|
| |
|
at a point 64 metres east of the bridge carrying Dawley Road over |
| |
| |
Work No. 3/13C– A railway (419 metres in length) commencing by a |
| |
junction with the Heathrow Express Railway at a point 86 metres |
| |
north of the junction of Conway Drive with Stormont Drive, passing |
| 5 |
eastwards and terminating by a junction with Work No. 3/13A at a |
| |
point 55 metres north-east of the northern end of Burnham Gardens; |
| |
Work No. 3/13D– A realignment of the Reading Railway (385 metres in |
| |
length) commencing by a junction with that railway at a point 104 |
| |
metres north of the junction of Conway Drive with Stormont Drive, |
| 10 |
passing eastwards and terminating by a junction with that railway at |
| |
a point 52 metres north of the northern end of Burnham Gardens; |
| |
Work No. 3/14– A bridge to carry a footpath and cycleway over the |
| |
Reading Railway commencing at a point 23 metres south of the |
| |
junction of Iron Bridge Road South with Old Stockley Road and |
| 15 |
terminating at a point 59 metres north of the junction of Old Stockley |
| |
Road with Stockley Road. Work No. 3/14 includes the removal of |
| |
the existing Old Stockley Road Bridge; |
| |
Work No. 3/15A– A temporary bridge to carry Station Road over the |
| |
Reading Railway at Hayes and Harlington Station (during the |
| 20 |
construction of Work No. 3/15B) commencing at a point 4 metres |
| |
north-east of the junction of Keith Road with Station Road and |
| |
terminating at a point 54 metres south-east of the junction of Blyth |
| |
| |
Work No. 3/15B– A raising and lengthening at the north-eastern end of |
| 25 |
the bridge carrying Station Road over the Reading Railway at Hayes |
| |
and Harlington Station commencing at a point 111 metres north-east |
| |
of the junction of Keith Road with Station Road and terminating at a |
| |
point 54 metres south-east of the junction of Blyth Road with Clayton |
| |
| 30 |
| In the London Borough of Ealing– |
| |
Work No. 3/16– A railway (469 metres in length) commencing by a |
| |
junction with the Greenford Branch Railway at West Ealing Station |
| |
at a point 130 metres west of the junction of Drayton Avenue with |
| |
Manor Road, passing south-eastwards then eastwards and |
| 35 |
terminating at a point in West Ealing Station 20 metres south of the |
| |
junction of Drayton Road with Manor Road; |
| |
Work No. 3/17– A deviation of the Reading Railway (2,068 metres in |
| |
length partly in tunnel) commencing by a junction with that railway |
| |
at a point 300 metres west of the bridge carrying Hanger Lane over |
| 40 |
that railway, passing eastwards and terminating by a junction with |
| |
that railway at a point 25 metres west of the bridge carrying Horn |
| |
| |
Work No. 3/17A– A railway (1,500 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 54 metres east of |
| 45 |
London Underground bridge No. D29 over that railway, passing |
| |
eastwards and terminating by a junction with the Poplar Lines 5 |
| |
metres west of the bridge carrying Horn Lane over those lines; |
| |
Work No. 3/17B– A railway (881 metres in length) forming sidings |
| |
within the Acton Yard, commencing by a junction with Work No. 3/ |
| 50 |
17A at a point 160 metres north-east of the bridge carrying Noel Road |
| |
over the Reading Railway, passing eastwards and terminating at a |
| |
point 155 metres west of the junction of York Road with Horn Lane; |
| |
|
| |
|
| |
|
| In the London Borough of Hammersmith & Fulham– |
| |
Work No. 3/19A- A railway (610 metres in length) commencing by a |
| |
junction with Works Nos. 3/19B and 3/19C at a point 316 metres |
| |
south-east of the junction of Salter Street with Hythe Road, passing |
| |
north-westwards and terminating within a proposed depot at a point |
| 5 |
196 metres east of the bridge carrying Old Oak Common Lane over |
| |
the North London Line railway. Work No. 3/19A includes a depot |
| |
| |
Work No. 3/19B- A railway (838 metres in length), forming sidings |
| |
within Old Oak Common depot, commencing by a junction with |
| 10 |
Works Nos. 3/19A and 3/19C at its commencement, passing |
| |
westwards and terminating at a point 838 metres west of its |
| |
commencement. Work No. 3/19B includes a depot building; |
| |
| In the London Borough of Hammersmith & Fulham and the Royal Borough |
| |
| 15 |
Work No. 3/19C- A railway (1,743 metres in length) commencing by a |
| |
junction with Works No. 3/19A and 3/19B at a point 316 metres |
| |
south-east of the junction of Salter Street with Hythe Road, passing |
| |
eastwards and terminating by a junction with the Reading Railway |
| |
at a point 16 metres west of the bridge carrying Ladbroke Grove over |
| 20 |
that railway. Work No. 3/19C includes a depot building; |
| |
| In the London Borough of Hammersmith & Fulham— |
| |
Work No. 3/19D- A railway (510 metres in length) commencing by a |
| |
junction with sidings within Old Oak Common depot at a point 500 |
| |
metres south-east of the junction of Old Oak Common Lane with |
| 25 |
Victoria Road, passing eastwards and terminating by a junction with |
| |
sidings within that depot at a point 273 metres west of the western |
| |
face of the bridge carrying Scrubs Lane over the Reading Railway. |
| |
Work No. 3/19D includes a depot building; |
| |
| In the London Borough of Hammersmith & Fulham and the Royal Borough |
| 30 |
| |
Work No. 3/19E- A railway (1,666 metres in length) commencing by a |
| |
junction with sidings within Old Oak Common depot at a point 121 |
| |
metres west of the western face of the bridge carrying Scrubs Lane |
| |
over the Reading Railway, passing eastwards and terminating by a |
| 35 |
junction with the Reading Railway at a point 85 metres north-east of |
| |
the junction of Barlby Road with Ladbroke Grove; |
| |
Work No. 3/19F- A railway (989 metres in length) commencing by a |
| |
junction with the Reading Railway at a point 315 metres west of the |
| |
western face of the bridge carrying Scrubs Lane over the Reading |
| 40 |
Railway, passing eastwards and terminating by a junction with that |
| |
railway at a point 116 metres north of the northern end of Webb |
| |
| |
Work No. 3/20A- A railway (145 metres in length) commencing by a |
| |
junction with tracks within North Pole Railway Depot at a point 59 |
| 45 |
metres east of the eastern portal of the Servicing and Inspection Shed, |
| |
passing eastwards and terminating by a junction with the loco siding |
| |
within that depot at a point 145 metres east of its commencement; |
| |
Work No. 3/20B - A railway (36 metres in length) forming a reinstated |
| |
connection with the West London Railway, commencing by a |
| 50 |
junction with that railway at a point 2 metres north-west of the |
| |
western abutment of the bridge carrying that railway over Scrubs |
| |
|
| |
|
| |
|
Lane, passing north-westwards and terminating by a junction with |
| |
tracks within North Pole Railway Depot at a point 36 metres north- |
| |
west of its commencement; |
| |
Work No. 3/20C - A railway (51 metres in length) forming a reinstated |
| |
connection with the West London Railway, commencing by a |
| 5 |
junction with that railway at a point 250 metres south-west of the |
| |
eastern abutment of the bridge carrying that railway over Scrubs |
| |
Lane, passing north-westwards and terminating by a junction with |
| |
tracks within North Pole Railway Depot at a point 51 metres north- |
| |
west of its commencement; |
| 10 |
| In the London Borough of Hammersmith & Fulham and the Royal Borough |
| |
| |
Work No. 3/20D- A railway (1,121 metres in length) commencing by a |
| |
junction with Transfer Siding No. 1 within North Pole Railway |
| |
Depot at a point 300 metres east of the eastern face of the bridge |
| 15 |
carrying Scrubs Lane over the Reading Railway, passing eastwards |
| |
and terminating at a point beneath the bridge carrying Ladbroke |
| |
Grove over the Reading Railway. Work No. 3/20D includes |
| |
extension of an existing depot building; |
| |
| In the Royal Borough of Kensington & Chelsea— |
| 20 |
Work No. 3/20E- A railway (387 metres in length) commencing by a |
| |
junction with tracks within North Pole Railway Depot at a point 361 |
| |
metres west of the Wheel Lathe Shed, passing eastwards and |
| |
terminating by a junction with Work No. 3/20D at a point 387 metres |
| |
east of its commencement; |
| 25 |
Work No. 3/20F- A railway (567 metres in length) commencing by a |
| |
junction with tracks within North Pole Railway Depot at a point 225 |
| |
metres west of the western portal of the Wheel Lathe Shed, passing |
| |
eastwards and terminating by a junction with Work No. 3/20D at a |
| |
point 81 metres west of the western face of the bridge carrying |
| 30 |
Ladbroke Grove over the Reading Railway; |
| |
Work No. 3/20G- A railway (272 metres in length) commencing by a |
| |
junction with tracks within North Pole Railway Depot at a point 190 |
| |
metres west of the western portal of the Wheel Lathe Shed, passing |
| |
eastwards and terminating at a point 272 metres east of its |
| 35 |
| |
Work No. 3/20H- A railway (336 metres in length) forming a siding |
| |
within North Pole Railway Depot commencing by a junction with |
| |
Work No. 3/20G at a point 102 metres west of the Wheel Lathe Shed, |
| |
passing eastwards and terminating at a point 336 metres east of its |
| 40 |
commencement. Work No. 3/20H includes a depot building. |
| |
| |
| |
Works: further and supplementary provisions |
| |
| |
1 (1) | The nominated undertaker may, for the purposes of or in connection with |
| 45 |
the scheduled works or otherwise for the purposes of or in connection with |
| |
|
| |
|
| |
|
Crossrail, do any of the following within the limits of deviation for the |
| |
scheduled works or within the limits of land to be acquired or used— |
| |
(a) | carry out and maintain railway electrification and signalling works; |
| |
(b) | make, provide and maintain all such approaches, bridges, subways, |
| |
interchanges, roundabouts, turning places, lifts, stairs, escalators, |
| 5 |
ramps, passages, means of access, shafts, buildings, apparatus, plant |
| |
and machinery as may be necessary or convenient, |
| |
(c) | construct, provide and maintain all such embankments, aprons, |
| |
abutments, retaining walls, wing walls, culverts and other works as |
| |
may be necessary or convenient, |
| 10 |
(d) | alter or remove any structure erected upon any highway or adjoining |
| |
| |
(e) | alter, or alter the position of, railway track and any apparatus |
| |
associated with railway track, |
| |
(f) | alter, or alter the position of, other apparatus, including mains, |
| 15 |
sewers, drains and cables, |
| |
(g) | alter the course of, or otherwise interfere with, non-navigable rivers, |
| |
streams or watercourses, and |
| |
(h) | carry out and maintain such other works, of whatever description, as |
| |
may be necessary or expedient. |
| 20 |
(2) | Sub-paragraph (1) shall not authorise the making of any cut for drainage |
| |
purposes which is more than 3.4 metres wide at the bottom. |
| |
| |
2 (1) | The nominated undertaker may, for the purposes of or in connection with |
| |
the works authorised by this Act or otherwise for the purposes of or in |
| 25 |
connection with Crossrail— |
| |
(a) | form and lay out means of access, and |
| |
(b) | improve existing means of access, |
| |
| at any place within the limits of deviation for the scheduled works or within |
| |
the limits of land to be acquired or used. |
| 30 |
(2) | In the case of works at a place shown on the deposited plans which require |
| |
the opening of an access onto, or the alteration of, a highway used by |
| |
vehicular traffic, the power under sub-paragraph (1) is exercisable on giving |
| |
at least 28 days’ notice to the highway authority. |
| |
(3) | Works which are the subject of a notice under sub-paragraph (2) may not be |
| 35 |
carried out at the place shown on the deposited plans if, within 28 days of |
| |
the giving of the notice, the highway authority objects to the works being |
| |
carried out there by giving the nominated undertaker notice to that effect. |
| |
(4) | The only ground on which the highway authority may object under sub- |
| |
paragraph (3) is that works under sub-paragraph (1) should be carried out |
| 40 |
instead at another place within the relevant limits to prevent or reduce— |
| |
(a) | injury to local amenity, or |
| |
(b) | prejudicial effects on road safety or on the free flow of traffic in the |
| |
| |
| and are reasonably capable of being carried out there. |
| 45 |
(5) | If, in the case of works under sub-paragraph (1) at a place shown on the |
| |
deposited plans, the works require the opening of an access onto, or the |
| |
|
| |
|
| |
|
alteration of, a highway used by vehicular traffic, they shall be carried out in |
| |
accordance with plans and specifications approved by the highway |
| |
authority at the request of the nominated undertaker. |
| |
(6) | The only ground on which the highway authority may refuse to approve |
| |
plans or specifications for the purposes of sub-paragraph (5) is that they |
| 5 |
ought to be modified to prevent or reduce— |
| |
(a) | injury to local amenity, or |
| |
(b) | prejudicial effects on road safety or on the free flow of traffic in the |
| |
| |
| and are reasonably capable of being so modified. |
| 10 |
(7) | Works under sub-paragraph (1) may only be carried out at a place not |
| |
shown on the deposited plans if the highway authority consents to the siting |
| |
of the works, such consent not to be unreasonably withheld. |
| |
(8) | Works under sub-paragraph (1) at a place not shown on the deposited plans |
| |
shall be carried out in accordance with plans and specifications approved by |
| 15 |
the highway authority at the request of the nominated undertaker, such |
| |
approval not to be unreasonably withheld. |
| |
(9) | In considering whether to give its consent for the purposes of sub-paragraph |
| |
(7), or approval for the purposes of sub-paragraph (8), in a case where the |
| |
works require the opening of an access onto, or the alteration of, a highway |
| 20 |
used by vehicular traffic, the highway authority shall have regard, in |
| |
particular, to effects on road safety and on the free flow of traffic in the local |
| |
| |
(10) | If, on application by the nominated undertaker for the approval of plans or |
| |
specifications under sub-paragraph (5) or (8), the highway authority fails to |
| 25 |
notify the nominated undertaker of its decision on the application before the |
| |
end of the period of 28 days beginning with the date on which the |
| |
application was made, it shall be deemed to have approved the plans or |
| |
specifications as submitted. |
| |
(11) | If a highway authority which receives an application for consent under sub- |
| 30 |
paragraph (7) fails to notify the applicant of its decision on the application |
| |
before the end of the period of 28 days beginning with the date on which the |
| |
application was made, it shall be deemed to have granted it. |
| |
(12) | Where an objection under sub-paragraph (3) leads to the carrying out of |
| |
works under sub-paragraph (1) at a place not shown on the deposited plans, |
| 35 |
sub-paragraphs (5), (7) and (8) shall have effect in relation to them as if the |
| |
place were shown on the deposited plans. |
| |
(13) | Any dispute with a highway authority under this paragraph shall, if the |
| |
parties agree, be referred to arbitration, but shall otherwise be determined |
| |
by the Secretary of State. |
| 40 |
| |
3 | Without prejudice to paragraph 1(1)(f), the nominated undertaker may, for |
| |
the purposes of or in connection with the works authorised by this Act, |
| |
undertake the electric line diversions specified in the following table. |
| |
|
| |
|
| |
|
| | | | | | | | Overhead line to be taken |
| | | | | | | | | | | | | New overhead electric line |
| | | | | | | | 5 | | | | | | | | | | between points E1, E4 and |
| | | | | | | | | | | | New overhead electric lines |
| | | | | | | | 10 | | | | | | | | | | | | | | | | | | | | | | | | |
|
Mitigation and protection works |
| 15 |
4 | The nominated undertaker may within the limits of deviation for the |
| |
scheduled works or within the limits of land to be acquired or used— |
| |
(a) | carry out and maintain landscaping and other works to mitigate any |
| |
adverse effects of the construction, maintenance or operation of any |
| |
of the works authorised by this Act, and |
| 20 |
(b) | carry out and maintain works for the benefit or protection of land |
| |
affected by any of the works authorised by this Act. |
| |
| |
5 (1) | This paragraph applies where it is necessary or expedient in consequence of |
| |
or in connection with the construction of any of the works authorised by this |
| 25 |
Act to support or strengthen a building within the relevant distance of the |
| |
| |
(2) | The nominated undertaker may support or strengthen the building on |
| |
giving at least 8 weeks’ notice to the owners and occupiers of the building of |
| |
| 30 |
(3) | If, within 21 days of the giving of a notice under sub-paragraph (2), the |
| |
person to whom the notice has been given gives to the nominated |
| |
undertaker notice disputing that this paragraph applies, the question of its |
| |
application shall be referred to arbitration. |
| |
(4) | If, under sub-paragraph (3), the arbitrator decides that this paragraph does |
| 35 |
apply, he shall, if one of the parties to the dispute so requires, prescribe how |
| |
the supporting or strengthening is to be carried out. |
| |
(5) | Where the supporting or strengthening of a building under this paragraph |
| |
cannot be carried out reasonably conveniently without entering land |
| |
adjacent to the building, the nominated undertaker may, on giving at least |
| 40 |
14 days’ notice to the owners and occupiers of the adjacent land, enter the |
| |
land (but not any building on it) and carry out the work. |
| |
(6) | In case of emergency, the power conferred by sub-paragraph (2) or (5) shall |
| |
be exercisable without notice. |
| |
|
| |
|
| |
|
(7) | For the purpose of deciding how to exercise its powers under this |
| |
paragraph, the nominated undertaker may at any reasonable time enter and |
| |
| |
(a) | any building within the relevant distance of any of the works |
| |
authorised by this Act, or |
| 5 |
(b) | any land adjacent to such a building (but not any building on any |
| |
| |
(8) | Section 6 of the Acquisition of Land Act 1981 (c. 67) (service of documents) |
| |
shall apply to the service of notices under this paragraph with, in subsection |
| |
(4), the substitution for the words from “authority” to “document is to be |
| 10 |
served” of “nominated undertaker”. |
| |
| |
“building” includes any structure and, in the case of a work under the |
| |
surface of the ground, reference to a building within the relevant |
| |
distance of that work includes a reference to any building within the |
| 15 |
relevant distance of any point on the surface below which the work |
| |
| |
“notice” means notice in writing, and |
| |
“relevant distance”, in relation to any work, means— |
| |
(a) | where the work relates to an underground railway, 50 |
| 20 |
| |
(b) | where it does not, 35 metres. |
| |
6 (1) | This paragraph applies where it is necessary or expedient in consequence of |
| |
or in connection with the construction of any of the works authorised by this |
| |
Act further to support or strengthen a building which has been supported or |
| 25 |
strengthened under paragraph 5. |
| |
(2) | The nominated undertaker may, at any time within the permitted period, |
| |
further support or strengthen the building on giving at least 8 weeks’ notice |
| |
to the owners and occupiers of the building of its intention to do so. |
| |
(3) | If, within 21 days of the giving of a notice under sub-paragraph (2), the |
| 30 |
person to whom the notice has been given gives to the nominated |
| |
undertaker notice disputing that this paragraph applies, the question of its |
| |
application shall be referred to arbitration. |
| |
(4) | If, under sub-paragraph (3), the arbitrator decides that this paragraph does |
| |
apply, he shall, if one of the parties to the dispute so requires, prescribe how |
| 35 |
the supporting or strengthening is to be carried out. |
| |
(5) | Where the supporting or strengthening of a building under this paragraph |
| |
cannot be carried out reasonably conveniently without entering land |
| |
adjacent to the building, the nominated undertaker may, on giving at least |
| |
14 days’ notice to the owners and occupiers of the adjacent land, enter the |
| 40 |
land (but not any building on it) and carry out the work. |
| |
(6) | In case of emergency, the power conferred by sub-paragraph (2) or (5) shall |
| |
be exercisable without notice. |
| |
(7) | For the purpose of deciding how to exercise its powers under this |
| |
paragraph, the nominated undertaker may at any reasonable time enter and |
| 45 |
| |
(a) | any building which has been supported or strengthened under |
| |
| |
|
| |
|