridleway
GUN/25/2 and GUN/31/1 and terminating at a point 22 metres
north of the junction of that bridleway with footpath GUN/29/1.
25Parish of Calvert Green—
-
Work No. 2/74 - An underpass beneath Work No. 2/49, commencing
at a point 186 metres west of the junction of bridleway GUN/25/1
with bridleway CAG/3/1 and terminating at a point 216 metres
north-west of that junction.
30Parishes of Calvert Green and Steeple Claydon—
-
Work No. 2/75 - A footbridge over Works Nos. 2/49 and 2/77
commencing at a point 120 metres north-west of the junction of
bridleway SCL/18/2 with footpath SCL/13/2 and terminating on
that footpath at a point 150 metres north of that junction; -
35Work No. 2/76 - A bridge over Works Nos. 2/49, 2/77 and 2/78,
commencing at a point 525 metres south-east of the junction of
Cotswolds Way with Brickhill Way and terminating at a point 345
metres north-east of that junction.
Parish of Calvert—
-
40Work No. 2/76A - An access road commencing at a point 545 metres
south-east of the junction of Cotswolds Way with Brickhill Way and
terminating at a point 360 metres east of that junction.
Parishes of Grendon Underwood, Calvert Green and Steeple Claydon—
-
Work No. 2/77 - A railway (4.42 kilometres in length) commencing by
45a junction with the Aylesbury Link at a point 40 metres east of the
junction of bridleway GUN/25/1, with bridleway CAG/3/1 and
terminating by a junction with Work No. 2/81 at a point 18 metres
west of the bridge carrying Addison Road over the Bicester to
Bletchley Line Railway.
High Speed Rail (London - West Midlands) BillPage 53
Parish of Steeple Claydon—
-
Work No. 2/78 - A loop railway (0.82 kilometres in length)
commencing by a junction with Work No. 2/77 at a point 520 metres
east of the junction of Cotswolds Way with Brickhill Way and
5terminating by a junction with Work No. 2/77 at a point 236 metres
west of the junction of School Hill with footpath SCL/12/1; -
Work No. 2/79 - A railway (2.51 kilometres in length) commencing by
a junction with the Aylesbury Link and Work No. 2/49 at a point 275
metres east of the junction of Cotswolds Way with Brickhill Way and
10terminating at a point 10 metres north of the bridge carrying
Addison Road over the Bicester to Bletchley Line; -
Work No. 2/80 - A realignment of School Hill commencing at a point 5
metres north of the junction of that road with Brackley Lane and
terminating on that road at a point 30 metres north-east of the
15junction of that road with footpath SCL/12/1. Work No. 2/80
includes bridges over Works Nos. 2/49, 2/77, 2/79 and 2/78; -
Work No. 2/80A - An accommodation access road commencing by a
junction with Work No. 2/80 at the junction of School Hill with
footpath SCL/12/1 and terminating at a point 490 metres west of
20that junction.
Parishes of Twyford and Steeple Claydon—
-
Work No. 2/81 - A railway (3.73 kilometres in length) being a
realignment of the Bicester to Bletchley Line commencing at a point
20 metres west of the level crossing over Queen Catherine Road and
25terminating at a point 22 metres east of the bridge carrying Main
Street over that railway. Work No. 2/81 includes bridges over
Works Nos. 2/49 and 2/79; -
Work No. 2/82 - A railway (4.77 kilometres in length) commencing at
a point 154 metres west of Queen Catherine Road level crossing over
30the Bicester to Bletchley Line and terminating at a point 160 metres
east of the bridge carrying the dismantled railway over Padbury
Brook. Work No. 2/82 includes a depot.
Parish of Steeple Claydon—
-
Work No. 2/82A - A railway (0.2 kilometres in length) commencing by
35a junction with Work No. 2/82 at a point 195 metres west of the
bridge carrying Addison Road over the Bicester to Bletchley Line
and terminating by a junction with Work No. 2/83 at a point 395
metres west of that bridge.
Parishes of Steeple Claydon and Twyford—
-
40Work No. 2/83 - A railway (2.87 kilometres in length) commencing at a
point 290 metres west of the Queen Catherine Road level crossing
over the Bicester to Bletchley Line and terminating at a point 460
metres north of the bridge carrying Perry Hill over the Bicester to
Bletchley Line. Work No. 2/83 includes a depot; -
45Work No. 2/83A - A railway siding (0.52 kilometres in length)
commencing at a point 764 metres west of the bridge carrying
Addison Road over the Bicester to Bletchley Line and terminating at
a point 225 metres north-east of the bridge carrying Perry Hill over
the Bicester to Bletchley Line. Work No. 2/83A includes a depot; -
50Work No. 2/83B - A railway siding (1.08 kilometres in length)
commencing at a point 94 metres north-west of the bridge carryingHigh Speed Rail (London - West Midlands) BillPage 54
Addison Road over the Bicester to Bletchley Line and terminating at
a point 475 metres north-east of the bridge carrying Perry Hill over
the Bicester to Bletchley Line. Work No. 2/83B includes a depot; -
Work No. 2/83C - A temporary railway siding (1.87 kilometres in
5length) commencing at a point 40 metres north of the bridge carrying
Addison Road over the Bicester to Bletchley Line and terminating by
a junction with Work No. 2/82 at a point 344 metres south of the
junction of West Street with Perry Hill.
Parish of Steeple Claydon—
-
10Work No. 2/83D - A temporary railway siding (0.83 kilometres in
length) commencing by a junction with Work No. 2/83C at a point
112 metres north-west of the bridge carrying Addison Road over the
Bicester to Bletchley Line and terminating at a point 762 metres
north-east of the bridge carrying Perry Hill over the Bicester to
15Bletchley Line including depot buildings.
Parishes of Steeple Claydon and Twyford—
-
Work No. 2/84 - A gas main diversion commencing at a point 210
metres north-east of the bridge carrying Main Street over the Bicester
to Bletchley Line and terminating at a point 414 metres south-east of
20the junction of Perry Hill with West Street.
Parish of Steeple Claydon—
-
Work No. 2/86 - A gas main diversion commencing at a point 260
metres north-west of the level crossing over Queen Catherine Road
and terminating at a point 425 metres south-east of the junction of
25Perry Hill with West Street.
Parishes of Steeple Claydon and Twyford—
-
Work No. 2/87 - A diversion of Addison Road commencing at a point
358 metres south of the bridge carrying that road over the Bicester to
Bletchley Line and terminating at a point 138 metres south of
30Redland Bridge. Work No. 2/87 includes a bridge over Works Nos.
2/81, 2/82 and 2/83; -
Work No. 2/88 - An access road commencing by a junction with Work
No. 2/87 at a point 224 metres south of Redland Bridge and
terminating on Addison Road at a point 326 metres south of that
35Bridge.
Parish of Steeple Claydon—
-
Work No. 2/88A - An access road commencing at a point 480 metres
south west of the bridge carrying Addison Road over the Bicester to
Bletchley Line and terminating at a point 536 metres west of that
40bridge carrying Addison Road over the Bicester to Bletchley Line; -
Work No. 2/89 - A footbridge over Works Nos. 2/81, 2/82 and 2/83
commencing on footpath SCL/8/1 at a point 320 metres east of the
bridge carrying Addison Road over the Bicester to Bletchley Line
and terminating on footpath SCL/8/2 at a point 60 metres south of
45the junction of that footpath with footpath SCL/8/3 and footpath
SCL/8/4.
Parish of Twyford—
-
Work No. 2/91 - A diversion of Perry Hill commencing at a point 430
metres south east of the bridge carrying that road over the Bicester to
50Bletchley Line and terminating at a point 20 metres south-east of theHigh Speed Rail (London - West Midlands) BillPage 55
junction of that road with West Street. Work No. 2/91 includes a
bridge over Works Nos. 2/49, 2/81, 2/82 and 2/83C; -
Work No. 2/91A - An access road commencing by a junction with
Work No. 2/91 at a point 139 metres south of the bridge carrying
5Perry Hill road over the Bicester to Bletchley Line and terminating at
a point 44 metres east of the bridge carrying Perry Hill road over the
Bicester to Bletchley Line; -
Work No. 2/91B - A road commencing by a junction with Work No. 2/
91 at a point 190 metres south of the junction of Perry Hill and West
10Street and terminating on Perry Hill at a point 228 metres south of
the junction of Perry Hill and West Street; -
Work No. 2/92 - A realignment of West Street, commencing at a point
220 metres north of the junction of that road with Portway Road and
terminating on West Street at a point 85 metres west of the junction
15of that road with Perry Hill Road; -
Work No. 2/93 - An access road commencing by a junction with Work
No. 2/92 at a point 220 metres south-west of the junction of West
Street with Perry Hill and terminating at a point 530 metres west of
that junction; -
20Work No. 2/94 - An access road commencing on West Street at a point
80 metres north of the junction of that road with Portway Road and
terminating at the sewage works at a point 196 metres south-east of
the junction of footpath TWY/18/2 with the dismantled railway.
Parish of Preston Bissett—
-
25Work No. 2/95 - A bridge over Work No. 2/49, commencing at a point
176 metres south-east of the junction of footpath PBI/5(F)/7 with the
dismantled railway and terminating on that footpath at a point 120
metres north of that junction; -
Work No. 2/96 - A bridge over Work No. 2/49, commencing on
30bridleway PBI/5A/3 at a point 206 metres west of the junction of
PBI/5(F)/7 with the dismantled railway and terminating at a point
304 metres north-west of that junction.
County of Oxfordshire, District of Cherwell, Parish of Godington, County of
Buckinghamshire, District of Aylesbury Vale, Parish of Chetwode—
-
35Work No. 2/97 - A diversion of Padbury Brook commencing at a point
38 metres east of the junction of bridleway CHW/24/2 with
bridleway 225/4 and terminating at that junction.
County of Buckinghamshire, District of Aylesbury Vale, Parish of
Chetwode—
-
40Work No. 2/98 - A diversion of The Green commencing on The Green
at a point 67 metres west of the junction of the access to Rosehill Farm
and terminating on The Green at a point 28 metres north of the
junction of the access to Sunflower Farm; -
Work No. 2/99 - A bridge over Work No 2/49, commencing by a
45junction with Work No. 2/98 at a point 63 metres south of the
junction of the access to Sunflower Farm and terminating on The
Green at a point 6 metres north-west of the junction of footpath
CHW/20/1 with The Green.
Parishes of Chetwode and Barton Hartshorn—
-
50Work No. 2/100 - A realignment of School End commencing at a point
30 metres north-east of the junction of that road with the dismantledHigh Speed Rail (London - West Midlands) BillPage 56
railway and terminating on that road at a point 162 metres north-east
of its commencement. Work No. 2/100 includes a bridge over Work
No. 2/49.
County of Buckinghamshire, District of Aylesbury Vale, Parish of Barton
5Hartshorn, County of Oxfordshire, District of Cherwell, Parish of Newton
Purcell with Shelswell—
-
Work No. 2/101- A footbridge over Work No. 2/49 commencing at a
point 200 metres north-west of the junction of footpaths BHA/2/1
and BHA/3/1 with footpath BHA/2/2 and terminating at a point
10208 metres north of that junction.
County of Oxfordshire, District of Cherwell, Parish of Newton Purcell with
Shelswell—
-
Work No. 2/102 - A diversion of the A4421 Buckingham Road
commencing at a point 4 metres west of its junction with the entrance
15to Old Rectory Farm and terminating at a point 308 metres north-east
of its junction with Manor Farm Road. Work No. 2/102 includes a
bridge over Work No. 2/49.
Parish of Finmere—
-
Work No. 2/103 - A bridge over Work No. 2/49 commencing on
20bridleway 213/7 at a point 732 metres north-west of the junction of
the A4421 Buckingham Road with the dismantled railway and
terminating on that bridleway at a point 114 metres north-east of its
commencement; -
Work No. 2/104 - A bridge over Work No. 2/49 commencing at a point
25166 metres west of the junction of bridleway 213/4 with the
dismantled railway and terminating at a point 154 metres north of
that junction.
Parishes of Finmere and Mixbury—
-
Work No. 2/105 - A realignment of the A421 London Road
30commencing at a point 40 metres west of its junction with bridleway
303/8 and terminating 360 metres east of the junction of that road
with the dismantled railway. Work No. 2/105 includes a bridge over
Work No. 2/49.
Parish of Finmere—
-
35Work No. 2/105A - An access road commencing by a junction with
Work No. 2/105 at a point 120 metres north-west of the junction of
the A421 London Road with the dismantled railway and terminating
on the access to Widmore Farm at a point 266 metres south of that
junction; -
40Work No. 2/105B - An access road commencing by a junction with
Work No. 2/105 at a point 118 metres east of the junction of the A421
London Road with the dismantled railway and terminating on the
access to Warren Farm at a point 260 metres north-east of that
junction.
45Parishes of Finmere and Mixbury—
-
Work No. 2/105C - A temporary diversion of the A421 London Road
over Work No. 2/49 commencing at a point 20 metres south-east of
the junction of that road with bridleway 303/8 and terminating by a
junction with the termination of Work No. 2/105.
High Speed Rail (London - West Midlands) BillPage 57
Parish of Mixbury—
-
Work No. 2/106 - A realignment of Featherbed Lane commencing at a
point 36 metres north-east of the junction of that road with Church
Lane and terminating at a point 132 metres north-east of that
5junction. Work No. 2/106 includes a bridge over Work No. 2/49; -
Work No. 2/106A - An access road commencing at a point 150 metres
east of the junction of Featherbed Lane with Church Lane and
terminating at a point 176 metres north-east of that junction; -
Work No. 2/107 - A bridge over Work No. 2/49 commencing at a point
1050 metres west of the junction of bridleway 303/4/30 and bridleway
303/22/20 with bridleway 303/4/20 and terminating on bridleway
303/4/20 at a point 96 metres north east of that junction.
County of Buckinghamshire, District of Aylesbury Vale, Parish of
Westbury—
-
15Work No. 2/108 - A footbridge over Work No. 2/49 commencing at a
point 74 metres east of the junction of footpath WBB/17/1 with
footpath TUW/11/2 and terminating at a point 180 metres east of
that junction.
Parishes of Westbury and Turweston—
-
20Work No. 2/109 - A diversion of the A422 Brackley Road commencing
at a point 184 metres west of the junction of that road with the access
to Grovehill Farm and terminating at a point 278 metres south-east
of the junction of that road with the access to Oatleys Farm.
Parish of Turweston—
-
25Work No. 2/109A - An access road commencing by a junction with
Work No. 2/109 at a point 106 metres south-east of the junction of the
A422 Brackley Road with the access to Oatleys Farm and terminating
on that access road at a point 78 metres north of that junction.
Parishes of Westbury and Turweston—
-
30Work No. 2/109B - A temporary diversion of the A422 Brackley Road
commencing at a point 230 metres west of the junction of that road
with the access to Grovehill Farm and terminating at a point 350
metres south-east of the junction of that road with the access to
Oatleys Farm.
35Parish of Turweston—
-
Work No. 2/110 - A bridge over Work No. 2/49 commencing on
bridleway TUW/4/1 at a point 62 metres west of the junction of that
bridleway with bridleways TUW/4/2 and TUW/9/2 and
terminating on bridleway TUW/4/3 at a point 80 metres north-east
40of the junction of that bridleway with bridleway TUW/4/2 and
footpath TUW/5/1; -
Work No. 2/110A - A temporary access road being a diversion of the
access road to Oatleys Hall commencing on bridleway TUW/4/1 at
a point 150 metres west of the junction of that bridleway with
45bridleways TUW/4/2 and TUW/9/2 and terminating on bridleway
TUW/4/3 at a point 220 metres north-east of the junction of that
bridleway with bridleway TUW/4/2 and footpath TUW/5/1. Work
No. 2/110A includes a bridge over Work No. 2/49; -
Work No. 2/110B - A watercourse being a diversion of Mill Stream
50commencing in Mill Stream at a point 10 metres south of the junctionHigh Speed Rail (London - West Midlands) BillPage 58
of the River Great Ouse with Mill Stream and terminating in Mill
Stream at a point 148 metres south of its commencement.
County of Northamptonshire, District of South Northamptonshire, Parishes
of Whitfield, Radstone, Greatworth, Marston St Lawrence, Culworth,
5Thorpe Mandeville, Chipping Warden and Edgcote, Aston Le Walls and
Boddington—
-
Work No. 2/111 - A railway (20.5 kilometres in length), commencing by
a junction with the termination with Work No. 2/49 at a point 1.03
kilometres north-west of the junction of bridleway TUW/9/2 and
10bridleway TUW/4/1 with bridleway TUW/4/2 and terminating at
a point 12 metres south-west of the junction of Banbury Road and
Boddington Road. Work No. 2/111 includes viaducts over Banbury
Lane, River Cherwell, Waddington Road and Highfurlong Brook.
Parishes of Brackley, Whitfield and Radstone—
-
15Work No. 2/112 - A realignment of the A43 Oxford Road commencing
on the roundabout by a junction with Northampton Road and
terminating at a point 50 metres west of the junction with The
Avenue. Work No. 2/112 includes a bridge over Work No. 2/111.
Parish of Radstone—
-
20Work No. 2/113 - An underpass beneath Work No. 2/112 commencing
at a point 144 metres north of the A43 Oxford Road roundabout and
terminating at a point 105 metres south-west of the junction of
bridleway BD10 with the A43 Oxford Road.
Parishes of Radstone and Whitfield—
-
25Work No. 2/114 - A bridge over Work No. 2/111 commencing at a
point 80 metres north of the junction of bridleway AX14 with
bridleway AX16 and terminating on bridleway AX16 at a point 219
metres north-east of that junction.
Parish of Radstone—
-
30Work No. 2/115 - A footbridge over Work No. 2/111 commencing on
footpath AX15 at a point 339 metres south-east of the junction of
footpath AX7 with Radstone Road and terminating on footpath
AX15 at a point 280 metres east of that junction; -
Work No. 2/116 - A diversion of Radstone Road commencing at a point
35102 metres south of the junction of that road with footpath AX7 and
terminating at a point 12 metres south of the junction of Radstone
Road with Whitfield Road. Work No. 2/116 includes a bridge over
Work No. 2/111; -
Work No. 2/116A - An access road commencing by a junction with
40Work No. 2/116 at a point 119 metres south of the junction of
Radstone Road with Whitfield Road and terminating on the access
road to Manor Farm at a point 16 metres north-east of the junction of
that access road with Radstone Road; -
Work No. 2/117 - A bridge over Work No. 2/111 commencing on
45footpath AX5 at a point 370 metres west of the junction of Radstone
Road with Whitfield Road and terminating on bridleway AX15 at a
point 68 metres west of that junction.
Parish of Greatworth—
-
Work No. 2/118 - A footbridge over Work No. 2/111 commencing on
50footpath AN22 at a point 10 metres south-west of the junction of thatHigh Speed Rail (London - West Midlands) BillPage 59
footpath with bridleway AN37 and terminating on that footpath at a
point 134 metres south-west of the junction of that footpath with
footpath AN20; -
Work No. 2/119 - A bridge over Work No. 2/111 commencing on
5footpath AN19 at a point 190 metres south-west of the junction of
that footpath with bridleway AN37 and terminating at a point 50
metres south-west of that junction; -
Work No. 2/120 - A bridge over Work No. 2/111 commencing on
bridleway AN14 at a point 84 metres north-east of its junction with
10bridleway AN28 and terminating on bridleway AN14 at a point 335
metres south-west of the junction of that bridleway with the B4525
Welsh Road; -
Work No. 2/121 - A realignment of Helmdon Road commencing at a
point 184 metres west of the junction of that road with the B4525
15Welsh Road and terminating at a point 28 metres north-east of the
junction of footpath AN4 with Helmdon Road; -
Work No. 2/122 - A realignment of the B4525 Welsh Road commencing
at a point 90 metres north-west of the junction of that road with
footpath AN4 and terminating at a point 550 metres north-west of
20that junction.
Parishes of Greatworth and Marston St. Lawrence—
-
Work No. 2/122A - A temporary diversion of the B4525 Welsh Road
commencing on that road at a point 90 metres north-west of the
junction of that road with footpath AN4 and terminating at a point
25220 metres south-west of the junction of footpath AN39 with that
road.
Parishes of Marston St Lawrence, Sulgrave and Thorpe Mandeville—
-
Work No. 2/122B - A temporary diversion of Sulgrave Road
commencing at a point 260 metres north of the junction of that road
30with the B4525 Welsh Road and terminating at a point 90 metres
north of the junction of that road with footpath AY12; -
Work No. 2/122C - A reconstruction of Sulgrave Road commencing at
a point 430 metres north of the junction of that road with the B4525
Welsh Road and terminating by a junction with Work No. 2/122B.
35Parishes of Marston St Lawrence and Thorpe Mandeville—
-
Work No. 2/123 - A diversion of Banbury Road commencing at a point
273 metres west of the junction of that road with footpath BB3 and
terminating at a point 184 metres east of that junction. Work No. 2/
123 includes a bridge over Work No. 2/111; -
40Work No. 2/123A - A temporary diversion of Banbury Road
commencing at a point 400 metres west of the junction of that road
with footpath BB3 and terminating at a point 360 metres east of that
junction.
Parish of Culworth—
-
45Work No. 2/124 - A bridge over Work No. 2/111 commencing at a
point 540 metres south-east of the junction of bridleway AG10 with
bridleway AN9 and terminating at a point 560 metres east of its
commencement; -
Work No. 2/125 - A bridge over Work No. 2/111 commencing on
50bridleway AG9 at a point 6 metres east of the junction of thatHigh Speed Rail (London - West Midlands) BillPage 60
bridleway with bridleway AG10 and AN9 and terminating on
bridleway AG9 at a point 350 metres east of that junction; -
Work No. 2/126 - A bridge over Work No. 2/111 commencing at a
point 720 metres north-west of the junction of bridleway AG10 with
5bridleway AN9 and terminating at a point 890 metres north of that
junction; -
Work No. 2/126A - A road commencing by a junction with Work No.
2/126 at a point 880 metres north-west of the junction of bridleway
AG10 with bridleway AG9 and terminating on bridleway AG10 at a
10point 140 metres north-west of its commencement.
Parish of Chipping Warden and Edgcote—
-
Work No. 2/126B - A diversion of the River Cherwell commencing at a
point 80 metres west of the junction of Wardington Road with Welsh
Road and terminating 60 metres west of its commencement; -
15Work No. 2/126C - A diversion of the River Cherwell commencing at a
point 272 metres north-west of the junction of Wardington Road with
Welsh Road and terminating at a point 90 metres north-west of its
commencement; -
Work No. 2/127 - An access road commencing on the access road to
20Blackgrounds at a point 220 metres south of the junction of Culworth
Road with that access road and terminating in Culworth Road at a
point 60 metres west of the junction of that road with footpath AE28; -
Work No. 2/128 - A road commencing on footpath AE20 at a point 12
metres west of the junction of that footpath with footpath AE21 and
25terminating on footpath AE21 at a point 134 metres north-east of that
junction; -
Work No. 2/128A - A temporary diversion of the A361 Byfield Road
commencing at a point 40 metres north of the junction of that road
with footpath AE20 and terminating at a point 256 metres north of
30the junction of that road with footpath AE16; -
Work No. 2/128B - A realignment of the A361 Byfield Road
commencing at a point 235 metres north of the junction of that road
with Footpath AE20 and terminating at a point 484 metres north of
that junction.
35Parish of Aston Le Walls—
-
Work No. 2/128C - A realignment of Appletree Lane commencing on
that road at a point 140 metres north-east of the junction of that road
with the access road to Field Farm and terminating at a point 360
metres north-east of that junction.
40Parish of Boddington—
-
Work No. 2/129 - A realignment of Claydon Road commencing on that
road at a point 280 metres south-west of the junction of that road
with footpath AC1 and terminating on that road at a point 250 metres
south-west of the junction of that road with Banbury Road. Work
45No. 2/129 includes a bridge over Work No. 2/111; -
Work No. 2/130 - An access road commencing on the access to Cedars
Farm at a point 445 metres south-west of the junction of that access
with Banbury Road and terminating on Claydon Road at a point 620
metres south-west of the junction of Banbury Road with Claydon
50Road; -
Work No. 2/131 - A diversion of a watercourse commencing at a point
550 metres south of the junction of Claydon Road with Banbury
Road and terminating 144 metres east of its commencement.
High Speed Rail (London - West Midlands) BillPage 61
County of Northamptonshire, District of South Northamptonshire, Parish of
5Boddington, County of Warwickshire, District of Stratford-on-Avon, Parish
of Wormleighton—
-
Work No. 2/132 - A diversion of Banbury Road, Boddington Road and
Wormleighton Road commencing at a point 24 metres south-east of
the junction of Banbury Road with Claydon Road and terminating
10on Wormleighton Road at a point 470 metres west of the junction of
Boddington Road with Stoneton Lane. Work No. 2/132 includes a
bridge over Work No. 2/111.
County of Northamptonshire, District of South Northamptonshire, Parish of
Boddington—
-
15Work No. 2/132A - A diversion of Claydon Road commencing at a
point 450 metres south-west of the junction of that road with
Banbury Road and terminating by a junction with Work No. 2/132
at a point 192 metres south-west of the junction of Banbury Road
with Warwick Road.
20County of Northamptonshire, District of South Northamptonshire, Parish of
Boddington, County of Warwickshire, District of Stratford-on-Avon, Parish
of Stoneton—
-
Work No. 2/132B - A diversion of Stoneton Lane commencing by a
junction with Work No. 2/132 at a point 120 metres south-east of the
25junction of Warwick Road with Banbury Road and terminating on
Stoneton Lane at a point 490 metres north-east of the junction of
Stoneton Lane with Boddington Road.
County of Warwickshire, District of Stratford-on-Avon, Parishes of
Stoneton, Wormleighton, Radbourne, Ladbroke, Southam and Long
30Itchington, County of Northamptonshire, District of South
Northamptonshire, Parish of Boddington, County of Warwickshire, District
of Stratford-on-Avon, Parish of Stoneton—
-
Work No. 2/133 - A railway (10.35 kilometres in length) commencing
by a junction with the termination of Work No. 2/111 passing north-
35westwards and terminating at a point 266 metres south-east of the
junction of the A425 Southam Road with the entrance to Lower Farm.
Work No. 2/133 includes viaducts over the Oxford Canal, the River
Itchen and Work No. 2/135.
County of Warwickshire, District of Stratford-on-Avon, Parish of
40Stoneton—
-
Work No. 2/134 - A footbridge carrying Footpath SM101 over Work
No. 2/133 commencing at a point 885 metres south-east of the bridge
carrying Footpath SM116a over the Oxford Canal and terminating at
a point 110 metres north-east of its commencement.
45Parish of Wormleighton—
-
Work No. 2/134A - A diversion of a watercourse commencing at a
point 340 metres south-west of the bridge carrying Footpath SM116a
over the Oxford Canal and terminating 55 metres north-east of its
commencement; -
Work No. 2/135 - An access road commencing at a point 1,028 metres
south-west of the bridge carrying Footpath SM116a over the Oxford
Canal and terminating at a point 620 metres north-west of that
bridge; -
5Work No. 2 /136 - A temporary bridge over the Oxford Canal
commencing at a point 12 metres south-west of the bridge carrying
Bridleway SM116 over that canal and terminating at a point 38
metres north of its commencement.
High Speed Rail (London - West Midlands) BillPage 62
Parishes of Radbourn and Wormleighton—
-
10Work No. 2/137 - An improvement and realignment of Wills Pastures
Road commencing at a point 75 metres south of its junction with the
A423 Banbury Road and terminating at a point 180 metres west of its
junction with Bridleway SM116.
Parish of Wormleighton—
-
15Work No. 2/137A - A temporary road commencing by a junction with
Work No. 2/137 at a point 78 metres south-east of the junction of
Wills Pastures Road with the A423 Banbury Road and terminating at
a point 72 metres south-west of the access road to Lower New House
Farm.
20Parishes of Radbourn and Napton-On-The-Hill—
-
Work No. 2/138 - An improvement and realignment of the access road
between Welsh Road and Lower Radbourn Farm commencing at a
point 430 metres west of Chapel Bank Cottage and terminating by its
junction with Welsh Road at a point 1,090 metres north-east of the
25access to Courtyard House. Work No. 2/138 includes a bridge over
Work No. 2/133.
Parish of Radbourn—
-
Work No. 2/138A - An access road commencing by a junction with
Work No. 2/138 at a point 390 metres north-west of Chapel Bank
30Cottage and terminating at a point 60 metres south-east of its
commencement.
Parishes of Radbourn, Hodnell with Wells Pastures and Ladbroke—
-
Work No. 2/139 - A road commencing by a junction with Work No. 2/
138 at a point 410 metres west of Chapel Bank Cottage and
35terminating by a junction with Radbourn Lane at a point 540 metres
south-west of the access to Ladbroke Grove Farm.
Parishes of Radbourn and Ladbroke—
-
Work No. 2/139A - An access road commencing by a junction with
Work No. 2/139 at a point 590 metres south of the access to Ladbroke
40Grove Farm and terminating at a point 10 metres south-east of that
access. Work No. 2/139A includes a bridge over Work No. 2/133.
Parish of Ladbroke—
-
Work No. 2/140 - A diversion of a watercourse commencing at a point
1,185 metres south-east of the junction of Windmill Lane with the
45A423 Ladbroke bypass and terminating at a point 220 metres north
of its commencement; -
Work No. 2/141 - A diversion of Windmill Lane commencing at a point
1,120 metres north-east of its junction with the A423 Ladbroke
bypass and terminating at a point 560 metres north-west of itsHigh Speed Rail (London - West Midlands) BillPage 63
commencement. Work No. 2/141 includes a bridge over Work No.
2/133; -
Work No. 2/141A - A road commencing by a junction with Work No.
2/141 at a point 860 metres north-east of the junction of Windmill
5Lane with the A423 Ladbroke bypass and terminating at a point 360
metres north of its commencement.
Parishes of Ladbroke and Southam—
-
Work No. 2/142 - A diversion of the A423 Banbury Road commencing
at a point 130 metres north-west of its junction with Southam Road
10and terminating at a point 88 metres south of the entrance to
Warwick House Industrial Park. Work No. 2/142 includes a bridge
over Work No. 2/133.
Parish of Ladbroke—
-
Work No. 2/142A - A road commencing by a junction with Work No.
152/142 at a point 390 metres north-west of the junction of the A423
Banbury Road with Southam Road and terminating at a point 75
metres north-east of its commencement.
Parishes of Ladbroke and Southam—
-
Work No. 2/142B - An access road to Starbold Farm commencing by a
20junction with Work No. 2/142 at a point 550 metres north-west of the
junction of the A423 Banbury Road with Southam Road and
terminating at a point 180 metres north-west of its commencement.
Parish of Southam—
-
Work No. 2/142C - A road commencing by a junction with Work No.
252/142 at a point 240 metres south of the junction of the A423 Banbury
Road with the access to Warwick Park Industrial Estate and
terminating at a point 710 metres south-east of its commencement; -
Work No. 2/143 - A diversion of a watercourse commencing at a point
320 metres south-west of the junction of the A423 Banbury Road with
30the access to Warwick Park Industrial Estate and terminating at a
point 240 metres south-west of its commencement; -
Work No. 2/144 - A diversion of Kineton Road commencing at a point
190 metres north of its junction with the access to Fields Farm and
terminating at a point 20 metres south-west of its junction with
35Westfield Road. Work No. 2/144 includes a bridge over Work No.
2/133; -
Work No. 2/144A - An access road commencing by a junction with
Work No. 2/144 at a point 370 metres north of the junction of
Kineton Road with the access to Fields Farm and terminating at a
40point 40 metres north-west of its commencement; -
Work No. 2/145 - An access road commencing by a junction with Work
No. 2/144 at a point 185 metres south-west of the junction of Kineton
Road with Westfield Road and terminating at a point 40 metres
north-west of its commencement.
45County of Warwickshire, District of Stratford-on-Avon, Parishes of Long
Itchington and Ufton, District of Warwick, Parishes of Offchurch,
Cubbington, Weston under Wetherly, Stoneleigh, Kenilworth and Burton
Green, Metropolitan Borough of Solihull, Parish of Berkswell —
-
Work No. 2/146 - A railway (21.57 kilometres in length) partly in
50tunnel and partly on viaduct commencing by a junction with theHigh Speed Rail (London - West Midlands) BillPage 64
termination of Work No. 2/133 and passing north-westwards and
terminating at a point 270 metres north-west of the bridge carrying
Waste Lane over Kenilworth Greenway. Work No. 2/146 includes
viaducts over the River Leam, Finham Brook and Work No. 2/175
5and bridges over the Grand Union Canal, Work No. 2/151 and the
River Avon.
County of Warwickshire, District of Stratford-on-Avon, Parish of Long
Itchington—
-
Work No. 2/147 - A realignment of the A425 Leamington Road
10commencing at a point 360 metres east of its junction with the access
to Lower Farm and terminating at a point 372 metres west of its
commencement. Work No. 2/147 includes a bridge over Work No.
2/146; -
Work No. 2/147A - A temporary road commencing at a point 360
15metres east of its junction with the access to Lower Farm and
terminating at a point 770 metres west of its commencement.
District of Warwick, Parish of Offchurch—
-
Work No. 2/148 - A diversion of a watercourse commencing at a point
320 metres south-west of the bridge carrying Welsh Road over the
20Grand Union Canal and terminating at a point 100 metres south-east
of the bridge carrying Ridgeway Lane over the Grand Union Canal; -
Work No. 2/149 - A diversion of Ridgeway Lane commencing at a
point 10 metres north of the bridge carrying Ridgeway Lane over the
Grand Union Canal and terminating at a point 120 metres north of its
25commencement; -
Work No. 2/150 - A gas main diversion commencing beneath a point
190 metres west of the bridge carrying Ridgeway Lane over the
Grand Union Canal and terminating at a point 320 metres north-east
of its commencement; -
30Work No. 2/151 - A diversion of Welsh Road commencing at a point 55
metres west of its junction with Ridgeway Lane and terminating at a
point 700 metres west of its commencement; -
Work No. 2/151A - A road commencing by a junction with Work No.
2/151 at a point 240 metres south-west of the junction of Ridgeway
35Lane with Welsh Road and terminating at a point 50 metres north-
west of its commencement; -
Work No. 2/152 - A gas main diversion commencing beneath a point
530 metres north-west of the bridge carrying Ridgeway Lane over
the Grand Union Canal and terminating at a point 295 metres north-
40east of its commencement; -
Work No. 2/153 - A diversion of Fosse Way commencing at a point 560
metres south-west of its junction with Welsh Road and terminating
at a point 400 metres north of its junction with Long Itchington Road.
Work No. 2/153 includes a bridge over Work No. 2/146; -
45Work No. 2/153A - A realignment of Welsh Road commencing at a
point 210 metres south-east of its junction with Fosse Way and
terminating at a point in Radford Road 65 metres west of its junction
with Long Itchington Road; -
Work No. 2/153B - An access road commencing by a junction with
50Work No. 2/153A at a point 65 metres south-east of the junction of
Welsh Road with Fosse Way and terminating at a point 35 metres
north-east of its commencement; -
Work No. 2/153C - A realignment of Long Itchington Road
commencing by a junction with Work No. 2/153 at a point 80 metres
north of its junction with Fosse Way and terminating at a point 280
metres east of its commencement; -
5Work No. 2/153D - An access road commencing by a junction with
Work No. 2/153 at a point 92 metres north-west of the junction of
Welsh Road with Fosse Way and terminating at a point 60 metres
south-east of its commencement; -
Work No. 2/153E - A diversion of Long Itchington Road commencing
10by a junction with Work No. 2/153A at a point 80 metres east of its
junction with Welsh Road and terminating at a point 70 metres
north-east of its commencement; -
Work No. 2/153F - An access road commencing by a junction with
Work No. 2/153E at a point 100 metres east of the junction of
15Radford Road with Welsh Road and terminating at a point 20 metres
north of its commencement; -
Work No. 2/154 - A footbridge to carry Footpath W192 over Work No.
2/146 commencing at a point 225 metres north-east of the junction of
Welsh Road with Long Itchington Road and terminating at a point
20320 metres north-east of its commencement; -
Work No. 2/154A - A cycle track commencing by a junction with Work
No. 2/153C at a point 35 metres north of the junction of Long
Itchington Road with Fosse Way and terminating at a point 380
metres north-west of its commencement; -
25Work No. 2/155 - A gas main diversion commencing beneath a point
445 metres north of the junction of Welsh Road with Long Itchington
Road and terminating beneath a point 860 metres north of that
junction; -
Work No. 2/156 - A diversion of Hunningham Road commencing at a
30point 120 metres north-east of its junction with the access road to
Manor Farm and terminating at a point 600 metres north-east of its
commencement. Work No. 2/156 includes a bridge over Work No.
2/146; -
Work No. 2/157 - A diversion of a watercourse commencing at a point
35540 metres north-east of the junction of the access road to Manor
Farm with Hunningham Road and terminating at a point 90 metres
north-east of its commencement; -
Work No. 2/158 - Improvement of the access road to Fields Farm and
Fields Farm Cottages commencing by its junction with Hunningham
40Road and terminating at a point 880 metres north-west of its
commencement; -
Work No. 2/159 - A footbridge to carry Footpath W129y over Work No.
2/146 commencing at a point 715 metres north of the junction of the
access road to Manor Farm with Hunningham Road and terminating
45at a point 80 metres north-east of its commencement.
High Speed Rail (London - West Midlands) BillPage 65
Parishes of Cubbington and Weston under Wetherley—
-
Work No. 2/160 - An access road commencing at a point 970 metres
north-west of the junction of Footpath W129d, W129x and W129t and
terminating at a point 250 metres north-east of its commencement.
50Work No. 2/160 includes a bridge over Work No. 2/146; -
Work No. 2/160A - An access road commencing at a point 640 metres
north-west of the junction of Footpath W129d, W129x and W129t and
terminating at a point 320 metres north-west of its commencement.
High Speed Rail (London - West Midlands) BillPage 66
Parish of Cubbington—
-
5Work No. 2/160B - An improvement of Mill Street and the access road
to Lower Grange commencing at a point 675 metres south-east of the
junction of that access with Mill Street and terminating at a point
225m north-west of that junction; -
Work No. 2/161 - A footbridge to carry Footpath W130 over Work No.
102/146 commencing at a point 1,220 metres north-west of the junction
of Footpaths W129d, W129x and W129t and terminating at a point 15
metres north-east of its commencement; -
Work No. 2/162 - A diversion of Rugby Road commencing at a point
564 metres south-east of the junction of the access to Oakdene with
15Coventry Road and terminating at a point 25 metres north-east of its
junction with the access to Wychwood. Work No. 2/162 includes a
bridge over Work No. 2/146; -
Work No. 2/162A - An access road commencing by a junction with
Work No. 2/162 at a point 135 metres south-west of the junction of
20the access to Wychwood with Rugby Road and terminating at a point
45 metres south-east of its commencement.
Parishes of Cubbington and Stoneleigh—
-
Work No. 2/163 - A diversion of Coventry Road commencing at a point
105 metres north of its junction with the access track to Oakdene and
25terminating at a point 855 metres north-east of its commencement.
Work No. 2/163 includes a bridge over Work No. 2/146; -
Work No. 2/163A - An access road commencing by a junction with
Work No. 2/163 at a point 845 metres north-east of the junction of the
access track to Oakdene with Coventry Road, and terminating 40
30metres north-west of its commencement; -
Work No. 2/164 - A realignment of the A445 Leicester Lane
commencing at a point 390 metres south-west of the junction of the
access track to Stonehouse Farm with Leicester Lane and terminating
at a point 720 metres north-east of that junction. Work No. 2/164
35includes a bridge over Work No. 2/146.
Parish of Stoneleigh—
-
Work No. 2/164A - An access road commencing by a junction with
Work No. 2/164 at a point 200 metres north-east of its junction with
Bridle Road and terminating at a point 20 metres south-west of that
40junction.
Parishes of Stoneleigh and Cubbington—
-
Work No. 2/164B - An access road commencing by a junction with
Work No. 2/164 at a point 235 metres north-west of the junction of
the access track to Stonehouse Farm with Leicester Lane and
45terminating at a point 220 metres south-west of its commencement; -
Work No. 2/165 - A gas main diversion commencing beneath a point
245 metres north-east of the junction of Bridle Road with Leicester
Lane and terminating beneath a point 350 metres south-west of the
junction of the access track to Stonehouse Farm with Leicester Lane.
50Parish of Stoneleigh—
-
Work No. 2/166 - A diversion of Stoneleigh Road commencing at a
point 65 metres north-east of its junction with the access road to
Rectory Cottages and terminating at a point 230 metres north-east of
the junction of Stareton Lane with Stoneleigh Road. Work No. 2/166
5includes a bridge over Work No. 2/146; -
Work No. 2/166A - A road commencing by a junction with Work No.
2/166 at a point 110 metres south of the junction of Stareton Lane
with Stoneleigh Road and terminating at a point 90 metres north-
west of its commencement; -
10Work No. 2/166B - An access road commencing by a junction with
Work No. 2/166 at a point 45 metres south-east of the junction of
Stareton Lane with Stoneleigh Road and terminating at a point 100
metres south-east of its commencement; -
Work No. 2/166C - A diversion of Stareton Lane commencing by a
15junction with Work No. 2/166 at a point 130 metres north-east of its
junction with Stoneleigh Road and terminating at a point 42 metres
south-west of its junction with Bridle Road; -
Work No. 2/166D - An access road commencing by a junction with
Work No. 2/166D at a point 158 metres north-east of the junction of
20Stareton Lane with Stoneleigh Road and terminating at a point 210
metres east of the junction of Bridle Road with Stareton Lane; -
Work No. 2/166E - An access road commencing at a point 140 metres
north-west of the junction of Stoneleigh Road with Stareton Lane and
terminating at the junction of 9th Street with Avenue A; -
25Work No. 2/166F - An access road commencing by a junction with
Work No. 2/166E at a point 90 metres east of the junction of 9th
Street with Avenue A and terminating at a point 140 metres north-
east of its commencement. Work No. 2/166F includes a bridge over
Work No. 2/146.
High Speed Rail (London - West Midlands) BillPage 67
30Parishes of Stoneleigh and Ashow—
-
Work No. 2/167 - A diversion of Ashow Road commencing at a point
1,010 metres north-east of its junction with Crew Lane and
terminating at a point 90 metres south-west of that junction. Work
No. 2/167 includes a bridge over Work No. 2/146.
35Parish of Stoneleigh—
-
Work No. 2/167A - A road commencing by a junction with Work No.
2/167 at a point 775 metres north-east of the junction of Crew Lane
with Ashow Road and terminating at a point 108 metres south of its
commencement.
40Parishes of Stoneleigh and Kenilworth—
-
Work No. 2/168 - A gas main diversion commencing beneath a point
215 metres north-west of the junction of Crew Lane with Ashow
Road and terminating beneath a point 350 metres south of the
junction of the access to Kingswood Farm with Dalehouse Lane; -
45Work No. 2/168A - A temporary diversion of the A46 Kenilworth
Bypass commencing at a point 10 metres north-east of the bridge
carrying that road over Crew Lane and terminating at a point 815
metres north-east of its commencement; -
Work No. 2/169 - A realignment of the A46 Kenilworth Bypass
50commencing at a point 10 metres north-east of the bridge carrying
that road over Crew Lane and terminating at a point 800 metresHigh Speed Rail (London - West Midlands) BillPage 68
north-east of its commencement. Work No. 2/169 includes a bridge
over Work No. 2/146.
Parish of Kenilworth—
-
Work No. 2/170 - A footbridge carrying Footpath K29 over Work No.
52/146 commencing at a point 472 metres south-west of the junction
of the access road to Kingswood Farm with Dalehouse Lane and
terminating at a point 108 metres north-east of its commencement.
Parishes of Stoneleigh and Kenilworth—
-
Work No. 2/171 - A diversion of Dalehouse Lane commencing at a
10point 230 metres south-west of its junction with the access road to
Kingswood Farm and terminating at a point 530 metres south-west
of its commencement. Work No. 2/171 includes a bridge over Work
No. 2/146; -
Work No. 2/171A - A road commencing by a junction with Work No.
152/171 at a point 640 metres south-west of the junction of the access
road to Kingswood Farm with Dalehouse Lane and terminating at a
point 180 metres north-east of its commencement.
Parish of Stoneleigh—
-
Work No. 2/172 - An access road commencing at a point 160 metres
20east of the bridge carrying the Coventry to Leamington Spa Line over
the access road to Milburn Grange and terminating at a point 210
metres north-east of that bridge. Work No. 2/172 includes a bridge
over Work No. 2/146; -
Work No. 2/173 - A diversion of the A429 Kenilworth Road
25commencing at a point 270 metres north-east of the junction of
Arborfields Close with the A429 Coventry Road and terminating at
a point 532 metres north-east of its commencement. Work No. 2/173
includes a bridge over Work No. 2/146; -
Work No. 2/174 - A realignment of the access road to Milburn Grange
30commencing by a junction with Work No. 2/173 at a point 40 metres
south-west of the junction of the existing access with Kenilworth
Road and terminating at a point 230 metres south-east of that
junction; -
Work No. 2/175 - A diversion of Canley Brook commencing at a point
35270 metres north-east of the junction of Arborfields Close with
Coventry Road and terminating at a point 195 metres south-east of
Oak Tree Cottages; -
Work No. 2/175A - A diversion of Canley Brook commencing by a
junction with Work No. 2/175 at a point 260 metres south of Oak
40Tree Cottages and terminating at a point 640 metres north-east of the
junction of Arborfields Close with Coventry Road; -
Work No. 2/176 - A bridge carrying Bridleway W164 over Work No. 2/
146 commencing at a point 560 metres south-east of the junction of
Blind Lane with Crackley Lane and terminating at a point 200 metres
45north-east of its commencement; -
Work No. 2/177 - A diversion of a watercourse commencing at a point
405 metres north-east of the junction of Blind Lane with Crackley
Lane and terminating at a point 60 metres south-west of its
commencement.
50Parish of Burton Green—
-
Work No. 2/178 - A diversion of Crackley Lane commencing at a point
7 metres south-east of its junction with Blind Lane and terminating
at a point 460 metres north-west of its commencement. Work No. 2/
178 includes a bridge over Work No. 2/146; -
5Work No. 2/178A - A diversion of Cryfield Grange Road commencing
by a junction with Work No. 2/178 at a point 96 metres north-west of
its junction with Crackley Lane and terminating at a point 110 metres
south-east of its commencement; -
Work No. 2/179 - A diversion of a watercourse commencing at a point
10305 metres south-east of the junction of Footpath W168 with
Footpath W168a and terminating at a point 110 metres north-east of
its commencement; -
Work No. 2/180 - A diversion of a fuel pipeline commencing beneath a
point 430 metres north-east of the junction of Footpath W169 with
15Red Lane and terminating at a point 150 metres north-east of that
junction; -
Work No. 2/181 - A diversion of a watercourse commencing at a point
150 metres north-east of the junction of Footpath W169 with Red
Lane and terminating at a point 155 metres north-east of its
20commencement.
High Speed Rail (London - West Midlands) BillPage 69
County of Warwickshire, District of Warwick, Parish of Burton Green,
Metropolitan Borough of Solihull, Parish of Berkswell—
-
Work No. 2/182 - A diversion of Kenilworth Greenway commencing at
a point 312 metres south-east of its junction with Footpath W169 and
25terminating at a point 230 metres south-east of the bridge carrying
Waste Lane over Kenilworth Greenway; -
Work No. 2/183B - A temporary cycle track commencing at a point 312
metres south-east of the junction of Footpath W169 with Kenilworth
Greenway and terminating at a point 280 metres south-west of the
30bridge carrying Waste Lane over Kenilworth Greenway.
County of Warwickshire, District of Warwick, Parish of Burton Green—
-
Work No. 2/183 - A diversion of Cromwell Lane commencing at a point
156 metres south of its junction with Hodgetts Lane and terminating
at a point 170 metres north of its commencement. Work No. 2/183
35includes bridges over Works Nos. 2/146 and 2/182; -
Work No. 2/183A - A temporary diversion of Cromwell Lane
commencing at a point 124 metres south of its junction with
Hodgetts Lane and terminating at a point 140 metres north of its
commencement.
40Metropolitan Borough of Solihull, Parish of Berkswell—
-
Work No. 2/184 - A footbridge carrying Footpath M186 as proposed to
be diverted over Work No. 2/146 commencing at a point 940 metres
north-west of the junction of Hodgetts Lane with Cromwell Lane
and terminating 40 metres north-east of its commencement; -
45Work No. 2/185 - A realigned access road commencing at a point 850
metres north-west of the junction of Hodgetts Lane with Cromwell
Lane and terminating at a point 240 metres south-east of the bridge
carrying Waste Lane over Kenilworth Greenway; -
Work No. 2/186 - A realignment of Waste Lane commencing at a point
50220 metres south-west of its junction with Hodgetts Lane andHigh Speed Rail (London - West Midlands) BillPage 70
terminating at a point 454 metres south-west of its commencement.
Work No. 2/186 includes a bridge over Work No. 2/146; -
Work No. 2/187 - A diversion of a fuel pipeline commencing beneath a
point 512 metres south-west of the junction of Waste Lane with
5Hodgetts Lane and terminating at a point 148 metres north-west of
its commencement.
County of Warwickshire, District of North Warwick, Parishes of Great
Packington, Little Packington and Coleshill—
-
Work No. 3/1 - A railway (10.9 kilometres in length) commencing by a
10junction with Work No. 2/146 at its termination, passing north-
westwards and terminating by a junction with Work No. 3/25 at a
point 440 metres north of the junction of Solihull Parkway with
Blackfirs Lane. Work No. 3/1 includes bridges over the Rugby to
Birmingham Line, Works Nos. 3/10A and 3/18; viaducts over
15Truggist Lane, Work No. 3/3, Bayley’s Brook, the River Blythe and
the M42 Motorway; and a new station (Birmingham Interchange
Station).
Metropolitan Borough of Solihull, Parish of Berkswell—
-
Work No. 3/1A - A temporary cycle track commencing by a junction
20with Work No. 2/183B at its termination and terminating by a
junction with Footpath M191 at a point 470 metres south-east of the
bridge carrying the Rugby to Birmingham Line over Truggist Lane; -
Work No. 3/1B - A diversion of a fuel pipeline commencing by a
junction with Work No. 2/187 at its termination and terminating
25beneath a point 375 metres east of the bridge carrying the Rugby to
Birmingham Line over Truggist Lane; -
Work No. 3/2 - A diversion of a watercourse commencing at a point 780
metres south-east of the bridge carrying Footpath M191 over the
Rugby to Birmingham Railway and terminating 400 metres north-
30west of its commencement; -
Work No. 3/3 - A diversion of Bayley’s Brook commencing at a point
170 metres north of the bridge carrying the Rugby to Birmingham
Railway over Truggist Lane and terminating at a point 110 metres
north-west of its commencement; -
35Work No. 3/4 - A diversion of a water main commencing beneath a
point 395 metres south of the junction of Park Lane with Lavender
Hall Lane and terminating beneath a point 446 metres north-east of
its commencement; -
Work No. 3/5 - A realignment of Lavender Hall Lane commencing at a
40point 150 metres north of the junction of that road with Hallmeadow
Road and terminating at a point 550 metres north-east of its
commencement. Work No. 3/5 includes bridges over Works Nos. 3/
1 and 3/6; -
Work No. 3/5A - A realignment of Park Lane commencing by a
45junction with Work No. 3/5 at a point 190 metres south-west of the
junction of that road with Lavender Hall Road and terminating by a
junction with Work No. 3/5B at a point 20 metres south of the
junction of Park Lane with Kenilworth Road; -
Work No. 3/5B - A reconstruction of the junction of Park Lane with
50Kenilworth Road commencing in Kenilworth Road at a point 40
metres north-west of the bridge carrying Kenilworth Road over theHigh Speed Rail (London - West Midlands) BillPage 71
Rugby to Birmingham Railway and terminating at point 300 metres
north-west of its commencement; -
Work No. 3/5C - A footbridge over Work No. 3/1 commencing at a
point 310 metres east of the junction of Park Lane with Kenilworth
5Road and terminating at a point 100 metres north-east of its
commencement; -
Work No. 3/6 - A diversion of a watercourse commencing at a point 130
metres north-east of the junction of Park Lane with Lavender Hall
Lane and terminating at a point 60 metres north-east of that junction; -
10Work No. 3/7 - A diversion of a high pressure gas main commencing
beneath a point 320 metres south-east of the access to New Mercote
Farm and terminating beneath a point 325 metres east of the junction
of Bridleway M218 with Kenilworth Road; -
Work No. 3/7A - A footbridge over Work No. 3/1 commencing at a
15point 750 metres east of the junction of Kenilworth Road with
Bradnock’s Marsh Lane and terminating at a point 72 metres north-
east of its commencement; -
Work No. 3/8 - A diversion of a watercourse commencing at a point 400
metres east of the access to New Mercote Farm and terminating at a
20point 630 metres north of the junction of Bradnock’s Marsh Lane
with Kenilworth Road.
Parishes of Berkswell, Hampton-in-Arden and Meriden—
-
Work No. 3/9 - A realignment of the A452 Kenilworth Road
commencing at a point 380 metres north of the junction of
25Bradnock’s Marsh Lane with Kenilworth Road, passing northwards
and terminating at a point 10 metres south of its junction with
Cornets End Lane and Meriden Road. Work No. 3/9 includes
bridges over Works Nos. 3/1, 3/9B and 3/11.
Parish of Berkswell—
-
30Work No. 3/9A - A realignment of an access road and bridleway M218
commencing by a junction with Work No. 3/9 at a point 180 metres
south-east of the junction of Marsh Lane with Kenilworth Road and
terminating at a point 370 metres east of that junction. Work No. 3/
9A includes a bridge over Work No. 3/1; -
35Work No. 3/9B - A diversion of Bayley’s Brook commencing at a point
65 metres east of the junction of Marsh Lane with Kenilworth Road
and terminating at a point 70 metres east of its commencement; -
Work No. 3/9C - A road, forming an extension of Marsh Lane,
commencing by a junction with Work No. 3/9 at a point 80 metres
40east of the junction of Marsh Lane and Kenilworth Road (A452) and
terminating by a junction with Marsh Lane at a point 106 metres
south-west of its commencement.
Parish of Hampton-in-Arden—
-
Work No. 3/10 - An access road commencing by a junction with Marsh
45Lane at a point 225 metres south-east of the bridge carrying Meriden
Road over the River Blythe and terminating by a junction with
Meriden Road at a point 55 metres north-east of that bridge; -
Work No. 3/10A - A realignment of Meriden Road commencing at a
point 92 metres north-east of the bridge carrying that road over the
50River Blythe and terminating at a point 150 metres north-east of its
commencement.
High Speed Rail (London - West Midlands) BillPage 72
Parishes of Berkswell, Hampton-in-Arden and Meriden—
-
Work No. 3/11 - A diversion of Horn Brook commencing at a point 550
metres south-west of the junction of Meriden Road with Cornets End
Lane and terminating at a point 410 metres south of that junction.
5Parish of Berkswell—
-
Work No. 3/11A - A diversion of a watercourse commencing by a
junction with Work No. 3/11 at a point 560 metres south of the
junction of Cornets End Lane with Meriden Road and terminating at
a point 646 metres south-east of that junction.
10Parish of Hampton-in-Arden—
-
Work No. 3/14 - A diversion of a water main commencing beneath a
point 400 metres north-east of the junction of Diddington Lane with
Meriden Road and terminating beneath a point 294 metres east of its
commencement; -
15Work No. 3/15 - A diversion of the access road to Pasture Farm
commencing by a junction with Work No. 3/15A at a point 220
metres west of the junction of that access road with Diddington Lane
and terminating by a junction with the access road to Pasture Farm
at a point 160 metres south-west of its commencement. Work No. 3/
2015 includes a bridge over Work No. 3/1; -
Work No. 3/15A - A diversion of the access road from Diddington Lane
to Pasture Farm commencing in that road at a point 155 metres west
of the junction of that access road with Diddington Lane and
terminating by a junction with Work No. 3/16B at a point 310 metres
25north-west of its commencement; -
Work No. 3/15B - An access road commencing at a point 265 metres
south-west of the junction of Footpath M114 with the access road to
Pasture Farm and terminating by a junction with Work No. 3/15 at a
point 185 metres north of its commencement.
30Parishes of Hampton-in-Arden and Bickenhill—
-
Work No. 3/16 - A realignment of the A45 Coventry Road commencing
at a point 240 metres south-west of the bridge carrying Middle
Bickenhall Lane over Eastway and terminating by a junction with the
A452 Chester Road at a point 40 metres west of the centre of the A45
35Coventry Road/A452 Chester Road roundabout. Work No. 3/16
includes a bridge over Work No. 3/1; -
Work No. 3/16A - A realignment of the A45 Coventry Road west
bound link and slip road commencing at a point 200 metres south-
west of a bridge carrying Middle Bickenhall Lane over Eastway and
40terminating at a point 70 metres north-west of the centre of the A45
Coventry Road/A452 Chester Road roundabout. Work No. 3/16A
includes a bridge over Work No. 3/1.
Parish of Hampton-in-Arden—
-
Work No. 3/16B - A realignment of the A45 Coventry Road service
45road commencing at a point 190 metres south-west of the bridge
carrying Middle Bickenhall Lane over Eastway and terminating at a
point 310 metres west of the centre of the A45 Coventry Road/A452
Chester Road roundabout. Work No. 3/16B includes a bridge over
Work No. 3/1.
50Parish of Bickenhill—
-
Work No. 3/16C - A realignment of Eastway commencing at a point
160 metres east of the bridge carrying Middle Bickenhall Lane over
Eastway and terminating at a point 320 metres west of the centre of
the A45 Coventry Road/A452 Chester Road roundabout. Work No.
53/16C includes a bridge over Work No. 3/1.
High Speed Rail (London - West Midlands) BillPage 73
Parish of Hampton-in-Arden—
-
Work No. 3/16D - An access road commencing by a junction with
Work No. 3/16B at a point 130 metres south of the bridge carrying
Middle Bickenhill Lane over Eastway and terminating at a point 310
10metres south-west of that bridge; -
Work No. 3/16E - A widening of the eastern side of the junction of the
A45 Service Road and the M42 Motorway southbound slip road
between points 228 metres north-east and 120 metres south-west of
that junction; -
15Work No. 3/16F - A widening of the eastern side of the M42 Motorway
southbound slip road from the A45 Coventry Road between points
90 metres and 200 metres south of its junction with Old Station Road; -
Work No. 3/16G - A widening of the M42 Motorway southbound slip
road between points 100 metres and 170 metres south of the bridge
20carrying Eastway over that Motorway; -
Work No. 3/16H - A widening of the junction of the A45 Coventry
Road slip road with South Way between points 60 metres and 190
metres south-west of that junction.
Parish of Bickenhill—
-
25Work No. 3/17 - A diversion of a watercourse commencing at a point
130 metres north-east of the junction of the A45 Coventry Road with
the Eastway Link Road and terminating by a junction with Hollywell
Brook at a point 260 metres south-west of the bridge carrying the
A452 Chester Road over Hollywell Brook; -
30Work No. 3/18 - A diversion of Hollywell Brook commencing at a point
400 metres west of the bridge carrying the A452 Chester Road over
Hollywell Brook and terminating at a point 700 metres west of that
bridge.
Metropolitan Borough of Solihull, Parishes of Hampton-in-Arden and
35Bickenhill, County of Warwickshire, District of North Warwickshire,
Parishes of Great Packington and Little Packington—
-
Work No. 3/19 - A realignment of the A452 Kenilworth Road
commencing at a point 40 metres south-east of its junction with
Diddington Lane and terminating in Chester Road at a point 150
40metres south-east of the bridge carrying Chester Road over
Packington Lane.
Metropolitan Borough of Solihull, Parish of Bickenhill—
-
Work No. 3/19A - An access road commencing by a junction with
Work No. 3/19 at a point 335 metres south-east of the bridge
45carrying the A452 Chester Road over Holywell Brook and
terminating at a point 425 metres south-east of that bridge.
County of Warwickshire, District of North Warwickshire, Parish of Little
Packington, Metropolitan Borough of Solihull, Parish of Bickenhill—
-
Work No. 3/19B - A road commencing at a point 320 metres south-east
50of the bridge carrying A452 Chester Road over Packington Lane andHigh Speed Rail (London - West Midlands) BillPage 74
terminating at a point 200 metres south of that bridge. Work No. 3/
19B includes a bridge over Work No. 3/19B.
Metropolitan Borough of Solihull, Parish of Bickenhill—
-
Work No. 3/19C - A road commencing in the A452 Chester Road at a
5point 240 metres north-west of the bridge carrying that road over
Hollywell Brook and terminating by a junction with Work No. 3/19B
at a point 200 metres south of the bridge carrying the A452 Chester
Road over Packington Lane; -
Work No. 3/20 - An elevated People Mover commencing at a point 185
10metres north-west of the centre of the Airport Way and Hermes Road
roundabout at Birmingham International Airport passing eastwards
over Vanguard Road, Bickenhill Lane, Birmingham International
Station, Pendigo Way, Eastway, the M42 Motorway and Middle
Bickenhill Lane and terminating at a point 498 metres south of the
15junction of Middle Bickenhill Lane with the A452 Chester Road; -
Work No. 3/20A - An elevated People Mover commencing by a
junction with Work No. 3/20 at a point 110 metres west of the
crossing of Middle Bickenhill Lane over Hollywell Brook passing
eastwards then south-eastwards and terminating at a point 137
20metres north-east of the junction of the Eastway Link Road with
Eastway. Work No. 3/20A includes a depot for the proposed People
Mover; -
Work No. 3/21 - A realignment of Pendigo Way, commencing at a
point 40 metres south of its junction with Eastway and terminating
25at a point 115 metres north of that junction; -
Work No. 3/21A - A realignment of Eastway, commencing at a point 70
metres east of its junction with Pendigo Way and terminating by a
junction with Work No. 3/21 at a point 62 metres north-west of its
junction with Pendigo Way; -
30Work No. 3/22 - A diversion of the A452 Chester Road commencing at
a point 155 metres north-west of the bridge carrying the A452
Chester Road over Packington Lane and terminating at a point 360
metres south-west of the centre of the roundabout carrying the
A446/A452 over the M42 motorway. Work No. 3/22 includes
35bridges over the M42 motorway and the A446 Stonebridge Road; -
Work No. 3/22A - A realignment of Northway commencing by a
junction with Works Nos. 3/22B and 3/22C at a point 58 metres
north-east of the centre of the B4438/Northway roundabout and
terminating at a point 170 metres south of that roundabout; -
40Work No. 3/22B - A realignment of the B4438 Road commencing by a
junction with Works Nos. 3/22A and 3/22C at a point 58 metres
north-east of the centre of the B4438/Northway roundabout and
terminating at a point 150 metres west of that roundabout; -
Work No. 3/22C - A realignment of the access road to the Holiday Inn
45Express (Birmingham NEC) hotel, commencing at a point 58 metres
north-east of the centre of the B4438/Northway roundabout and
terminating at a point 95 metres west of that roundabout; -
Work No. 3/22D - A realignment of Solihull Parkway commencing by
a junction with Work No. 3/22 at a point 100 metres west of the
50centre of the A452/A446/B4438 roundabout over the M42
Motorway and terminating at a point 160 metres west of its
commencement; -
Work No. 3/22E - A diversion of the A452 Chester Road commencing
at a point 20 metres north of the junction of Middle Bickenhill Lane
with the A452 Chester Road and terminating by a junction with
Work No. 3/22 at a point 110 metres south-west of the bridge
5carrying the A452 Chester Road over the A446 Stonebridge Road.
High Speed Rail (London - West Midlands) BillPage 75
Metropolitan Borough of Solihull, Parish of Bickenhill, County of
Warwickshire, District of North Warwickshire, Parish of Little Packington—
-
Work No. 3/22F - An access road commencing by a junction with
Works Nos. 3/22 and 3/22G at a point 200 metres west of bridge
10carrying the A452 Chester Road over the A446 Stonebridge Road and
terminating by a junction with the existing access to the Quartz Point
Business Park at a point 75 metres east of the junction of that access
with the A452 Chester Road.
Metropolitan Borough of Solihull, Parish of Bickenhill, County of
15Warwickshire, District of North Warwickshire, Parishes of Coleshill and
Little Packington—
-
Work No. 3/22G - A diversion of the A452 Chester Road and the A446
commencing by a junction with Works Nos. 3/22 and 3/22F at a
point 200 metres west of the bridge carrying the A452 Chester Road
20over the A446 Stonebridge Road and terminating at a point 400
metres north-east of the centre of the A452/A446/B4438 roundabout
over the M42 Motorway.
Metropolitan Borough of Solihull, Parish of Bickenhill, County of
Warwickshire, District of North Warwickshire, Parish of Little Packington—
-
25Work No. 3/23 - A diversion of a watercourse commencing at a point
390 metres south-west of the bridge carrying the A452 Chester Road
over the A446 Stonebridge Road and terminating by a junction with
that watercourse at a point 310 metres north-west of the bridge
carrying the A452 Chester Road over Packington Lane.
30County of Warwickshire, District of South Warwickshire, Parish of
Coleshill—
-
Work No. 3/24 - A widening of the bridge carrying the northbound
carriageway of the A446 Stonebridge Road over the M6 Motorway to
M42 Motorway Link Road commencing at a point 110 metres south
35of the centre of the roundabout over the M6 Motorway and
terminating at a point 100 metres south-west of that roundabout; -
Work No. 3/24A - A widening of the south-western side of the junction
of the A446 Stonebridge Road and the M6 Motorway between points
20 metres south-west and 120 metres south-east of that junction; -
40Work No. 3/24B - A widening of the north-western side of the junction
of the A446 Stonebridge Road and the M6 Motorway between points
90 metres north and 145 metres west of that junction.
Metropolitan Borough of Solihull, Parishes of Bickenhill and Chelmsley
Wood, County of Warwickshire, District of North Warwickshire, Parish of
45Coleshill—
-
Work No. 3/25 - A railway (5.27 kilometres in length) partly on viaduct
commencing by a junction with the termination of Work No. 3/1
passing northwards and terminating at a point 195 metres west of the
roundabout junction in Coleshill Industrial Estate. Work No. 3/25
50includes bridges over Works Nos. 3/26, 3/28 and 3/151 and
viaducts over the M6 Motorway, M6 Motorway Slip Road, M6-M42High Speed Rail (London - West Midlands) BillPage 76
Link Road, M42 Motorway, M6/M42 Motorway, Coleshill Brook,
Works Nos. 3/26B, 3/26C, 3/26D, 3/27A, 3/29, 3/32 and 3/32B.
Metropolitan Borough of Solihull, Parishes of Bickenhill and Chelmsley
Wood—
-
5Work No. 3/26 - A realignment of Coleshill Heath Road commencing
at a point 20 metres north-east its junction with Yorkminster Drive
and terminating at a point 145 metres north-east of its
commencement; -
Work No. 3/26A - An access road commencing by a junction with
10Work No. 3/26 at a point 145 metres north-east of the junction of
Yorkminster Drive with Coleshill Heath Road and terminating at a
point 80 metres south-east of its commencement.
County of Warwickshire, District of North Warwickshire, Parish of
Coleshill—
-
15Work No. 3/26B - A diversion of a watercourse commencing at a point
180 metres north-east of the intersection of the M42/M6 eastbound
link and the M6 eastbound off slip road and terminating at a point
125 metres north-west of its commencement; -
Work No. 3/26C - A diversion of a watercourse commencing at a point
20195 metres north of the intersection of the M42/M6 eastbound link
and the M6 eastbound off slip road and terminating at a point 232
metres north-east of its commencement; -
Work No. 3/26D - A diversion of a watercourse commencing at a point
230 metres north of intersection of the M42/M6 eastbound link and
25the M6 eastbound off slip road and terminating by a junction with
Work No. 3/26C at a point 45 metres east of its commencement; -
Work No. 3/27 - A gas main diversion commencing beneath a point 200
metres north-west of the intersection of the M42/M6 eastbound link
and the M6 eastbound off slip road and terminating beneath a point
30235 metres west of the junction of Footpath M72 with Footpath M76; -
Work No. 3/27A - A diversion of a watercourse commencing at a point
255 metres south-west of the junction of Footpath M72 with Footpath
M76 and terminating at a point 350 metres south-west of that
junction; -
35Work No. 3/28 - A diversion of Birmingham Road commencing at a
point 7 metres south-west of the bridge carrying that road over the
River Cole and terminating at a point 13 metres south-west of its
junction with Manor Drive; -
Work No. 3/28A - A diversion of Manor Road commencing by a
40junction with Work No. 3/28 at a point 40 metres north-east of the
bridge carrying Birmingham Road over the River Cole and
terminating at a point 185 metres south-east of the junction of South
Drive with Manor Drive. Work No. 3/28A includes a bridge over
Work No. 3/29; -
45Work No. 3/28B - A temporary diversion of Birmingham Road
commencing at a point 25 metres north-east of the bridge carrying
that road over the River Cole and terminating at a point 512 metres
south-east of the bridge carrying Manor Drive over the River Cole; -
Work No. 3/29 - A diversion of the River Cole commencing at a point
50210 metres south-east of the junction of South Drive with Manor
Drive and terminating at a point 300 metres south-west of the bridge
carrying Footpath M56 over the River Cole; -
Work No. 3/30 - A temporary bridge over the M42 motorway
commencing at a point 312 metres south-west of the bridge carrying
Footpath M56 over the River Cole and terminating at a point 70
metres north-east of its commencement; -
5Work No. 3/31 - A sewer diversion commencing beneath a point 260
metres west of the bridge carrying Footpath M56 over the River Cole
and terminating beneath a point 360 metres south-east of the junction
of Gilson Drive with Gilson Road; -
Work No. 3/32 - A diversion of Gilson Road commencing at a point 285
10metres south-east of its junction with Gilson Drive and terminating
at a point 20 metres north-west of its junction with Footpath M63; -
Work No. 3/32A - A diversion of Gilson Drive commencing by a
junction with Work 3/32 at a point 230 metres south of its junction
with Gilson Road and terminating at a point 100 metres south of its
15commencement; -
Work No. 3/32B - A diversion of a watercourse commencing at a point
165 metres south-east of the junction of Gilson Drive with Gilson
Road and terminating at a point 25 metres south-east of that junction; -
Work No. 3/32C - A diversion of a watercourse commencing at a point
20285 metres south-east of the junction of Gilson Drive with Gilson
Road and terminating at a point 40 metres north-west of its
commencement; -
Work No. 3/33 - A footbridge to carry Footpaths M60 and M62 over
Work No. 3/25 commencing at a point 115 metres north of the
25junction of Gilson Drive with Gilson Road and terminating at a point
80 metres east of its commencement; -
Work No. 3/34 - A diversion of a sewer commencing beneath a point
265 metres south-west of the junction of Footpath M62 with the A446
Lichfield Road and terminating at a point 495 metres north-west of
30its commencement.
High Speed Rail (London - West Midlands) BillPage 77
Parishes of Coleshill, Water Orton and Curdworth—
-
Work No. 3/35 - A spur railway (3.35 kilometres in length) partly on
viaduct commencing by a junction with the termination of Work No.
3/25 and the commencement of Work No. 3/36, passing northwards
35and terminating at a point 240 metres north-west of the junction of
Marston Lane with the A4097 Kingsbury Road. Work No. 3/35
includes viaducts over the A446 Lichfield Road, Birmingham to
Nuneaton Line, River Tame, Minworth Effluent Conduit,
Birmingham and Derby Line, Work No. 3/39B and a bridge over
40Work No. 3/41.
Parishes of Coleshill, Water Orton, Curdworth, Lea Marston, Kingsbury and
Middleton—
-
Work No. 3/36 - A railway (4.95 kilometres in length) partly on viaduct
commencing by a junction with the termination of Work No. 3/25
45and the commencement of Work No. 3/35, passing northwards and
terminating at a point 600 metres north-west of the junction of
Bridleway T18 with Bridleway T154. Work No. 3/36 includes
viaducts over the A446 Lichfield Road, Birmingham to Nuneaton
Line, River Tame, Minworth Effluent Conduit, Birmingham and
50Derby Line, M42 Motorway, Birmingham and Fazeley Canal, Work
No. 3/39B and bridges over Works Nos. 3/41, 3/40 and Byway T179.
Parish of Water Orton—
-
Work No. 3/37 - A sewer diversion commencing beneath a point 90
metres north-east of the junction of Watton Lane with the A446
Lichfield Road and terminating beneath a point 260 metres north of
the junction of the access to Bromwich Court with the A446 Lichfield
5Road.
High Speed Rail (London - West Midlands) BillPage 78
Parishes of Coleshill and Curdworth—
-
Work No. 3/38 - A diversion of a gas main commencing beneath a point
30 metres north-east of the junction of the access to Bromwich Court
with the A446 Lichfield Road and terminating beneath a point 230
10metres south-east of the bridge carrying the Birmingham and Derby
Line above the Minworth Effluent Conduit.
Parishes of Water Orton and Coleshill—
-
Work No. 3/38A - A diversion of a watercourse commencing at a point
265 metres north of the junction of Watton Lane with the A446
15Lichfield Road and terminating at a point 325 metres south of the
bridge carrying the Birmingham and Derby Line above the
Minworth Effluent Conduit.
Parish of Curdworth—
-
Work No. 3/39B - A temporary railway (0.95 kilometres in length)
20commencing by a junction with the Birmingham and Derby Line at a
point 35 metres south-west of the bridge carrying the Birmingham
and Derby Line over the Minworth Effluent Conduit passing north-
eastwards and terminating by a junction with Work No. 3/39C at a
point 310 metres south-west of the junction of the access to Hams
25Hall electricity substation with Hams Lane.
Parishes of Lea Marston, Curdworth and Kingsbury—
-
Work No. 3/39C - A temporary railway (5.12 kilometres in length)
commencing by a junction with the Birmingham and Derby Line at a
point 155 metres south-west of the bridge carrying that railway over
30the River Tame passing south-westwards and then northwards and
terminating at a point 330 metres north-east of Marston Farm Hotel.
Parishes of Curdworth and Lea Marston—
-
Work No. 3/39D - A temporary railway (1.23 kilometres in length)
commencing by a junction with Work No. 3/39C at a point 265
35metres south-west of the junction of Marston Lane with the A4097
Kingsbury Road passing north-eastwards and terminating at a point
380 metres south-west of the junction of footpath M22 with Seeneys
Lane.
Parish of Curdworth—
-
40Work No. 3/40 - A spur railway (1.90 kilometres in length)
commencing by a junction with Work No. 3/36 at a point 370 metres
north-west of the southernmost bridge carrying Faraday Avenue
over the Birmingham and Derby Line passing northwards and
terminating by a junction with the termination of Work No. 3/35 at
45a point 240 metres north-west of the junction of Marston Lane with
the A4097 Kingsbury Road. Work No. 3/40 includes a bridge over
Faraday Avenue; -
Work No. 3/41 - A realignment of Faraday Avenue commencing at a
point 25 metres south-east of the bridge carrying that road over theHigh Speed Rail (London - West Midlands) BillPage 79
Birmingham and Derby Line and terminating at a point 15 metres
east of the centre of the Lichfield Road/Faraday Road roundabout; -
Work No. 3/41A - An access road commencing at a point 110 metres
south-west of the junction of the access to Newlands Farm with
5Faraday Avenue and terminating by a junction with Work No. 3/41
at a point 60 metres north-west of the centre of the bridge carrying
Faraday Avenue over the Birmingham and Derby Line; -
Work No. 3/41B - A temporary diversion of Faraday Avenue
commencing at a point 195 metres north-west of the centre of the
10A446 Lichfield Road/Faraday Road roundabout and terminating at
a point 60 metres north-west of the centre of the bridge carrying
Faraday Avenue over the Birmingham and Derby Line; -
Work No. 3/41C - A realignment of Hams Lane commencing by a
junction with Work No. 3/41D at a point 10 metres north-east of its
15junction with Faraday Avenue and terminating at a point 380 metres
south-west of its junction with the access road to Hams Hall
electricity substation. Work No. 3/41C includes a bridge over Work
No. 3/39C; -
Work No. 3/41D - A temporary diversion of Hams Lane commencing
20by its junction with Faraday Avenue and terminating at a point 375
metres south-west of its junction with the access road to Hams Hall
electricity substation.
Parishes of Curdworth and Lea Marston—
-
Work No. 3/43 - An access road commencing at a point 80 metres
25north-east of the centre of the bridge carrying the A446 Lichfield
Road over the Minworth Effluent Conduit and terminating at a point
150 metres north-east of the junction of the access to Hams Hall
electricity substation with Hams Lane. Work No. 3/43 includes
bridges over Works Nos. 3/35, 3/36, 3/39C, 3/40, 3/41 and 3/41B.
30Parish of Curdworth—
-
Work No. 3/44 - A diversion of the A4097 Kingsbury Road
commencing at a point 110 metres north-east of its junction with the
M42 Junction 9 roundabout and terminating at a point 110 metres
south-west of its junction with Marston Lane. Work No. 3/44
35includes bridges over Works Nos. 3/35, 3/36, 3/39C and 3/40; -
Work No. 3/44A - An access road commencing at a point 75 metres
south-east of the junction of Kingsbury Road with Footpath M14 and
terminating by a junction with Work No. 3/44 at a point 255 metres
south west of the junction of Marston Lane with Kingsbury Road.
40Parishes of Curdworth and Lea Marston—
-
Work No. 3/45A - A diversion of a fuel pipeline commencing beneath
a point 20 metres west of Fox’s Bridge over the Birmingham and
Fazeley Canal and terminating beneath a point 230 metres north-east
of the junction of Marston Lane with Kingsbury Road.
45Parishes of Wishaw and Middleton—
-
Work No. 3/45B - An improvement of Cuttle Mill Lane commencing at
a point 450 metres south-east of its junction with the A4091
Tamworth Road and terminating at a point 10 metres south-east of
that junction.
50Parish of Curdworth—
-
Work No. 3/46 - A spur railway (0.07 kilometres in length)
commencing by a junction with the termination of Works Nos. 3/35
and 3/40 passing north-eastwards and terminating at a point 65
metres north-east of its commencement.
High Speed Rail (London - West Midlands) BillPage 80
5Parish of Lea Marston—
-
Work No. 3/47 - A bridge carrying Footpath M23a over Work No. 3/
39C commencing at a point 380 metres south of the Marston Farm
Hotel and terminating at a point 120 metres north-west of its
commencement.
10Parishes of Lea Marston and Kingsbury—
-
Work No. 3/47A - A diversion of a watercourse commencing at a point
310 metres north-east of Marston Farm Hotel and terminating at a
point 95 metres north-west of its commencement.
County of Warwickshire, District of North Warwickshire, Parish of
15Middleton, County of Staffordshire, District of Lichfield, Parishes of
Drayton Bassett, Hints, Weeford, Swinfen and Packington, Whittington and
Fradley and Streethay—
-
Work No. 3/48 - A railway (19.23 kilometres in length) commencing by
a junction with the termination of Work No. 3/36 passing
20northwards and terminating at a point 760 metres north-west of the
junction of Netherstowe Lane with Wood End Lane. Work No. 3/48
includes viaducts over Langley Brook, Black Brook, Cappers Lane,
the Wyrley and Essington Canal, West Coast Main Line, South
Staffordshire Line, Rykneld Street, Rykneld Street off-slip onto
25Burton Road, Trent and Mersey Canal, Works Nos. 3/89A and 3/
107A and a bridge over Work No. 3/68.
County of Warwickshire, District of North Warwickshire, Parish of
Middleton—
-
Work No. 3/49 - An access road commencing at a point 770 metres
30south-east of the junction of Bodymoor Heath Lane with the A4091
Tamworth Road and terminating at a point 610 metres north-east of
its commencement; -
Work No. 3/50 - A diversion of Bodymoor Heath Lane commencing by
a junction with Brick Kiln Lane at a point 190 metres west of its
35junction with the A4091 Tamworth Road and terminating at a point
440 metres east of that junction. Work No. 3/50 includes a bridge
over Work No. 3/48; -
Work No. 3/50A - An access road commencing at a point on Bond
Street 360 metres north-east of its junction with Bodymoor Heath
40Lane and terminating at a point 60 metres east of its commencement.Work No. 3/50B - A diversion of Brick Kiln Lane by a junction with the A4091 Tamworth Road and terminating at a point 190 metres west of that junction;
-
Work No. 3/51 - A diversion of the A4091 Tamworth Road
commencing at a point 330 metres north of its junction with Brick
Kiln Lane and terminating at a point 485 metres north of its junction
45with Park Lane. Work No. 3/51 includes a bridge over Work No. 3/
48; -
Work No. 3/51A - A diversion of Park Lane commencing at a point 205
metres south-west of its junction with the A4091 Tamworth RoadHigh Speed Rail (London - West Midlands) BillPage 81
and terminating by a junction with Work No. 3/51 at a point 125
metres north-east of its commencement; -
Work No. 3/51B - A diversion of Crowberry Lane commencing by a
junction with Work No. 3/51A at a point 110 metres south-west of its
5junction with Park Lane and terminating at a point 210 metres north-
west of its commencement; -
Work No. 3/52 - A diversion of Church Lane commencing at a point 70
metres west of its junction with Crowberry Lane and terminating at
a point 110 metres west of the bridge carrying Tamworth Road over
10Church Lane. Work No. 3/52 includes a bridge over Work No. 3/48; -
Work No. 3/52A - A spur road commencing by a junction with Work
No. 3/52 at a point 95 metres north-east of the junction of Crowberry
Lane with Church Lane and terminating at a point 135 metres east of
that junction; -
15Work No. 3/53 - A diversion of a gas main commencing beneath a point
470 metres south-west of the crossing of Footpath T15 over Gallows
Brook and terminating beneath a point 480 metres north of its
commencement; -
Work No. 3/54 - A footbridge carrying Footpath T15 over Work No. 3/
2048 commencing at a point 390 metres south-west of the crossing of
Footpath T15 over Gallows Brook and terminating at a point 230
metres north-east of its commencement.
County of Warwickshire, District of North Warwickshire, Parish of
Middleton, County of Staffordshire, District of Lichfield, Parish of Drayton
25Bassett—
-
Work No. 3/55 - A diversion of Gallows Brook commencing at a point
500 metres west of its junction with Footpath T15 and terminating at
a point 150 metres north-east of its commencement; -
Work No. 3/56 - A diversion of Gallows Brook commencing at a point
30810 metres north-west of its junction with Footpath T15 and
terminating at a point 335 metres north-west of its commencement.
County of Staffordshire, District of Lichfield, Parish of Drayton Bassett—
-
Work No. 3/57 - A diversion of Shirrall Drive commencing at a point
420 metres south-west of its junction with Drayton Lane and
35terminating by a junction with Work No. 3/58 at a point 320 metres
north of its commencement; -
Work No. 3/58 - A diversion of Drayton Lane commencing at a point
10 metres north-west of its junction with Shirrall Drive and
terminating by a junction with Work No. 3/59 at the junction of
40Sutton Road with Drayton Lane. Work No. 3/58 includes a bridge
over Work No. 3/48; -
Work No. 3/59 - A realignment of the A453 Sutton Road/Carroway
Head Hill commencing at a point 90 metres south-west of its junction
with Drayton Lane and terminating at a point 330 metres north-east
45of its commencement. Work No. 3/59 includes a bridge over Work
No. 3/48; -
Work No. 3/59A - A temporary diversion of the A453 Sutton Road/
Carroway Head Hill commencing at a point 90 metres south-west of
its junction with Drayton Lane and terminating at a point 460 metres
50north-east of its commencement; -
Work No. 3/60 - A gas main diversion commencing beneath a point 720
metres south-east of the junction of Footpath Drayton Bassett 11 withHigh Speed Rail (London - West Midlands) BillPage 82
Footpath Drayton Bassett 12 and terminating beneath a point 650
metres north-west of its commencement; -
Work No. 3/61 - A footbridge carrying Footpath Drayton Bassett 11
over Work No. 3/48 commencing at a point 370 metres north-east of
5the junction of Footpath Drayton Bassett 11 with Footpath Drayton
Bassett 12 and terminating at a point 240 metres north-east of its
commencement.
Parishes of Hints and Drayton Bassett—
-
Work No. 3/63 - A diversion of Bangley Lane commencing at a point
10300 metres north-east of the junction of Footpath Drayton Bassett 11
with Footpath Drayton Bassett 12 and terminating at a point 410
metres north-east of its commencement. Work No. 3/63 includes a
bridge over Work No. 3/48; -
Work No. 3/63B - An access road commencing by a junction with Work
15No. 3/63 at a point 370 metres north-east of the junction of Footpath
Drayton Bassett 11 with Footpath Drayton Bassett 12 and
terminating at a point 220 metres north-west of its commencement.
Parish of Hints—
-
Work No. 3/65 - A footbridge carrying Footpath Hints 14 over Work
20No. 3/48 commencing at a point 70 metres north-east of the junction
of Footpath Hints 14 with Footpath Hints 13 and terminating at a
point 320 metres north-east of its commencement; -
Work No; 3/67 - A gas main diversion commencing beneath a point 330
metres north-east of the junction of footpath Hints 13 with Hints 14
25and terminating beneath a point 490 metres north-west of its
commencement; -
Work No. 3/68 - A realignment of Brockhurst Lane commencing at a
point 510 metres north-west of the junction of Footpath Hints 13 and
Footpath Hints 14 and terminating at a point 100 metres north-east
30of its commencement; -
Work No. 3/70 - A temporary bridge over Black Brook commencing at
a point 420 metres south-east of the junction of Footpath Hints 5 with
Watling Street and terminating at a point 20 metres north-west of its
commencement; -
35Work No. 3/71 - A realignment of Watling Street commencing at a
point 120 metres south-east of its junction with Footpath Hints 5 and
terminating at a point 160 metres south-east of its commencement.
Work No. 3/71 includes a bridge over Work No. 3/48; -
Work No. 3/71A - A temporary diversion of Watling Street
40commencing at a point 350 metres south-east of its junction with
Footpath Hints 5 and terminating at a point 350 metres north-west of
its commencement.
Parishes of Hints and Weeford—
-
Work No. 3/72 - A realignment of the A5 Fazeley to Weeford New
45Road commencing at a point beneath the Flats Lane Overbridge and
terminating at its junction with the Bridleway Hints 3 crossing.
Work No. 3/72 includes a bridge over Work No. 3/48.
Parish of Hints—
-
Work No. 3/72A - A footbridge carrying Bridleway Hints 4 over the A5
50Fazeley to Weeford New Road commencing at a point 260 metresHigh Speed Rail (London - West Midlands) BillPage 83
east of the junction of Footpath Hints 5 with Watling Street and
terminating at a point 345 metres north of its commencement.
Parishes of Weeford and Swinfen and Packington—
-
Work No. 3/74 - A diversion of Flats Lane and Jerrys Lane commencing
5at a point 570 metres north-east of the junction of Flats Lane with
Watling Street and terminating at a point 305 metres north-east of the
junction of Jerrys Lane with Knox’s Grave Lane. Work No. 3/74
includes a bridge over Work No. 3/48; -
Work No. 3/75 - A road commencing by a junction with Work No. 3/
1074 at a point 170 metres south-west of the junction of Flats Lane with
Knox’s Grave Lane and terminating at a point 170 metres north-west
of its commencement; -
Work No. 3/76 - A realignment of Knox’s Grave Lane commencing at
a point 85 metres east of its junction with Flats Lane and terminating
15at a point 155 metres east of its commencement.
Parish of Swinfen and Packington—
-
Work No. 3/77A - A footbridge carrying Bridleway Swinfen and
Packington 8 over Work No. 3/48 commencing at a point 690 metres
north-west of the junction of that bridleway with Jerrys Lane and
20terminating at a point 80 metres west of its commencement; -
Work No. 3/78 - A diversion of an access road to The Bungalow
commencing at a point 810 metres north-west of the junction of
Bridleway Swinfen and Packington 8 with Jerrys Lane and
terminating by a junction with Work No. 3/79 at a point 260 metres
25south-west of the junction of the access road to Ingleyhill Farm with
Tamworth Road; -
Work No. 3/79 - A diversion of an access road commencing at a point
40 metres south-west of the junction of Bridleway Swinfen and
Packington 8 with Bridleway Swinfen and Packington 9 with
30Tamworth Road and terminating at a point 380 metres south-east of
its commencement.
Parishes of Swinfen and Packington and Whittington—
-
Work No. 3/80 - A realignment of the A51 Tamworth Road
commencing at a point 250 metres south-east of its junction with
35Bridleway Swinfen and Packington 9 and terminating at a point 130
metres north-west of its commencement. Work No. 3/80 includes a
bridge over Work No. 3/48; -
Work No. 3/80A - A temporary diversion of the A51 Tamworth Road
commencing at a point 70 metres north-west of its junction with
40Bridleway Swinfen and Packington 9 and terminating by its junction
with the access road to Ingleyhill Farm; -
Work No. 3/81 - A diversion of the access road to Freeford Home Farm
commencing at a point 50 metres south-west of its junction with
Tamworth Road and terminating by a junction with Work No. 3/
4580A at a point 50 metres north-east of its commencement.
Parish of Whittington—
-
Work No. 3/83 - A diversion of Sandy Lane commencing at a point 100
metres south-east of its junction with Lichfield Road and terminating
at a point 95 metres north-west of that junction; -
Work No. 3/84 - A realignment of Lichfield Road commencing at a
point 90 metres east of its junction with Marsh Lane and terminating
at a point 85 metres east of its commencement; -
Work No. 3/84A - A temporary diversion of Lichfield Road
5commencing at its junction with Marsh Lane and terminating at a
point 285 metres east of its commencement; -
Work No. 3/85 - A diversion of Darnford Lane commencing at a point
130 metres north-east of its junction with Marsh Lane and
terminating at a point 60 metres north-west of its junction with the
10access track to Ellfield Nurseries. Work No. 3/85 includes a bridge
over Work No. 3/48; -
Work No. 3/85A - An access road commencing by a junction with
Work No. 3/85 at a point 225 metres north-east of the junction of
Marsh Lane with Darnford Lane and terminating at a point 45 metres
15south of its commencement.
High Speed Rail (London - West Midlands) BillPage 84
Parish of Fradley and Streethay—
-
Work No. 3/86 - A diversion of the access road to the Wyrley &
Essington Canal Marina Car Park commencing at a point 255 metres
north-west of the junction of the access to Mill Farm and Cappers
20Lane and terminating at a point 90 metres east of its commencement; -
Work No. 3/87 - A realignment of Broad Lane commencing at a point
210 metres north-east of its junction with Cappers Lane and
terminating at a point 270 metres north-east of its commencement; -
Work No. 3/87A - A temporary diversion of Broad Lane commencing
25at a point 230 metres north-east of its junction with Cappers Lane and
terminating at a point 330 metres north-east of its commencement; -
Work No. 3/89 - A diversion of an access road to Manor House
commencing by a junction with Work No. 3/89A at a point 370
metres north-east of the junction of Ash Tree Lane with Burton Road
30and terminating by a junction with its existing access; -
Work No. 3/89A - A diversion of the A38 Rykneld Street northern slip
road commencing at its junction with Burton Road and terminating
at a point 310 metres south-west of its junction with the access road
to Orchard Farm; -
35Work No. 3/89B - A temporary road commencing by a junction with
the A38 Rykneld Street at a point 50 metres north-east of the bridge
carrying that road over the West Coast Main Line and terminating at
a point 410 metres north-east of its commencement; -
Work No. 3/90 - A diversion of Mare Brook commencing at a point 430
40metres south-west of the junction of the access road to Orchard Farm
with Rykneld Street and terminating at point 130 metres south-west
of its commencement; -
Work No. 3/91 - A diversion of Mare Brook commencing at a point 500
metres south-west of the junction of Nanseawen Road with Wood
45End Lane and terminating at a point 255 metres north-west of its
commencement; -
Work No. 3/91A - An access road commencing at a point 180 metres
south-west of the roundabout at the end of Nanseawen Road and
terminating at a point 15 metres south-west of that roundabout.
50Parishes of Fradley and Streethay, King’s Bromley and Armitage with
Handsacre—
-
Work No. 3/93 - A railway (6.22 kilometres in length) commencing by
a junction with Work No. 3/48 at a point 494 metres south-west of
the junction of Nanseawen Road with Wood End Lane passing
north-westwards and terminating by a junction with Works Nos. 3/
5104 and 3/106 at a point 180 metres north-east of the junction of
Rowan Drive with Lichfield Road. Work No. 3/93 includes viaducts
over the Trent and Mersey Canal, Pyford Brook, Bourne Brook and
bridges over Works Nos. 3/95, 3/103, 3/103B and 3/106.
High Speed Rail (London - West Midlands) BillPage 85
Parishes of Fradley and Streethay and King’s Bromley—
-
10Work No. 3/94 - A railway (2.63 kilometres in length) commencing by
a junction with Work No. 3/48 at a point 494 metres south-west of
the junction of Nanseawen Road with Wood End Lane passing
north-westwards and terminating by a junction with Work No. 3/93
at a point 575 metres north-east of the junction of Watery Lane with
15Wood End Lane. Work No. 3/94 includes viaducts over the Trent
and Mersey Canal and Pyford Brook and bridges over Works Nos.
3/95 and 3/48.
Parish of Fradley and Streethay—
-
Work No. 3/95 - A diversion of Wood End Lane commencing by its
20junction with Gorse Lane and terminating at a point 270 metres
north-west of its junction with Netherstowe Lane; -
Work No. 3/95A - An access road commencing at a point 560 metres
south-east of the junction of Netherstowe Lane with Wood End Lane
and terminating by a junction with Work No. 3/95 at a point 335
25metres south-east of that junction; -
Work No. 3/96 - A diversion of an access road commencing by a
junction with Work No. 3/95 at a point 60 metres south-west of the
junction of Gorse Lane with Wood End Lane and terminating at a
point 150 metres north-east of the junction of Netherstowe Lane with
30Wood End Lane; -
Work No. 3/97 - A diversion of Netherstowe Lane commencing by a
junction with Work No. 3/95 at a point 170 metres south-west of its
junction with Wood End Lane and terminating at a point 310 metres
south-west of that junction; -
35Work No. 3/98 - A temporary bridge over the Trent and Mersey Canal
commencing at a point 490 metres north-west of the junction of
Netherstowe Lane with Wood End Lane and terminating 40 metres
north-west of its commencement.
Parish of King’s Bromley—
-
40Work No. 3/99 - A temporary bridge over the Trent and Mersey Canal
commencing at a point 100 metres north-west of Woodend Lock
Cottage and terminating at a point 65 metres north-west of its
commencement; -
Work No. 3/100 - A diversion of an access road to Ravenshaw Cottage
45commencing at a point 220 metres north-west of Ravenshaw Cottage
and terminating at a point 80 metres south-east of its junction with
Lichfield Road; -
Work No. 3/100A - A gas main diversion commencing beneath a point
390 metres north-west of the junction of Footpath King’s Bromley
500.392 with Wood End Lane and terminating beneath a point 185
metres north-west of Ravenshaw Cottage; -
Work No. 3/103 - A realignment of the A515 Lichfield Road
commencing at a point 170 metres north-east of its junction with
Wood End Lane and terminating at a point 230 metres north-east of
its commencement; -
5Work No. 3/103B - A temporary diversion of the A515 Lichfield Road
commencing at a point 50 metres north of its junction with Wood
End Land and terminating at a point 430 metres north-east of its
commencement; -
Work No. 3/103C - An access road commencing at a point 50 metres
10south of the junction of Wood End Lane with Lichfield Road and
terminating at a point 200 metres south-west of the junction of
Tuppenhurst Lane with Shaw Lane.
High Speed Rail (London - West Midlands) BillPage 86
Parishes of Armitage with Handsacre and King’s Bromley—
-
Work No. 3/104 - A diversion of the West Coast Main Line (1.90
15kilometres in length) commencing at a point 20 metres north-west of
the bridge carrying Shaw Lane over that railway, passing north-
westwards and terminating at a point 20 metres south-east of the
bridge carrying the B5014 over that railway.
Parish of King’s Bromley—
-
20Work No. 3/105 - A realignment of the access road south-west of Shaw
Lane commencing at a point 330 metres south-west of the junction of
Tuppenhurst Lane with Shaw Lane and terminating at a point 55
metres south-west of its commencement.
Parishes of King’s Bromley and Armitage with Handsacre—
-
25Work No. 3/106 - A diversion of the West Coast Main Line (3.11
kilometres in length) commencing at a point 20 metres north of the
bridge carrying the A575 Lichfield Road over that railway passing
north-westwards and terminating at a point 22 metres south-east of
the bridge carrying that railway over the A513 New Road.
30Parish of Fradley and Streethay—
-
Work No. 3/107A - A temporary railway (3.25 kilometres in length)
commencing by a junction with the West Coast Main Line at a point
110 metres west of Huddlesford Bridge carrying that railway over
the Coventry Canal passing northwards and terminating by a
35junction with the South Staffordshire Line at a point 265 metres
south-west of the bridge carrying Brookhay Lane over that canal.
Work No. 3/107A includes a bridge over the Coventry Canal; -
Work No. 3/107B - A temporary spur railway (1.00 kilometre in length)
commencing by a junction with Work No. 3/107A at a point 436
40metres east of the bridge carrying the A38 Rykneld Street over the
West Coast Main Line and terminating by a junction with that work
at a point 200 metres north-east of the bridge carrying the A38
Rykneld Street over the South Staffordshire Line; -
Work No. 3/107C - A temporary spur railway (0.69 kilometres in
45length) commencing by a junction with Work No. 3/107A at a point
1120 metres south-west of the bridge carrying Brookhay Lane over
the Coventry Canal passing north-eastwards and terminating at a
point 450 metres south-west of that bridge.
Parish of Colton—
-
Work No. 3/109 - An improvement of the Chase Line and a
realignment of the West Coast Main Line (2.47 kilometres in length)
commencing by a junction with the Chase Line at a point 30 metres
north of the bridge carrying that line over the river Trent, passing
5north-westwards and terminating by a junction with the West Coast
Main Line at a point 115 metres south-east of the bridge carrying that
railway over Bellamour Lane.
High Speed Rail (London - West Midlands) BillPage 87
District of Stafford, Parish of Colwich—
-
Work No. 3/110 - An improvement of the North Staffordshire Line
10(1.43 kilometres in length) commencing at a point 330 metres west of
the bridge carrying Bishton Lane over that railway and the West Cost
Main Line passing westwards and terminating at a point 10 metres
south-east of the bridge carrying the North Staffordshire Line over
Meadow Lane; -
15Work No. 3/111 - An improvement of the West Coast Main Line at
Colwich Junction (0.43 kilometres in length) commencing at a point
300 metres south-west of the bridge carrying the A51 Lichfield Road
over that railway passing south-westwards and terminating at a
point 225 metres east of the bridge carrying Meadow Lane over that
20railway.
District of Lichfield, Parish of Curborough and Elmhurst—
-
Work No. 3/112 - A railway siding on the West Coast Main Line (2.82
kilometres in length) commencing at a point 750 metres north-west
of Burton Road overbridge, passing north-westwards and
25terminating at a point 670 metres north-west of the footbridge
carrying Footpath Curborough and Elmhurst over that railway.
County of Warwickshire, District of North Warwickshire, Parishes of
Coleshill and Water Orton—
-
Work No. 3/151 - A railway (4.19 kilometres in length) partly on
30viaduct commencing at a point 260 metres north-east of the bridge
junction of the M6 Junction 4 Eastbound Off Slip Road and the M42/
M6 Eastbound Link passing northwards and terminating at a point
160 metres north-east of the subway beneath the M6 Motorway.
Work No. 3/151 includes viaducts over Coleshill Brook, M6-M42
35Motorway Link, Works Nos. 3/27A, 3/29, 3/153 and bridges over
Work No. 3/28; -
Work No. 3/152 - A railway (4.12 kilometres in length) partly on
viaduct commencing at a point 280 metres north of the bridge
junction of the M6 Junction 4 Eastbound Off Slip Road and the M42/
40M6 Eastbound Link passing northwards and terminating at a point
160 metres north-east of the subway beneath the M6 Motorway.
Work No. 3/152 includes viaducts over Coleshill Brook, M6-M42
Motorway Link, Works Nos. 3/27A, 3/29, 3/155 and bridges over
Work No. 3/28.
45Parishes of Curdworth, Coleshill and Water Orton—
-
Work No. 3/153 - A railway (3.35 kilometres in length) partly on
viaduct commencing by a junction with Works Nos. 3/35 and 3/36
at a point 320 metres west of the southernmost bridge carrying
Faraday Avenue over the Birmingham and Derby Line, passing
50westwards and terminating at a point 160 metres north-east of the
subway beneath the M6 Motorway. Work No. 3/153 includes aHigh Speed Rail (London - West Midlands) BillPage 88
viaduct over the Birmingham and Derby Line, Minworth Effluent
Conduit, the River Tame, the Birmingham to Nuneaton Line, A446
Lichfield Road, Gilson Road, M6/M42 Link Southbound, M42
Motorway/M6 Toll, Works Nos. 3/36 and 3/39B; -
5Work No. 3/154 - A railway (3.28 kilometres in length) partly on
viaduct commencing by a junction with Works Nos. 3/35 and 3/36
at a point 320 metres west of the southernmost bridge carrying
Faraday Avenue over the Birmingham and Derby Line, passing
westwards and terminating at a point 160 metres north-east of the
10subway beneath the M6 Motorway. Work No. 3/154 includes a
viaduct over the Birmingham and Derby Line, Minworth Effluent
Conduit, the River Tame, the Birmingham to Nuneaton Line, A446
Lichfield Road, Gilson Road, M6/M42 Link Southbound, M42
Motorway/M6 Toll, Works No 3/39B.
15Parishes of Coleshill and Water Orton—
-
Work No. 3/155 - A road forming an extension to Attleboro Road
commencing at a point 360 metres north-west of the junction of
Footpath M57 with Footpath M54 and terminating at a point 50
metres south-east of its junction with the southern access to
20Attleboro Farm.
Parish of Coleshill—
-
Work No. 3/155A - A diversion of a watercourse commencing at a
point 285 metres east of the junction of Footpath M57 with Footpath
M54 and terminating at a point 35 metres south of that junction.
25Parishes of Coleshill and Water Orton—
-
Work No. 3/155B - A diversion of a watercourse commencing at a point
155 metres south-east of the junction of Gypsy Lane with Coleshill
Road and terminating at a point 155 metres north-east of junction of
the A452 Chester Road with Lanchester Way; -
30Work No. 3/155C - A diversion of a watercourse commencing by a
junction with Work No. 2/155B at a point 240 metres south of the
junction of Gypsy Lane with Coleshill Road and terminating at a
point 280 metres north-west of its commencement.
Parish of Water Orton—
-
35Work No. 3/156 - A diversion of Attleboro Lane commencing at a point
100 metres north of its junction with the northern access road to
Attleboro Farm and terminating at a point 465 metres north of that
junction. Work No. 3/156 includes bridges over Works Nos. 3/151,
3/152, 3/153 and 3/154.
40County of Warwickshire, District of North Warwickshire, Parish of Water
Orton, City of Birmingham—
-
Work No. 3/157 - A railway (1.13 kilometres in length) partly on
viaduct commencing by a junction with the termination of Works
Nos. 3/151, 3/152, 3/153 and 3/154 passing westwards and
45terminating by a junction with Work No. 3/200 at a point 317 metres
north-west of the bridge carrying Water Orton Road over the M6
Motorway; -
Work No. 3/158 - A diversion of a fuel pipeline commencing beneath a
point 350 metres east of the junction of the A452 with LanchesterHigh Speed Rail (London - West Midlands) BillPage 89
Way and terminating beneath a point 305 metres north-west of the
entrance to the Twisted Oak Riding Stables.
City of Birmingham—
-
Work No. 3/159 - A realignment of Water Orton Road commencing at
5a point 155 metres south-west of the entrance to the Twisted Oak
Riding Stables and terminating at a point 170 metres south-west of
its commencement; -
Work No. 3/159A - A temporary diversion of Water Orton Road
commencing at a point 190 metres south-west of the entrance to the
10Twisted Oak Riding Stables and terminating at a point 125 metres
south-west of its commencement; -
Work No. 3/159B - A diversion of an access road to Park Hall Estate
commencing by a junction with Work No. 3/159 at a point 295
metres south-west of the entrance to the Twisted Oak Riding Stables
15and terminating at a point 285 metres west of its commencement; -
Work No. 3/200 - A railway (2.06 kilometres in length) commencing by
a junction with Work No. 3/157 at its termination, passing generally
westwards and terminating at a point 165 metres south of the
junction of Cadbury Drive and Beale Close. Work No. 3/200 includes
20a viaduct over Work No. 3/202 and bridge over a Work No. 3/202A; -
Work No. 3/201 - A diversion of a fuel pipeline beneath a point 205
metres south-west of the bridge carrying the Birmingham and Derby
Line over the River Tame and terminating beneath a point 200 metres
south-east of the junction of Lancaster Drive with Blenheim Way; -
25Work No. 3/202 - A diversion of the River Tame commencing at a point
505 metres west of the bridge carrying the Birmingham and Derby
Line over the River Tame and terminating at a point 210 metres east
of the junction of Orton Way with Tameside Drive; -
Work No. 3/202A - A diversion of Plants Brook commencing by a
30junction with Work No. 3/202 at a point 72 metres south-east of the
culvert carrying Plants Brook beneath the Birmingham and Derby
Line and terminating at the southern end of that culvert; -
Work No. 3/202B - A diversion of the Dunlop Channel commencing by
a junction with Work No. 3/202 at a point 140 metres south-east of
35the of the culvert carrying Dunlop Channel beneath the Birmingham
and Derby Line and terminating at a point 165 metres south-east of
the junction of Lancaster Drive with Blenheim Way; -
Work No. 3/202C - An access road commencing at a point 245 metres
west of the bridge carrying the Birmingham to Derby Line over
40Plants Brook and terminating by a junction with Javelin Avenue at a
point 140 metres north-west of its commencement; -
Work No. 3/203 - A railway (2.86 kilometres in length, in tunnel)
commencing by a junction with Work No. 3/200 at its termination,
passing westwards and terminating by a junction with Work No. 3/
45205 at a point 245 metres north-west of the junction of Wolsey Drive
and Bromford Lane; -
Work No. 3/204 - A diversion of a sewer commencing beneath a point
190 metres east of the junction of Tameside Drive with the A452
Chester Road and terminating beneath a point 15 metres south of the
50junction of Kenrick Croft with Cadbury Drive; -
Work No. 3/204A - A diversion of a high pressure gas main
commencing beneath a point 150 metres north east of the junction ofHigh Speed Rail (London - West Midlands) BillPage 90
Bromford Drive with Ayala Croft and terminating beneath a point
250 metres north-west of the junction of Ayrshire Close with
Bromford Drive; -
Work No. 3/205 - A railway (5.09 kilometres in length) partly on
5viaduct commencing by a junction with Work No. 3/203 at its
termination, passing south-westwards and terminating at a point
545 metres north-west of the junction of Freeman Street with Park
Street; Work No. 3/205 includes a bridge over the Grand Union
Canal and a new station (Curzon Street); -
10Work No. 3/205A - A railway (2.41 kilometres in length) commencing
by a junction with Work No. 3/205 at a point 190 metres south-east
of the junction of the access road to Hurricane Park with Heartlands
Parkway, passing westwards then south-westwards and
terminating by a junction with Work No. 3/205 at a point 165 metres
15south-west of the junction of Crawford Street with Cranby Street.
Work No. 3/205A includes a bridge over the Grand Union Canal; -
Work No. 3/205B - A railway (1.51 kilometres in length) commencing
at a point 80 metres north-east of the western limit of Wolseley Drive,
passing westwards then south-westwards and terminating by a
20junction with Work No. 3/205A at a point 160 metres north of the
junction of Arley Road with Aston Church Road; -
Work No. 3/206 - A realignment of Wolseley Drive commencing at the
junction of that road with Bromford Lane and terminating at a point
132 metres west of its commencement; -
25Work No. 3/207 - Protective works to the bed of the River Tame
commencing at a point 170 metres north-west of the junction of
Wolseley Drive with Bromford Lane and terminating at a point 110
metres south-west of the junction of Heartlands Parkway and
Bromford Lane; -
30Work No. 3/208 - A diversion of Washwood Heath Brook commencing
at a point 100 metres north-west of the junction of Wolseley Drive
with Bromford Lane and terminating at a point 60 metres south of
the northern limit of Common Lane; -
Work No. 3/208A - A diversion of Washwood Heath Brook
35commencing by a junction with Work No. 3/208 at a point 369
metres south-west of the western limit of Wolseley Drive and
terminating at a point 44 metres south of its commencement; -
Work No. 3/209 - A railway (1.35 kilometres in length) commencing at
a point 60 metres north-east of the western limit of Wolseley Drive,
40passing westwards and terminating by a junction with Work No. 3/
205B at a point 209 metres north-east of the junction of Arley Road
with Aston Church Road; -
Work No. 3/209A - A railway (2.66 kilometres in length) commencing
at a point 80 metres north-east of the western limit of Wolseley Drive,
45passing westwards then southwards and terminating by a junction
with Work No. 3/205A at a point 134 metres north-west of the
junction of Crawford Street with Cranby Street; -
Work No. 3/209B - A railway (0.75 kilometres in length) commencing
by a junction with Work No. 3/209A at a point 296 metres south of
50the junction of Hurricane Park Access with Heartlands Parkway
passing south-westwards and terminating at a point 445 metres
south-west of the northern limit of Common Lane; -
Work No. 3/210 - A railway (1.69 kilometres in length) being a
realignment of Washwood Heath through siding of the Birmingham
and Derby Line, commencing at a point 332 metres south-east of the
junction of Hurricane Park Access with Heartlands Parkway,
5passing westwards and terminating at a point 179 metres west of the
junction Arley Road with Aston Church Road; -
Work No. 3/211 - A diversion of a sewer commencing in Common
Lane beneath a point 85 metres south of the northern limit of
Common Lane and terminating beneath a point 170 metres south-
10west of the junction of Chartist Road with Arley Road; -
Work No. 3/212 - A diversion of a sewer commencing in Pennine Way
beneath a point 320 metres north-west of the roundabout junction of
Washwood Heath Road, Alum Rock Road, Adderley Road and High
Street and terminating beneath a point 195 metres north-west of the
15roundabout junction of Pembroke Way with Pennine Way; -
Work No. 3/215 - A realignment of Aston Church Road commencing at
a point 125 metres south-east of the junction of Arley Road with that
road and terminating at the junction of that road with Heartlands
Parkway. Work No. 3/215 includes bridges over Works Nos. 3/217,
203/205, 3/205A and 3/209A and the Birmingham and Derby Line
railway; -
Work No. 3/215A - Alteration of the level of Arley Road commencing
by a junction with Work No. 3/215 in Aston Church Road and
terminating in Arley Road at a point 80 metres south of its
25commencement; -
Work No. 3/215B - An access road commencing by a junction with
Work No. 3/215 at a point 30 metres west of the junction of Arley
Road with Aston Church Road and terminating at a point 65 metres
north of that junction; -
30Work No. 3/216 - A partial reconstruction and extension of the bridge
carrying the Stechford and Aston Line over the Birmingham and
Derby Line commencing at a point 65 metres north-west of the
junction of Arley Road with Aston Church Road and terminating at
a point 55 metres south-east of the bridge carrying the Stechford and
35Aston Line over Watson Road; -
Work No. 3/217 - A diversion of the River Rea Overflow Channel
commencing at a point 35 metres north of the junction of Watson
Road East with Heartlands Parkway and terminating at a point 240
metres south-west of the roundabout junction of Heartlands
40Parkway with Aston Church Road; -
Work No. 3/217A - A diversion of a gas main commencing at a point
155 metres north-east of the Aston Church Road/Heartlands
Parkway roundabout and terminating at a point 300 metres south-
west of that roundabout; -
45Work No. 3/218 - A railway (0.84 kilometres in length) commencing at
a point 20 metres east of the bridge carrying the Birmingham and
Derby Line over the Grand Union Canal continuing in a generally
southerly direction and terminating at a point 205 metres south of
the bridge carrying Duddeston Mill Road over the Birmingham and
50Derby Line; -
Work No. 3/219 - A diversion of a sewer commencing beneath a point
160 metres west of the junction of Crawford Street with Cranby
Street and terminating in Duddeston Mill Road beneath a point 40High Speed Rail (London - West Midlands) BillPage 92
metres east of the bridge carrying that road over the Birmingham
and Derby Line;Work No. 3/220 - A realignment of Washwood Heath Road, High Street and Saltley Viaduct, including replacement of the existing Saltley viaduct commencing at a point 40 metres north-east of the centre of the Alum Rock Road/Adderley Road/High Street roundabout and terminating at a point 35 metres east of the Mainstream Way/Saltley Road/Nechells Place/Heartlands Parkway roundabout;
-
Work No. 3/220A - A diversion of Pennine Way commencing by a
5junction with Work No. 3/220 at High Street and terminating in
Pembroke Way at a point 130 metres north of the junction of
Crawford Street with High Street; -
Work No. 3/220B - A realignment of Pembroke Way commencing in
that road at a point 25 metres north-west of its roundabout junction
10with Pennine Way and terminating by a junction with Work No. 3/
220A at its termination; -
Work No. 3/221 - An access road commencing in Cranby Street at a
point 35 metres west of the bridge carrying that street over the Grand
Union Canal and terminating at a point 270 metres south-west of that
15bridge; -
Work No. 3/222 - A sewer being an overflow from the Grand Union
Canal commencing beneath a point 100 metres north of the junction
of Cranby Street with Crawford Street and terminating in the Grand
Union Canal at a point 22 metres west of its commencement; -
20Work No. 3/223 - A railway (0.24 kilometres in length) commencing by
a junction with Work No. 3/218 at a point 60 metres south of the
bridge carrying Duddeston Mill Road over the Birmingham and
Derby Line and terminating by a junction with the Birmingham and
Derby Line at Duddeston Junction at a point 300 metres south of the
25bridge carrying Duddeston Mill Road over that line; -
Work No. 3/224 - A railway (0.99 kilometres in length) being a
realignment of Duddeston Junction track layout, commencing at a
point 11 metres south of the bridge carrying the Birmingham and
Derby Line over the Grand Union Canal, continuing in a generally
30southerly direction and terminating at a point 310 metres south of
the bridge carrying Duddeston Mill Road over the Birmingham and
Derby Line; -
Work No. 3/225 - A realignment of Lawley Middleway commencing in
that road at a point 80 metres south-east of the bridge carrying that
35road over the Birmingham and Bushbury Line and terminating in
that road at a point 160 metres north-east of Curzon Circus
roundabout; -
Work No. 3/225A - A realignment of Lawley Middleway (southbound
carriageway) commencing in that road at a point 20 metres south-
40east of the bridge carrying that road over the Birmingham and
Bushbury Line and terminating by a junction with Work No. 3/225
at Curzon Circus roundabout; -
Work No. 3/225B - A realignment of Vauxhall Road and Curzon Street
commencing in Vauxhall Road at a point 125 metres north-east of
45Curzon Circus roundabout and terminating in Curzon Street at a
point 140 metres south-west of that roundabout; -
Work No. 3/225C - An access road commencing in Curzon Street by a
junction with Work No. 3/225B at a point 90 metres south-west of
Curzon Circus roundabout and terminating by a junction with Miles
Druce Way at a point 35 metres east of the bridge carrying Miles
5Druce Way over the Digbeth Branch Canal; -
Work No. 3/226 - An access road commencing in Curzon Street by a
junction with Work No. 3/227, at a point 100 metres north-east of the
junction of that street with New Canal Street and terminating by a
junction with Work No. 3/227 in New Canal Street at a point 55
10metres south of its junction with Banbury Street; -
Work No. 3/227 - A realignment of Curzon Street and New Canal
Street commencing in Curzon Street at a point 160 metres north-east
of the junction of that street with New Canal Street and terminating
at the junction of New Bartholomew Street with New Canal Street; -
15Work No. 3/228 - A diversion of a sewer commencing beneath Park
Street at a point 20 metres north of the junction of Bordesley Street
with Park Street and terminating beneath a point 15 metres west of
the western limit of Freeman Street; -
Work No. 3/229 - A diversion of a sewer commencing beneath New
20Canal Street at a point 55 metres north of the junction of that street
with Fazeley Street and terminating beneath a point 140 metres
north-east of the junction of New Canal Street with Curzon Street; -
Work No. 3/230 - A diversion of a sewer commencing beneath a point
185 metres south of the bridge carrying Duddeston Mill Road over
25the River Rea and terminating beneath a point 230 metres south-east
of the junction of Dollman Street with Alma Crescent; -
Work No. 3/231 - A diversion of a sewer commencing beneath a point
220 metres south of the junction of Alma Crescent with Dollman
Street and terminating beneath a point 60 metres east of the junction
30of Viaduct Street with Northumberland Street; -
Work No. 3/232 - A diversion of a sewer commencing beneath a point
45 metres south-east of the junction of Viaduct Street with
Northumberland Street and terminating in Viaduct Street beneath a
point 40 metres south-west of that junction; -
35Work No. 3/233 - A diversion of a sewer commencing beneath a point
60 metres south-west of the junction of Viaduct Street with
Northumberland Street and terminating beneath a point 10 metres
south-east of the junction of Viaduct Street with St James’ Place.
High Speed Rail (London - West Midlands) BillPage 91
High Speed Rail (London - West Midlands) BillPage 93
Section 2(4)
SCHEDULE 2 40Works
Part 1 Further and supplementary provisions
Authority to survey and investigate land etc
1 (1) The nominated undertaker may for the purposes of this Act—
(a)
45survey or investigate land which is within the Act limits or which
may be affected by the works authorised by this Act;
High Speed Rail (London - West Midlands) BillPage 94
(b)
take steps to protect or remove any flora or fauna on land which may
be affected by the carrying out of the works authorised by this Act.
(2) The power in sub-paragraph (1)(a) includes power to—
(a)
make trial holes in such positions as the nominated undertaker
5thinks fit on the land to investigate the nature of the surface layer and
subsoil;
(b) carry out ecological or archaeological investigations on the land;
(c) take samples of anything in or on the land.
(3)
Sub-paragraph (2)(a) does not authorise the making of trial holes in a
10carriageway or footway without the consent of the highway authority; but
such consent must not be unreasonably withheld.
(4)
Any dispute as to the giving of consent under sub-paragraph (3) must be
referred to arbitration if the parties so agree; but must otherwise be
determined by the Secretary of State.
(5)
15In connection with the exercise of the powers in sub-paragraph (1) the
nominated undertaker may—
(a)
place or leave apparatus for use in connection with those powers on,
and remove such apparatus from, land within the Act limits or land
which may be affected by the works authorised by this Act;
(b)
20enter on land within the Act limits or land which may be affected by
the works authorised by this Act,
and the land referred to in paragraphs (a) and (b) need not be the same as the
land in relation to which the powers in sub-paragraph (1) are being or are to
be exercised.
(6)
25No land may be entered, or apparatus placed or left on or removed from
land, under this paragraph unless at least 7 days’ notice has been given to
every owner and occupier of the land.
Support of buildings
2
(1)
The nominated undertaker may support or strengthen a building within the
30relevant distance of any of the works authorised by this Act if—
(a)
it is necessary or expedient, in consequence of or for the purposes of
or in connection with the construction of the work, for the building
to be supported or strengthened, and
(b)
the nominated undertaker gives at least 8 weeks’ notice to the
35owners and occupiers of the building of its intention to support or
strengthen it.
(2)
If, within 21 days of the giving of a notice under sub-paragraph (1)(b), the
person to whom the notice has been given gives to the nominated
undertaker notice disputing that the condition in sub-paragraph (1)(a) is
40met, the dispute must be referred to arbitration.
(3) If—
(a)
under sub-paragraph (2) the arbitrator decides that the condition in
sub-paragraph (1)(a) is met, and
(b) one of the parties to the dispute so requires,
45the arbitrator must prescribe how the supporting or strengthening is to be
carried out.