A34

Dr. Harris: To ask the Secretary of State for the Environment, Transport and the Regions when the A34 north of Oxford will be resurfaced under the initiative announced recently in respect of concrete roads; and what difference the new resources announced in the 10-year plan have made to the forecast timescale. [133579]

Mr. Hill: Our 10-year strategy for transport, "Transport 2010--The Ten Year Plan", has been published and sets out proposals for dealing with road noise, including the provision of quieter surfaces on over 60 per cent. of the network, including all concrete surfaces.

I have asked the Highways Agency to draw up a programme for all such trunk roads for agreement. The A34 north of Oxford will be included in this programme.

A30 (Exeter)

Dr. Harris: To ask the Secretary of State for the Environment, Transport and the Regions how the costs of the resurfacing of the A30 near Exeter recently announced by the Prime Minister will be split between the Highways Agency and the private sector. [133580]

Mr. Hill: I have asked the Chief Executive of the Highways Agency to write to the hon. Member.

Letter from Richard Thorndike to Dr. Evan Harris, dated 28 July 2000:



28 Jul 2000 : Column: 928W

M3

Mr. Hawkins: To ask the Secretary of State for the Environment, Transport and the Regions when the M3 will (a) be resurfaced and (b) have noise reduction measures provided beside it, between junctions 2 and 4a. [133226]

Mr. Hill: Our 10-year strategy for transport, "Transport 2010--The 10 Year Plan," has been published and sets out proposals for dealing with road noise, including the provision of quieter surfaces on over 60 per cent. of the network, including all concrete surfaces.

I have asked the Highways Agency to draw up a programme for all such trunk roads for agreement. Junctions 2 to 4a will be included in the programme.

Great Western Main Line

Mr. Jenkin: To ask the Secretary of State for the Environment, Transport and the Regions what the start date is for construction works on the upgrade of the Great Western Main Line cited on page 47 of his Department's Ten-Year Plan. [133503]

Mr. Hill: The upgrade options which Railtrack has set out in its Network Management Statement, and the timetable for taking them forward, will be developed in discussions between Railtrack, the shadow Strategic Rail Authority, and the train operators, in the light of consultation with appropriate industry stakeholders.

Road Improvements

Mr. Jenkin: To ask the Secretary of State for the Environment, Transport and the Regions (1) what the expected start date is for (a) the A27 Southerham- Beddington improvement, (b) the M23 junctions 8 to 9 widening, (c) the M25 junctions 15 to 16 widening, (d) the M25 junctions 16 to 19 widening, (e) the M4 junction 4B to 8/9 widening, (f) the A2 Lydden-Dover improvement, (g) the A3 Hindhead improvement, (h) the A21 Tonbridge-Pembury dualling, (i) the A27 Wilmington bypass and (j) the A27 Selmeston bypass; [133495]

28 Jul 2000 : Column: 929W

28 Jul 2000 : Column: 930W

Mr. Hill: I have asked the Chief Executive for the Highways Agency to write to the hon. Member.

Letter from Peter Nutt to Mr. Bernard Jenkin, dated 28 July 2000:




28 Jul 2000 : Column: 929W

Trunks roads in England
PQ/133495
(a)A27 Southerham-Beddington ImprovementWithdrawn--Southampton to Folkestone Study
(b)M23 Junctions 8 to 9 WideningGatwick Area Study
(c)M25 Junctions 15 to 16 WideningLondon Orbital Study
(d)M25 Junctions 16 to 19 WideningLondon Orbital Study
(e)M4 Junction 4B to 8/9 WideningLondon and Reading Study
(f)A2 Lydden-Dover ImprovementNext round of RPG
(g)A3 Hindhead ImprovementA3 Hindhead Study
(h)A21 Tonbridge-Pembury DuallngAccess to Hastings Study
(i)A27 Wilmington BypassSouthampton to Folkestone Study
(j)A27 Selmeston BypassSouthampton to Folkestone Study
PQ/133496
(a)M5 Junctions 17 to 21 WideningWithdrawn--London to South West Study and South Wales Study
(b)A31 Poole Link RoadWithdrawn, to be detrunked
(c)A36 Codford-Heystesbury ImprovementWithdrawn, to be detrunked
(d)A30/A303 Marsh Honiton and A35 Honiton Eastern BypassLondon to South West Study
(e)A38 Saltash-Stoketon Cross ImprovementLondon to South West Study
(f)A38 Dobwalls BypassLondon to South West Study
(g)A303 Illminster to Marsh ImprovementLondon to South West Study
(h) A303 Sparkford to Ilchester ImprovementLondon to South West Study
(i)A303 Wylye-Stockton Wood ImprovementLondon to South West Study
(j)A303 Chicklade Bottom-Mere ImprovementLondon to South West Study
PQ/133497
(a)M11 Junction 5 North-facing Slip Road ImprovementWithdrawn--problem for RPC
(b)M1 Junctions 10 to 14 WideningWithdrawn--London to South Midlands Study
(c)M11 Junctions 8 to 9 WideningWithdrawn--London to South Midlands Study
(d)All Fiveways to Thetford ImprovementIn TPI--Subject to Statutory Procedures (Public Consultation)
(e)All Attleborough BypassIn TPI--Subject to Statutory Procedures (Public Consultation)
(f)M1 Junctions 6A to 10 WideningLondon to South Midlands Study
(g)M11 Junction 14 ImprovementCambridge-Huntingdon Study--considered by RPC
(h)A1(M) Junctions 6 to 8 WideningLondon to South Midlands Study--considered by RPC
(i)A5 Dunstable Eastern BypassLondon to South Midlands Study--considered by RPC
(j)A14/M11 Junction 14 to M1/A1 Link ImprovementCambridge to Huntingdon Study--considered by RPC
PQ/133499
(a)A1 Gateshead Western Bypass ImprovementTynesdie Area Study
(b)M60 Junctions 12 to 18 ImprovementsM60 12-18 Study
(c)M62 Junction 6 ImprovementsWithdrawn--RPC to consider
(d)A6(M) Stockport North/South BypassWithdrawn--to be detrunked
(e)-(f)A555 Poynton Bypass/A523 Poynton BypassWithdrawn--to be detrunked
(g)A555 Manchester Airport Link West Road SchemeWithdrawn--to be detrunked
(h)A570 Ormskirk BypassWithdrawn--to be detrunked
(i)A595 Parton-Lillyhill ImprovementWithdrawn--to be detrunked
(j)A65 Gargrave BypassWithdrawn--to be detrunked
(k)A65 Hellifield and Long Preston ImprovementWithdrawn--to be detrunked
(l)A650 Hard Ings ImprovementWithdrawn--Smaller scale solution
PQ/133501
(a)M1 Junctions 31-32 WideningHA to consider smaller scale option
(b)M62 East-M606 Link RoadsTo be considered by RPC
(c)A1(M) Redhouse Ferrybridge ImprovementsSouth and West Yorkshire Motorway Box Study
(d)A63 Castle Street (Hull) ImprovementHull Study
(e)A49 Hereford BypassWithdrawn--RPC to consider
(f)M6 Junctions 11A-16 WideningWest Midlands to North West Conurbation Study
(g)M42 Junctions 3A-7 WideningWest Midlands Area Study
(h)A43 Geddington BypassWithdrawn--to be detrunked
(i)A43 Moulton-Broughton ImprovementWithdrawn--to be detrunked
(j)A46/A16 Stamford Relief RoadWithdrawn--to be detrunked
(k)A45 Weedon Flore/Upper Heyford BypassWithdrawn--to be detrunked
PQ/133506
(a)A46 Newark-Widmerpool ImprovementWithdrawn--RPC to consider
(b)M1 Junctions 25 to 28 Junction ImprovementsNorth South East Midlands Study
(c)M1 Junctions 23A to 25 Widening (including A6 to M1 Link)North South East Midlands Study
(d)M1 Junctions 21A to 23A WideningNorth South East Midlands Study
(e)A38 Derby Ring RoadA38 Derby Junction Study
(g)A52/A5111 Grade-Separated JunctionA38 Derby Junction Study
(h)A453 Clifton-M1 ImprovementA453 M1 Nottingham Study
(i)A453 Clifton Lane ImprovementA453 M1 Nottingham Study
(j)A47 Hardwick Roundabout FlyoverWithdrawn--Smaller scale solution
(k)A428 Norse Road LinkWithdrawn--Problem for RPC
PQ/133542
(a)A27 Arundel BypassSouthampton to Folkestone Study
(b)A259 Pevensey to Bexhill ImprovementAccess to Hastings Study
(c)A259 Bexhill and Hastings Western BypassAccess to Hastings Study
(d)A205 Catford Town Centre ImprovementWithdrawn--to be detrunked
(e)A4 Henlys/Waggoners' Corner ImprovementWithdrawn--small scale solution
(f)A406 Bounds Green-Green Lanes ImprovementWithdrawn--to be detrunked
(g)A406/A1/A578 Regents Park Road Junction ImprovementWithdrawn--to be detrunked
(h)A406 Golders Green Road Junction ImprovementWithdrawn--to be detrunked

28 Jul 2000 : Column: 931W

28 Jul 2000 : Column: 931W