Memorandum submitted by William Davis Limited

  We understand that a select committee is gathering information and evidence regarding British Waterways involvement in regeneration projects. I submit the following brief summary of our experience as developers working with British Waterways here in Loughborough.

  The old Loughborough Wharf was a hidden area of the canal network providing poor access and boating facilities right at the edge of Loughborough Town centre, and was surrounded by a number of old terraced houses, derelict workshops and a builders yard.

  William Davis Limited owned a number of old town houses adjacent the canal on Derby Road. On the opposite side of the canal the Local Authority also had a large land holding which was under utilised as a council storage depot.

  In early 2002 a partnership was formed between William Davis Limited and British Waterways to explore the development potential of the "wharf" and surrounding land.

  BW's aspiration was to create a much improved boaters facility and public realm area coupled with some commercial A3 space. As developers William Davis were drawing together a number of uses to create a commercially viable mix comprising social housing, student housing, apartments for sale in addition to delivering the A3 units and public realm.

  Negotiations with the LA enabled their land to be brought into the equation in exchange for a new depot on land outside of the town and the first draft scheme was born.

  However soon into the planning process a potential flooding issue was identified by the EA which affected the LA land and which then had to be withdrawn from the scheme.

  A hasty rework of the masterplan and a restructure of the finances from BW rescued the schemes viability and detailed planning consent was then sought for the reduced scheme. This proved to be a very challenging exercise which the "partnership" handled very sensitively.

  The final scheme design included an enlarged canal basin, boaters toilet/shower facilities high quality public realm with open access to the community, 179 student bedrooms, 7000 sq ft of A3 restaurant space an 35 private apartments.

  The first phase of the scheme was delivered in summer 2007 with the opening of the basin, boaters amenity and public realm. The first A3 unit is currently being fitted out.

  The overall scheme proved to be very challenging particularly through the early planning and viability stages but the fact the scheme has now been delivered is testament to the strength and resolve of the "partnership" between BW and a private developer. There were setbacks at times such as the EA flooding issue plus planning objections to handle and it would have been all too easy at times to say "this won't work" but the tenacity and belief of the whole team plus a "can do" attitude of all involved saw the scheme through.

  Our experience as developers of working with British Waterways is one which we would very much like to continue.

Dave Camp

Commercial Director

William Davis Limited

March 2008






 
previous page contents next page