Select Committee on Environment, Food and Rural Affairs Written Evidence


Memorandum submitted by Grantham Canal Restoration Society Limited

  1.  We wish to express our utmost concern for the future of British Waterways ( BW ) restoration and regeneration role. The fact that BW have had to withdraw from the Cotswold Canals Partnership, in order to divert large funds to progress the urgent first phase of a repair programme for the Monmouthshire & Brecon Canal expected to cost around £15 million over four years is significant.

Refer to our Memorandum (BW 78) Ev 367/8 fourth para.)[4]. This withdrawal from BW participation in a major canal partnership could be the pattern for similar canal partnerships elsewhere in the areas of BW administration throughout the UK.

  2.  Most of the canals within BW jurisdiction were built by independant canal companies during the so called period of "Canal Mania" between the 1770s and the turn of the 19th century, and are over two hundred years old. There are a few exceptions in a very small minority. Many companies built to their own size specifications, which would later help to their own downfall. One thing they all had in common was that they were designed to operate with horses/mules/donkeys towing the boats suitable for each navigation, ie barges, narrowboats, tub-boat strings. Consequently each canal had a towing path, in some rare cases one on each side. Accordingly most canals ran along contours where possible, but where not practicable, on embankments, crossing streams and rivers on aqueducts of varying lengths according to necessity. Other sections wound around the sides of hills, embanked on the lower sides, cut into them on the upper sides. Not many lengths or sections were cut into ground completely level on both sides. Quite a number of canal tunnels were built, some with towpaths through and some where horses were led over the tunnelled hills whilst the boats were "legged" through. Maintenance was carried out by all the canal companies, but costs were comparatively low. Horse drawn boats left little disturbance or wash as they travelled along at 2 or 3 mph at best. Large tonnage capacity was far more important than speed, and once a supply chain of boats was established, deliveries to depots and wharves became continuous and reliable.

  3.  The preceding paragraph sets the scene which eventually became BW's responsibility and problem. Whilst the canal companies were trading successfully, funds were available for ongoing maintenance. With the coming of the railways from around the 1840s, canals started loosing trade, and many canal companies were purchased and absorbed by railway companies. Some canal beds were converted to railway tracks, but many canals soldiered on, slowly loosing more trade as their railway owners (with the exception of one or two) looking to run the canals down to cut out competion. Maintenance was poor and largely carried out when crisis demanded, rather than on a prevention basis.

  More and more repairs were required as many of the barges and narrowboats were converted to, and built first with steam engines propelled with shaft and screw and later with diesel engines. The canals had not been built to withstand the wear and undercutting of banks by propwash, and maintenance standards were still declining. As trade continued to decline, more and more canals became silted and weedy, and many were abandoned by Act of Parliament. After World War II, along with road and rail, the canals were nationalised, and the waterways became the Cinderella of the Transport network. The long winter of 1963 was the death knell of most canal workboat trading, and BW inherited a very run down system when it was formed to become the owners and custodian of a large part of the UK's canal and river navigations. Under the 1968 Transport Act, navigations were re-classified under three headings. Commercial (those still carrying on commercial trading and to be maintained and dredged to appropriate standard), "Cruiseway" (those still navigable but with little commercial carrying, and being used by growing numbers of pleasure craft and to be maintained to a necessary standard, but not dredged to more than 3' 6",), and all waterways classified disused or abandoned defined as "Remainder" and only to be maintained as far as health and safety required, and if need be, disposed of in the way most deemed as economical.

  4.  For many years, BW struggled on with inadequate funding, whilst much of navigation furniture such as locks, gates, bridges and tunnels received minimum maintenance. Much of the system's buildings and works had to perform far beyond their design build. But, as pressure built up from volunteer organisations such as Inland Waterways Association, and local canal societies actively engaging in restoration, often supported in their aims by local authorities and BW participating with them in partnerships, a waterways revival gathered momentum. Major canal restorations succeeded, with canals such as the Kennet and Avon being completely re-opened to through navigation. Other regeneration and restoration projects have also been completed, and many more are working to that end, recovering more and more mileage.

  5.  Much has been achieved by the present government, allowing BW extra funding to catch up on many decades of maintenance neglect, and in formulating its policy of "Waterways For Tomorrow". But, suddenly, through no fault of BW, funding has been cut to a degree that BW now finds it necessary to "divert" funds to major repairs. This, quite clearly, has to be to the deprivation of restoration and regeneration. There will be other working navigations that will require heavy injections of funds to carry out repairs to breaches, embankments and land slippage. BW will never be able to keep up with its repair bills by "developing" its own assets, or even "selling the family silver".

EXECUTIVE SUMMARY

  6.  Our canals and the water based leisure, national/international tourism industry, with all its benefits of employment, boat building with all the growing revenue must be supported by proper funding and investment. The whole waterway network is truly a National Heritage site. Its regenerational capacity is enormous. It needs abandoned and disused waterways to be opened up to relieve the pressure points, and to further enlarge that capacity. What must not happen is that the many millions of pounds worth of restoration, carried out by the voluntary sector, to be wasted. Just as a small example, volunteers have carried out restoration work, valued by BW at £7½ million, on the Grantham Canal. Yet, because it is a remainder waterway, BW's budget does not extend to being able to maintain the restoration work completed. This includes 5 locks and 3 swing bridges, fully restored, and blockages to the navigation being removed. Some of our restored navigations still are classified as "remainder". There must be a better method of upgrading to "Cruiseway" than the present parliamentary process permits. In concluding, we have to say to government, please don't wreck the good work achieved during your "Waterways For Tomorrow" policy, for the sake of what in terms of our national GDP is "penny pinching".

  Restored "Remainder" canals still requiring upgrading to "Cruiseway" status are :- Remainder lengths of the Kennet & Avon Canal and of the Forth & Clyde and Union Canals. All the more recent restorations have not (yet) resulted in reclassification. BW state they have "in hand", applications for all of the previously mentioned canals for re-classification to "Cruiseway". This does require a Ministerial Order, and this will usually depend on BW demonstrating the waterway is essentially sustainable and the Order will not result in additional grant being required.

  The last re-classification from "Remainder" to "Cruiseway" was of the Sheffield & Tinsley Canal in the late 1990's. Before then a batch were re-classified under the BW Act 1983, including most of the Monmouthshire & Brecon Canal. BW add "that there are a whole variety of Remainder Waterways, some of which have always been navigable (just), some which were in poor condition (albeit not closed) but which have since been improved, some of which were closed due to specific blockages that have since been cleared, and some which were wholly derelict and have since been subject to major reconstructions for restoration (and of course some which remain derelict and closed to navigation)."

  In reality each Remainder Waterway has (or had) different stretches of any of the above descriptions.

  GCRS Ltd. would like to express its thanks to BW's Legal Department for its assistance in providing accurate information with regard to "Remainder Waterways", and express concern that BW are bound by re-classification to "Cruiseway" not resulting in additional grant being required. GCRS Ltd. believe this policy short-sighted by the government expecting BW to take on further redevelopment, restoration and regeneration whilst cutting funding and restricting BW's ability to maintain, properly, its increasing responsibility of maintaining and preventing wear and tear to the canal and river network within its jurisdiction.

Christopher Tizzard

Vice President and Founder Member

Grantham Canal Restoration Society Limited

March 2008






4   House of Commons, Environment, Food and Rural Affairs Committee, British Waterways, Seventh Report of Session 2006-07, Volume II. Back


 
previous page contents next page

House of Commons home page Parliament home page House of Lords home page search page enquiries index

© Parliamentary copyright 2008
Prepared 1 July 2008