Select Committee on Transport Written Evidence


APPENDIX 1

PERFORMANCE AGAINST TARGETS UP TO PERIOD 7, 2004-05:

BAKERLOO LINE


    —  Performance continues to improve in most areas on the Bakerloo line, improving overall by approximately 21% compared to the same period last year.

    —  The major improvements in LCH performance has been delivered chiefly through fewer track fires and the length of consequent delays.

    —  Closer working with the lift contractor, OTIS, has reduced the number of lift failures by two per period and reduced the average duration of closures from 80 minutes to 50 minutes.

CENTRAL LINE


    —  MRBCV has been successful in improving the overall Availability score for the Central Line by approx 8% compared to the same period last year.

    —  The number of incidents recorded per period has reduced by 8%.

    —  Good performance has been recorded on L&E (Lifts & Escalators), Stations, and Track Speed Restrictions (TSRs). The number of station closures caused by L&E is consistently better than target and has reduced by approximately 18%.

VICTORIA LINE


    —  Overall, Victoria line performance is at the same level experienced during 2003-04.

    —  Two improvement projects introduced to address the poor performance of signals have proved an early success. Compared to the same period last year, signal performance is approximately 9% better.

    —  Other improvement projects such as track connections and co-incidence circuit modification and relay replacement should specifically address the main causes of failure. Results are expected by year end.

WATERLOO AND CITY AND OTHER LINES


    —  Poor rolling stock and signalling performance during the last three periods affected the overall score for the Waterloo & City line during the first half of the year.

    —  Various initiatives, including signalling modifications, power facilities enhancement and centralised control are being developed to address these problems.

    —  Significant progress has been made in reducing failures which affect other lines (MRSSL & Tube Lines). To date only 13,819 LCHs have been incurred, compared with 50,832 LCHs during the same period last year—a 73% reduction.

DISTRICT LINE


    —  The District line availability has improved by 23% in the last seven periods compared to average figures in 2003-04.

    —  Performance has been consistently better than PPP benchmark with the year-end forecast expected to be better than business target.

    —  Track and Fleet activities have been the major contributors, largely as a result of improved inspections, a block joint programme and better root cause analysis and mitigation.

MCH LINE


    —  Overall availability on the MCH lines has improved by 35% compared to 2003-04 figures.

    —  This improving trend has been consistently better than PPP benchmark and business targets and this trend forecast to continue.

    —  Train reliability programmes have delivered the majority of this improvement, particularly the C-stock trains which service the Circle, Hammersmith & City and part of the District lines.

EAST LONDON LINE


    —  Performance on the East London line declined by 5% and "Other lines" 14% compared to 2003-04.

    —  The number of signal faults has increase on "Other Lines" with a peak of 60,000 LCHs in period 5. A number of programmes are underway to increase their availability, for example:

—  Enhanced inspection regime to pro-actively identify and resolve issues;

—  Track wire replacement programme in the area

—  between Barons Court and Hammersmith;

—  Lever frame contact at Rayner's Lane;

—  Strategic location of Technical Officers to ensure fast response to faults;

OTHER LINES


    —  Track reliability has improved by 60% between Barons Court and Acton Town due to an intensive improvement programme.


 