Crossrail Bill


Crossrail Bill
Schedule 1 — Scheduled works

52

 

Work No. 2/12– A railway (2,125 metres in length) forming a freight

loop line, commencing by a junction with the Up Main Line of the

Great Eastern Main Line Railway at a point 155 metres west of the

junction of Ashgrove Road with Granton Road, passing eastwards

and terminating by a junction with that railway at a point 75 metres

5

south-east of the junction of Heath Road with Junction Road West;

          

In the London Boroughs of Barking & Dagenham and Havering–

Work No. 2/13– A railway (2,273 metres in length, partly in tunnel)

commencing by a junction with the existing Electric Lines of the

Great Eastern Main Line Railway at a point 210 metres south of the

10

junction of Whalebone Lane South with Morden Road, passing

eastwards and under that railway and terminating within a

proposed depot at a point 220 metres north of the junction of

Oldchurch Road and Nursery Walk. Work No. 2/13 includes a new

bridge over Jutsums Lane and a depot;

15

Work No. 2/13A– A railway (679 metres in length) commencing by a

junction with Work No. 2/13 at a point 255 metres south-east of the

junction of Whalebone Lane South with Morden Road, passing

eastwards and terminating by a junction with the Great Eastern Main

Line Railway at a point 362 metres south-west of the junction of Eddy

20

Close with Bridport Avenue;

          

In the London Borough of Havering–

Work No. 2/13B– A railway (398 metres in length) commencing by a

junction with Work No. 2/13 at a point 125 metres south-east of the

junction of Jutsums Lane with Bridport Avenue, passing westwards

25

and terminating by a junction with the Great Eastern Main Line

Railway at a point 308 metres south-west of the junction of Eddy

Close with Bridport Avenue. Work No. 2/13B includes a new bridge

over Jutsums Lane;

Work No. 2/13C– A railway (960 metres in length) forming sidings

30

within the proposed depot (part of Work No. 2/13) commencing by

a junction with Work No. 2/13 at a point 295 metres north-west of

the junction of Crow Lane with Beechfield Gardens, passing

eastwards and terminating at a point 220 metres south-east of the

junction of St Andrews Road with Queen Street;

35

Work No. 2/13D– A railway (733 metres in length) forming sidings

within the proposed depot (part of Work No. 2/13) commencing by

a junction with Work No. 2/13C at a point 85 metres south of the

junction of Sheringham Avenue with Knighton Road and

terminating at a point 140 metres east of the junction of Waterloo

40

Road with Exchange Street;

Work No. 2/14A– An accommodation road, being a diversion of part

of Sandgate Close, commencing at a point in that road 185 metres

north of its junction with Crow Lane and terminating at a point 205

metres north-east of that junction;

45

Work No. 2/14B– An improvement of Nursery Walk and Footpath

FP127 including an extension of the footpath subway between that

road and Stockland Road commencing at a point 10 metres south of

the junction of Stockland Road with Cotleigh Road and passing

southwards and terminating at its junction with Oldchurch Road;

50

Work No. 2/15A– A diversion of the sewer west of Waterloo Road

commencing by a junction with that sewer beneath a point 65 metres

 

 

Crossrail Bill
Schedule 1 — Scheduled works

53

 

south of the junction of Waterloo Road with Exchange Street and

terminating by a junction with that sewer beneath a point 30 metres

south-east of its commencement in Waterloo Road;

Work No. 2/15B– A widening of the southside bridge carrying the

Great Eastern Main Line Railway over Waterloo Road, commencing

5

at a point 70 metres south of the junction of Waterloo Road with

Exchange Street and terminating at a point 25 metres south of that

junction;

Work No. 2/15C– A bridge, for vehicular access over the River Rom,

commencing at a point 210 metres west of the junction of Victoria

10

Road with South Street and terminating at a point 20 metres east of

its commencement;

Work No. 2/15D– A road forming a temporary diversion of Atlanta

Boulevard commencing in that road at a point 105 metres west of its

junction with South Street and terminating at a point 49 metres

15

south-east of its commencement;

Work No. 2/15E– An access road, commencing by a junction with

Havana Close at a point 77 metres south-west of its junction with

South Street and terminating at a point in The Battis 70 metres south-

west of its junction with South Street;

20

Work No. 2/16A– A railway (1,264 metres in length) being a

realignment of sidings commencing by a junction with the Electric

Lines of the Great Eastern Main Line Railway at a point 145 metres

south-east of the junction of Wallenger Avenue with Cranbrook

Drive, passing eastwards and terminating by a junction with that

25

railway at a point 135 metres south of the junction of Ewan Road

with Cavell Crescent;

Work No. 2/16B– A railway (462 metres in length) forming sidings

commencing by a junction with Work No. 2/16A at a point 60 metres

south-east of the junction of Clunas Gardens with Amery Gardens,

30

passing south-west and terminating at a point 130 metres east of the

junction of Upper Brentwood Road with South Drive;

          

In the County of Essex, Borough of Brentwood–

Work No. 2/18A– A railway (704 metres in length) commencing by a

junction with the Down Electric Line of the Great Eastern Main Line

35

Railway at a point 32 metres east of the junction of Woodway with

Abbots Close, passing northwards and terminating at a point 107

metres north-east of the junction of Hutton Road with Crossways;

Work No. 2/18B– A railway (1,226 metres in length) commencing by a

junction with the Up Electric Line of the Great Eastern Main Line

40

Railway at a point 35 metres east of the junction of Woodway with

Abbots Close, passing northwards and terminating at a point 305

metres north of the junction of Rayleigh Road with Alexander Lane.

Work No. 2/18B includes the provision of sidings on the western

side of the Great Eastern Main Line Railway and to the north of

45

Shenfield Station;

Work No. 2/18C– A railway (263 metres in length) forming sidings on

the western side of the Great Eastern Main Line Railway and to the

south of Shenfield Station, commencing by a junction with Work No.

2/18A at a point 105 metres east of the junction of Friar’s Avenue

50

with Friar’s Close, passing southwards and terminating at a point

125 metres north-east of the junction of Woodway with Gordon

Road;

 

 

Crossrail Bill
Schedule 1 — Scheduled works

54

 

Work No. 2/18D– A railway (653 metres in length), being a realignment

of the Chelmsford Loop of the Great Eastern Main Line railway,

commencing by a junction with the existing Up Electric Line of the

Great Eastern Main Line Railway at a point 160 metres north-east of

the junction of Hutton Road with Crossways, passing north-east and

5

terminating by a junction with the existing Down Main Line of the

Great Eastern Main Line railway at a point 85 metres east of the

junction of Oliver Road with Hunter Road;

Work No. 2/18E– A railway (307 metres in length), being a realignment

of the Southend Loop Line, commencing by a junction with Work

10

No. 2/18D at a point 185 metres north of the junction of Rayleigh

Road with Alexander Lane, passing northwards and terminating by

a junction with the Southend Loop Line at a point 55 metres east of

the junction of Oliver Road with Hunter Avenue;

          

In the County of Essex, District of Basildon–

15

Work No. 2/19­– A railway (626 metres in length) forming sidings for

construction purposes, commencing by a junction with the London,

Tilbury & Southend Railway at a point 57 metres south-east of the

junction of The Meads with Elmtree Road, passing eastwards and

terminating at a point 133 metres south of the junction of Pitsea Hall

20

Lane with Brackendale Avenue;

          

In the London Borough of Redbridge—

Work No. 2/20A- A railway (935 metres in length) commencing by a

junction with tracks within Ilford Depot at a point 116 metres north-

east of the bridge carrying Griggs Approach over the Great Eastern

25

Main Line Railway, passing eastwards and terminating by a junction

with that railway at a point 32 metres east of the bridge carrying

Aldborough Road over that railway. Work No. 2/20A includes two

depot buildings;

Work No. 2/20B- A railway (280 metres in length) commencing by a

30

junction with tracks within Ilford Depot at a point 83 metres south-

east of the junction of Carriage Mews with Ley Street, passing

westwards and terminating at a point 50 metres east of the junction

of Ley Street and Griggs Approach;

          

In the London Borough of Newham—

35

Work No. 2/21A- railway (567 metres in length) forming a deviation of

the eastbound District line, commencing by a junction with that

railway at a point 64 metres south-east of the junction of Tom Nolan

Close with Jack Clow Road, passing eastwards and terminating by a

junction with that railway at a point 44 metres north of the junction

40

of Hartsworth Close with Whitelegg Road;

Work No. 2/21B- A railway (448 metres in length) forming a train

reversing siding, commencing by a junction with Work No. 2/21A at

its commencement, passing eastwards and terminating by a junction

with the westbound District line at a point 34 metres north-west of

45

the junction of Moxon Close with Whitelegg Road;

Work 2/21C- A railway (87 metres in length) commencing by a junction

with the westbound District line at a point 70 metres south-east of the

junction of Tom Nolan Close with Jack Clow Road, passing

eastwards and terminating by a junction with Work No. 2/21B at a

50

point 58 metres north-west of the junction of Springfield Road with

Holland Road;

 

 

Crossrail Bill
Schedule 1 — Scheduled works

55

 

Work No. 2/21D- A railway (76 metres in length) commencing by a

junction with Work No. 2/21B at a point 53 metres south-east of the

junction of Holbrook Road with Corporation Street, passing

eastwards and terminating by a junction with Work No. 2/21A at a

point 52 metres north-west of the junction of Moxon Close with

5

Whitelegg Road;

Work No. 2/21E- A railway (94 metres in length) forming a deviation

of the terminating District line track at Plaistow Station, commencing

by a junction with Work No. 2/21A at a point 43 metres north-west

of the junction of Moxon Close with Whitelegg Road, passing

10

eastwards and terminating by a junction with the terminating

District line track at a point 45 metres north-west of the junction of

Hartsworth Close with Whitelegg Road;

          

In the County of Berkshire, Royal Borough of Windsor & Maidenhead–

Work No. 3/1A– A deviation of the Reading Railway (1,604 metres in

15

length) commencing by a junction with that railway at a point 160

metres south of the junction of Longlea Gardens with Lexington

Avenue, passing eastwards and terminating by a junction with that

railway at a point 25 metres west of the bridge carrying that railway

over York Stream;

20

Work No. 3/1B– A railway (634 metres in length), forming sidings

within Maidenhead Station Yard, commencing by a junction with

Work No. 3/1A at a point 215 metres west of the bridge carrying the

Reading Railway over King Street/Braywick Road, passing

westwards and terminating at a point 129 metres south-east of the

25

junction of Clarendon Copse with Clare Road;

Work No. 3/1C– A railway (743 metres in length) commencing at a

point within Maidenhead Station Yard 166 metres south-east of the

junction of Clarendon Copse with Clare Road, passing eastwards

and terminating by a junction with the Reading Railway at a point 66

30

metres west of the bridge carrying that railway over King Street/

Braywick Road;

Work No. 3/1D– A railway (239 metres in length) commencing by a

junction with the Bourne End Branch Railway at Maidenhead

Station at a point 6 metres south-east of the bridge carrying that

35

railway over Silco Drive, passing eastwards and terminating at a

point 107 metres west of the bridge carrying the Reading Railway

over King Street/Braywick Road;

Work No. 3/1E– A diversion of a sewer commencing by a junction with

that sewer beneath a point 145 metres south-east of the junction of

40

Boyn Valley Road with Clare Road and terminating by a junction

with that sewer beneath a point 114 metres west of the junction of

Ludlow Road and Shoppenhanger’s Road. Work No. 3/1E includes

shafts for construction and maintenance;

Work No. 3/1F– A temporary road, being a realignment of

45

Shoppenhanger’s Road, commencing in that road at a point 143

metres west of the junction of Shoppenhanger’s Road with Braywick

Road and terminating in Shoppenhanger’s Road at a point 35 metres

west of that road junction;

          

In the County of Berkshire, Borough of Slough–

50

Work No. 3/2– A reconstruction of the bridge carrying Leigh Road

over the Reading Railway commencing at a point 90 metres north of

 

 

Crossrail Bill
Schedule 1 — Scheduled works

56

 

the junction of Argyll Avenue with Leigh Road and terminating at a

point 42 metres south of the junction of Bedford Avenue with Leigh

Road;

Work No. 3/3– A realignment of the Reading Railway (1,710 metres in

length) commencing by a junction with that railway at a point 101

5

metres west of the bridge carrying Farnham Road over that railway,

passing eastwards and terminating by a junction with that railway at

a point 135 metres east of the bridge carrying William Street over that

railway;

Work No. 3/3A– A raising of the bridge carrying Stoke Poges Lane

10

over the Reading Railway and Work No. 3/3, commencing at a point

8 metres south of the junction of Simpsons Way with Stoke Poges

Lane and terminating at a point 14 metres north of the junction of

Lansdowne Avenue with Stoke Poges Lane;

Work No. 3/4– A realignment of the Windsor and Eton Branch Railway

15

at Slough Station (214 metres in length) commencing by a junction

with that railway at a point 62 metres west of the bridge carrying

William Street over that railway, passing eastwards and terminating

at a point within Slough Station 152 metres east of that bridge;

Work No. 3/5A– A temporary bridge to carry Wexham Road over the

20

Reading Railway (for the duration of the construction of Work No.

3/5B), commencing in Wexham Road at a point 55 metres north of

the junction of Diamond Road with Wexham Road and terminating

in Wexham Road at a point 170 metres north of that road junction;

Work No. 3/5B– A partial reconstruction of the bridge carrying

25

Wexham Road over the Reading Railway, commencing at a point 95

metres north of the junction of Diamond Road with Wexham Road

and terminating at a point 120 metres north of that road junction;

Work No. 3/6– A partial reconstruction of the bridge carrying

Middlegreen Road over the Reading Railway, commencing at a

30

point 86 metres north of the junction of Halkingcroft with

Middlegreen Road and terminating at a point 66 metres south of the

bridge carrying Middlegreen Road over the Grand Union Canal;

Work No. 3/7A– A temporary bridge to carry St. Mary’s Road over the

Reading Railway (for the duration of the construction of Work No 3/

35

7B), commencing in St. Mary’s Road at a point 55 metres north-west

of the junction of Maryside with St. Mary’s Road and terminating in

St. Mary’s Road at a point 55 metres south-east of the bridge carrying

that road over the Grand Union Canal;

Work No. 3/7B– A partial reconstruction of the bridge carrying St.

40

Mary’s Road over the Reading Railway, commencing at a point

60 metres north-west of the junction of Maryside with St. Mary’s

Road and terminating at a point 80 metres south-east of the bridge

carrying St. Mary’s Road over the Grand Union Canal;

Work No. 3/8– A reconstruction of Trenches Bridge carrying footpath

45

FP 47a and cycleway over the Reading Railway, commencing at a

point 65 metres north-east of the junction of Maryside with Minster

Way and terminating at a point 40 metres south-west of the bridge

carrying the footpath FP 47a and cycleway over the Grand Union

Canal;

50

          

In the County of Berkshire, Borough of Slough and County of

Buckinghamshire, District of South Bucks, Parish of Iver–

 

 

Crossrail Bill
Schedule 1 — Scheduled works

57

 

Work No. 3/9– A railway (2,264 metres in length) commencing by a

junction with the Reading Railway at a point 80 metres north of the

junction of Mead Avenue with Harvey Road, passing eastwards and

terminating by a junction with that railway at a point 80 metres west

of the bridge carrying the M25 over that railway. Work No. 3/9

5

includes a bridge over Hollow Hill Lane and the removal of Dog

Kennel Bridge at Iver;

          

In the County of Berkshire, Borough of Slough—

Work No. 3/9D- A diversion of Hollow Hill Lane commencing in that

road at a point beneath the north side of the bridge carrying the

10

Reading Railway over that road and terminating in that road at a

point 195 metres north-east of that bridge;

          

In the County of Buckinghamshire, District of South Bucks, Parish of Iver–

Work No. 3/9A– A realignment of part of a private access road adjacent

to Iver Station, commencing in that access road at a point 111 metres

15

north of the junction of Syke Cluan with Bathurst Walk and

terminating by a junction with Work No. 3/9B at a point 40 metres

south of the existing junction of Court Lane with Thorney Lane

South;

Work No. 3/9B– A diversion of Thorney Lane South commencing in

20

that road at a point 165 metres north of the existing junction of Court

Lane with Thorney Lane South and terminating in that road at a

point 262 metres south-east of the existing junction of Bathurst Walk

with Thorney Lane South. Work No. 3/9B includes a bridge over the

Reading Railway and the removal of the existing Thorney Lane

25

South road bridge;

Work No. 3/9C– An extension of Bathurst Walk at its eastern end,

commencing in that road at a point 12 metres west of the existing

junction of Bathurst Walk with Thorney Lane South and terminating

by a junction with Work No. 3/9B at a point 42 metres east of that

30

existing road junction;

          

In the London Borough of Hillingdon–

Work No. 3/10– A railway (1,486 metres in length) commencing by a

junction with the Reading Railway at a point 16 metres west of the

bridge carrying that railway over the Colnbrook branch line (the

35

former Staines and West Drayton Railway), passing eastwards and

terminating by a junction with the Reading Railway at a point 40

metres east of the existing bridge carrying Kingston Lane over that

railway;

Work No. 3/10A– A railway (640 metres in length) forming a siding

40

within West Drayton Yard commencing by a junction with Work No.

3/10 at a point 103 metres west of the bridge carrying the Reading

Railway over High Street, passing westwards and terminating at a

point 113 metres north of the western end of Fairway Avenue;

Work No. 3/10B– A railway (625 metres in length) forming sidings

45

within West Drayton Yard commencing by a junction with Work No.

3/10 at a point 103 metres west of the bridge carrying the Reading

Railway over High Street, passing westwards and terminating at a

point 166 metres north of the western end of Fairway Avenue;

Work No. 3/10C– An access road in the West Drayton Yard

50

commencing in that Yard at a point 124 metres north-west of the

junction of Fairway Close with Fairway Avenue and terminating in

 

 

Crossrail Bill
Schedule 1 — Scheduled works

58

 

the existing access road leading from High Street at a point 77 metres

south-east of the junction of Winnock Road with Tavistock Road.

Work No. 3/10C includes a level crossing of the Colnbrook branch

line (the former Staines and West Drayton Railway) and a bridge

over Fray’s River;

5

Work No. 3/10D– A realignment of an existing culvert in the West

Drayton Yard, commencing at a point 315 metres north-west of the

junction of Fairway Close with Fairway Avenue and terminating at

a point 187 metres north of that road junction. Work No. 3/10D

includes an inspection chamber;

10

Work No. 3/10E– A diversion of the Colne Valley Sewer commencing

by a junction with that sewer beneath a point 155 metres west of the

junction of Padcroft Road with Tavistock Road and terminating by a

junction with that sewer beneath a point 190 metres south of the

junction of Wimpole Road with Tavistock Road. Work No. 3/10E

15

includes shafts for construction and maintenance;

Work No. 3/10F– A bridge, incorporating steps and ramp facilities, to

carry the footpath and cycleway between Kingston Lane and Horton

Bridge Road over the Reading Railway, commencing at a point 145

metres north-east of the junction of Ruffle Close with Kingston Lane

20

and terminating at a point 192 metres south of the junction of Horton

Bridge Road with Horton Road. Work No. 3/10F includes the

removal of the existing bridge carrying Kingston Lane over the

Reading Railway;

Work No. 3/11– A railway (2,800 metres in length) commencing by a

25

junction with the Heathrow Express Railway at a point 171 metres

north of the northern tunnel portal of that railway, passing

northwards then eastwards and terminating by a junction with the

Reading Railway at a point 243 metres west of the bridge carrying

The Parkway over that railway. Work No. 3/11 includes a viaduct

30

adjacent to the Stockley Flyover;

Work No. 3/12A– A realignment of the Heathrow Express Railway

(377 metres in length) commencing by a junction with that railway at

a point 148 metres north of the northern tunnel portal of that railway,

passing northwards and terminating by a junction with that railway

35

at a point 336 metres north-west of the junction of Conway Drive

with Stormont Drive;

Work No. 3/12B– A realignment of the Heathrow Express Railway (308

metres in length) commencing by a junction with Work No. 3/12A at

a point 200 metres north of the northern tunnel portal of that railway,

40

passing northwards and terminating by a junction with that railway

at a point 336 metres north-west of the junction of Conway Drive

with Stormont Drive;

Work No. 3/13A– A realignment of the Reading Railway (975 metres in

length) commencing by a junction with that railway at a point 100

45

metres north of the junction of Conway Drive with Stormont Drive,

passing eastwards and terminating by a junction with that railway at

a point 162 metres east of the bridge carrying Dawley Road over that

railway;

Work No. 3/13B– A railway (721 metres in length and partly on the

50

viaduct forming part of Work No. 3/11) commencing by a junction

with Work No. 3/11 on that viaduct at a point 170 metres north-east

of the junction of Conway Drive with Stormont Drive, passing

eastwards and terminating by a junction with the Reading Railway

 

 

 