64 | “Deposited plans”, “deposited sections” |
| |
(1) | In this Act, “deposited plans” and “deposited sections” mean, respectively, the |
| |
plans and sections deposited in connection with the Crossrail Bill in the office |
| |
of the Clerk of the Parliaments and the Private Bill Office of the House of |
| |
| 5 |
(2) | The plans and sections referred to in subsection (1) are— |
| |
(a) | those deposited in February 2005, as altered by replacement Sheets |
| |
Nos. 11, 17, 23, 43, 44, 113, 114, 152, 158, 180, 181 and 193 deposited in |
| |
January 2006, replacement Sheets Nos. 4, 26, 33, 46, 48, 102, 155, 156, 180 |
| |
and 206 deposited in May 2006, replacement Sheets Nos. 1 to 6, 9, 10, |
| 10 |
13, 17, 21, 22, 25, 32, 47, 59 to 62, 70, 86, 112, 121, 128 to 130 and 162 to |
| |
164 deposited in November 2006, replacement Sheets Nos. 30 to 37 and |
| |
169 to 174 deposited in May 2007 and consolidated replacement Sheets |
| |
Nos. 14, 15, 155 and 156 deposited in July 2007, |
| |
(b) | Sheet No. 244 deposited in January 2006, |
| 15 |
(c) | Sheets Nos. 25a, 246 to 257 and 259 to 275 deposited in November 2006, |
| |
| |
(d) | consolidated replacement Sheet No. 245 deposited in July 2007. |
| |
| |
| 20 |
“bridleway”, “carriageway”, “footpath”, “footway”, highway”, “highway |
| |
authority” and “local highway authority” have the same meanings as in |
| |
the Highways Act 1980 (c. 66); |
| |
“burial ground” means a churchyard, cemetery or other ground, whether |
| |
consecrated or not, which has at any time been set apart for the |
| 25 |
| |
“development” has the same meaning as in the Town and Country |
| |
Planning Act 1990 (c. 8); |
| |
“the EIA regulations” has the meaning given by section 10(9); |
| |
“limits of deviation” means the limits of deviation which are shown on the |
| 30 |
| |
“limits of land to be acquired or used” means the limits of land to be |
| |
acquired or used which are shown on the deposited plans; |
| |
“owner” (except in the expression “facility owner”) has the same meaning |
| |
as in the Acquisition of Land Act 1981 (c. 67); |
| 35 |
“scheduled works” has the meaning given by section 1(1); |
| |
“unitary authority” means— |
| |
(a) | the council of any county so far as it is the council for an area for |
| |
which there are no district councils; |
| |
(b) | the council of any district comprised in an area for which there |
| 40 |
| |
(c) | the council of a London borough; |
| |
(d) | the Common Council of the City of London. |
| |
(2) | References in this Act to Crossrail are to a railway transport system running |
| |
from Maidenhead, in the County of Berkshire, and Heathrow Airport, in the |
| 45 |
London Borough of Hillingdon, through central London to Shenfield, in the |
| |
County of Essex, and Abbey Wood, in the London Borough of Greenwich. |
| |
|
| |
|
| |
|
(3) | References in this Act to land within the relevant limits are to land within the |
| |
limits of deviation for the scheduled works or within the limits of land to be |
| |
| |
(4) | References in this Act to the nominated undertaker shall be construed in |
| |
accordance with section 48. |
| 5 |
| |
(a) | a reference to a highway or any other place identified by letters and |
| |
numbers is a reference to the highway or place shown as such on the |
| |
| |
(b) | a reference to a work identified by numbers (or numbers and a letter) is |
| 10 |
a reference to the scheduled work of those numbers (or those numbers |
| |
| |
(c) | any reference in any description of works, powers or land to area, |
| |
distance, length or direction, or to a particular location, shall be |
| |
construed as if qualified by the words “or thereabouts”; |
| 15 |
(d) | reference to distance, in relation to points on a road or railway, is to |
| |
distance measured along the centre line of the road or railway. |
| |
(6) | For the purposes of this Act, the level of the surface of land shall be taken— |
| |
(a) | in the case of land on which a building is erected, to be the level of the |
| |
surface of the ground adjoining the building, and |
| 20 |
(b) | in the case of a watercourse or other area of water, to be the level of the |
| |
surface of the adjoining ground which is at all time above water level. |
| |
| |
There shall be paid out of money provided by Parliament— |
| |
(a) | any expenditure incurred by the Secretary of State in consequence of |
| 25 |
| |
(b) | any increase attributable to this Act in the sums payable out of money |
| |
so provided under any other enactment. |
| |
| |
This Act may be cited as the Crossrail Act 2008. |
| 30 |
|
| |
|
| |
|
| |
| |
| |
| |
| |
| The works which the nominated undertaker is authorised by section 1 to |
| 5 |
make and maintain are the following– |
| |
| In the City of Westminster, London Boroughs of Camden, Islington and |
| |
Tower Hamlets and City of London– |
| |
Work No. 1/3A– A railway (10,809 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/2 at its termination, |
| 10 |
passing eastwards and terminating beneath a point 140 metres west |
| |
of the junction of Stepney Green with White Horse Lane; |
| |
Work No. 1/3B– A railway (10,942 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/2 at its termination, |
| |
passing eastwards and terminating beneath a point 135 metres |
| 15 |
south-west of the junction of Stepney Green with White Horse Lane; |
| |
Works Nos. 1/3A and 1/3B include stations at Paddington, Bond |
| |
Street, Tottenham Court Road, Farringdon, Liverpool Street and |
| |
Whitechapel, shafts between Ranelagh Bridge and Westbourne |
| |
Bridge, at North Carriage Drive in Hyde Park, and at Park Lane, |
| 20 |
Fisher Street, Hanbury Street and Stepney Green; |
| |
| In the London Boroughs of Tower Hamlets and Newham– |
| |
Work No. 1/4A– A railway (5,378 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3A at its termination, |
| |
passing south-eastwards and terminating at a point 75 metres south- |
| 25 |
east of the junction of Bridgeland Road with Victoria Dock Road; |
| |
Work No. 1/4B– A railway (5,337 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3B at its termination, |
| |
passing south-eastwards and terminating at a point 80 metres south- |
| |
east of the junction of Bridgeland Road with Victoria Dock Road; |
| 30 |
Works Nos. 1/4A and 1/4B include shafts at Stepney Green, Lowell |
| |
Street, Hertsmere Road, Blackwall Way and Limmo and a station at |
| |
| |
| In the London Borough of Newham– |
| |
Work No. 1/5– A railway (2,752 metres in length) commencing by a |
| 35 |
junction with Works Nos. 1/4A and 1/4B at their termination, |
| |
continuing eastwards and through the existing Connaught Tunnel |
| |
and terminating at a point 50 metres south-east of the junction of |
| |
Winifred Street with Albert Road. Work No. 1/5 includes a station |
| |
at Custom House (being a reconfiguration of the existing North |
| 40 |
|
| |
|
| |
|
London Line Custom House Station) and alteration of the |
| |
Connaught Tunnel comprising lowering of the track base within the |
| |
| |
| In the London Boroughs of Newham and Greenwich– |
| |
Work No. 1/6A– A railway (3,579 metres in length, in tunnel) |
| 5 |
commencing by a junction with Work No. 1/5 at its termination, |
| |
continuing south-eastwards beneath the River Thames, continuing |
| |
eastwards and terminating at a point 157 metres north-west of the |
| |
junction of Marmadon Road with Church Manor Way; |
| |
Work No. 1/6B– A railway (3,586 metres in length, in tunnel) |
| 10 |
commencing by a junction with Work No. 1/5 at its termination, |
| |
continuing south-eastwards beneath the River Thames, continuing |
| |
eastwards and terminating at a point 156 metres north-west of the |
| |
junction of Marmadon Road with Church Manor Way; |
| |
Works Nos. 1/6A and 1/6B include shafts at Warren Lane, Arsenal |
| 15 |
| |
| In the London Borough of Greenwich— |
| |
Work No. 1/6C- A box to accommodate a station at Woolwich situated |
| |
in The Royal Arsenal north of Plumstead Road; |
| |
| In the London Boroughs of Greenwich and Bexley– |
| 20 |
Work No. 1/7– A railway (2,590 metres in length) commencing by a |
| |
junction with Works Nos. 1/6A and 1/6B at their termination, |
| |
continuing eastwards and terminating at a point 143 metres north- |
| |
west of the junction of Abbey Road with Tunstock Way. Work No. |
| |
1/7 includes the reconstruction of Abbey Wood Station; |
| 25 |
| In the City of Westminster and Royal Borough of Kensington & Chelsea– |
| |
Work No. 1/8B– A railway (1,487 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with the Marcon |
| |
Sidings of the Reading Railway at a point 90 metres south-west of the |
| |
junction of Great Western Road with Elkstone Road, passing |
| 30 |
eastwards and terminating at a point 135 metres north-east of the |
| |
junction of Westbourne Terrace with Orsett Terrace; |
| |
Work No. 1/8C- A railway (1,086 metres in length) forming sidings |
| |
within Paddington New Yard, commencing by a junction with the |
| |
Reading Railway at a point 105 metres north-east of the junction of |
| 35 |
Morgan Road with St. Ervans Road, passing eastwards and |
| |
terminating at a point 44 metres west of the western face of Lord |
| |
Hill’s Bridge carrying Porchester Road over that railway; |
| |
Work No. 1/8D- A railway (917 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 7 metres west of the |
| 40 |
western face of the viaduct carrying the A40(M) Westway over that |
| |
railway, passing eastwards and terminating by a junction with Work |
| |
No. 1/3A at its commencement; |
| |
| In the City of Westminster– |
| |
Work No. 1/8E- A railway (798 metres in length) commencing by a |
| 45 |
junction with the Reading Railway a point 4 metres east of the east |
| |
face of the bridge carrying the Great Western Road over that railway, |
| |
passing eastwards and terminating by a junction with Work No. 1/ |
| |
| |
|
| |
|
| |
|
Work No. 1/8F- A railway (476 metres in length) commencing by a |
| |
junction with Work No. 1/8E at a point 23 metres east of the |
| |
footbridge carrying Westbourne Park Passage footpath over the |
| |
Reading Railway, passing westwards and terminating at a point 59 |
| |
metres east of the bridge carrying the Great Western Road over that |
| 5 |
| |
Work No. 1/8G- A railway (314 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 114 metres north of the |
| |
junction of Chepstow Road with Westbourne Park Road, passing |
| |
eastwards and terminating by a junction with the Reading Railway |
| 10 |
at a point 137 metres south of the junction of Torquay Street with |
| |
| |
Work No. 1/9A– A replacement bus parking facility, being an |
| |
extension of the existing Westbourne Park Garage, comprising an |
| |
| 15 |
Work No. 1/9B– A road commencing by a junction with Great Western |
| |
Road at a point 100 metres north of its junction with Tavistock Road |
| |
and terminating by a junction with Alfred Road at a point 205 metres |
| |
south-west of its junction with Harrow Road; |
| |
Work No. 1/9C- A partial reconstruction and extension of the |
| 20 |
footbridge carrying Westbourne Park Passage over the Reading |
| |
Railway commencing at a point in that footway 93 metres north-east |
| |
of the junction of Westbourne Park Road with Westbourne Park |
| |
Villas and terminating at a point in that footway 132 metres south of |
| |
the junction of Westbourne Park Passage with Alfred Road; |
| 25 |
Work No. 1/9D- A partial reconstruction and extension of the |
| |
footbridge carrying Westbourne Park Passage over the Reading |
| |
Railway, commencing at a point in that footway 78 metres north-east |
| |
of the junction of Westbourne Park Villas with Westbourne Park |
| |
Road and terminating at a point in Westbourne Park Villas 127 |
| 30 |
metres east of that road junction. Work No. 1/9D incorporates steps |
| |
| |
Work No. 1/10A– A temporary diversion of the Ranelagh Sewer, |
| |
commencing by a junction with that sewer beneath a point 5 metres |
| |
west of the north-west abutment of the Ranelagh Bridge and |
| 35 |
terminating by a junction with that sewer beneath a point below that |
| |
Bridge 70 metres north of the junction of that Bridge with Gloucester |
| |
| |
Work No. 1/10B– A reinstatement of the Ranelagh Sewer, commencing |
| |
by a junction with that sewer beneath a point 5 metres west of the |
| 40 |
north-west abutment of the Ranelagh Bridge and terminating by a |
| |
junction with that sewer beneath a point below that Bridge 70 metres |
| |
north of the junction of that Bridge with Gloucester Terrace; |
| |
Work No. 1/11A– A passenger subway linking the proposed Crossrail |
| |
(Paddington) station to the London Underground Bakerloo line |
| 45 |
platforms commencing beneath a point 65 metres north-east of the |
| |
junction of Chilworth Street with Eastbourne Terrace and |
| |
terminating beneath a point 10 metres south-west of the junction of |
| |
Winsland Street with London Street; |
| |
Work No. 1/11B– A road commencing by a junction with Bishop’s |
| 50 |
Bridge Road at a point 125 metres north-east of its junction with |
| |
Eastbourne Terrace and terminating in South Wharf Road at its |
| |
junction with London Street; |
| |
|
| |
|
| |
|
Work No. 1/12– A diversion of a sewer in Eastbourne Terrace, |
| |
commencing by a junction with that sewer in Bishop’s Bridge Road |
| |
beneath a point 10 metres west of the junction of Eastbourne Terrace |
| |
with Bishop’s Bridge Road, and terminating by a junction with that |
| |
sewer in Praed Street beneath a point 11 metres south-west of the |
| 5 |
junction of Praed Street with Spring Street; |
| |
Work No. 1/12A- A lowering of Eastbourne Terrace between a point in |
| |
that road 1 metre south-east of its junction with Bishops Bridge Road |
| |
and a point in Eastbourne Terrace 2 metres north-west of its junction |
| |
| 10 |
Work No. 1/12B- A lowering of Chilworth Street between a point in |
| |
that road 63 metres north-east of its junction with Westbourne |
| |
Terrace and its junction with Work No.1/12A at a point 11 metres |
| |
north-east of the junction of Chilworth Street with Eastbourne |
| |
| 15 |
Work No. 1/13– A subway commencing as a ventilation subway at a |
| |
point 55 metres south-west of the junction of Bayswater Road with |
| |
Brook Street to the proposed shaft in Hyde Park (part of Works Nos. |
| |
1/3A and 1/3B), continuing as an access subway and terminating at |
| |
a point 90 metres south-west of the junction of Bayswater Road with |
| 20 |
| |
Work No. 1/14– A passenger subway linking the proposed Crossrail |
| |
station to the existing London Underground Bond Street station |
| |
commencing beneath a point 5 metres south-east of the junction of |
| |
Davies Street with Weighhouse Street and terminating in the said |
| 25 |
Bond Street station beneath a point 40 metres north-west of the |
| |
junction of Oxford Street with Stratford Place; |
| |
Work No. 1/14A- A tunnel for construction purposes commencing by |
| |
a junction with Work No. 1/14C at a point 17 metres north-west of |
| |
the junction of the western arm of Marylebone Lane with Oxford |
| 30 |
Street and terminating by a junction with Work No. 1/14B at a point |
| |
42 metres north of the junction of Stratford Place with Oxford Street. |
| |
Work No. 1/14A includes a shaft for construction and operational |
| |
| |
Work No. 1/14B- An escalator, subway, and stairs commencing by a |
| 35 |
junction with an existing passenger subway at a point 26 metres |
| |
north of the junction of Stratford Place with Oxford Street and |
| |
terminating by a junction with the existing London Underground |
| |
Jubilee Line platforms at a point 135 metres north-west of the |
| |
junction of the western arm of Marylebone Lane with Oxford Street; |
| 40 |
Work No. 1/14C- A passenger subway incorporating stairs |
| |
commencing by a junction with Work No. 1/14A at a point 17 metres |
| |
north-west of the junction of the western arm of Marylebone Lane |
| |
with Oxford Street and terminating by a junction with an existing |
| |
passage between the London Underground Jubilee Line platforms at |
| 45 |
a point 55 metres north-west of the junction of Stratford Place with |
| |
| |
Work No. 1/14D- A passenger subway commencing by a junction with |
| |
the existing London Underground Central Line platforms beneath |
| |
Oxford Street at a point 20 metres east of the junction of Davies Street |
| 50 |
with Oxford Street and terminating by a junction with Work No. 1/ |
| |
14C at a point 20 metres north-east of the junction of Stratford Place |
| |
| |
Works Nos. 1/14A, 1/14C and 1/14D include a ticket hall; |
| |
|
| |
|
| |
|
Work No. 1/14E- A passenger subway commencing by a junction with |
| |
the existing London Underground Central Line platforms beneath |
| |
Oxford Street at a point 12 metres west of the junction of Davies |
| |
Street with Oxford Street and terminating by a junction with Work |
| |
No. 1/14C at a point 23 metres north-west of the junction of Stratford |
| 5 |
Place with Oxford Street; |
| |
Work No. 1/15A– A temporary diversion of a sewer in Davies Street, |
| |
commencing by a junction with that sewer beneath a point 10 metres |
| |
north of the junction of Davies Street with Weighhouse Street and |
| |
terminating by a junction with that sewer beneath a point 4 metres |
| 10 |
south-east of the junction of Davies Street with St Anselm’s Place; |
| |
Work No. 1/15B– A reinstatement of a sewer in Davies Street, |
| |
commencing by a junction with that sewer beneath a point at the |
| |
junction of Davies Street with Weighhouse Street and terminating by |
| |
a junction with that sewer beneath a point 4 metres north-west of the |
| 15 |
junction of Davies Street with St Anselm’s Place; |
| |
Work No. 1/15C– A diversion of a sewer in Weighhouse Street, |
| |
commencing by a junction with that sewer beneath a point 44 metres |
| |
north-east of the junction of Gilbert Street with Weighhouse Street |
| |
and terminating by a junction with that sewer beneath a point 5 |
| 20 |
metres south-west of the junction of Davies Street with Weighhouse |
| |
| |
Work No. 1/16– A diversion of a sewer in Oxford Street comprising a |
| |
shaft connecting that sewer with the mid level sewer No.1 beneath a |
| |
point 68 metres east of the junction of Oxford Street with Soho Street; |
| 25 |
| In the City of Westminster and London Borough of Camden– |
| |
Work No. 1/17– A utilities culvert commencing beneath a point in |
| |
Charing Cross Road 10 metres south-west of the junction of Charing |
| |
Cross Road with Oxford Street, and terminating beneath a point in |
| |
that road 25 metres north-west of the junction of Charing Cross |
| 30 |
| |
| In the London Borough of Camden– |
| |
Work No. 1/18A- A temporary road, being a diversion of Charing |
| |
Cross Road at its northern end, commencing at a point in that road |
| |
20 metres north-west of the junction of that road with Denmark Place |
| 35 |
and terminating at a point in St Giles High Street 45 metres south of |
| |
the junction of that street with New Oxford Street; |
| |
Work No. 1/18B- A temporary road, being a diversion of Charing |
| |
Cross Road at its northern end, commencing at a point in that road |
| |
25 metres south-west of the junction of that road with Denmark Place |
| 40 |
and terminating at a point in St Giles High Street 45 metres south of |
| |
the junction of that street with New Oxford Street; |
| |
| |
Work No. 1/21A- A diversion of the Moorgate Station Sewer, |
| |
commencing by a junction with that sewer beneath a point in |
| 45 |
Moorgate Station 31 metres north-west of the junction of Keats Place |
| |
with Moorfields and terminating by a junction with that sewer |
| |
beneath a point in Moorfields 12 metres south-west of that road |
| |
junction. Work No. 1/21A includes shafts for construction and |
| |
| 50 |
| In the City of London and London Borough of Islington– |
| |
|
| |
|