Select Committee on Environment, Food and Rural Affairs Written Evidence


Memorandum submitted by South West Tourism Ltd (DMB 40)

NATURAL ENGLAND'S OUTLINE SCHEME

  South West Tourism the Regional Tourism Board wish to submit their views on behalf of the tourism industry on Coastal Access.

  The Natural England outline scheme on the whole is very balanced and seems open to negotiation with individual business and we welcome many of the objectives of the outline scheme.

  The South West is unique in having the South West Coast Path and do advocate that the SWCP is used as best practice.

  There are three main areas of concern for the tourism industry the potential exceptions to, and deviations from the continuous access (paragraph 1). The right to compensation (paragraph 2) and additional access for other users (paragraph 3).

  It is stressed throughout the document that negotiation will be critical to a successful outcome and SWT are pleased to see that it has been a reoccurring theme in the outline scheme.

1.  The case for exceptions to and deviations from, a route giving continuous access to the coast itself

  Some tourism businesses trade on the uniqueness of having a private beach or access to wildlife which is unattainable to any other businesses in the area. To have this niche selling point removed will seriously affect the individual business viability. Quite often these products are at the top end of the market and are exemplars to the tourism industry, not only with quality but with the overall visitor experience. The loss of these products could also damage the reputation of the brand of the South West which sells itself on quality and visitor experience.

  You will also be detracting from the visitor experience to the business if access was allowed.

  In many cases the route could be deviated around the property without detracting from the walker's experience. The walker could be out of site of the sea of only a few minutes and there could be other heritage, environmental, landscape experiences which will compensate for the deviation. There could be negotiation with the landowner to allow the path through adjoining land which then still allows private access to and privacy on the beach.

  In some cases such as on an island it maybe necessary for an exception, access could be permitted to a large proportion but an exception in front of the business to allow for uninterrupted views and privacy.

  All deviations should be undertaken in negotiation with the landowner as set out in the outline scheme

2.  Whether the Draft Bill strikes the right balance between the rights of access and the rights of owners and occupiers, and whether there should be compensation in any circumstances for the creation of coastal access rights

  There is a good case for compensation to the business as in some cases it could completely destroy its viability, others could be still be able to trade but at a much reduced level. It would be completely unfair to take incomes and asset values away without compensation.

  In some cases years of investment have been undertaken to reach the quality level of today's product. With reduced incomes the asset value of theses businesses will also suffer.

  Natural England has not looked at the likely levels of reduced income to these businesses. It is important that we understand how these businesses would be affected. South West Tourism is willing to undertake some research to look at incomes levels and the effects of Coastal Access. This could also incorporate the numbers of businesses which will be affected to evaluate the total compensation cost to the tourism industry in the South West.

  Compensation does not necessarily need to be monetary, some businesses especially campsites may except planning gains in compensation ie if a caravan has to removed as it is to near to the path or to make way for the path it could be compensated with planning for more caravans in another area of the site.

  Work could also be undertaken to show businesses, how it could add value to the existing business by allowing access to café/restaurants/shops etc and this might negate the negative effects of allowing access.

  Once again negotiation will be key to a successful outcome.

3.  Whether there should be access rights for other users such as cyclists or horse riders

  There could be access for cyclists and horse riders where it builds on existing bridleways or cycle routes. The paths must be in the right location where there is user demand and where there is room for a wider path to ensure there is no conflict between the different sectors.

  Other factors should be taken into account, the cost of maintenance of a suitable surface which combats erosion and it should be on land which has the landowner's complete agreement. This type of access should not be enforced.

  Additional types of access may encourage non traditional users into the countryside.

South West Tourism Ltd

May 2008





 
previous page contents next page

House of Commons home page Parliament home page House of Lords home page search page enquiries index

© Parliamentary copyright 2008
Prepared 22 July 2008