UNCORRECTED TRANSCRIPT OF ORAL EVIDENCE To be published as HC 655-i
House of COMMONS
MINUTES OF EVIDENCE
TAKEN BEFORE
THE committee OF
PUBLIC ACCOUNTS
Wednesday 4
June 2008
REDUCING
PASSENGER RAIL DELAYS
BY BETTER
MANAGEMENT OF INCIDENTS
DEPARTMENT FOR TRANSPORT
DR MIKE MITCHELL and DR GARY BACKLER
NETWORK RAIL
MR IAIN COUCHER
OFFICE OF RAIL REGULATION
DR BILL EMERY
ASSOCIATION OF TRAIN OPERATING
COMPANIES
MR DAVID FRANKS
Evidence heard in Public Questions 1 - 126
USE OF THE TRANSCRIPT
|
1.
|
This is an uncorrected transcript of evidence taken in
public and reported to the House. The transcript has been placed on the
internet on the authority of the Committee, and copies have been made
available by the Vote Office for the use of Members and others.
|
|
2.
|
Any public use of, or reference to, the contents should
make clear that neither witnesses nor Members have had the opportunity to
correct the record. The transcript is not yet an approved formal record of
these proceedings.
|
|
3.
|
Members who
receive this for the purpose of correcting questions addressed by them to
witnesses are asked to send corrections to the Committee Assistant.
|
|
4.
|
Prospective
witnesses may receive this in preparation for any written or oral
evidence they may in due course give to the Committee.
|
Oral evidence
Taken before the Committee of Public Accounts
on Wednesday 4 June 2008
Members present:
Mr Edward Leigh, in the Chair
Mr Ian Davidson
Nigel Griffiths
Mr Austin Mitchell
Dr John Pugh
________________
Mr Tim Burr, Comptroller
and Auditor General and Ms Geraldine
Barker, Director, National Audit Office, gave evidence.
Mr Marius Gallaher, Alternate
Treasury Officer of Accounts, HM Treasury, gave evidence.
REPORT BY THE COMPTROLLER AND AUDITOR GENERAL
REDUCING
PASSENGER RAIL DELAYS
BY BETTER
MANAGEMENT OF INCIDENTS
Examination of Witnesses
Witnesses: Dr Mike Mitchell, Director General,
Rail and National Networks Group and Dr
Gary Backler, Director, Rail Service Delivery, National Networks,
Department for Transport; Mr Iain
Coucher, Chief Executive, Network Rail; Dr Bill Emery, Chief Executive, Office of Rail Regulation and Mr David Franks, Chief Executive,
Trains Division, National Express Group and Managing Director, National Express
East Coast and an ATOC Board Member, Association of Train Operating Companies, gave
evidence.
Q1 Chairman:
Good afternoon. Welcome to the
Committee of Public Accounts where today we are considering the Comptroller and
Auditor General's Report into Reducing
Passenger Rail Delays by Better Management of Incidents. We welcome Dr Mike Mitchell who is the
Director General of Rail and National Networks in the Department for Transport;
Iain Coucher who is the Chief Executive of Network Rail; Bill Emery who is
Chief Executive of the Office of Rail Regulation and David Franks who is the
Managing Director for National Express Rail and a Board Member of the
Association of Train Operating Companies.
Mr Mitchell, before I ask any questions of Mr Coucher, it strikes me
that Network Rail is a bit of an enigma; there is a bit of a fiction that it is
a private company but in fact 50% of its funding comes from the public sector,
from us the tax payer. That is £3.4
billion a year. Mr Coucher is not an
accounting officer so how do we actually exercise control over him as a Committee
of Public Accounts?
Dr Mitchell: Network Rail, as
you know, is an independent private sector company and the Government cannot
intervene in its operation and decision making.
Q2 Chairman:
An independent private sector company with half its funding coming from the tax
payer, to the tune of £3.4 billion.
Dr Mitchell: That is correct,
yes.
Q3 Chairman:
You say that with a straight face, do you?
Dr Mitchell: Network Rail is a
private company but you are correct in saying that most of its funding comes
from the Government.
Q4 Chairman:
So how are we supposed to exercise control over it as a Committee of Public
Accounts if Mr Coucher is not an accounting officer, although he is responsible
for £3.4 billion of public money?
Dr Mitchell: The secretary of
state is responsible for the £3.4 billion of public money. Our principal contractor is of course
Network Rail and we are able to influence Network Rail in that way, but only as
a customer.
Q5 Chairman:
You still have not answered my question, but we will have to leave it
there. Mr Coucher, you are responsible
for this body. Can I refer you to
figures four and five on page 12? I
want to deal first with the rail delays and what progress has been made. I want to ask you why it has taken so long
since the Hatfield disaster to reduce the number of incidents and the length of
delays to anywhere near pre-Hatfield levels.
If you look at figures four and five you can see it has taken a long
time to get back to square one, has it not?
Mr Coucher: We have been set a
target by the regulator as to what is achievable given the age of the assets,
the funding and the level of use on the network.
Q6 Chairman:
I might ask Mr Emery about the targets in a moment; I am not convinced that
this target is particularly challenging.
Whether there is a target or not, you are responsible for this
body. How much are you paid to run it,
by the way?
Mr Coucher: I am paid, as a
matter of record, £585,000.
Q7 Chairman:
Plus bonuses?
Mr Coucher: Yes.
Q8 Chairman:
So what I want to know on behalf of the long-suffering public is why it has
taken so long for you to reduce delays and the number of delays to pre-Hatfield
levels.
Mr Coucher: That is because we
are not measuring on a like for like basis.
We are now running considerably more trains and it means that every
single incident we get on the railway does impact a lot more trains. Today we run about 22,000 trains a day and
in Railtrack's time it was 18,000 trains a day. It is a much more congested railway and we have consistently
beaten all targets set for us by the regulator who is there to determine what
is achievable given the age of the assets and the activity on the railways.
Q9 Chairman:
If you are doing so well why has the rate of improvement slowed in the last
year? If what you said was right and
gradually the usage had gone up, you would surely expect the improvement to
continue, but in fact the improvements have slowed in the last year; the
lengths of delays has dropped hardly at all, there has only been a marginal
drop in length of delays. You are responsible
for this body, what are you doing about it?
Mr Coucher: We have just
completed the following year 2007/2008 and we have taken another million
minutes off that target so the out-turn was actually 9.8 and we have continued
that downward trend. There were
specific reasons in 2006/2007, in particular one day in which we incurred some
250,000 minutes.
Q10 Chairman:
Why was that?
Mr Coucher: Because of extreme
weather in which we continued to run trains because we believed that was the
right thing to do for passengers, even though it would cause Network Rail to
miss its targets. We ran trains in this
country whilst Holland, Germany and France cancelled the vast majority of
theirs. We stand by that decision.
Q11 Chairman:
So that is why the improvements have slowed down in the last year, is it?
Mr Coucher: In the last year we
have taken a million minutes off the targets, so the final out-turn which is
the next block on the curve which you do not have there is actually 9.8 million
minutes and this year we are targeting a further 900,000 minutes reduction to
8.9 million.
Q12 Chairman:
Mr Emery, Mr Coucher has mentioned this target and your target for delays in
2006/2007 was 10.6 million minutes which was actually less demanding than
Network Rail's own target. You are
supposed to be the regulator; why have you got a target which is less demanding
than the person you are regulating?
Dr Emery: In the determination
in 2003 the Office of Rail Regulation set the targets. We expect Network Rail to meet those
targets.
Q13 Chairman:
I am sorry but you have not answered the question I put to you. You are supposed to be the regulator; you
are not supposed to be a pushover. Why
are your performance targets not more demanding? Why are they not challenging enough?
Dr Emery: In essence I think
there is a bit of hindsight here. The
judgment was made by the regulator in 2003; the trajectory on delayed minutes
was set for a five year period.
Q14 Chairman:
The obvious question then is why do you not review your targets more regularly
then?
Dr Emery: We review our targets
and as we will be making our announcement for the period 2009 to 2014 tomorrow
- our draft determination is tomorrow - we will be setting Network Rail
challenging targets for the next period.
Q15 Chairman:
Which will be more challenging than what we have seen hitherto, will they?
Dr Emery: Certainly. The Government, in its requirements for the
railways from 2009 to 20014, has set out expectations for increased
punctuality, reductions in delays; those are part and parcel of the package of
measures that we will be requiring from Network Rail as part of our draft
determination which we will announce tomorrow.
Q16 Chairman:
Dr Mitchell, let us look at the train operating companies. If we look at the targets you set there at
paragraphs 1.4 and 1.13 they caused 38% of delayed minutes last year. Are their targets challenging enough?
Dr Mitchell: I believe they are,
yes.
Q17 Chairman:
Why?
Dr Mitchell: The performance
targets have been tightened over the years and the train companies have, in most
cases, achieved them. However, in one
particular case they did not achieve them and, as you know from the secretary
of state's announcement some three months ago, we took action against that
company.
Q18 Chairman:
Train faults are the main cause of delays, are they not?
Dr Mitchell: They are, yes.
Q19 Chairman: Are train operating companies not operating
trains? So if it is their fault why are
you setting a target which apparently is not very challenging?
Dr Mitchell: The targets for
overall performance are, I believe, challenging. You are correct in saying that train faults are the most
significant cause of delay. Having said
that, a large number of new trains have entered service over the last few years
and, as a result of that, the number of train faults is declining.
Q20 Chairman:
Is that still the main cause of delays?
Dr Mitchell: That is correct, it
still is the main cause of delays.
Q21 Chairman: Something for which they are entirely
responsible.
Dr Mitchell: They are, yes.
Q22 Chairman:
Other colleagues can come back on rail delays but I will just leave that for a
moment. Can I just ask a couple of
questions about incident management and lesson learning? Mr Coucher, would you like to look at
paragraph 2.9 which you can find on page 16?
If we look at paragraph 2.9 we see that 20% of incident reports noted
that communications were poor within Network Rail. Should you not do more to improve them?
Mr Coucher: Yes. We always try to improve and improve and
improve. There is obviously scope for
improvement and we will continue to do so.
Q23 Chairman:
Some of these reasons were very basic, for instance mobile phones were not
available. It does not sound like
rocket science to me.
Mr Coucher: Not all of the
network has network coverage with mobile communications. There are pockets around the country,
particular in remote parts of Scotland, where there is no signal at all so that
does cause us difficulties.
Q24 Chairman:
You believe you could do more to improve communications.
Mr Coucher: Yes, and we are
currently rolling out a complete mobile communication system which will enable
everybody - signallers, drivers and line side people - to be able to talk. That is a big win for the rail industry.
Q25 Chairman:
If we look at the incident review process - this is dealt with in paragraph
2.26 - we can see that incident reports are often very carefully compiled. Perhaps they could be used to spread best
practice more. Is that right, do you
think?
Mr Coucher: I do agree and that
is an area where the NAO rightly pointed out areas where we can improve and
since we have done that we now routinely look at the incident reports and we
promulgate best practice across the country.
Q26 Chairman:
Can I just ask you a question about how you work with the emergency services,
Mr Coucher? If you look at paragraph
2.22 which you can find on page 20 you will see there that you stopped funding
British Transport Police to train other emergency services. Why did you do this?
Mr Coucher: I think that is
perhaps a misrepresentation there. We
have doubled the amount we give the British Transport Police in the last five
years from £33 million a year to £66 million a year and we have changed the
arrangements, so we have an all inclusive sum and we had expected that to be
included.
Q27 Chairman:
They say that eight police forces commented that more training would be
beneficial: "Three forces noted that they had experienced difficulties in
organising exercises with Network Rail in recent years. The British Transport Police commented that
until the late 1990s it had received funding from Railtrack (Network Rail's
predecessor) to provide multi-agency training for all rail incidents and
confirmed that it would be happy to reinstate such a training programme
again". So all this is wrong, is it?
Mr Coucher: No. What I said was that the funding for the
British Transport Police we have increased from £33 million in 2002 to £66
million, which includes the provision of training and we are prepared to work
with any outside agencies in any kind of training. We are happy to do that at any time.
Q28 Chairman:
So the British Transport Police can have enough much money as they want to to help
train the other emergency services, can they?
This paragraph is giving a wrong impression, is it?
Mr Coucher: There has been a
change in the funding arrangements by which we fund British Transport Police
and we are more than happy to work with any outside agency in training their
people if they are prepared to do so, but we do have 43 police forces out
there, the primary interface of course is with the British Transport Police.
Q29 Chairman:
Mr Franks, looking at paragraph 3.5 on page 24, why is it so difficult to
provide the public with reliable and decent information about delays?
Mr Franks: The most difficult
thing is finding out precisely what has happened at any particular time and
getting the message across to a large number of customers, a large number of
trains and a large number of staff.
This whole point is a subject of real review within the industry. ATOC has established a working group to try
to improve things; we have issued a code of practice for the whole industry and
we are trying to ensure that code of practice is rolled out across all of the
train operating companies. It is an
area of real focus.
Q30 Chairman:
I am sure you recognise it is a real priority with the public.
Mr Franks: Absolutely.
Chairman: It drives them crazy
to be sitting in a train and not know what is going on. John Pugh?
Q31 Dr Pugh:
One of the great opportunities you have here, if you have been delayed by
trains and trains going off the rails, is to get your own back in part. I use the West Coast Main Line quite a
lot. I looked through the stats and I
find they have the greatest number of significant incidents - I think that is
correct from the stats we have in front of us - and most of those are down to
Network Rail in origin and most of those appear to fall into various categories:
cable faults, overhead lines and signal faults. I have sat here in the past and I have heard quite glowing
reports of West Coast Main Line progress and all that sort of thing. Is that not something of a paradox? If I had thought that a lot of money had
been spent to little effect given the actual reliability record of that
particular line, would I have any sort of case?
Mr Coucher: We have to be
slightly careful about the comparison for the West Coast Main Line because it
is our geographical area. Our London
Northwest area goes from Euston right the way to Holyhead, into the northern
parts of Wales, into Manchester and into the Pennines; it is a very, very large
geographical area, it does not relate just to the West Coast Main Line. I think your comments about West Coast
reliability just go to underline precisely why we need to complete the investment
programme. It is very old infrastructure;
it is very unreliable. That is why we
are trying to replace it. Recent
incidents that we have experienced on the West Coast go to underline that. The cable problems we had just a few weeks
ago were because cables that were 60 years old were starting to fail and they
are due to be replaced, but we know that this causes very significant impact on
the travelling public and we are determined to finish this project so that we
can give a much better service to the passengers very quickly.
Q32 Dr Pugh:
I travel across lines which obviously have been invested in because they are
disrupted on a Sunday and lots of other times for good purposes and have been
for quite some time. I am assured that
the sections I travel on have received very, very significant investment. You are saying that even with this you are
still looking at very old equipment on certain on stretches of line.
Mr Coucher: We are gradually
replacing it. Not all of it is being
replaced of course; there is a rolling programme that will go on for many
years. The West Coast is the most
intensely used piece of railway that we have out there; some of the track that
we put down today will have to be replaced in five years because it is wearing
out. It is a constant challenge to keep
that railway operating at very, very high levels of performance.
Q33 Dr Pugh:
Going back to the point the Chairman made about communication, the point made
in the Report is that there are not enough rail staff often available at the
time when things go wrong. That is
quite understandable because you do need extra staff. If you see people mobbing round Euston when the trains are called
off you fear for them to some extent because they are in a very pressured
situation and they do not actually know themselves what is going to
happen. In terms of good practice
guidance that is disseminated, what does that have in it that is not done at
the moment? What is that suggesting
that people do more of?
Mr Franks: There are a number of
things. I have a copy here, if you
would like to see it. It is quite a
comprehensive document but it actually covers information off station, so that
is including things like websites and e-services, external media, contact
centres and giving information to those places. It includes information at stations and, picking up your point
about additional resources, when we take this and develop it into contingency
plans or review our contingency plans it is looking at things like whether we
can bring people out of headquarters organisations, can we train them to
actually assist on stations and give support?
It is looking at information on train, providing guidance on precisely
when and what type of information we should give on train and it has also got a
section on information for planned engineering works and how we should get that
information out to customers. It is a
very comprehensive document.
Q34 Dr Pugh:
One of the points picked out on page 24 at 3.5 is a point made by the train operating
companies: "too many rail staff trying to contact the control centre at the
same time".
Mr Franks: That is a real issue
because obviously everyone is seeking information.
Q35 Dr Pugh:
Does that document say something about that?
Mr Franks: Yes, it does, and
there is some real innovation in this using the web where we are now able to
provide information on what we call a flip chart - an automated flip chart - so
that as much information as we can get out to our people is actually available
and can be accessed electronically.
Q36 Dr Pugh:
Does it say something about a point also made here: "a perceived reluctance
among drivers to speak to passengers"?
I think all of us round here are very glad to have the drivers or the
guards or whoever speak to us; the more chatty they are we, the more we, as
passengers, actually like it.
Mr Franks: Exactly. There is a cultural issue in the industry
with drivers and getting drivers to actually communicate with customers where
there are driver-only operated services.
Where we have guards and on-board personnel then that is not so much of
an issue.
Q37 Dr Pugh:
Rather than protocol it would be quite a good idea to ask everybody to be more
forthcoming. I travel on a train to
Liverpool very, very frequently and there is a chap on there who not only tells
me where I am going and what is happening, but what football he supports and
how they have done in the European Championship. That kind of communication actually gives you the impression that
you are dealing with a human being who understands the transport experience.
Mr Franks: I support the point totally.
Q38 Dr Pugh:
On the question of being able to respond positively to the situation when it
occurs, clearly there is a difficulty mentioned in the Report that sometimes
the people at the stations have no idea what is going on out there because the
information is possessed by Network Rail or whoever is looking at the bit of
mangled signalling or cabling that confronts them out in the sticks. How is that being improved?
Mr Franks: One of the big
innovations in recent times is integrated control centres where our own train
operating personnel are sitting right next door to Network Rail personnel and
making the decisions on how to deal with disruptions. That is almost widespread across the country now, that the Train Operating
Companies are sitting with Network Rail.
So that is one way. The second
way is through technology. I would be
the first to admit that there is a lot we can still do in terms of
technological advance here but, as I said, the guidance that we have issued
actually does tackle all of these points.
I would be happy to leave a copy behind.
Q39 Dr Pugh:
Targets have been mentioned already and clearly you are very sensitive to that
because they affect how you are remunerated and so on, but that may be not
necessarily always to the advantage of the passenger. Is there any evidence within the industry that actually the
targets to some extent do not always help when there is an incident? In other words, it may be sometimes more
expedient to the company not to let the train run late but actually to cancel
it altogether. It is not useful to the
passenger to have that happen but it may actually help you meet targets.
Mr Franks: If a train is
cancelled it features in our passenger performance measure as a failure, so it
is effectively late; it counts in our statistics. There is no reason for taking that sort of decision other than to
try to recover the railway in an effective way.
Mr Coucher: If I could just draw
the Committee's attention to paragraph 3.9 which did question whether there was
a perception of whether it was in the best interests of the passengers and the
Report did not find evidence that we were not doing the right thing. Indeed, on the contrary there are instances
where we have made the right decision for passengers even though it will affect
the incentivisation regimes of Network Rail.
Q40 Dr Pugh:
The Report mentioned difficulties you have with coroners when there are
incidents and so on. I did not
understand how coroners could generate difficulties for you; could somebody
explain to me how?
Mr Coucher: We do sadly get some
240 suicides a year; they are very, very disruptive to the network. The BTP do a very good job in trying to
clear these up and they try to get them sorted out in 70 minutes but that does
cause us a big problem, particularly if they are very messy. The coroners are the people who decide
whether this has been a suicide or not and there are a number of coroners
around the country who insist on using their own undertakers and their own
people to assert death. That causes us
problems in one or two pockets.
Q41 Mr Mitchell:
I would just to ask the National Audit Office, why did you not talk to the
victims? You have used general surveys
from Passenger Focus or whatever it is called, but they are very general. They just say whether there is
dissatisfaction and, if there is an incident, was it well-handled. I was involved in a major incident just
before your survey began in 2005. There
was a big break down on the East Coast Line and the train was stuck for hours
in conditions which approximated those on the Bridge on the River Kwai in an
overheated train with no information. I
could have given you a very graphic story about it. Why did you not talk to the victims?
Ms Barker: We did talk to
Passenger Focus and use their information.
Q42 Mr Mitchell:
You could have taken an incident and talked to those people who had live
through it.
Ms Barker: To be
honest it is the practicalities of how much we can do within a period on a
study and unfortunately we did not have the time to do that. We had a good source of information from
Passenger Focus about passengers' experiences.
Q43 Mr Mitchell:
If you talk to the companies and you talk to the Department and to Railtrack
and the rest of it, they are all going to put the best possible gloss on it. You need to get the harrowing stories and
try to come to some conclusions from that.
Mr Burr: I agree with your point, Mr Mitchell, that it is
always better if you can talk to the consumers, the users of the service, and
not just to those who provide it. We
did try to cover that through Passenger Focus.
Q44 Mr Mitchell:
It is not so much the consumers, it is the victims.
Mr Burr: The victims, yes.
Q45 Mr Mitchell:
Just one more point for the Audit Office.
Why are there no figures company by company? I see on page 15 at paragraph 2.2 the most common incident
category was train faults: "with some 48 incidents (65 per cent of our sample)"
had train faults. Those are related,
presumably, to the up-to-date rolling stock, to the maintenance of the rolling
stock, to the way the companies invest in new rolling stock. Surely we need to know that on a company by
company basis.
Ms Barker: The data
we had was on the basis of routes and, given the sample size, if we had broken
it down by companies I think it would probably have been misrepresentative,
there would not have been a big enough sample size. The best thing for us to do was to do it by routes; that was
statistically more valid. You might
have more than one train company operating on a route and given that we were
looking at a constrained period that might not have been a fair picture of what
was going on with particular companies.
Q46 Mr Mitchell:
Mr Mitchell, does the Department have company by company information on who is
investing, whose trains are most likely to break down, who has the ancient
rolling stock? Certainly when it comes
to Grimsby we have been served by ancient, appalling stock. First Group has now put in some new rolling
stock, but the adequacy of that service and the rolling stock was
appalling. Do you have company by
company break down information?
Dr Mitchell: There is a body
called the National Task Force which is made up of representatives of Network
Rail and the train companies and attended by ourselves and the Office of Rail
Regulation. They review, on a company
by company basis, how companies are performing across a whole range of issues,
including the performance of the rolling stock. However, you are correct in saying that over the past few years this
feature has declined in importance as new rolling stock has been brought into
use.
Q47 Mr Mitchell:
I cannot see from the Network Rail point of view that it is any achievement to
have got the rate of breakdowns and problems back down to the level it was
before 2000. That is no achievement.
Mr Coucher: We are proud of our
contribution to pushing rail punctuality to the highest level it has been in
recent memory. The trains are now
running at 90% punctuality; that has been a huge effort by the entire rail
industry and we are proud of our record.
Q48 Mr Mitchell:
The improvement has not gone on, has it?
Mr Coucher: We are now running
considerably more trains; it is a lot more congested out there and that means
that every time you get a single failure it does cause more delays, but on a
like for like basis it is performing in many parts at pre-Hatfield levels.
Q49 Mr Mitchell:
Mr Franks, I would like National Express to put trains on to Grimsby so I will
be very deferential. I have had a brief
experience of this disaster but there are others that have happened when the
cables get tangled on the East Coast line and the whole line is put out. It struck me that a lot of the problems were
those of the operator because as a passenger first of all I am struck by the
fact that supplies - water and food supplies - just were not available. The trains do not carry enough supplies to
cope in case of a breakdown.
Mr Franks: There are a few
issues there. On the point about
supplies on the train, we should carry enough supplies. You referred to the incident in GNER time
when there was a big problem when the train overheated; because the train was
stranded for a long period of time the air conditioning was not working.
Q50 Mr Mitchell:
They ran out of water within a quarter of an hour.
Mr Franks: Yes, they did, and
there were a number of lessons learned.
As a consequence the trains now carry big supplies of water in the
guard's break van. There was a very
deep inquiry into that particular incident I remember well because it was
brought and shared with the industry.
Q51 Mr Mitchell:
In that incident a helicopter had to bring in bottles of Perrier water which
was slightly humiliating, I thought, for the train company. The other thing that struck me - we were
several hours on the train in overheated conditions - was that nobody knew what
to tell us. Staff were running up and
down but nobody could tell us anything.
The passengers were anxious to know but nobody could give us any
information. You are very adept at huge
announcements when people get on the train telling you to get off if you do not
have this ticket or that ticket or you have got an advanced booking ticket;
announcements flood out that you should not really be there. However, in this particular incident
announcements dropped off.
Mr Franks: That was before we were
operating that piece of railway.
Q52 Mr Mitchell:
I accept that.
Mr Franks: There was an
investigation and a lot of lessons were learned. What I would say is that the guidance that we have issued from
ATOC to all industry partners actually does pick up a number of these
issues. It picks up a number of things
that have come from previous investigations and I hope you will find that it is
properly implemented across the industry and we have a group making sure that
the recommendations of the guidance are implemented. When implemented you will see a difference in the way we handle
these things. Sometimes things have not
been done well; we want to make a big difference.
Q53 Mr Mitchell:
We were eventually pulled or towed or whatever back to Peterborough. Peterborough Station was milling with
thousands of people because all the trains had stopped and they were just being
disgorged there. We were told to go to
the Peterborough Railway Hotel which was crowded out. Five minutes after my arrival they ran out of meat pies. There was nobody from the company in a
position to tell us what was going on.
I accept again that this is your predecessor but it seemed to be a major
weakness that nobody was coordinating anything and giving the information to
the passengers.
Mr Franks: We have been running
the East Coast Main Line now for six months and in that period of time one of
my urgent tasks has been to review all of our contingency plans up and down the
line. There was a good reason for that
because soon after we took control we had the overhead wires down on a number
of occasions and as a consequence we have had similar types of incidents to
deal with. Because of that, as I said,
we have reviewed the contingency plans up and down the East Coast Main Line and
our contingency plans do address the issues that are shown in our guidance
notes. I hope you will see a difference
in the future.
Q54 Mr Mitchell:
Moving on to Mr Coucher, the Report finds at 2.17 and 2.19 that often the
emergency services do not know who to deal with and there seems to be
inadequate communication between Network Rail and the different emergency
services. Is this being put right? What are you doing about it?
Mr Coucher: We had already
picked up on that but on the basis of the NAO Report we have gone back and
looked at precisely what we do here. We
recognise that this was a weakness. I
know the Report highlights many failings here but in general a single emergency
service will not have anything to do with the railway for months and months -
maybe years - before they have to deal with something significant. We recognise in that period of time that
phone numbers may have got out of date and we need to do more in that
area. We have looked at this and we
have a rolling programme to go out and re-brief emergency services. From our perspective there are one or two
slight issues to deal with. We do have
co-located controls with our operators so that they can be geographically separated
from the incident itself - for example trains as far as Carlisle are controlled
out of Birmingham - so we need to work more closely with the local areas. Yes, it needs to be put right and we will do
so.
Q55 Mr Davidson:
Can I ask about compensation to passengers?
Do we have figures about how much has been paid out in compensation for
delays to passengers by company?
Dr Mitchell: I am afraid we do
not have a figure broken down by companies.
We can send you a note on that.
Q56 Mr Davidson:
That would be helpful. Do you know how
many incidents occurred in which compensation was paid?
Dr Mitchell: Yes.
Q57 Mr Davidson:
Can you tell me what it was?
Dr Mitchell: We can supply that
too. We do not have detailed figures.
Q58 Mr Davidson:
Give me a feel for it as a percentage of journeys for which a compensation
claim ends up being payable.
Dr Mitchell: We do not have that
data to hand.
Mr Franks: I can give you a feel
in terms of revenue that we hand back to customers. Using an East Coast example we will be paying back about 1% of
our turnover in compensation to customers, about £5 million per annum.
Q59 Mr Davidson:
For how many of your journeys do you think payment would be due? Is it only 1%?
Mr Franks: We offer compensation
to anybody who has been delayed for more than 30 minutes. If their journey has been delayed for an
hour or longer then they get much bigger compensation. For a journey delay of 30 minutes they get
half of their ticket price back.
Q60 Mr Davidson:
That was not the point I asked. What I
was asking was what percentage of the journeys that are undertaken are eligible
for compensation?
Mr Franks: I would need to give
you a calculation to give you that answer.
Q61 Mr Davidson:
I am presuming it is much more than 1%.
Mr Franks: It is, yes.
Q62 Mr Davidson:
What percentage of those passengers that would be due compensation actually
make claims?
Mr Franks: Again that is a very
difficult question to answer because we do not know precisely who is joining
and alighting from trains at particular times.
Q63 Mr Davidson:
You must have a feel for it.
Mr Franks: No. I could do a calculation and give you an answer
if you want me to.
Q64 Mr Davidson:
I think that would be helpful. What I
am concerned about or interested in is to what extent the pockets of the
operating companies depend upon people not claiming the compensation that they
are due and about which they are not made aware. Can you give me a feel for that at all?
Mr Franks: Perhaps I can answer
the question slightly differently. The
performance regimes within our access agreements and the payments we pay back
to customers absolutely incentivise us to get the performance right on the
railway. I will use an East Coast
example because I know it well, but we could find ourselves exposed to a £10
million to £15 million payment to Network Rail and a £5 million payment to
customers in a typical year if we do not get things right.
Q65 Mr Davidson:
I do understand that, but you are also incentivised to make sure that
passengers are aware of their right to claim.
Network Rail will know the system for claiming, but at the moment there
is not much effort made by the operating companies to tell passengers that they
are entitled to claim. Is that correct?
Mr Franks: No, it is not
correct. Again if you were to travel on
a train that has been delayed for 30 minutes on the East Coast you will be
handed out a delay repay form on the train.
Q66 Mr Davidson:
Of the times that I have been on either the East Coast or the West Coast and
there have been delays I have never received a form indicating to me that I can
claim.
Mr Franks: I can only comment in
this regard in terms of the services I am operating, but that is certainly the
case.
Q67 Mr Davidson:
I am genuinely surprised by that answer.
You are saying to me that the rule that you are trying to apply is that
everyone who might be eligible would actually be handed an application form to
claim back compensation.
Mr Franks: Absolutely.
Q68 Mr Davidson:
That would be, to take the London to Glasgow line, as little as 30 minutes of a
delay.
Mr Franks: I am using my East
Coast as an example here, so if you came on the East Coast from Glasgow then if
you had been delayed 30 minutes or more then you would be entitled to claim a
refund.
Q69 Mr Davidson:
How do you know whether or not that is actually taking place?
Mr Franks: I certainly know how
much money I am handing back to customers.
Q70 Mr Davidson:
That does not count because it could be that you are either paying a large
amount from one train or a small amount from a large number of trains. It does not necessarily follow that forms
are always handed out. Do you have
figures, for example - I think it would be helpful if we had a note on this -
which indicate which trains were delayed and then being able to compare whether
or not you had any claims for compensation from those particular trains. Not just yourself as your particular
company, but for the industry as a whole, because presumably if there were
trains which had been delayed by an amount which would then lead to a claim
being payable but in fact no claims were made, it would be reasonable for us to
assume that the forms had not been issued.
Mr Franks: I can answer for
National Express Group companies.
Q71 Mr Davidson:
Can I clarify something? I understand
that you are not here from National Express; you are here from the Association
of Train Operating Companies and therefore you are liable to answer for all
companies, not just for yourself.
Sliding out of it by saying, "It wasn't me, guv, it was somebody else"
is not really clear enough.
Mr Franks: I have not tried to
slide out of it. What I would say is
that I think if it is an industry response to this you might need to ask Dr
Mitchell from the Department. I can
certainly provide data from the train operating companies that I operate.
Q72 Mr Davidson:
You are not here representing only your company. You are here, as I understand it, representing the Association of
Train Operating Companies and therefore presumably speaking on their collective
behalf rather than as an individual. Is
this being passed to Dr Mitchell?
Dr Mitchell: We can possibly
help you. We are quite happy to ask the
Association of Train Operating Companies for the data you have requested and we
will get back to you on that.
Q73 Mr Davidson:
Would you normally collect that?
Dr Mitchell: No, we would not
normally collect that data.
Q74 Mr Davidson:
So if I had not been raising this you would not be asking for it. If I had not raised this with you there is
no check on whether or not the train operating companies actually issue the
forms to passengers who are delayed by an amount for which compensation would
be payable.
Dr Mitchell: We do not carry out
a check. I know it is only a number of
instances that I can tell you about, but I am a regular passenger on the East
Coast Line and I can recall four or five occasions when I have been issued with
delay pay forms.
Q75 Mr Davidson:
They will recognise you!
Dr Mitchell: No, not at all.
Q76 Mr Davidson:
A little flag will go up when you are on the train.
Dr Mitchell: No, I do not think
so, but I can say in support of Mr Frank that it does happen when delays
occur. What I cannot say of course is
that it always occurs on every train and that is why we would offer to get the
information for you from the Association of Train Operating Companies.
Q77 Mr Davidson:
It would be helpful if you got it not only collectively but also by companies
to identify whether or not there is any company that is particularly poor. I take it that yourself or the National
Audit Office will actually check that the figures you are getting back in are
correct on that. Can I just clarify
about the publicity for eligibility to claim?
Is there publicity provided only at the point when the delay occurs or
is it provided beforehand? From my own
experience I have never had any publicity provided to me about eligibility to
claim.
Mr Franks: It appears in our
Passenger Charter.
Q78 Mr Davidson:
How many passengers do you think read that?
Mr Franks: That is where it is
recorded.
Q79 Mr Davidson:
So really that means that no information is provided.
Mr Franks: Other than in the way
I have described, we would hand out the forms on trains.
Q80 Mr Davidson:
Can I ask about attacks on staff related to delays? Obviously you monitor attacks on staff. Is there a pattern by which it is identifiable that attacks on
staff are more numerous at times of delay?
Mr Franks: There certainly are a
number of instances recorded where staff have been assaulted as a consequence
of passengers being unhappy about disruption.
Q81
Mr Davidson:
Is there a pattern to that at all? Is
it a particular line? A particular
area? A particular part of the country? Or is it entirely random?
Mr Franks: Again I would need to
go and check statistics but I think it is probably random.
Q82 Mr Davidson:
Could you do that? I think it would be
helpful for us to know whether or not there was any pattern there. In terms of delays, which operating company
is worst and which is best, and how do you define that?
Dr Mitchell: There are figures
which are published on a monthly basis and it will be no secret that First
Great Western was, until recently, the poorest performing company. As a result of that the secretary of state
took action to enforce an improvement plan.
Generally speaking the most up-to-date figures I have for period 13 -
which is most of March this year - the cumulative position for the whole of the
train industry showed the best performer as Chiltern Railways achieving a 95%
public performance measure, which is a measure including not only lateness but
cancellations as well. The worse
performer was National Express East Coast at 82.6%.
Q83 Mr Davidson:
Do I take it that there should probably be a correlation between the bad
figures from the National Express and the amount paid out in compensation, and
that generally we would expect that those were the best records?
Dr Mitchell: Yes.
Q84 Mr Davidson:
If there is anything that does not correlate to that then there would be
something wrong.
Dr Mitchell: One would expect
that except that, as the table on page 47 of the Report at appendix four
indicates, there are variations, but with that proviso yes.
Q85 Mr Davidson:
The final point I would seek to clarify is about train faults and the
relationship between the operating companies and the leasing companies. Is there any sanction in these circumstances
applied to the companies from whom the trains are being leased or does it all
fall on the operating companies?
Mr Franks: It all falls onto the
operating companies.
Q86 Mr Davidson:
So there is no responsibility for the leasing companies at all then.
Mr Franks: No.
Q87 Mr Davidson:
Are any of the faults traceable back to the leasing companies or are they all
the responsibility of the operating companies?
Mr Franks: The most common
problem that could be associated with a rolling stock company would be where
they have undertaken heavy maintenance, which is their responsibility, and
there may be a warranty issue with a piece of equipment that has been installed
on a train which then causes delay on the network, but that becomes our
accountability.
Q88 Mr Davidson:
Can you then claim the money that you end up paying to somebody else back from
the leasing company or are they getting off scot-free?
Mr Franks: They do not take any
responsibility for any compensation that we pay.
Q89 Mr Davidson:
Being a leasing company is the best position of all in these circumstances.
Mr Franks: Well it is certainly
better than being a train operating company if they cause a delay.
Q90 Mr Davidson: Who allowed this position to develop,
that the leasing companies can lease the trains but they have no accountability
for the fines that are applied to the operating company? It does seem to be a trifle unfair.
Dr Mitchell: The leasing
companies effectively purchased the rolling stock from British Rail in the
mid-1990s and the terms on which they are then leased back were determined at
the time. The leasing companies own the
rolling stock but they do not take any responsibility for the condition of the
trains. It is left to the operators to
maintain those trains in good condition.
Q91 Mr Davidson:
Does that seem reasonable to you?
Dr Mitchell: They are not
regulated.
Q92 Mr Davidson:
That is not what I asked you. Does that
seem reasonable to you?
Dr Mitchell: That is the
position we have inherited.
Q93 Mr Davidson:
I know that; I am asking you whether or not that seems reasonable to you.
Dr Mitchell: We have made a
complaint to the Competition Commission about the position of the rolling stock
companies and the Competition Commission is considering our complaint as we
speak.
Q94 Nigel Griffiths:
Dr Mitchell, you said the newer rolling stock is more reliable; what is the
sort of history and pattern of replacing rolling stock over the past decade or
two decades?
Dr Mitchell: The majority of the
new rolling stock came into service in the early part of this century, that was
to replace the slam door rolling stock on the electric lines south of
London. That is the biggest single influx
of additional rolling stock that came in.
However, I think it is fair to say that every company in the country has
seen an influx of new rolling stock, so much so that we now, I believe, have
the youngest rolling stock fleet in Europe.
Q95 Nigel Griffiths:
I notice the Report says that passenger rail services are being used more
heavily than at any time in almost 60 years which must be putting some strains
on it. I am interested to know the
impact of Hatfield on your operations.
Can you tell us something about pre-Hatfield and post-Hatfield?
Dr Mitchell: No doubt Mr Coucher
will wish to comment on that particular issue because, as you are aware, the
Hatfield incident arose from a track defect which then caused multiple speed
restrictions throughout the country and that led to a major reduction in
punctuality of the railways. It has
been a major challenge to get back to pre-Hatfield performance and we have now
set the high level output specification for the next five years from 2009 to
2014, an even higher target for the railways of 92.6% right time, which
compares with the current performance of about 90%.
Q96 Nigel Griffiths:
What were the reasons for Hatfield?
What caused the Hatfield incident?
Mr Coucher: A piece of rail on
one of the high speed turns cracked and failed due to a concept called rolling
contact fatigue.
Q97 Nigel Griffiths:
How widespread was that throughout the network?
Mr Coucher: Immediately after
Hatfield Railtrack then put in an investigation programme which uncovered huge
amounts of problems with this concept called rolling contact fatigue and that
has largely been removed now.
Q98 Nigel Griffiths:
What had caused the fatigue?
Mr Coucher: Just the speed of
trains going over the rails and the problem had not been picked up.
Q99 Nigel Griffiths:
Figure 16 on page 29 indicates that the annual number of incidents causing
delays is actually at an eight year low.
Is that right?
Mr Coucher: Yes.
Q100 Nigel Griffiths:
I am not sure in the Report why eight years were chosen as the sort of
timescale. Was there something
horrendous the year before that?
Ms Barker: No, it is fairly
standard to look at Hatfield and then look at performance thereafter. It is just a way of looking at it.
Q101 Nigel Griffiths:
What has been the trend in passenger satisfaction?
Dr Mitchell: Passenger
satisfaction is currently running at a very high level. It is approximately 80% of people being
satisfied or very satisfied with performance, but of course I would be the
first to admit that that is an average figure across the whole of the railway
and may not necessarily reflect the position on individual services or
individual lines.
Q102 Nigel Griffiths:
One of the things that I did find distressing and shocking, although not as
terrible for the train crews and the emergency services, is the number of
fatalities and incidents. If I look at
table 21 in appendix two, am I right in interpreting that the external
fatalities and trespass amount to what is almost one year of delays, a delay of
522,000 minutes?
Dr Mitchell: Yes.
Q103 Nigel Griffiths:
In Sussex I see the problems that are highlighted in paragraph 23 on page 36
where fatalities on the Sussex route caused over 40,000 delay minutes, that is
a month of delays. Am I interpreting
the data from the Report correctly?
Mr Franks: This is a continuing trend. In East Anglia alone this year there have
been more than 50 fatalities.
Q104 Nigel Griffiths:
Can more not be done to prevent such fatalities?
Mr Franks: It is an incredibly
difficult problem. We have been working
with the Samaritans, particularly in East Anglia, because it seems an extreme
set of circumstances there. We have
tried to adopt a number of things, providing contact details and alerting our
staff and training our staff to look out for potential signs that somebody may
be attempting to commit suicide. There
are some things you can do, but it is a really difficult problem.
Q105 Nigel Griffiths:
The Jubilee Line at Westminster in particular is like the Moscow Underground
and does have a non-access closed door system.
Has that been considered at all for stations or do fatalities take place
mainly away from the stations?
Mr Franks: It is a mix. Some are at stations; some are away from
stations. It would be an incredibly
expensive exercise to try to protect people on every single station. It is not an easy thing to do.
Q106 Nigel Griffiths:
I see train crew causes, which are fourth highest for causing delay
minutes. Presumably that is a mixture
of non-attendance, sickness or what?
Mr Franks: It can be but it can
also include displacement of train crews because of other disruption earlier on
on the network.
Q107 Nigel Griffiths:
Knock-on effects.
Mr Franks: Yes.
Q108 Nigel Griffiths: The examples that the National Audit
Office have helpfully given us, the case studies, you clearly seem to be in the
hands of the emergency services. If we
take case study three, they seem to be able to respond fairly quickly to a
potential incident around acetylene gas cylinders. These must be difficult problems to get to grips with.
Mr Coucher: Yes. Fire is a particular concern for us. There was a change in the fire regulations
which extended the cordon zone which fire officers would put around a burning
fire to 200 metres. Regrettably,
because of the nature of the railway, we do get a lot of industrial work sites
along the side of the railway and we have been caught with that a number of
times. You can see from example three
just how impactful these things are. We
have been working very closely with the London Fire Brigade to look at new ways
in which we can use technology - remote robots for example - to reduce the
impact of these but they are disruptive.
We have got some great ideas of how we can reduce it and hopefully we
can roll those out in the next few months or years.
Q109 Nigel Griffiths:
I think it might be helpful to have a summary of that in a note.
Mr Coucher: Of course.
Q110 Nigel Griffiths:
On fatalities, I notice it is not listed in the 44 categories and I presume
that it is not in the top 44, but there are dangerous operating conditions
obviously for contractors. Do you have
at your fingertips the trend in terms of fatalities on railway lines by staff
and contractors working and whether action that you have taken has eliminated
those?
Mr Coucher: I can certainly
provide that. These are all the
categories of delays, not just the top 44.
We have worked long and hard to improve the safety of our workforce over
the last four years. The safety record
of the workforce is at an all time high.
The previous year we had zero workforce fatalities for the first time in
the history of the British rail network but sadly since then there have been
one or two instances and we are constantly looking for ways in which we can
improve safety for our workforce.
Q111 Nigel Griffiths:
On page 35 the NAO make the pretty sensible point that shows that the routes
that have the highest number of incidents and delays also I think have the
highest loads and they are contrasting London and the Northeast and
Scotland. Do you monitor a per mile
usage or per passenger usage figure that shows you that some areas are actually
much better at dealing with incidents than others and if that is the case are
you able to showcase and adopt best practice from those areas?
Mr Coucher: That is precisely
what we do do. A lot of the efforts we
have done to reduce delays over the last four or five years have been based on
identifying best practice and rolling it out, not just in dealing with
incidents but providing the best ways of maintaining the asset to reduce the
number of failures in the first instance.
I have countless examples I could provide - but I am sure you would not
want them all - about how we are taking best practice and rolling it around the
country. The charts are slightly
misleading here because they are not normalised by the number of train
movements but we could do that for you as well. You will find that although places like Sussex and Wessex have
relatively small numbers when you normalise the number of trains, they are
actually similar in terms of complexity.
Q112 Dr Pugh:
We touched briefly on the weather and I think you said proudly that you were
running trains in times when Holland and so on were taking them off because of
bad weather. That is not the perception
of the British passenger; the British passenger often thinks that when trains
go off because we have some freak weather that over in Switzerland, Sweden,
Finland and all those sorts of places the trains carry on regardless and there
is something quintessentially British about the fact that we take our trains
off during bad weather, which is precisely the times when we do not want to use
our cars. You gave us the anecdote - I
was impressed but it, it was not what I expected - but is there any hard data
that either you have or the NAO have that show whether our system is more
vulnerable or less vulnerable to bad weather?
Mr Coucher: I do not have the
statistics for that but I can explain that we do a lot of benchmarking
work. A lot of the European companies
come to us to see how well we manage autumn.
Autumn has been a problem in the past and there has been a lot of hard
work with ourselves and the train operating companies because it is a joint
responsibility. We have improved
that. We still struggle from extreme weather
conditions; it is difficult to run trains when the railway is under water.
Q113 Dr Pugh:
To be fair, our weather is probably no more extreme than weather of most
mainland continental European countries.
Mr Coucher: It is much more
variable so we get swings in weather conditions which change in a matter of
hours rather than the more benign type of weather. The weather in Switzerland, for example, is much more predictable
and they do have systems and processes designed to cope with their weather.
Q114 Dr Pugh:
Is it possible for you to share with us the results of some of your
benchmarking exercises?
Mr Coucher: Yes, I would be
happy to do that.
Q115 Mr Mitchell:
I see from the Report that delays - passenger mile delays or whatever - are up
30% in the period concerned due to vandalism and theft. This is largely attributed to cable thefts
in the Northeast. Why is that? Is it that the scrap metal dealers live by
the railway track in Geordie-land? Or
is the cabling more exposed there? What
are you doing about it? I know a kind
of glad song of praise for Geordies goes up at Doncaster Station every time the
train is a couple of hours late because of cable theft. Why is it?
Mr Coucher: In the last few
years the price of copper has risen dramatically.
Q116 Mr Mitchell:
Yes but not particularly in the Northeast.
Mr Coucher: It has risen
dramatically and we have seen a significant increase in the amount of cable
theft and the specific target areas - we are not entirely sure why this might
be - are the Sheffield and Nottingham areas.
Those are the most prevalent areas.
We have had instances in the Northeast but we are working long and hard
with the British Transport Police. It
costs the industry millions of pounds a year in sorting repairs out and causes
huge amounts of disruption to passengers.
It is a real problem we are having to wrestle with now; I do not think
it is specific to certain people around the country, but there are parts of the
railway which are more easily targeted, particularly where there are freight
only lines which are scarcely used. If
you are trying to be a cable thief in the Southeast where there are trains
moving every few minutes you do not get much chance to work. It is where they are lightly used and
exposed.
Q117 Mr Mitchell:
Have you got on top of it now? The
stoppages have not been as frequent.
Mr Coucher: It is a difficult
problem to get on top of. We put a huge
amount of resource in, along with our customers and with the BTP to try to keep
it in abeyance. It looks like it is
coming down but it could change drastically.
There has been a lot of hard work targeting thieves and the scrap metal
merchants. We are using helicopters and
doing anything we can to try to track this down but it is a real problem and it
particularly affects the operators on the East Coast.
Q118 Chairman:
I see at appendix two on page 33, Mr Coucher, that incidents are analysed by
category. There is an incident there:
vegetation management failure. What
does that mean?
Mr Coucher: The railways are a
wonderful natural corridor covered with a lot of trees and when it rains and
branches fall down they can either fall onto the overhead line or they can
obscure signals and we have to fix them.
One of the solutions is to cut these things back but we appreciate that
is somewhat sensitive in many areas.
Q119 Chairman:
Mr Franks, what difference have you made in the six months since you have taken
over from GNER as far as the public are concerned?
Mr Franks: I can give you a
couple of very quick examples. Our
National Passenger Service goals have improved from 82% to 86% in our first go,
and our performance has also improved quite significantly such that in the last
period of results which have just been published we have managed to get a PPM
score of 89.5%. So performance is
getting better.
Q120 Chairman:
What about the way the staff deal with the passengers?
Mr Franks: I would like to think
there has been some improvement. GNER
in their time did a good job with the staff on the East Coast Main Line and I
think towards the end of the franchise some heads went down; I think some heads
have come back up now. I would like to
think that we have made an immediate impact but I think there is always a lot
to do to keep that going.
Q121 Chairman:
Do you mind if I ask a purely personal question? Mobile phones drive me absolutely round the bend on trains. Why do you not have a quiet coach in first
class as well as second class? Or
extend quiet coaches generally? There
is nothing worse than people who just witter inanities into their mobile phone
endlessly.
Mr Franks: It is a difficult
balance because there are a limited number of seats in first class and a lot of
people want to use the space to actually work.
Q122 Chairman:
We are in the era now of blackberries and texting and all the rest of it. It is not necessary for people to have
lengthy meetings on their mobile phones, is it?
Mr Franks: It is a difficult
call. Some people would say that but
other people would say they want to be able to use their mobile phones.
Q123 Chairman:
So you are not going to do anything about it.
Mr Franks: I will certainly take
the point you have made.
Q124 Mr Davidson:
Perhaps you could have a special section for boring calls and another for
interesting calls. Some of the calls I
hear are actually quite interesting.
People obviously have far more exciting lives than I do! Going back to the question of compensation Dr
Mitchell, I see in paragraph 3.12 that there are negotiations under way to have
harmonisation of compensation as part of the franchise agreement. Do you have any idea when that is likely to
take place and are you meeting with any resistance?
Dr Mitchell: I would not say
that we are meeting with any resistance, but we have so far got to delay the
pay arrangements with a large number of franchises. I can give you the list here if you wish: Arriva Cross Country,
East Midlands Trains, Chiltern Railways, First Capital Connect, Gatwick
Express, London Midland and the two National Express East Anglia and East Coast
franchises. We would expect, to answer
your question directly, to complete that when we complete the full round of
franchises.
Q125 Mr Davidson:
None of the new arrangements are worse than the best of the previous
arrangements.
Dr Mitchell: No, that is
correct. In fact there is a fair amount
of evidence that the individuals who are delayed are getting a better deal from
the new arrangements than they were out of the more generalised season ticket
discounts and other arrangements that applied before.
Q126 Mr Davidson:
Just to be clear, the new arrangements are better than all the old
arrangements, are they?
Dr Mitchell: We believe so, yes.
Chairman: Thank you very much
gentlemen. As trains become more
popular they become more crowded and we are still looking at 10,000 days of
delays suffered by travellers so there is a lot of hard work still to be done,
but we are grateful for your efforts.
If one thing comes from this hearing I am sure we would like to stress
the absolute vital importance of sharing information as quickly as possible
with passengers. Thank you very much.