Base CostVATGross cost
ProjectDetailed Project£m£m£m

Site Preparation and Infrastructure

Powerlines

240

42

282

Utilities

217

38

255

Enabling works

310

54

364

Structures, Bridges, Highways

706

124

830

Contribution to Prescott Lock upgrade

5

0

5

Other infrastructure (Greenway, Landscaping

175

31

206

Total Site Preparation and Infrastructure

1,653

289

1,942

Venues

Stadium

422

74

496

Other Olympic Park Venues

488

86

574

Non Olympic Park Venues

86

15

101

Total Venues

996

175

1,171

Transport

Stratford Regional station

114

5

119

Contribution to DLR upgrade

86

0

86

Thorntons Field relocation

40

7

47

Contribution to North London Line upgrade

110

0

110

Other transport capital projects

161

17

178

Other transport operating expenditure

328

29

357

Total Transport Projects

839

58

897

Other Parkwide Projects

Logistics for site construction

287

50

337

Section 106 and master planning

108

19

127

Insurance

42

8

50

Security for park construction

301

53

354

Total Other Parkwide Projects

738

130

868

IBC/MPC, Olympic Village, Programme Delivery and Taxation

IBC/MPC, Olympic Village

491

1

492

Programme Delivery

580

67

647

Corporation Tax and Net Interest

0

73

73

TOTAL

5,297

793

6,090

REMAINING CONTINGENCY

2,009

MAXIMUM FUNDING AVAILABLE FOR ODA

8,099

The amounts shown above are net of contributions receivable totalling £5 8 9m, which includes amounts related to enabling works, utilities and village.
Projects which are not disaggregated such as Other Olympic Park Venues are still subject to contract and accordingly are commercially sensitive at this stage.
Programme delivery includes a provision for performance related payments to CLM, the ODA Delivery Partner.
Contingency as announced on 15 March 2007 totalled £2,247m. This is included as two separate amounts, £2,009m as included above and £238m identified as
Security Contingency within the Non-ODA Budget. The Security Contingency of £238m was announced to Parliament on 17 October 2007 (Hansard 17 October 2007 Column 1133W).
While a cost to the games, all tax paid by the ODA will be a future receipt to the Exchequer and accordingly no net additional cost to the public sector.

Table 3: The Detailed Breakdown of Contingency Released.

Released ContingencyIincluded in Cost

Site preparation and Infrastructure

177

Venues

100

Transport

21

Other Parkwide projects

208

IBC/MPC, Olympic Village, Programme Delivery and Taxation

(6)

500


Work and Pensions

Self-Invested Personal Pensions

The Minister for Pensions Reform (Mr. Mike O'Brien): Consultation begins today on draft regulations which will allow protected rights to be held in Self-Invested Personal Pensions (SIPPs). A copy of the consultation document and draft regulations have been placed in the Libraries of both Houses of Parliament.

The consultation is the result of the very useful dialogue we have had with the pensions community about the existing restrictions preventing SIPPs from holding protected rights. In light of recent changes bringing SIPPs under the regulatory control of the FSA, the Government consider that these restrictions are no longer necessary.

The consultation runs until 29 February 2008.


    Index Home Page