Memorandum from The National Union of Rail, Maritime and Transport Workers (RMT) (FT 06)

  1.  The National Union of Rail, Maritime and Transport Workers (RMT) welcomes the opportunity to contribute to the Transport Select Committee inquiry into Freight Transport.

  2.  RMT organises around 75,000 workers in all sectors of the transport industry and negotiates, on behalf of our members, with some 150 employers. In the freight transport sector we represent members at rail freight operating companies including EWS, Freightliner and Freightliner Heavy Haul. We also organise workers in the road freight industry at companies including Freightliner (which operates multi-modal services), DHL, Wincanton Logistics, UPS and Initial City Link.

ENCOURAGING MODAL SHIFT

  3.  RMT remains committed to a fully integrated, publicly owned and democratically accountable transport network. Self-evidently, all forms of freight transport will continue to contribute towards an integrated and environmentally sustainable freight and logistics industry across Britain. However we are strongly of the view that in order to tackle road congestion, to counter the damaging effects of environmental pollution and contribute to the statutory targets set out in the Climate Change Bill to reduce carbon emissions by 60% by 2050, Government should develop a freight and logistics strategy which encourages significant modal shift from road to rail and other environmentally sustainable forms of transport.

  4.  Regrettably, the percentage of freight moved by road in the UK is higher than the EU average. Indeed, carbon emissions in the UK from Heavy Goods Vehicles increased from 6.3MtC in 1994 to 7.6MtC in 2004: a rise of just over 20%.[3]

  5.  The environmental benefits of rail freight are well established. The Freight on Rail partnership, of which RMT is a member, indicates that an average freight train and an average aggregates train can remove from our roads 50 and 120 HGV journeys respectively. Furthermore, the Rail Freight Group estimates that over the past six years rail freight has saved two million tones of pollutants, 6.4 billion lorry kilometres and 31.5 million lorry journeys. RMT believes that as a contribution to meeting the 60% reduction target set out in the Climate Change Bill the DfT should be required to set three year targets to reduce carbon emissions from road freight.

STRATEGIC FREIGHT NETWORK

  6.  RMT welcomes the commitment in the July 2007 Delivering a Sustainable Railway White Paper to develop a Strategic Freight Network (SFN). We look forward to entering into discussions, alongside our sister rail unions, the Rail Freight Group and the freight operating companies, with the DfT and Network Rail about the scale and scope of the network. In terms of funding, whilst welcoming the £200 million budget for the SFN, we would trust that where social, environmental and business cases are identified for rail freight upgrades and schemes further funding will become available. The Committee will no doubt be aware of the representations made by the rail freight lobby to the DfT in the run up to the publication of High Level Output Specification and the rail White Paper (See Appendix A).

  7.  RMT will also be seeking clarification on the relationship between the funding of the Strategic Freight Network and monies that might become available for schemes funded by this and possible future rounds of the Transport Innovation Fund.

  8.  Whilst welcoming the DfT's commitment to a Strategic Freight Network, we remain disappointed that the Delivering a Sustainable Railway White Paper has sidestepped issues which are important for the future expansion of rail freight including the high-speed North-South passenger rail link and capacity enhancements on the West Coast Main Line which, according to the National Audit Office, is unlikely to be able to accommodate current growth levels beyond 2015-20.[4] RMT is also concerned that any widespread extension of differentiated maintenance standards could have serious implications for freight and we shall be seeking confirmation from the DfT that any such extension does not exclude freight traffic from those lines.

LONGER AND HEAVIER VEHICLES

  9.  In December 2005 the Department for Transport rejected two applications from road hauliers which sought permission to trial 60 tonne lorries. However, the DfT did commit itself to undertake further studies into LHVs. As the committee will know trials of the vehicles are currently underway in a number of EU states and the DfT is currently undertaking a desk-based study into whether trials should be allowed in the UK. The study is likely to conclude in October 2007.

  10.  RMT is completely opposed to the introduction of these vehicles onto the UK road network. We believe that should they be awarded licenses, existing rail freight will transfer to road leading to increased carbon emissions and job losses in the rail freight sector. Research produced by the freight operating company EWS in May 2007 indicates that:

    —  LHVs will create additional external costs of more than £900 million a year.

    —  Nearly half of existing rail freight traffic in commodities such as Aggregates will transfer to road.

    —  The introduction of LHVs will generate only minimal environmental benefits compared to existing road fleets.

    —  International studies do no support the introduction of the vehicles.

  11.  Regrettably, the European Parliament appears to have conceded the principle of allowing these vehicles onto the European road network. On 4 September the European Parliament by 577 votes to 52, with a further 51 abstentions, voted on non-legislative proposals to allow 60 tonne lorries on certain routes in individual member states. The matter is now with the European Commission who will report back to the Parliament in 2008-09. RMT alongside our colleagues in the Freight on Rail partnership will continue to lobby hard, both in Europe and domestically, against the introduction of these "road-trains".

AIR FREIGHT

  12.  RMT believes that Government plans to expand the aviation sector in the UK should be revisited. To increase passenger number from 189 million in 2002 to between 350 and 460 million by 2020 and freight volumes in the South East of England from 2.2 million tonnes in 2003 to 14 million tonnes in 2030 is, in our view, environmentally unsustainable.

  13.  In 2005, 585,682,000 tonnes of foreign and domestic cargo was moved through UK ports[5]. RMT's view is that the proposed increase in air freight should be moved where possible by sea. Given the huge volume of cargo being taken through UK ports it would seem perfectly possible for the additional business to be readily accommodated.

  14.  In 2005 90,000 tonnes of domestic cargo and mail was uplifted at UK airports. To deliver an environmentally sustainable freight sector we believe that the vast majority of this cargo and mail should be moved by rail, inland waterway and coastwise traffic. If Government decides to press ahead with their plans to expand the aviation sector, both for passengers and freight, then the very least that RMT would want to see are dedicated rail freight terminals at airports. Currently only the construction site at Heathrow's Terminal 5 is rail connected, although there has been an interest expressed in building temporary rail freight access for the construction needs at Stansted.

THE SAFETY RECORD OF HGV VEHICLES

  15.  The January 2004 Income Data Service, Report number 896 on pay, conditions and labour market changes, indicated that it is heavy goods vehicle drivers, working an average of 52.9 hours a week, who top the league table of full-time occupations in Britain with the longest working hours.

  16.  It is well established that the "long hours and low pay" culture in the road transport sector is a threat to road safety, creates unnecessary stress and sits uneasily alongside initiatives to promote a reasonable work-life balance. RMT has campaigned for some time alongside the TUC, TGWU, GMB and URTU for more effective statutory measures aimed at improving the health and safety at work of professional HGV drivers and crew.

  17.  In April 2005 the Government introduced the Road Transport (Working Time) Regulations 2005. Whilst the regulations do set a maximum average working week of 48 hours over a 17 week reference period (which can be extended up to 26 weeks) from which there is no individual or collective opt-out, they fall short of what we had hoped for. The Regulations introduce a category of time called a "periods of availability" which includes periods spent at depots waiting to load/unload or travelling as a crew member when not navigating or driving which do not count towards the 48 hour average. The result is that road transport workers are being placed in the invidious position of continuing to work excessively long hours in order to maintain their existing living standards. This creates the conditions for bringing the regulations themselves into disrepute, with some drivers wanting to individually opt-out from the 48 hour average.

  18.  The DfT is currently conducting a review of the Working Time Regulations. The TUC is part of the working party which is seeking to investigate abuses of periods of availability. The result of the review and working party is due by the end of the year. RMT believes that the DfT should conclude their review of the Regulations by deciding to bring forward a framework for the industry that is designed to improve the health and safety of HGVs drivers and by extension other road users. Such a framework should scrap the periods of availability, address the long-hours and low-pay culture in the road transport industry, support shorter working hours and deliver a better work-life balance.

CONCLUSION

    —  RMT welcomes the opportunity to contribute to the freight transport inquiry. RMT remains committed to a publicly owned, fully integrated and democratically accountable freight and logistics network. Specifically RMT is calling for.

    —  Modal shift from road to rail and other forms of environmentally sustainable transport.

    —  A well funded Strategic Freight Network.

    —  Statutory three year targets to reduce carbon emissions from road freight.

    —  The proposed expansion of air freight to be accommodated where possible by sea.

    —  Where air freight is required there should be dedicated rail freight access to airports.

    —  Opposition to 60 tonne longer heavier vehicles on the UK road network.

    —  A framework to improve the health and safety record of HGVs by tackling the long hours low pay culture in the road transport sector.

APPENDIX A

    —  Channel Tunnel gauge enhancement to W12 and full european gauge.

    —  Felixstowe to Nuneaton capacity enhancements.

    —  Southampton to WCML capacity enhancements.

    —  Southampton to WCML diversionary capacity and gauge enhancement.

    —  South Humberside Main Line capacity and flexibility.

    —  Newcastle to Carlisle gauge enhancements.

    —  Felixstowe & Southampton train lengths.

    —  Gospel Oak to Barking capacity & electrification.

    —  Oxford to Bletchley route reopening.

    —  Stourbridge to Walsall route reopening.

    —  Hope Valley capacity enhancements.

    —  Blaenau Ffestiniog enhance route capability to allow slate waste train operation.

    —  Newport to Shrewsbury additional capacity & enhanced loop length and capability.

    —  Cardiff to Bristol enhance Severn Tunnel capacity and increase relief line speeds.

    —  Cwmbargoed Branch Line improve operation by enhancing line speeds and the creation of new loops.

    —  Cardiff Central to Cardiff Queen Street additional signalling capacity.

    —  W12 gauge enhancement from Berwick to Glasgow, including Shotts route.

    —  Run round facilities at Kilmarnock.

    —  W12 Gauge enhancements and capacity improvements between Glasgow and Aberdeen.

    —  Electrification between Monktonhall Junction and Slatford Junction.

    —  W12 Gauge enhancement of Glasgow & South Western Route.

    —  W12 Gauge enhancement from Mossend/Edinburgh to Grangemouth.

    —  Lengthen loops and moving signal to allow longer coal trains from Hunterston.

    —  Capacity improvements between Edinburgh and Inverkeithing.

October 2007








3   DfT: Transport Statistics 2006 Back

4   The Modernisation of the West Coast Main Line-NAO November 2006 Back

5   DfT Transport Statistics 2006 Back


 