Memorandum from Eurotunnel (TS 46)

INTRODUCTION

1.   Eurotunnel—description

  Eurotunnel is the privately-funded Anglo/French concessionaire, which designed, built and now operates the Channel Tunnel. The tunnel system links the rail and motorway networks of the United Kingdom and France. The system comprises three tunnels, each of approximately 50 kilometers in length and running under the English Channel between terminals in Folkestone, Kent and Coquelles, France.

  Two single-track rail tunnels are used for truck and passenger shuttle trains and for Eurostar trains and freight trains. The third tunnel which is a road way laying for most its length between the two rail tunnels is designed to provide a safe means of evacuation (the safe "haven") and is used for maintenance purposes.

  Juxtaposed frontier controls and security clearance take place at the departure terminal, avoiding the need for such systematic controls on arrival.

  The capacity of the tunnel is expressed in standard paths per hour in each direction. The signalling system currently permits 20 standard paths per hour in each direction. Ten of these paths are assigned to Eurotunnel's Shuttle Services, and 10 to train operators.

  Eurotunnel operates a fleet of 16 truck shuttles and nine passenger shuttles. Truck Shuttle Services currently provide a maximum of six departures in each direction at peak times. Each freight shuttle can carry up to 30 trucks. Passenger shuttles carry cars, campervans, caravans, coaches, motorcycles and trailers and currently provide a maximum of four departures in each direction at peak times. Each passenger shuttle can carry up to 120 cars and 12 coaches or 180 cars.

  Under the Railway Usage Contract (RUC) half of all Channel Tunnel capacity is given to train operators. This includes Eurostar, which operates high-speed passenger-only services which connect London and Ashford with Calais, Lille, Paris, and Brussels. La Societe Nationale des Chemins de Fer (SNCF) and English, Welsh & Scottish Railways (EWS) operate international rail freight services.

  Eurostar is jointly owned by Eurostar (UK) Limited, SNCF and SNCB. There are a minimum of 14 Eurostar daily departures in each direction between London and Paris and seven daily departures in each direction between London and Brussels.

  During 2005 the Eurotunnel system transported: 1,308,786 trucks, 2,047,166 cars, 77,267 coaches.

  In addition, 7,454,497 Eurostar passengers were transported as well as 1.6 million tons of merchandise (SNCF, EWS).

2.   The Eurotunnel Debt

  Eurotunnel currently has debts of £6.3 billion, which date from the construction phase. Traffic levels have never reached those forecast at the outset and therefore the group is unable to meet repayments on this debt. In November 2006 the Minimum Usage Contribution from the railway operators comes to an end with the loss of c £70 million per annum revenue. In early 2007 the first major repayments of debt principal become due. Without a consensual financial restructuring, Eurotunnel will be unable to meet its contractual obligations from early in 2007.

  Since July 2005, Eurotunnel has engaged its creditors in talks aimed at achieving a consensual financial restructuring that will allow the Company to meet its obligations and develop its services in the future. A first "waiver" period ended on 31 January 2006 with the signing of a Memorandum of Understanding between Eurotunnel and an Ad Hoc Committee representing more than 50% of the total debt. A second waiver period came to an end on 31 March 2006, by which time other creditors had formed a committee representing a large majority of junior and subordinated debt holders. A third waiver period is currently in place, allowing Eurotunnel to negotiate, for the first time, with all the creditors together. This waiver ends on 12 July 2006 but has a review point in mid May by which time Eurotunnel hopes to have achieved significant progress towards a financial restructuring.

THE INITIAL DESIGN OF EUROTUNNEL

  3.  Having been designed and built during an era of terrorism, Eurotunnel had the advantage of being able to incorporate suitable countermeasures into every phase of the construction and commissioning. The Eurotunnel scheme was authorised following a competition involving three other rival projects. In their "Invitation to Promoters", dated April 1985, the two governments required promoters to prepare a separate confidential report, detailing how they would counter the threat of terrorism and sabotage. In its White Paper ("The Channel Fixed Link") dated 6 February 1986, the UK Government said that one of the reasons the Eurotunnel system had been selected was that it was the least susceptible to sabotage.

  4.  The Treaty of Canterbury signed on 12 February 1986 and the Concession Agreement dated 14 March 1986 authorised the bi-national Company Eurotunnel to operate the Channel Tunnel Fixed Link which comprises the tunnels and the French and British terminals.

  5.  In compliance with Article 5 (3) of the Treaty of Canterbury concerning the construction and operation of a Channel Fixed link and with Clause 23.1 of the Concession Agreement in respect of the security of the Fixed Link, Eurotunnel submitted a Global Security Report to the Joint Principals. This document is also a response to the joint Government letter of 14 February 1989 which sets out the general principles which the Governments wished to see in the Channel Fixed Link arrangements. It details the security measures to be taken by the appointed authorities to ensure the safety and security of individuals, installation and assets, as well as the commercial integrity of the enterprise. The submission by the Channel Tunnel Group to obtain the Channel Fixed Link Concession identified threats which might have to be considered during the period of the Concession like destruction or very severe damage by a very large explosive charge, terrorist acts with smaller explosive devices, hijacking or hostage taking, disruption of the services by hoaxes, interruption of the services by demonstrations. The Joint Principals considered that threats to be taken into account were: intrusion onto the site (peripheral or in depth), introduction of weapons, sabotage, placing of an explosive device, attacks against the installations, attacks against persons, bomb alerts, internal complicity or negligence. Reappraisal of the threat changed the original concept and careful consideration was given to assessing the likelihood of such a threat materialising under various conditions. As a consequence, Eurotunnel was asked to have at its disposal for the UK site, in accordance with English law and practice and the legal requirements stated above, a security force capable of carrying out the security functions needed to provide a satisfactory security cover for the day-to-day operations to a level which will provide an effective deterrent. This force should undertake the following tasks: security controls and supervision, access controls on the sites, manning of static control and check points operation of mobile patrols, security checks on tourist and freight traffic, operation of explosive detection equipment and X Ray screening. A list of systems and equipment including CCTV, fence alarms, perimeter security systems were proposed.

  6.  Eurotunnel believes that it has complied fully with, and in fact has gone beyond all the security requirements of both governments.

REGULATION OF EUROTUNNEL SECURITY

  7.  In the UK, the Secretary of State for Transport, in exercise of his powers under Articles 11 and 12 of the Channel Tunnel (Security) Order 1994, conferred under section 11 of the Channel Tunnel Act 1987, requires that the "concessionaire Eurotunnel" be responsible for security on a day-to-day basis for the Eurotunnel site.

  8.  An Inter Governmental Commission (IGC) has been created to supervise, on behalf of the governments, all matters connected with the Channel Tunnel, including questions relating to security and safety. Specific Security Committees (national and bi-national) have been established to oversee the security arrangements for the tunnel system. They include representatives of the relevant Administrations and the Transport System Operators.

  9.  In conformity with the Treaty and the Concession Agreement, the governments have appointed specific "Competent Authorities" responsible for the security of the Channel Tunnel Fixed Link. In the UK:

    —  TRANSEC (the Department for Transport's Security organisation) prescribes the arrangements necessary for site security and for security checks on tunnel users, contractors and visitors. Under TRANSEC's authority and supervision, Eurotunnel implements these measures. TRANSEC in turn regularly inspects and audits the security arrangements.

    —  Notices and directions issued from time to time by TRANSEC define and refine the security arrangements required of Eurotunnel.

    —  The Eurotunnel Security Department liaises with the UK Authorities and implements the necessary measures to enable Eurotunnel to respect the security obligations imposed by TRANSEC.

    —  Kent Police is present on site and carries out Police functions and provides support to the frontier controls.

  10.  Since the start of the operation of the Eurotunnel Fixed Link in 1994, security measures defined by the Governments have been both implemented and financed by Eurotunnel.

  For example, Eurotunnel has provided Ionscan, Under Vehicle Video Systems (UVVS), Access Control Systems, CCTV and the Euroscan (X-Ray) security systems with a global cost of approximately £19 million.

  Each Year the employment of security personnel costs approximately £7 million. In addition Eurotunnel has financed the measures needed to counteract the illegal immigrant phenomenon in France costing £4.2 million, to protect the site against illegal intrusions.

  In 2001-02 Eurotunnel considerably reinforced the French site with CCTV, Passive Millimetric Wave Imaging (PMMW) and extra fencing at a cost of £2.7 million.

  11.  In compliance with the Government and industry policy for the border agencies and industry to work closely together, the Multi Agency Threat and Risk Assessment (MATRA) was implemented on the UK terminal in 2005 in order to analyse the remaining vulnerabilities, to respond to changing requirements and to implement a clear method of response to the new risk (Please see attached Annexe).

  12.  Safety and security have always been and remain Eurotunnel's primary operating principles, taking priority over financial and commercial considerations.

ASSESSMENT OF SECURITY EFFECTIVENESS

  13.  Eurotunnel security measures are constantly assessed to refine and improve them, in particular by means of Internal Audit, and external reporting to and feedback from the various bodies referred to above.

  14.  The annual bi-national emergency exercise ("BINAT"), organised by the two governments in turn, tests emergency response in extreme situations. Each year Eurotunnel halts commercial operations to test its procedures for dealing with different crisis situations. This year an exercise was organised to test reactions in the case of a chemical attack in the Tunnel. Following this exercise a working group has been established, comprising representatives from Eurotunnel as well as the French and UK Authorities in order to develop the procedures for managing new types of threat, such as chemical, biological or nuclear attack (CBRN).

  15.  Personnel are currently being trained and made aware of the new threats being presented by CBRN and possible attacks on the tunnel's computer systems.

  16.  Action Plans incorporating recommendations from audits and projects aimed at reinforcing the periphery protection of the site and dealing with equipment which has become obsolete since its implementation in 1994, have been put in place in liaison with TRANSEC and Kent Police.

CONCLUSIONS

  17.  The equipment and facilities required by the British Government, and financed and put in place by Eurotunnel, have required very substantial investment. Such investment in security is unprecedented in a private transport company. In addition to the measures originally put in place, Eurotunnel has continued to invest in new security measures—enhancement of the Euroscan facility and the development, with Qinetic of PMMW, for example—to keep pace both with the emerging threat of global terrorism and the growth in tunnel traffic.

  18.  In addition, Eurotunnel does not impose a security tax on customers as do the sea and ports operators.

  19.  Eurotunnel has put in place all the various measures to combat terrorism, as required by the Government and as identified by internal auditing and other procedures.

  20.  Eurotunnel has therefore provided and financed security over and above what is customarily required.

  21.  Continuing to absorb fully these security costs is an additional obstacle to Eurotunnel in reaching a consensual financial restructuring agreement with its creditors.

Annex

MATRA (MULTI-AGENCY THREAT & RISK ASSESSMENT)

  The current protective security arrangements for the Channel Tunnel are designed to be sustainable, proportionate and responsive to any particular terrorist threat. They seek to protect private and commercial passengers, their vehicles, and site personnel against criminal and terrorist acts; they also cover rolling stock and infrastructure.

  The security arrangements are generated from the Directions set by TRANSEC who are responsible for monitoring their effectiveness, and they are implemented and paid for by Eurotunnel.

  Kent Police (Channel Tunnel Police Unit—CTPU) are responsible for policing the Eurotunnel terminal and have a significant counter-terrorism operational role and response capability.

  H M Customs Revenue and Excise and HM Immigration Service run their own separate security operations on site.

  MATRA is a process designed to manage risk, by identifying and bringing together all those who have an interest in security at a site ("security stakeholders") and who are seeking collaborative working.

  The MATRA methodology takes a given threat, assessed as capable of being carried out, and seeks to identify all potential vulnerabilities in a site's operation arising from both criminal and terrorist activity—from shop-lifting to hijacking. The product of threat and vulnerability to that threat is risk:

Threat x Vulnerability = RISK

  The result of listing all the threats and attendant vulnerabilities of a site has a "risk register". By providing a methodology for examining the vulnerability of the site to each and every threat and assessing the effectiveness of physical and procedural methods for reducing that vulnerability, the MATRA process actively manages the mitigation of those risks to safety and security.

  The risk register is based on risk to the site, not on the scope of responsibility of each security stakeholder. It is used as a basis for prioritisation and action planning and identifies lead stakeholders—those who are best placed to tackle the risk. The likelihood of a risk being ignored by two adjacent stakeholders is minimised. The process improves efficiency of resource usage by eliminating duplication of effort: And tactical plans and resources are aligned to an informed set of standard operating procedures based on the likelihood of a vulnerability being exploited.

  MATRA was developed jointly by the Department for Transport and the Home Office in response to the safety and security environment of airports.

  Following an IGC meeting on 20 July 2004, the Kent Constabulary and Eurotunnel commenced preliminary work to assess the applicability of the principles of MATRA to the Channel Tunnel operation at the Cheriton site. A number of development group meetings were undertaken by the Strategic Research and Planning Unit of Kent Police (SB) and Eurotunnel managers. The work has been reviewed at several meetings, and the project is now being piloted for the final application at Eurotunnel.