Select Committee on Defence Written Evidence

 
 

 
1. Memorandum from the Ministry of Defence

MINISTRY OF DEFENCE SPRING SUPPLEMENTARY ESTIMATE 2006-07 ESTIMATES MEMORANDUM

1.  INTRODUCTION

  1.1  This Memorandum covers the Spring Supplementary Estimate for the Ministry of Defence (MoD). The Department's spending plans for 2006-07 are based upon the outcome of the Government's Spending Review 2004, which was published in the Government's Expenditure Plans 2006-07 to 2007-08 (Cm 6822). This Estimates Memorandum should be read in conjunction with the Spring Supplementary Estimate and the Department's Main Estimate and Winter Supplementary Estimate.

  1.2  The Introduction to the Estimate lists the changes being made since the Winter Supplementary Estimate. This is shown by Request for Resources (RfR[1]), and the section number shown in brackets after the detail for each change is a reference to the line(s) that are affected by the change in Part II of the Estimate.

  1.3  There is a separate Estimates Memorandum for the Spring Supplementary Estimate for the Armed Forces Retired Pay, Pensions vote.

2.  SUMMARY OF RESOURCES SOUGHT IN THE ESTIMATE

  2.1  The Introduction to the Estimate shows a net increase in resources of £593 million from £34,231 million at Winter Supplementary Estimates to £34,824 million. There is an increase in RfR1 (Provision of Defence Capability) resources of £243 million, which is primarily due to the drawdown of part of the Departmental Unallocated Provision (DUP) of Indirect Resource DEL (IRDEL). Further detail is provided at Para 4. There is a net increase in RfR2 (Conflict Prevention) resources of £340.2 million, which is additional funding for Iraq, Afghanistan, the Balkans and Global Rest of the World conflict prevention pools. Further detail is provided at Para 5. There is a net increase in RfR3 (War Pensions, allowances, etc) resources of £10 million, to cover additional expenditure. Further detail is provided at Para 7. Changes in capital relate to RfR2, where additional funding is requested of £89 million for operations in Iraq and Afghanistan. The changes are summarised in the following tables:

Table 1

CHANGES IN RESOURCE AND CAPITAL EXPENDITURE
 £ million 
Resource Expenditure   
Provision of Defence Capability (RfR1)  243.074 
Conflict Prevention (RfR2) 340.200  
War Pensions and Allowances (RfR3) 10.000  
Total Net Request for Resources  593.274 
Capital Expenditure   
Conflict Prevention (RfR2) 89.000  
Total Change  682.274  


  2.2  The total change in the Estimate is £682 million which gives an additional net cash requirement of £550 million. The cash requirement is analysed in the following table and a reconciliation between the changes in the Estimate and the net cash requirement is shown in Part II of the Estimate, "Resource to Cash Reconciliation".

Table 2

CHANGE IN CASH REQUIREMENT
 £ million 
Near Cash in Resource DEL 450.530  
Cash in Capital DEL 89.000  
Non Budget (Grants) 0.801  
Near Cash in Annually Managed Expenditure (AME)  10.000 
Net Cash Requirement 550.331  


  2.3  The most significant changes to the Defence Expenditure Limits (DEL) are:

    —  net transfers in of £59.530 million from other Government departments under RfR1 and RfR2 (see Table 4), which includes funding for the Balkans and Global Rest of World Conflict Prevention Pool (funded by transfers in from the Foreign & Commonwealth Office);

    —  increase in RfR2 by £241 million Resource DEL and £89 million Capital DEL to reflect the forecast costs of peace-keeping in Iraq and Afghanistan;

    —  transfer of £150 million from Indirect Resource DEL to Direct Resource DEL (See Para 4.2) and transfer £42 million of Indirect Resource DEL from RfR1 to RfR2 to cover the cost of capital and depreciation costs (See Para 4.3);

    —  draw down of £250 million from the Department's (Unvoted) Unallocated Resource Provision to cover the shortfall in the provision as a result of the transfers above, and to reflect the increased (Voted) Indirect Resource DEL forecast of outturn for RfR1.  This does not represent a substantive change in business.

  2.4  There are also additions to costs falling outside of the DEL of £10 million to the RfR3 War Pensions Benefits Programme costs; nuclear provision costs of £31.943 million; and £0.801 million for Non Budget costs.

3.  DETAILED EXPLANATION OF CHANGES

  3.1  Part I of the Estimate summarises the changes described above and provides detail about the costs included in each RfR.

  3.2  Part II of the Estimate shows the changes proposed in the Estimate, by Top Level Budget Holder (TLB). This shows the present net position (the position at Winter Supplementary Estimates), the changes in the position, and the new net provision (Spring Supplementary Estimates). Again this is set out by Request for Resources. The transfers and other changes outlined in the Introduction to the Estimate are analysed in this section of the Memorandum.

  3.3  The table below shows how the Spring Supplementary Estimate is compiled, identifying changes since 2006-07 Winter Supplementary Estimates.

Table 3

CHANGES TO RESOURCES AND CAPITAL AT SPRING SUPPLEMENTARY ESTIMATES


£million  Direct
R DEL 
Indirect R DEL  Total
R DEL 
AME  Non budget Near cash  Total Net Resources  Capital
DEL 
Capital
AME 
Total Net
Capital 
[1] 
RfR1 Provision at Winter Supplementary Estimates  21,360.5 10,555.0  31,915.5 178.1  12.4 32,106.0  6,998.0 -7.0  6,991.0 
Transfers In 3.1   3.1    3.1     
Transfers Out -0.7   -0.7    -0.7     
Switch from Indirect to Direct R DEL  150.0 -150.0  0.0    0.0     
Switch Indirect R Del from RfR1 to RfR2   -42.0  -42.0    -42.0     
Departmental Unallocated Provision   250.0  250.0    250.0     
AdditionalProvision     31.9  0.8 32.7     
RfR1 at Spring Supplementary Estimates  21,512.9 10,613.0  32,125.9 210.0  13.2 32,349.1  6,998.0 -7.0  6,991.0 
RfR2 Provision at Winter Supplementary Estimates  1,087.3 0.0  1,087.3    1,087.3  360.0   360.0 
AdditionalProvision  241.0   241.0    241.0  89.0  89.0  
Transfers In 57.2   57.2    57.2     
Switch Indirect R Del from RfR1 to RfR2   42.0  42.0    42.0     
RfR2 at Spring Supplementary Estimates  1,385.5 42.0  1,427.5    1,427.5  449.0   449.0 
RfR3 Provision at Winter Supplementary Estimates     1,037.7   1,037.7     
AdditionalProvision     10.0   10.0     
RfR3 at Spring Supplementary Estimates     1,047.7   1,047.7     
Spring SupplementaryEstimates Total  22,898.4 10,655.0  33,553.4 1,257.7  13.2 34,824.3  7,447.0 -7.0  7,440.0 

[1] Definitions of the column headings are shown at Annex 1.

[2] Minimal differences may occur due to roundings.

4.  RFR1 PROVISION OF DEFENCE CAPABILITY—EXPLANATION OF CHANGES

Transfers In/Out

  4.1  The Estimate includes three transfers in from Other Government Departments and one transfer out, which are detailed in Table 4.

Table 4

TRANSFERS BETWEEN MOD AND OTHER GOVERNMENT DEPARTMENTS
  RfR  £ million   Purpose
Transfers out     
Cabinet Office (0.750)  For the expansion and capability of the Security and Intelligence Agencies.  
Transfers In     
Department of Culture, Media and Sport  3.080 Contribution to the National Meteorological Programme and Severe Weather Warning Service.  
Foreign and Commonwealth Office 2  4.200 Contribution to the Global Rest of the World Conflict Prevention Pool costs.  
Foreign and Commonwealth Office 2  53.000 Contribution to the Balkans Conflict Prevention Pool costs.  
Total Net Transfers   59.530  


Transfer from Indirect Resource DEL to Direct Resource DEL—£150 million

  4.2  HM Treasury have agreed the transfer of £150 million from non-cash to near-cash. This has enabled the Department to accommodate some minor provisions of TLBs planned programmes that otherwise might have led to the Department reining back on other elements of spend. This additional Resource DEL (some 0.7% of Direct Resource DEL), has enabled the Department to maintain its originally planned programme, despite changes at the margins of a significant number of individual programmes. Examples of how this additional near cash has been used are:

    —  Additional funding for the Defence Logistics Organisation (DLO) to expedite early elements of the Future Defence Supply Chain initiative (FDSCi) in-year and gain benefits. The FDSCi aims to improve the use of working capital within the support area through the use of high-specification logistics processes which includes stock tracking, computerised stores depots (which require less space) and depletion/deletion of under-utilised stock lines. Fuel and utility price increases, and a range of other minor pressures have required the Department to increase the budgets of the Fleet and Centre TLBs in order to maintain their planned programmes.

Transfer of Indirect Resource from RfR1 to RfR2—£42 million

  4.3  As in previous years the Department has transferred £42 million Indirect Resource DEL from RfR1 to RfR2 to cover cost of capital and depreciation charges associated with fixed assets purchased under Urgent Operational Requirement arrangements. These are continuing non-cash charges associated with holding these assets for as long as they are required. The cash procurement and running costs of this equipment, while being used on operations, are met from the Treasury's Reserve.

Draw Down of the Department Unallocated Provision—£250 million

  4.4  Following the transfers described in paragraphs 4.2 and 4.3, the latest forecasts of Indirect Resource spend from TLB Holders indicated that the Department would need to draw down £250 million from the £470 million available in the non-voted provision to ensure that sufficient resources were available for the current year.

Increases in Non Budget Items

  4.5  A review of Grants in Aid to the Royal Hospital Chelsea and repayments to the National Loans Fund have resulted in an increase in Non Budget Estimate of £0.8 million.

Increases in AME Items

  4.6  There has been an increase in the provisions required for a number of projects relating to the nuclear programme for example, revised forecasts associated with storage of nuclear submarines awaiting disposal.

Neutral Transfers

  4.7  The changes under these sub-headings reflect alterations to TLB allocations of Resource and Capital funding to bring the allocations into line with responsibility transfers between TLBs, and other adjustments to reflect the defence outputs planned since the start of the year, but which require funding adjustments to deliver as the year progresses. These comprise a number of individual changes; an example of this is the transfer of new-in-service equipment from the Defence Procurement Agency (DPA) to the Defence Logistics Organisation. These changes do not represent substantive adjustments to our planned outputs.

  4.8  The MoD fixed asset management project which is part of the Defence Resource Management Programme has led to centralisation of fixed asset management under four single balance sheet owners (SBSOs) Defence Estates (DE), Defence Logistics Organisation, Defence Procurement Agency and the Defence Communications Services Agency (DCSA), which is part of the DLO. Some budget re-allocations were made in the Winter Supplementary Estimates to reflect the change of budgetary responsibility, and further adjustments have been made in this Estimate.

  4.9  The Operating and Non-Operating Appropriations in Aid forecasts are subject to continual review, and the changes to the Estimate reflect the latest estimate of outturn for each TLB.

5.  REQUEST FOR RESOURCES 2

Conflict Prevention

  5.1  The Spring Supplementary Estimate requests an additional £142 million for peace-keeping operations in Iraq; £230 million for peace-keeping costs for operations in Afghanistan; £53 million for Balkans Programme costs; and £4.2 million for Other Global Pool Programme costs. This is summarised in Table 5 below, with a more detailed analysis is shown in Table 6.  The Department has not included a contingency in this Estimate.

Table 5

SUMMARY CONFLICT PREVENTION CLAIM AT 2006-07 SSE

Operation  Direct Resource DEL £ million  Indirect Resource DEL £ million  Capital DEL £ million  Total SSE claim 2006-07 £ million 
 
Iraq 105  21 15 142  
Afghanistan 136 20  74 230 
Programme Expenditure      
Balkans 53 0  53 
Global Pool 0  
Total 298 42  89 429 


Operational Allowance

  5.2  The Spring Supplementary Estimate now includes the estimated costs of £59 million for the tax-free bonus to military personnel on designated operational deployments, which was announced by the Secretary of State for Defence on 10 October 2006.  The forecast costs are included in Military Personnel costs in Table 6.

Conflict Prevention Pool costs—£ 57.200 million

  5.3  This element of RfR2 covers the Programme Costs relating to MoD activities in the Balkans (£53 million) and the Global Pool (£4.2 million). This expenditure is covered by budgetary transfers from the Foreign and Commonwealth Office, as shown in the transfer section, and the costs of the Balkans are shown in detail in Table 6.

Transfer of Indirect Resource DEL from RfR1 to RfR2—£42 million

  5.4  As noted in Para 4.3 the Department has transferred £42 million Indirect Resource DEL from RfR1 to RfR2 to cover cost of capital and depreciation charges.

  5.5  The forecast cost of operations for 2006-07 is shown in Table 6.

Table 6

THE FORECAST COST OF OPERATIONS IN 2006-07
Cost Type  Iraq £ million  Afghanistan £ million  Balkans £ million 
Direct Resource DEL     
Civilian Personnel 15 
Military Personnel 111  51 12 
Stock/Other Consumption 212  140 13 
Infrastructure Costs 89  99 12 
Equipment Support Costs 214  122 
Other Costs and Services 139  77 14 
Income Foregone 10 6  
Income Generated (5)  (2) (11) 
Total Direct Resource DEL 785  496 53 
Indirect Resource DEL 22  20 
Total Resource DEL 807  516  53 
Capital DEL     
Capital Additions 195  254 
Total Capital DEL 195  254 0 
Total Cost 1,002  770 53 


  5.6  The total conflict prevention claim for 2006-07 is set out in Table 7. The Department will report outturn against this in the Annual Report and Accounts.

Table 7

TOTAL CONFLICT PREVENTION CLAIM FOR 2006-07
Operation  Direct Resource DEL
£ million 
Indirect Resource DEL
£ million 
Capital
DEL
£ million 
Total Forecast 2006-07
£ million 
Total Outturn
2005-06
£ million
 
Iraq 785 22  195 1,002 958  
Afghanistan 496 20  254 770 199  
Programme Expenditure        
Balkans 53 0  53 63 
Global Pool 20 0  20  11 
African Pool 31 0  31 36 
Total 1,385 42  449 1,876 1,267  

6.  END YEAR FLEXIBILITY

  6.1  The Department took up its Direct DEL End Year Flexibility (EYF) at Winter Supplementary Estimates.

7.  RFR3 WAR PENSION BENEFIT

  7.1  RfR3 has increased by £10 million on Annually Managed Expenditure (AME) for War Pensions Benefits Programme costs to reflect the latest forecasts received from the Veterans Agency.

8.  THE DEPARTMENTAL EXPENDITURE LIMIT (DEL)

  8.1  The following table shows the DEL from 2003-04 to 2006-07 for all RfRs. The Total DEL is calculated by adding Resource DEL, Capital DEL and deducting depreciation, which forms part of Resource DEL. Depreciation is excluded from Total DEL; including this as well as Capital DEL would be double counting. The figures are for voted and Non voted DEL; the Non voted figure for 2006-07 is £331.294 million net of depreciation, and this is shown in more detail in the Notes to the Estimate.

Table 8

CHANGES TO MoD DIRECT EXPENDITURE LIMITS
 2003-04

SSE

£ million  

2004-05

SSE

£ million  

2005-06

SSE

£ million  

2006-07

ME

£ million  

2006-07

WSE

£ million  

2006-07

SSE

£ million  

Resource DEL 32,315 32,831  33,727 32,643 33,803  34,104 
Capital DEL 6,421 6,662  6,798 6,926 7,359  7,448 
Depreciation -7,437 -8,049  -8,168 -7,551 -7,551  -7,401 
Total DEL 31,299  31,444 32,357  32,018 33,611  34,151 

9.  ADMINISTRATION COSTS LIMIT

  9.1  The Department is not currently subject to an Administration Costs Limit.

10.  PROVISIONS AND CONTINGENT LIABILITIES

  10.1  There are increased provisions of £31 million to cover the latest forecasts for nuclear provisions (AME).

11.  MACHINERY OF GOVERNMENT CHANGES

  11.1  There are no Machinery of Government changes in this Estimate.

12.  NET ADDITIONAL CASH REQUIREMENT

  12.1  The Net Cash impact for the Spring Supplementary Estimate is an increased requirement of £550 million, of which £539 million relates to DEL (£450 million Resource DEL and £89 million Capital DEL); £10 million relates to War Pensions and Allowances AME; and £1 million relates to Non Budget (Grants).

13.  VOTES A

  13.1  We will be laying the 2007-08 Votes A Annual Estimate alongside this 2006-07 Spring Supplementary Estimate. This will be published as HC280.

20 February 2007

ANNEX

A.  DEFINITION OF TERMS

1.  DIRECT RESOURCE DEPARTMENTAL EXPENDITURE LIMITS (RDEL)

  This is a control aggregate within the resource budget. It excludes the non-cash items such as depreciation, cost of capital and movement in provisions. Direct Resource DEL is also known as `near cash in the resource budget'.

2.  INDIRECT RESOURCE DEL (IRDEL)

  This covers items such as depreciation, cost of capital charges, movement in provisions, and the notional auditors' fees for the National Audit Office (NAO). This is also known as non-cash.

3.  TOTAL RESOURCE DEL

  This is the sum of Direct and Indirect Resource DEL.

4.  ANNUALLY MANAGED EXPENDITURE (AME)

  Annually Managed Expenditure (AME) includes Programmes that are demand-led, such as War Pensions (RfR3) and exceptionally volatile items that cannot be controlled by the Department. AME also includes Programmes that are so large that the Department could not be expected to absorb the effects of volatility within them, such as cash release of nuclear provisions.

5.  NON-BUDGET

  Items of expenditure which are included in the Estimate, but are outside of DEL and AME. This is a Parliamentary control but not a Treasury control.

6.  TOTAL NET RESOURCES

  This is the net of items 1 to 5.

7.  CAPITAL DEPARTMENTAL EXPENDITURE LIMIT (CDEL)

  This is for new investment, including Capital additions, disposals, and the capital repayment of loans.

8.  CAPITAL AME

  Includes the capital element of the loan repayments for self- financing public corporations, such as QinetiQ.

9.  TOTAL NET CAPITAL

  This is the sum of the above capital items.

10.  TOTAL NEAR CASH

  This is the total accrued expenditure spend and is the sum of Direct RDEL and Capital DEL.

11.  REQUEST FOR RESOURCES 1

  Provision of Defence Capability, provides for expenditure primarily to meet the Ministry of Defence's operational support and logistics services costs and the costs of providing the equipment capability required by defence policy.

12.  REQUEST FOR RESOURCES 2

  Conflict Prevention provides primarily for the additional costs of operations. These are the net additional costs incurred: the costs that the Department would have incurred regardless of the operation taking place, such as wages and salaries are recorded against RfR1.

13.  REQUEST FOR RESOURCES 3

  War Pensions and Allowances, etc. provides primarily for the payments of pensions and allowances for disablement or death arising out of war or service in the Armed Forces after 2 September 1939, and associated non-cash items.

B.  LIST OF ABBREVIATIONS USED IN THE ESTIMATE
AME Annually Managed Expenditure  
DCSA Defence Communications Services Agency  
DE Defence Estates 
DLO Defence Logistics Organisation  
DPA Defence Procurement Agency  
DUP Departmental Unallocated Provision  
EYF End Year Flexibility 
FCO Foreign and Commonwealth Office  
FDSCi Future Defence Supply Chain initiative  
MoD Ministry of Defence 
NAO National Audit Office 
RfR Request for Resources 
SBSO Single Balance Sheet Owner  
SSE Spring Supplementary Estimates  
UK United Kingdom 
WSE Winter Supplementary Estimates  

 
 





1   For detail on the different Requests for Resources, see Annex 1. Back


 

 