Select Committee on Public Accounts Thirty-Second Report


Summary


Maintenance of almost[1] all of England's 9,500 kilometres of motorways and trunk roads is the responsibility of the Highways Agency (the Agency), an executive agency of the Department for Transport (the Department). The Agency has contracted out maintenance work to third parties. Managing agents investigate, design, manage and control repair work, and maintenance contractors carry out the work. In 2001-02 the Agency spent £502 million, approximately half its annual budget, or over £56,000 per kilometre, maintaining its part of the network.

On the basis of a Report by the Comptroller and Auditor General,[2] we took evidence from the Department and the Agency on the condition of the road network and delivery of the maintenance programme, and the Agency's actions to reduce disruption to the motorist caused by roadworks.

  • The condition of the motorway and trunk road network has improved. The proportion of the network at the end of its life, and therefore requiring reconstruction, has fallen from 14% in the late 1980s to around 5% currently. The surface condition has also improved. The condition of the network does, however, vary significantly between regions with just over 5% of the network in the South West requiring maintenance at March 2002 compared with 9% of the network in the North West. The Agency should set regional road condition targets and review its funding allocations to reduce variations in road conditions across the country.
  • The Agency has made significant changes to the management and delivery of the maintenance programme but needs to consider further the risks arising from these changes. The Agency has introduced lump sum contracts for routine maintenance, which carry a risk of disputes with contractors over whether desired outcomes have been achieved. The use of target prices for an agreed amount and complexity of work may lead contractors to overstate the work required to achieve higher target prices. The duration of contracts has been extended, and independent supervision of contractors' work has been removed through the merger of the roles of managing agents and maintenance contractors. The Agency should assess the risks associated with its new contracting arrangements as a whole, and set out a strategy for managing these risks.
  • The Agency is not doing enough to reduce the impact of maintenance work on the motorist. Accident rates at roadworks are much higher than elsewhere on the network, yet the Agency is only now examining whether accident rates are being reduced as a result of measures to improve safety. Although they were successful in reducing by a third the average time taken to complete maintenance work, the Agency has now largely phased out lane rentals and is replacing them with new contract arrangements in the belief that they will incentivise contractors to complete work on time and keep lanes open as much as possible during the course of the work. The Agency will need to demonstrate that these new arrangements are as effective as lane rentals in reducing the time taken to carry out maintenance work and in minimising disruption to the motorist.
  • The Agency needs to put in place more robust winter maintenance and emergency response procedures. Despite only relatively light snowfalls and access to an early warning system, one of the Agency's contractors in the East of England failed to prevent roads from icing over, causing severe disruption to the network at the end of January 2003. These problems were compounded by poor emergency response, which left many motorists stranded in their vehicles. The Agency needs to strengthen its gritting and emergency response capabilities so that motorists are never left in such a situation again.
  • The Agency's data on asset condition and maintenance history remain incomplete despite recommendations made by this Committee in 1991 and accepted by the government. In 1991 the Committee highlighted the need for better information about the condition of roadside assets such as lights and drains, but inventories remain incomplete and inaccurate, and information on assets' condition is not available nationally. A new information system was to be in place by April 1992 to remedy deficiencies in data on the maintenance history of roads but data on maintenance work remains incomplete, only covering recent major maintenance schemes. The Agency should now act on these recommendations.




1   Some 600 kilometres are managed by contractors who have designed, built, financed and now operate, as well as maintain, eight roads on the network. Back

2   C&AG's Report, Maintaining England's Motorways and Trunk Roads (HC 431, Session 2002-03) Back


 