Public Bill Committee: 26th February 2008                

76

 

Energy Bill, continued

 
 

Repayment in cases of over-charging

 

Charles Hendry

 

Mr John Baron

 

NC3

 

To move the following Clause:—

 

‘(1)    

The Secretary of State shall by regulations make provision about the repayment

 

of sums by energy suppliers following over-charging of consumers.

 

(2)    

Regulations under subsection (1) may, in particular—

 

(a)    

make provision about the circumstances in which energy suppliers are

 

required to make repayments and the time limits for such repayments;

 

(b)    

provide for the Authority to determine charges to be made on energy

 

companies which fail to meet requirements relating to repayments.’.

 


 

Information on contributions towards environmental taxes

 

Charles Hendry

 

Mr John Baron

 

NC4

 

To move the following Clause:—

 

‘(1)    

The Secretary of State shall make regulations requiring energy utilities

 

companies to specify the proportion of those consumers’ energy bills that

 

contribute towards environmental taxes.

 

(2)    

In this section “environmental taxes” means—

 

(a)    

the Renewables Obligation Certificates,

 

(b)    

charges resulting from the EU Emissions Trading Scheme, and

 

(c)    

charges resulting from the Carbon Emissions Reduction Targets and

 

future additional environmental charges.’.

 


 

Annual report on gas storage

 

Charles Hendry

 

Mr John Baron

 

NC5

 

To move the following Clause:—

 

‘The Secretary of State shall, in each calendar year following that in which this

 

Act is passed, lay before Parliament a report on—

 

(a)    

his assessment of the appropriate volume of onshore gas storage to ensure

 

long-term energy security, and

 

(b)    

the progress that has been made towards reaching that target.’.

 



 
 

Public Bill Committee: 26th February 2008                

77

 

Energy Bill, continued

 
 

Feed-in tariffs

 

Charles Hendry

 

Mr John Baron

 

NC6

 

To move the following Clause:—

 

‘(1)    

The Secretary of State may by regulations make provision to introduce feed-in

 

tariffs for renewable micro-generation and decentralised energy.

 

(2)    

In this section—

 

“feed-in tariffs” means a requirement on utilities to buy electricity from

 

renewable sources at a feed-in rate to be set by the Secretary of State,

 

dependent on available renewable technology;

 

“micro-generation” means any generation under 250kW;

 

“renewable energy” means any form of energy produced in the generation

 

stage without using fossil fuels or emitting carbon;

 

“a feed-in rate” means a guaranteed payment by the energy suppliers for

 

each kilowatt of electricity generated.’.

 


 

Carbon capture competitions

 

Steve Webb

 

Martin Horwood

 

NC7

 

To move the following Clause:—

 

‘In any competitive process relating to carbon capture initiated by the Secretary

 

of State, equal status shall be given to all carbon capture technologies.’.

 


 

Feed-in tariffs (No. 2)

 

Steve Webb

 

Martin Horwood

 

NC8

 

To move the following Clause:—

 

‘(1)    

The Secretary of State may make regulations for the purposes of requiring

 

designated electricity suppliers to purchase the electricity generated from

 

renewable sources by small-scale generators (“feed-in tariffs”).

 

(2)    

For the purposes of subsection (1)—

 

(a)    

“small-scale generators” are persons generating electricity below a level

 

to be determined by the Secretary of State following consultation,

 

(b)    

“renewable sources” are such energy sources as may be determined by

 

the Secretary of State following consultation,


 
 

Public Bill Committee: 26th February 2008                

78

 

Energy Bill, continued

 
 

(c)    

“designated electricity suppliers” are those persons licensed by the

 

Secretary of State to supply electricity as set out in section 6 of the

 

Electricity Act 1989.

 

(3)    

The Secretary of State must consult for the purposes of determining the

 

appropriate form of regulations as set out in subsection (5) below and must—

 

(a)    

commence such consultation within a period of six months of the day on

 

which this Act is passed,

 

(b)    

determine a reasonable period of consultation,

 

(c)    

consult with—

 

(i)    

designated electricity suppliers,

 

(ii)    

the National Consumer Council (incorporating energywatch),

 

(iii)    

the Gas and Electricity Markets Authority (“GEMA”),

 

(iv)    

the National Grid,

 

(v)    

such generators of electricity from renewable sources as he

 

considers appropriate,

 

(vi)    

such environmental organisations as he considers appropriate,

 

and

 

(vii)    

such other persons as he considers appropriate.

 

(4)    

The Secretary of State shall, within six months after the end of such consultation,

 

make regulations for the purpose of bringing into effect feed-in tariffs pursuant to

 

subsection (1), in such manner as the Secretary of State shall consider

 

appropriate.

 

(5)    

The regulations mentioned in subsection (4) above must—

 

(a)    

define the renewable sources in respect of which feed-in tariffs shall

 

apply,

 

(b)    

define the maximum level of electricity generation in respect of which

 

feed-in tariffs shall be available, as referred to in subsection (2)(a) above,

 

(c)    

define which persons generating electricity from renewable sources shall

 

be eligible for feed-in tariffs,

 

(d)    

prescribe the means by which tariffs applicable under feed-in tariffs are

 

to be calculated and, where necessary, amended,

 

(e)    

prescribe, where appropriate, the terms and duration of the feed-in tariff

 

arrangements,

 

(f)    

make provision for the payment and incidence of the costs of connection

 

of relevant small-scale generators to the National Grid,

 

(g)    

make provision for the regulation of feed-in tariff arrangements by a

 

designated body,

 

(h)    

make provision for the Secretary of State to report periodically on the

 

effectiveness of the regulations made under subsection (1) in achieving

 

their objectives,

 

(i)    

provide for the making of any necessary amendments to distribution

 

licences or supply licences held by any person, and

 

(j)    

make such changes as may be necessary to existing legislation, including

 

that providing for the Renewables Obligation Order.’.

 



 
 

Public Bill Committee: 26th February 2008                

79

 

Energy Bill, continued

 
 

Report on payment of energy bills

 

Charles Hendry

 

Mr John Baron

 

NC9

 

To move the following Clause:—

 

‘The Secretary of State shall, in each calendar year following that in which this

 

Act is passed, lay before Parliament a report on—

 

(a)    

his assessment of the number of households able to pay their energy bills

 

in full and on time in order to illustrate the number facing difficulty in

 

paying, and

 

(b)    

the progress that has been made towards lowering this number.’.

 


 

Renewable heat obligation

 

Charles Hendry

 

Mr John Baron

 

NC10

 

To move the following Clause:—

 

‘(1)    

The Secretary of State shall make regulations which introduce a renewable heat

 

obligation on suppliers of fossil heating fuels.

 

(2)    

In this section a “renewable heat obligation” means a market-based regulation

 

which requires suppliers of fossil fuels for the purpose of heating, to replace, over

 

a specified period, a rising proportion of their supply with metered units of

 

renewable heat energy.

 

(3)    

The regulations must provide that renewable heat energy units—

 

(a)    

are not eligible for support under the Renewable Obligation on suppliers

 

of electricity, and

 

(b)    

may be generated using—

 

(i)    

biofuel;

 

(ii)    

blended and co-fired biofuel;

 

(iii)    

any solid, liquid, gaseous or electrical source of energy (other

 

than fossil fuel or nuclear) which is produced—

 

(a)    

wholly by energy from a renewable source, or

 

(b)    

wholly by a process powered wholly by such

 

energy;

 

(iv)    

electricity, where there is a net surplus of useable heat energy

 

relative to the electrical input.

 

(4)    

Regulations made under this section must be made within a period of 12 months

 

beginning on the date on which this Act is passed.’.

 



 
 

Public Bill Committee: 26th February 2008                

80

 

Energy Bill, continued

 
 

Duty to encourage a reduction in emissions of greenhouse gases

 

Charles Hendry

 

Mr John Baron

 

NC11

 

To move the following Clause:—

 

‘In section 3A of the Electricity Act (c. 29) (the principal objective and general

 

duties of the Secretary of State and the Authority), at end of subsection (1), insert

 

“while reducing the emissions of greenhouse gases in accordance with

 

Government targets for greenhouse gas emissions reductions.’.

 


 

Duties of the regulatory authority

 

Dr Alan Whitehead

 

Dr Desmond Turner

 

Paddy Tipping

 

NC12

 

To move the following Clause:—

 

‘(1)    

For sections 4AA(1) and (2) of the Gas Act 1986 (c.44) substitute—

 

“(1)    

The principal objective of the Secretary of State and the Gas and

 

Electricity Markets Authority (in this Act referred to as “the Authority”)

 

in carrying out their respective functions under this Part is to deliver a

 

secure and sustainable energy system operating within greenhouse gas

 

emission limits notified by the Secretary of State to the Authority in

 

accordance with the provisions of the Climate Change Act 2008 [c. ].

 

(2)    

The Secretary of State and the Authority shall carry out those functions

 

in the manner which he or it considers is best calculated to further the

 

principal objective, having regard to—

 

(a)    

the protection of the interests of consumers in relation to gas or

 

heat conveyed through pipes, through effective competition

 

between persons engaged in, or in commercial activities

 

connected with, the transportation or supply of gas or heat; and

 

(b)    

the need to secure that, so far as it is economical to meet them,

 

all reasonable demands in Great Britain for gas and heat

 

conveyed though pipes are met; and

 

(c)    

the need to secure that licence holders are able to finance the

 

activities which are the subject of obligations imposed by or

 

under this Part or the Utilities Act 2000 (c.27).”

 

(2)    

For section 3(1) and (2) of the Electricity Act 1989 (c.29) substitute—

 

“(1)    

The principal objective of the Secretary of State and the Gas and

 

Electricity Markets Authority (in this Act referred to as “the Authority”)

 

in carrying out their respective functions under this Part is to deliver a

 

secure and sustainable energy system operating within greenhouse gas

 

emission limits notified by the Secretary of State to the Authority in

 

accordance with the provisions of the Climate Change Act 2008 [c ].


 
 

Public Bill Committee: 26th February 2008                

81

 

Energy Bill, continued

 
 

(2)    

The Secretary of State and the Authority shall carry out those functions

 

in the manner which he or it considers is best calculated to further the

 

principal objective, having regard to—

 

(a)    

the protection of the interests of consumers in relation to

 

electricity conveyed by distribution systems, through effective

 

competition between persons engaged in, or in commercial

 

activities connected with, the generation, transmission,

 

distribution or supply of electriciy; and

 

(b)    

the need to secure that all reasonable demands for electricity are

 

met; and

 

(c)    

the need to secure that licence holders are able to finance the

 

activities which are the subject of obligations imposed by or

 

under this Part of the Utilities Act 2000 (c.27).”’.

 


 

Access for renewable energy to the electricity and gas grids

 

Dr Alan Whitehead

 

Dr Desmond Turner

 

Paddy Tipping

 

 

NC13

 

To move the following Clause:—

 

‘(1)    

After section 3A of the 1989 Electricity Act (c.29) there is inserted—

 

“3B    

Access for renewable energy to the electricity networks

 

(1)    

In carrying out their respective functions, the Secretary of State and the

 

Authority shall ensure that—

 

(a)    

transmission system operators and distribution system operators

 

guarantee the transmission and distribution of electricity

 

produced from renewable energy sources, without prejudice to

 

the maintenance of the reliability and safety of the grid;

 

(b)    

transmission system operators and distribution system operators

 

provide for priority access to the grid system for electricity

 

produced from renewable energy sources;

 

(c)    

when dispatching electricity generating installations,

 

transmission system operators shall give priority to generating

 

installations using renewable energy sources insofar as the

 

security of the national electricity system permits;

 

(d)    

transmission system operators and distribution system operators

 

are required to set up and publish their standard rules relating to

 

the bearing and sharing of costs of technical adaptations,

 

including grid connections and grid reinforcements, which are

 

necessary in order to integrate new producers feeding electricity

 

produced from renewable energy sources into the interconnected

 

grid, and that such rules—

 

(i)    

shall be based on objective, transparent and non-

 

discriminatory criteria taking particular account of all

 

the costs and benefits associated with the connection of

 

these producers to the grid and of the particular


 
 

Public Bill Committee: 26th February 2008                

82

 

Energy Bill, continued

 
 

circumstances of producers located in peripheral regions

 

and in regions of low population density,

 

(ii)    

may provide for different types of connection, and

 

(iii)    

shall provide for the sharing of costs to be enforced by a

 

mechanism based on objective, transparent and non-

 

discriminatory criteria taking into account the benefits

 

which initially and subsequently connected producers as

 

well as transmission system operators and distribution

 

system operators derive from connections;

 

(e)    

transmission system operators and distribution system operators

 

are required to provide any new producer wishing to be

 

connected to the system with a comprehensive and detailed

 

estimate of the costs associated with the connection;

 

(f)    

the charging of transmission and distribution fees does not

 

discriminate against electricity from renewable energy sources,

 

including in particular electricity from renewable energy sources

 

produced in peripheral regions, such as island regions, and in

 

regions of low population densitiy;

 

(g)    

fees charged by transmission system operators and distribution

 

system operators for the transmission and distribution of

 

electricity from plants using renewable energy souces reflect

 

realisable cost benefits resulting from the plant’s connection to

 

the network.

 

(2)    

The Secretary of State shall review and take the necessary measures to

 

improve the frameworks and rules for bearing and sharing of costs

 

referred to in paragraph (d) by 30th June 2011 at the latest, and every two

 

years thereafter, in order to ensure the intergration of new producers.

 

(2)    

After section 4AA of the Gas Act 1986 (c.44) there is inserted—

 

“4AB  

Access for renewable gas to the gas networks

 

(1)    

In carrying out their respective functions, the Secretary of State and the

 

Authority shall ensure that—

 

(a)    

gas network operators guarantee the transport of gas produced

 

from renewable energy sources, without prejudice to the

 

maintenance of the reliability and safety of the gas networks;

 

(b)    

gas network operators provide for priority access to the gas

 

networks system for gas produced from renewable energy

 

sources;

 

(c)    

when dispatching gas, network operators shall give priority to

 

renewable energy sources insofar as the security of the national

 

gas system permits;

 

(d)    

gas network operators are required to set up and publish their

 

standard rules relating to the bearing and sharing of costs of

 

technical adaptations, such as gas network connections and gas

 

network upgrades, which are necessary in order to integrate new

 

producers feeding gas produced from renewable energy sources

 

in to the interconnected gas networks, and that such rules—

 

(i)    

shall be based on objective, transparent and non-

 

discriminatory criteria taking particular account of all

 

the costs and benefits associated with the connection of

 

these producers to the gas networks and of the particular

 

circumstances of producers located in peripheral regions

 

and in regions of low population density,


 