| The works which the nominated undertaker is authorised by section 1 to |
| 5 |
make and maintain are the following– |
| |
| In the City of Westminster, London Boroughs of Camden, Islington and |
| |
Tower Hamlets and City of London– |
| |
Work No. 1/3A– A railway (10,809 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/2 at its termination, |
| 10 |
passing eastwards and terminating beneath a point 140 metres west |
| |
of the junction of Stepney Green with White Horse Lane; |
| |
Work No. 1/3B– A railway (10,942 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/2 at its termination, |
| |
passing eastwards and terminating beneath a point 135 metres |
| 15 |
south-west of the junction of Stepney Green with White Horse Lane; |
| |
Works Nos. 1/3A and 1/3B include stations at Paddington, Bond |
| |
Street, Tottenham Court Road, Farringdon, Liverpool Street and |
| |
Whitechapel, shafts between Ranelagh Bridge and Westbourne |
| |
Bridge, at North Carriage Drive in Hyde Park, and at Park Lane, |
| 20 |
Fisher Street, Hanbury Street and Stepney Green; |
| |
| In the London Boroughs of Tower Hamlets and Newham– |
| |
Work No. 1/4A– A railway (5,378 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3A at its termination, |
| |
passing south-eastwards and terminating at a point 75 metres south- |
| 25 |
east of the junction of Bridgeland Road with Victoria Dock Road; |
| |
Work No. 1/4B– A railway (5,337 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3B at its termination, |
| |
passing south-eastwards and terminating at a point 80 metres south- |
| |
east of the junction of Bridgeland Road with Victoria Dock Road; |
| 30 |
Works Nos. 1/4A and 1/4B include shafts at Stepney Green, Lowell |
| |
Street, Hertsmere Road, Blackwall Way and Limmo and a station at |
| |
| |
| In the London Borough of Newham– |
| |
Work No. 1/5– A railway (2,752 metres in length) commencing by a |
| 35 |
junction with Works Nos. 1/4A and 1/4B at their termination, |
| |
continuing eastwards and through the existing Connaught Tunnel |
| |
and terminating at a point 50 metres south-east of the junction of |
| |
Winifred Street with Albert Road. Work No. 1/5 includes a station |
| |
at Custom House (being a reconfiguration of the existing North |
| 40 |
|
| |
|
| |
|
London Line Custom House Station) and alteration of the |
| |
Connaught Tunnel comprising lowering of the track base within the |
| |
| |
| In the London Boroughs of Newham and Greenwich– |
| |
Work No. 1/6A– A railway (3,579 metres in length, in tunnel) |
| 5 |
commencing by a junction with Work No. 1/5 at its termination, |
| |
continuing south-eastwards beneath the River Thames, continuing |
| |
eastwards and terminating at a point 157 metres north-west of the |
| |
junction of Marmadon Road with Church Manor Way; |
| |
Work No. 1/6B– A railway (3,586 metres in length, in tunnel) |
| 10 |
commencing by a junction with Work No. 1/5 at its termination, |
| |
continuing south-eastwards beneath the River Thames, continuing |
| |
eastwards and terminating at a point 156 metres north-west of the |
| |
junction of Marmadon Road with Church Manor Way; |
| |
Works Nos. 1/6A and 1/6B include shafts at Warren Lane, Arsenal |
| 15 |
| |
| In the London Borough of Greenwich— |
| |
Work No. 1/6C- A box to accommodate a station at Woolwich situated |
| |
in The Royal Arsenal north of Plumstead Road; |
| |
| In the London Boroughs of Greenwich and Bexley– |
| 20 |
Work No. 1/7– A railway (2,590 metres in length) commencing by a |
| |
junction with Works Nos. 1/6A and 1/6B at their termination, |
| |
continuing eastwards and terminating at a point 143 metres north- |
| |
west of the junction of Abbey Road with Tunstock Way. Work No. |
| |
1/7 includes the reconstruction of Abbey Wood Station; |
| 25 |
| In the City of Westminster and Royal Borough of Kensington & Chelsea– |
| |
Work No. 1/8B– A railway (1,487 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with the Marcon |
| |
Sidings of the Reading Railway at a point 90 metres south-west of the |
| |
junction of Great Western Road with Elkstone Road, passing |
| 30 |
eastwards and terminating at a point 135 metres north-east of the |
| |
junction of Westbourne Terrace with Orsett Terrace; |
| |
Work No. 1/8C- A railway (1,086 metres in length) forming sidings |
| |
within Paddington New Yard, commencing by a junction with the |
| |
Reading Railway at a point 105 metres north-east of the junction of |
| 35 |
Morgan Road with St. Ervans Road, passing eastwards and |
| |
terminating at a point 44 metres west of the western face of Lord |
| |
Hill’s Bridge carrying Porchester Road over that railway; |
| |
Work No. 1/8D- A railway (917 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 7 metres west of the |
| 40 |
western face of the viaduct carrying the A40(M) Westway over that |
| |
railway, passing eastwards and terminating by a junction with Work |
| |
No. 1/3A at its commencement; |
| |
| In the City of Westminster– |
| |
Work No. 1/8E- A railway (798 metres in length) commencing by a |
| 45 |
junction with the Reading Railway a point 4 metres east of the east |
| |
face of the bridge carrying the Great Western Road over that railway, |
| |
passing eastwards and terminating by a junction with Work No. 1/ |
| |
| |
|
| |
|
| |
|
Work No. 1/8F- A railway (476 metres in length) commencing by a |
| |
junction with Work No. 1/8E at a point 23 metres east of the |
| |
footbridge carrying Westbourne Park Passage footpath over the |
| |
Reading Railway, passing westwards and terminating at a point 59 |
| |
metres east of the bridge carrying the Great Western Road over that |
| 5 |
| |
Work No. 1/8G- A railway (314 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 114 metres north of the |
| |
junction of Chepstow Road with Westbourne Park Road, passing |
| |
eastwards and terminating by a junction with the Reading Railway |
| 10 |
at a point 137 metres south of the junction of Torquay Street with |
| |
| |
Work No. 1/9A– A replacement bus parking facility, being an |
| |
extension of the existing Westbourne Park Garage, comprising an |
| |
| 15 |
Work No. 1/9B– A road commencing by a junction with Great Western |
| |
Road at a point 100 metres north of its junction with Tavistock Road |
| |
and terminating by a junction with Alfred Road at a point 205 metres |
| |
south-west of its junction with Harrow Road; |
| |
Work No. 1/9C- A partial reconstruction and extension of the |
| 20 |
footbridge carrying Westbourne Park Passage over the Reading |
| |
Railway commencing at a point in that footway 93 metres north-east |
| |
of the junction of Westbourne Park Road with Westbourne Park |
| |
Villas and terminating at a point in that footway 132 metres south of |
| |
the junction of Westbourne Park Passage with Alfred Road; |
| 25 |
Work No. 1/9D- A partial reconstruction and extension of the |
| |
footbridge carrying Westbourne Park Passage over the Reading |
| |
Railway, commencing at a point in that footway 78 metres north-east |
| |
of the junction of Westbourne Park Villas with Westbourne Park |
| |
Road and terminating at a point in Westbourne Park Villas 127 |
| 30 |
metres east of that road junction. Work No. 1/9D incorporates steps |
| |
| |
Work No. 1/10A– A temporary diversion of the Ranelagh Sewer, |
| |
commencing by a junction with that sewer beneath a point 5 metres |
| |
west of the north-west abutment of the Ranelagh Bridge and |
| 35 |
terminating by a junction with that sewer beneath a point below that |
| |
Bridge 70 metres north of the junction of that Bridge with Gloucester |
| |
| |
Work No. 1/10B– A reinstatement of the Ranelagh Sewer, commencing |
| |
by a junction with that sewer beneath a point 5 metres west of the |
| 40 |
north-west abutment of the Ranelagh Bridge and terminating by a |
| |
junction with that sewer beneath a point below that Bridge 70 metres |
| |
north of the junction of that Bridge with Gloucester Terrace; |
| |
Work No. 1/11A– A passenger subway linking the proposed Crossrail |
| |
(Paddington) station to the London Underground Bakerloo line |
| 45 |
platforms commencing beneath a point 65 metres north-east of the |
| |
junction of Chilworth Street with Eastbourne Terrace and |
| |
terminating beneath a point 10 metres south-west of the junction of |
| |
Winsland Street with London Street; |
| |
Work No. 1/11B– A road commencing by a junction with Bishop’s |
| 50 |
Bridge Road at a point 125 metres north-east of its junction with |
| |
Eastbourne Terrace and terminating in South Wharf Road at its |
| |
junction with London Street; |
| |
|
| |
|
| |
|
Work No. 1/12– A diversion of a sewer in Eastbourne Terrace, |
| |
commencing by a junction with that sewer in Bishop’s Bridge Road |
| |
beneath a point 10 metres west of the junction of Eastbourne Terrace |
| |
with Bishop’s Bridge Road, and terminating by a junction with that |
| |
sewer in Praed Street beneath a point 11 metres south-west of the |
| 5 |
junction of Praed Street with Spring Street; |
| |
Work No. 1/12A- A lowering of Eastbourne Terrace between a point in |
| |
that road 1 metre south-east of its junction with Bishops Bridge Road |
| |
and a point in Eastbourne Terrace 2 metres north-west of its junction |
| |
| 10 |
Work No. 1/12B- A lowering of Chilworth Street between a point in |
| |
that road 63 metres north-east of its junction with Westbourne |
| |
Terrace and its junction with Work No.1/12A at a point 11 metres |
| |
north-east of the junction of Chilworth Street with Eastbourne |
| |
| 15 |
Work No. 1/13– A subway commencing as a ventilation subway at a |
| |
point 55 metres south-west of the junction of Bayswater Road with |
| |
Brook Street to the proposed shaft in Hyde Park (part of Works Nos. |
| |
1/3A and 1/3B), continuing as an access subway and terminating at |
| |
a point 90 metres south-west of the junction of Bayswater Road with |
| 20 |
| |
Work No. 1/14– A passenger subway linking the proposed Crossrail |
| |
station to the existing London Underground Bond Street station |
| |
commencing beneath a point 5 metres south-east of the junction of |
| |
Davies Street with Weighhouse Street and terminating in the said |
| 25 |
Bond Street station beneath a point 40 metres north-west of the |
| |
junction of Oxford Street with Stratford Place; |
| |
Work No. 1/14A- A tunnel for construction purposes commencing by |
| |
a junction with Work No. 1/14C at a point 17 metres north-west of |
| |
the junction of the western arm of Marylebone Lane with Oxford |
| 30 |
Street and terminating by a junction with Work No. 1/14B at a point |
| |
42 metres north of the junction of Stratford Place with Oxford Street. |
| |
Work No. 1/14A includes a shaft for construction and operational |
| |
| |
Work No. 1/14B- An escalator, subway, and stairs commencing by a |
| 35 |
junction with an existing passenger subway at a point 26 metres |
| |
north of the junction of Stratford Place with Oxford Street and |
| |
terminating by a junction with the existing London Underground |
| |
Jubilee Line platforms at a point 135 metres north-west of the |
| |
junction of the western arm of Marylebone Lane with Oxford Street; |
| 40 |
Work No. 1/14C- A passenger subway incorporating stairs |
| |
commencing by a junction with Work No. 1/14A at a point 17 metres |
| |
north-west of the junction of the western arm of Marylebone Lane |
| |
with Oxford Street and terminating by a junction with an existing |
| |
passage between the London Underground Jubilee Line platforms at |
| 45 |
a point 55 metres north-west of the junction of Stratford Place with |
| |
| |
Work No. 1/14D- A passenger subway commencing by a junction with |
| |
the existing London Underground Central Line platforms beneath |
| |
Oxford Street at a point 20 metres east of the junction of Davies Street |
| 50 |
with Oxford Street and terminating by a junction with Work No. 1/ |
| |
14C at a point 20 metres north-east of the junction of Stratford Place |
| |
| |
Works Nos. 1/14A, 1/14C and 1/14D include a ticket hall; |
| |
|
| |
|
| |
|
Work No. 1/14E- A passenger subway commencing by a junction with |
| |
the existing London Underground Central Line platforms beneath |
| |
Oxford Street at a point 12 metres west of the junction of Davies |
| |
Street with Oxford Street and terminating by a junction with Work |
| |
No. 1/14C at a point 23 metres north-west of the junction of Stratford |
| 5 |
Place with Oxford Street; |
| |
Work No. 1/15A– A temporary diversion of a sewer in Davies Street, |
| |
commencing by a junction with that sewer beneath a point 10 metres |
| |
north of the junction of Davies Street with Weighhouse Street and |
| |
terminating by a junction with that sewer beneath a point 4 metres |
| 10 |
south-east of the junction of Davies Street with St Anselm’s Place; |
| |
Work No. 1/15B– A reinstatement of a sewer in Davies Street, |
| |
commencing by a junction with that sewer beneath a point at the |
| |
junction of Davies Street with Weighhouse Street and terminating by |
| |
a junction with that sewer beneath a point 4 metres north-west of the |
| 15 |
junction of Davies Street with St Anselm’s Place; |
| |
Work No. 1/15C– A diversion of a sewer in Weighhouse Street, |
| |
commencing by a junction with that sewer beneath a point 44 metres |
| |
north-east of the junction of Gilbert Street with Weighhouse Street |
| |
and terminating by a junction with that sewer beneath a point 5 |
| 20 |
metres south-west of the junction of Davies Street with Weighhouse |
| |
| |
Work No. 1/16– A diversion of a sewer in Oxford Street comprising a |
| |
shaft connecting that sewer with the mid level sewer No.1 beneath a |
| |
point 68 metres east of the junction of Oxford Street with Soho Street; |
| 25 |
| In the City of Westminster and London Borough of Camden– |
| |
Work No. 1/17– A utilities culvert commencing beneath a point in |
| |
Charing Cross Road 10 metres south-west of the junction of Charing |
| |
Cross Road with Oxford Street, and terminating beneath a point in |
| |
that road 25 metres north-west of the junction of Charing Cross |
| 30 |
| |
| In the London Borough of Camden– |
| |
Work No. 1/18A- A temporary road, being a diversion of Charing |
| |
Cross Road at its northern end, commencing at a point in that road |
| |
20 metres north-west of the junction of that road with Denmark Place |
| 35 |
and terminating at a point in St Giles High Street 45 metres south of |
| |
the junction of that street with New Oxford Street; |
| |
Work No. 1/18B- A temporary road, being a diversion of Charing |
| |
Cross Road at its northern end, commencing at a point in that road |
| |
25 metres south-west of the junction of that road with Denmark Place |
| 40 |
and terminating at a point in St Giles High Street 45 metres south of |
| |
the junction of that street with New Oxford Street; |
| |
| |
Work No. 1/21A- A diversion of the Moorgate Station Sewer, |
| |
commencing by a junction with that sewer beneath a point in |
| 45 |
Moorgate Station 31 metres north-west of the junction of Keats Place |
| |
with Moorfields and terminating by a junction with that sewer |
| |
beneath a point in Moorfields 12 metres south-west of that road |
| |
junction. Work No. 1/21A includes shafts for construction and |
| |
| 50 |
| In the City of London and London Borough of Islington– |
| |
|
| |
|
| |
|
Work No. 1/22– A passenger subway linking the proposed Crossrail |
| |
platforms at Liverpool Street station with the London Underground |
| |
Northern Line platforms at Moorgate Station commencing beneath a |
| |
point in Moorfields 140 metres south-west of its junction with |
| |
Ropemaker Street, passing under Ropemaker Street and terminating |
| 5 |
in Moorgate beneath a point 43 metres south-east of that junction; |
| |
| |
Work No. 1/23A– A temporary diversion of the London Bridge Sewer, |
| |
commencing by a junction with that sewer beneath a point 12 metres |
| |
south-west of the junction of Moorgate with Finsbury Circus, and |
| 10 |
terminating by a junction with that sewer beneath a point 25 metres |
| |
south-west of that road junction; |
| |
Work No. 1/23B– A reinstatement of the London Bridge Sewer, |
| |
commencing by a junction with that sewer beneath a point 12 metres |
| |
south-west of the junction of Moorgate with Finsbury Circus, and |
| 15 |
terminating by a junction with that sewer beneath a point 25 metres |
| |
south-west of that road junction; |
| |
Work No. 1/24– A diversion of the sewer in Liverpool Street |
| |
commencing by a junction with that sewer beneath a point 10 metres |
| |
south-east of the junction of Liverpool Street with Blomfield Street |
| 20 |
and terminating beneath a point 40 metres west of the junction of |
| |
Liverpool Street with Old Broad Street. Work No. 1/24 includes |
| |
shafts for construction and maintenance; |
| |
Work No. 1/24A- A cable tunnel commencing beneath a point 41 |
| |
metres south-west of the junction of Old Broad Street with Liverpool |
| 25 |
Street and terminating beneath a point 28 metres north-west of that |
| |
road junction. Work No. 1/24A includes a shaft for construction; |
| |
| In the London Borough of Tower Hamlets– |
| |
Work No. 1/25A– A shaft and tunnel, for construction purposes, |
| |
commencing beneath a point 88 metres south-west of the junction of |
| 30 |
Hanbury Street with Spital Street, passing northwards and |
| |
terminating beneath a point 126 metres north-east of the junction of |
| |
Bratley Street with Weaver Street; |
| |
Work No. 1/25B– A conveyor on viaduct or supporting structures |
| |
commencing at a point 84 metres north of the junction of Bratley |
| 35 |
Street with Weaver Street, passing north-westwards, then eastwards |
| |
and then northwards under the Great Eastern Main Line Railway, |
| |
crossing eastwards over the Grand Union/Regent’s Canal and |
| |
terminating in Mile End Park at a point 98 metres north-west of the |
| |
junction of Grove Road with Ashcroft Road. Work No. 1/25B |
| 40 |
includes a bridge carrying the conveyor over the said Grand Union/ |
| |
| |
Work No. 1/25C– An accommodation road, forming an access to the |
| |
Great Eastern Main Line Railway viaduct, commencing by a junction |
| |
with Vallance Road at a point 60 metres south of the junction of that |
| 45 |
road with Dunbridge Street and terminating at a point 100 metres |
| |
south-east of the junction of Vallance Road with Dunbridge Street; |
| |
Work No. 1/25D– A railway (652 metres in length) forming a |
| |
realignment of the Mile End (Devonshire Street) Sidings, |
| |
commencing by a junction with the Great Eastern Main Line Railway |
| 50 |
at a point 228 metres south-west of the junction of Grove Road with |
| |
|
| |
|
| |
|
Ashcroft Road, passing westwards and terminating at a point 55 |
| |
metres north of the junction of Globe Road with Bancroft Road; |
| |
Work No. 1/25E– A conveyor on viaduct or supporting structures, |
| |
commencing in Mile End Park at a point 155 metres north-west of the |
| |
junction of Grove Road with Ashcroft Road, passing south- |
| 5 |
westwards crossing over the Grand Union Canal/Regent’s Canal, |
| |
and passing southwards beneath the Great Eastern Main Line |
| |
Railway, then passing westwards and terminating in the existing |
| |
Mile End (Devonshire Street) Sidings at a point 135 metres north- |
| |
west of the junction of Moody Street with Longnor Road; |
| 10 |
Work No. 1/26A– A passenger subway linking the proposed Crossrail |
| |
platforms to the London Underground District Line, commencing |
| |
beneath a point 13 metres north-west of the bridge carrying Durward |
| |
Street over the East London Line railway and terminating beneath a |
| |
point 33 metres south-east of the junction of Durward Street with |
| 15 |
| |
Work No. 1/26B– An escalator linking the proposed Crossrail |
| |
platforms to the London Underground District Line, commencing by |
| |
a junction with Work No. 1/26A at a point 61 metres east of the |
| |
junction of Durward Street with Court Street and terminating |
| 20 |
beneath a point 19 metres south-east of that junction; |
| |
Work No. 1/26C– A diversion of the North Eastern Storm Relief Sewer, |
| |
commencing by a junction with that sewer beneath a point 112 |
| |
metres west of the junction of Durward Street with Brady Street and |
| |
terminating by a junction with that sewer beneath a point 100 metres |
| 25 |
south-west of the junction of Durward Street with Brady Street. |
| |
Work No. 1/26C includes a shaft for construction and maintenance; |
| |
Work No. 1/27A- An escalator and bridge linking the proposed Isle of |
| |
Dogs Station platforms to North Quay commencing at a point 156 |
| |
metres west of the bridge carrying Upper Bank Street over West |
| 30 |
India Dock (North) and terminating in North Quay at a point 3 |
| |
metres east of the bridge carrying the Docklands Light Railway over |
| |
| |
Work No. 1/27B- A bridge and escalator linking The North Colonnade |
| |
to the proposed Isle of Dogs Station platforms commencing by a |
| 35 |
junction with that road at a point 174 metres west of the junction of |
| |
Upper Bank Street with The North Colonnade and terminating at a |
| |
point 36 metres east of the bridge carrying the Docklands Light |
| |
Railway over West India Dock (North); |
| |
Work No. 1/27C- An escalator and bridge linking the proposed Isle of |
| 40 |
Dogs Station platforms to South Quay commencing at a point 20 |
| |
metres east of the bridge carrying Upper Bank Street over West India |
| |
Dock (North) and terminating by a junction with Work No. 1/27D at |
| |
a point 30 metres west of the junction of Belmouth Passage and the |
| |
| 45 |
Work No. 1/27D- A bridge commencing by junction with Upper Bank |
| |
Street at a point 68 metres north-east of the junction of that road with |
| |
The North Colonnade and terminating at a point 18 metres west of |
| |
the junction of Belmouth Passage and West India Dock (North); |
| |
Work No. 1/28– A jetty incorporating a conveyor, for construction |
| 50 |
purposes, commencing in West India Dock North at a point 117 |
| |
metres north of the junction of Bellmouth Passage with Churchill |
| |
Place extending into West India Dock South and terminating at a |
| |
|
| |
|