114

 

Planning Bill, continued

 
 

Mrs Jacqui Lait

 

Robert Neill

 

Mr David Jones

 

Mr Richard Benyon

 

James Duddridge

 

Mr David Curry

 

Not called  364

 

Schedule  6,  page  129,  line  21,  at end insert ‘Section 59(4)(f)’.

 

Schedule, as amended, Agreed to.

 

Clause 186 Agreed to.

 


 

John Healey

 

Agreed to  159

 

Clause  187,  page  105,  line  15,  leave out ‘16’ and insert ‘[Gas reception facilities]’.

 

Clause, as amended, Agreed to.

 


 

John Healey

 

Agreed to  611

 

Clause  188,  page  106,  line  2,  after ‘154,’ insert ‘[local development orders:

 

removal of requirement to implement policies],’.

 

John Healey

 

Agreed to  612

 

Clause  188,  page  106,  line  2,  after ‘158,’ insert ‘[Appeals: miscellaneous

 

amendments]’.

 

John Healey

 

Agreed to  613

 

Clause  188,  page  106,  line  2,  leave out ‘Schedule 3’ and insert ‘Schedules 3 and

 

[Appeals: miscellaneous amendments]’.

 

John Healey

 

Agreed to  513

 

Clause  188,  page  106,  line  10,  at end insert—

 

‘(4A)    

Section [Powers of National Assembly for Wales] comes into force at the end of

 

two months beginning with the day on which this Act is passed.’.

 

Clause, as amended, Agreed to.

 



 
 

Public Bill Committee Proceedings: 5th February 2008      

115

 

Planning Bill, continued

 
 

Mr John Leech

 

Susan Kramer

 

Not selected  48

 

Clause  189,  page  106,  line  20,  after ‘Planning’, insert ‘(Additional Runways and

 

Nuclear Power Stations)’.

 

Clause Agreed to.

 


 

NEW CLAUSES

 

LNG facilities

 

John Healey

 

Added  NC1

 

To move the following Clause:—

 

‘(1)    

The construction of an LNG facility is within section 13(1)(ca) only if (when

 

constructed) the facility will be in England and—

 

(a)    

the storage capacity of the facility is expected to be at least 43 million

 

standard cubic metres, or

 

(b)    

the maximum flow rate of the facility is expected to be at least 4.5 million

 

standard cubic metres per day.

 

(2)    

The alteration of an LNG facility is within section 13(1)(ca) only if the facility is

 

in England and the effect of the alteration is expected to be—

 

(a)    

to increase by at least 43 million standard cubic metres the storage

 

capacity of the facility, or

 

(b)    

to increase by at least 4.5 million standard cubic metres per day the

 

maximum flow rate of the facility.

 

(3)    

“LNG facility” means a facility for—

 

(a)    

the reception of liquid natural gas from outside England,

 

(b)    

the storage of liquid natural gas, and

 

(c)    

the regasification of liquid natural gas.

 

(4)    

In this section—

 

“maximum flow rate”, in relation to a facility, means the maximum rate at

 

which gas is able to flow out of the facility, on the assumption that—

 

(a)    

the facility is filled to maximum capacity, and

 

(b)    

the rate is measured after regasification of the liquid natural gas

 

and any other processing required on the recovery of the gas

 

from storage;

 

“storage capacity” means the capacity of the facility for storage of liquid

 

natural gas.

 

(5)    

The storage capacity of an LNG facility is to be measured as if the gas were stored

 

in regasified form.’.

 

 



 
 

Public Bill Committee Proceedings: 5th February 2008      

116

 

Planning Bill, continued

 
 

Gas reception facilities

 

John Healey

 

Added  NC2

 

To move the following Clause:—

 

‘(1)    

The construction of a gas reception facility is within section 13(1)(cb) only if

 

(when constructed)—

 

(a)    

the facility will be in England and will be within subsection (4), and

 

(b)    

the maximum flow rate of the facility is expected to be at least 4.5 million

 

standard cubic metres per day.

 

(2)    

The alteration of a gas reception facility is within section 13(1)(cb) only if—

 

(a)    

the facility is in England and is within subsection (4), and

 

(b)    

the effect of the alteration is expected to be to increase by at least 4.5

 

million standard cubic metres per day the maximum flow rate of the

 

facility.

 

(3)    

“Gas reception facility” means a facility for—

 

(a)    

the reception of natural gas in gaseous form from outside England, and

 

(b)    

the handling of natural gas (other than its storage).

 

(4)    

A gas reception facility is within this subsection if—

 

(a)    

the gas handled by the facility does not originate in England, Wales or

 

Scotland,

 

(b)    

the gas does not arrive at the facility from Scotland or Wales, and

 

(c)    

the gas has not already been handled at another facility after its arrival in

 

England.

 

(5)    

“Maximum flow rate” means the maximum rate at which gas is able to flow out

 

of the facility.’.

 


 

Highways

 

John Healey

 

Added  nc7

 

To move the following Clause:—

 

‘(1)    

Highway-related development is within section 13(1)(e) only if—

 

(a)    

it is the construction of a highway in a case within subsection (2) or (6),

 

(b)    

it is the improvement of a highway in a case within subsection (3) or (5),

 

or

 

(c)    

it is the alteration of a highway in a case within subsection (5).

 

(2)    

Construction of a highway is within this subsection if—

 

(a)    

the construction is to take place outside the boundary of an existing

 

highway,

 

(b)    

the highway will (when constructed) be wholly in England,

 

(c)    

the Secretary of State will be the highway authority for the highway, and

 

(d)    

the highway is proposed to be (or to be part of) a highway of a type within

 

subsection (4).

 

(3)    

Improvement of a highway is within this subsection if—


 
 

Public Bill Committee Proceedings: 5th February 2008      

117

 

Planning Bill, continued

 
 

(a)    

it is to take place outside the boundary of the highway,

 

(b)    

the highway is wholly in England,

 

(c)    

the Secretary of State is the highway authority for the highway, and

 

(d)    

the highway is (or is part of) a highway of a type within subsection (4).

 

(4)    

The types of highway referred to in subsections (2)(d) and (3)(d) are—

 

(a)    

a trunk road;

 

(b)    

a special road;

 

(c)    

a highway the construction of which is a project in respect of which the

 

Secretary of State is required to publish an environmental statement

 

under section 105A(3) of the Highways Act 1980;

 

(d)    

a cycle track or footpath on land separated by intervening land from a

 

trunk road in connection with which it is to be used.

 

(5)    

Development is within this subsection if—

 

(a)    

it is the improvement, raising, lowering or other alteration of a highway,

 

(b)    

the highway is wholly in England, and

 

(c)    

the highway—

 

(i)    

crosses or enters the route of a trunk road or special road, or

 

(ii)    

is (or will be) otherwise affected by the construction or

 

improvement of a trunk road or special road.

 

(6)    

Construction of a highway is within this subsection if—

 

(a)    

the highway will (when constructed) be wholly in England,

 

(b)    

the highway is to be constructed for a purpose connected with—

 

(i)    

development within subsection (5), or

 

(ii)    

a trunk road or special road, or

 

(iii)    

the construction of a trunk road or special road.

 

(7)    

The following terms have the meanings given by section 329(1) of the Highways

 

Act 1980—

 

“cycle track”;

 

“footpath”;

 

“improvement”.’.

 


 

Welsh offshore generating stations

 

John Healey

 

Added  NC11

 

To move the following Clause:—

 

‘(1)    

Section 29(2) does not prevent an order under section 3 of the Transport and

 

Works Act 1992 from being made in relation to the carrying out of works

 

consisting of the construction or extension of a generating station that is or (when

 

constructed or extended) will be a Welsh offshore generating station.

 

(2)    

A “Welsh offshore generating station” is a generating station that is in waters in

 

or adjacent to Wales up to the seaward limits of the territorial sea.


 
 

Public Bill Committee Proceedings: 5th February 2008      

118

 

Planning Bill, continued

 
 

(3)    

If, by virtue of subsection (1), an order under section 3 of the Transport and

 

Works Act 1992 is made in relation to the carrying out of any works, development

 

consent is treated as not being required for the carrying out of those works.’.

 


 

Timetable for decisions

 

John Healey

 

Added  NC12

 

To move the following Clause:—

 

‘(1)    

The decision-maker is under a duty to decide an application for an order granting

 

development consent by the end of the period of 3 months beginning with the day

 

after the start day.

 

(2)    

The start day is—

 

(a)    

in a case where a Panel is the decision-maker, the deadline for the

 

completion of its examination of the application under section 89;

 

(b)    

in a case where the Council is the decision-maker, the deadline for the

 

completion of the single Commissioner’s examination of the application

 

under section 89;

 

(c)    

in a case where the Secretary of State is the decision-maker, the day on

 

which the Secretary of State receives a report on the application under

 

section 66(2)(b) or 75(2)(b).

 

(3)    

The appropriate authority may set a date for the deadline under subsection (1) that

 

is later than the date for the time being set.

 

(4)    

The appropriate authority is—

 

(a)    

in a case where a Panel or the Council is the decision-maker, the person

 

appointed to chair the Commission;

 

(b)    

in a case where the Secretary of State is the decision-maker, the Secretary

 

of State.

 

(5)    

The power under subsection (3) may be exercised—

 

(a)    

more than once in relation to the same deadline;

 

(b)    

after the date for the time being set for the deadline.

 

(6)    

Where the power under subsection (3) is exercised other than by the Secretary of

 

State—

 

(a)    

the person exercising the power must notify the Secretary of State of

 

what has been done and of the reasons for doing it, and

 

(b)    

the Commission’s report under paragraph 16 of Schedule 1 for the

 

financial year in which the power is exercised must mention and explain

 

what has been done.

 

(7)    

Where the power under subsection (3) is exercised by the Secretary of State, the

 

Secretary of State must—

 

(a)    

notify each interested party of what has been done and of the reasons for

 

doing it, and

 

(b)    

lay before Parliament a report explaining what has been done.

 

(8)    

A report under subsection (7)(b) must be published in such form and manner as

 

the Secretary of State thinks appropriate.


 
 

Public Bill Committee Proceedings: 5th February 2008      

119

 

Planning Bill, continued

 
 

(9)    

“Interested party” means a person who is an interested party in relation to the

 

application for the purposes of Chapter 4 (see section 92).’.

 


 

Correction of errors in decisions

 

John Healey

 

Added  NC18

 

To move the following Clause:—

 

‘In section 56(3)(c) of PCPA 2004 (appropriate consent required for correction of

 

errors) at the beginning insert “in a case where the decision document relates to

 

the exercise of a function in relation to Wales,”.’.

 


 

Validity of orders, decisions and directions

 

John Healey

 

Added  nc19

 

To move the following Clause:—

 

‘(1)    

Section 284(3) of TCPA 1990 (validity of certain actions on the part of the

 

Secretary of State) is amended as follows.

 

(2)    

Before paragraph (a) insert—

 

“(za)    

any decision on an application referred to the Secretary of State

 

under section 76A;”.

 

(3)    

In paragraph (a) for “for planning permission referred to him” substitute “referred

 

to the Secretary of State”.’.

 


 

Applications and appeals by statutory undertakers

 

John Healey

 

Added  nc20

 

To move the following Clause:—

 

‘In section 266 of TCPA 1990 (applications for planning permission by statutory

 

undertakers), after subsection (1) insert—

 

“(1A)    

Subsection (1) has effect in relation to an application or appeal relating

 

to land in England only if the Secretary of State or the appropriate

 

Minister has given a direction for it to have effect in relation to the

 

application or appeal (and the direction has not been revoked).”’

 



 
 

Public Bill Committee Proceedings: 5th February 2008      

120

 

Planning Bill, continued

 
 

Appeals relating to old mining permissions

 

John Healey

 

Added  nc21

 

To move the following Clause:—

 

‘(1)    

Schedule 6 to TCPA 1990 (determination of certain appeals by person appointed

 

by Secretary of State) is amended as set out in subsections (2) and (3).

 

(2)    

In paragraph 1—

 

(a)    

in sub-paragraph (1) after “208” insert “of this Act, paragraph 5 of

 

Schedule 2 to the Planning and Compensation Act 1991”, and

 

(b)    

in sub-paragraph (4) for “any instrument made under it” substitute “any

 

other Act or any instrument made under this Act or any other Act”.

 

(3)    

In paragraph 2—

 

(a)    

after sub-paragraph (1)(d) insert—

 

“(e)    

in relation to an appeal under paragraph 5 of Schedule

 

2 to the Planning and Compensation Act 1991, as the

 

Secretary of State has under paragraph 6(1) and (3) of

 

that Schedule.”, and

 

(b)    

in sub-paragraph (2) after “208(5)” insert “of this Act and paragraph 6(2)

 

of Schedule 2 to the Planning and Compensation Act 1991”.

 

(4)    

In paragraph 5 of Schedule 2 to the Planning and Compensation Act 1991 (c. 34)

 

(registration of old mining permissions: right of appeal) after sub-paragraph (8)

 

insert—

 

  “(9)  

Schedule 6 to the principal Act (determination of appeals by persons

 

appointed by Secretary of State) applies to appeals under this

 

paragraph.”’

 


 

Powers of National Assembly for Wales

 

John Healey

 

Added  nc22

 

To move the following Clause:—

 

‘In Part 1 of Schedule 5 to the Government of Wales Act 2006 (Assembly

 

measures: matters within Assembly’s legislative competence), after the heading

 

Field 18: town and country planning” insert—

 

    

Matter 18.1

5

    

Provision for and in connection with—

 

(a)    

plans of the Welsh Ministers in relation to the

 

development and use of land in Wales, and

 

(b)    

removing requirements for any such plans.

 

    

This does not include provision about the status to be given to

10

any such plans in connection with the decision on an

 

application for an order granting development consent under

 

the Planning Act 2008.

 

    

Matter 18.2


 
previous section contents continue
 
House of Commons home page Houses of Parliament home page House of Lords home page search page enquiries