Select Committee on Transport Written Evidence


Memorandum from Dover District Council (FT 22)

  It is noted that the Department of Transport's stated objectives recognise the importance of facilitating the continued development of a competitive and efficient freight sector while reducing the impact of freight movement on congestion, safety and the environment and other road users.

  Much of the UK's trade is channelled through Dover. Recent estimates from Dover Harbour Board place the combined value of import and export freight passing through Dover to be in the order of £55 thousand million per annum.

  This level of activity translates to just under some 2.5 million HGV's per annum, with daily flows of around 10,000 vehicles, now being recorded and which continues to grow. All indications suggest that this level of traffic will exceed 4 million vehicles over the next 20 years.

  Clearly, this level of activity has a profound impact in and around Dover as a consequence of the traffic using both the strategic route corridors—the A20/M20 and A2/M2—to and from the port, which also operate in a regional and local context within the town. These problems range from congestion, disruption to the local functioning of the town, environmental impact (that has resulted in the declaration of an Air Quality Management Area) and the attendant impacts from overnight parking, all of which are hugely exacerbated on the occasions when the need for "Operation Stack" arises.

  Both the A20/M20 and A2/M2 route corridors have been identified as part of the Trans-European Network. However, the A20/M20 has been defined as the Highway Agency's preferred strategic route.

  This point was highlighted in the recent Panel Report in response to the South East Plan where it was recognised (Para 18.39) that "The Dover Area experiences serious transport problems due largely to the increase in freight vehicles using the port and the local topography. We were informed that a comprehensive transportation study is in progress. The study will test the cumulative impact of additional growth levels going beyond those in the draft Plan and the freight impact as part of the LDF process".

  The port has also been recognised as a "Gateway" on the basis of and in recognition of the important role that it fulfils in a regional and national context. It was also noted (Para 9.28) and accepted that improvements are needed to the London-Dover International Corridor, and that this would include the A2 and rail access to the port.

  This was also recognised by the Panel (at Para 18.83) when they indicated:

    "We think it important for the Plan to identify the main pieces of infrastructure that are critical to the delivery of the sub-regional strategy. While most elements of infrastructure are adequately covered in the regional policies or are appropriate to the Implementation Plan, transport improvements are so vital to support the spatial planning framework that a separate section is justified . . . "

  It was recommended (at Para 18.84) that, among other schemes, the following key transport themes should be named in the text to indicate the Sub-regional Transport Strategy to support sustainable growth and regeneration in East Kent and Ashford:

RAIL

  Frequent domestic services on the CTRL for Ashford and the East Kent towns.

Ashford

    —  Improvements of junction 10 of M20 and additional junction 10A.

    —  Ashford to Thanet improved rail links.

    —  Ashford-Hastings rail capacity improvements.

    —  Enhancement of Ashford station and a new south Ashford rail station

    —  Co-ordinated bus route planning with new and existing development, new bus interchange and park and ride facilities.

    —  Measures to support cycling and walking.

    —  A south Ashford orbital road linking the A28 to the A2070 after 2016

Canterbury

    —  Improvement of A2 Canterbury bypass junctions together with associated demand

management measures including park and ride.

Dover

    —  Improvements to A2 and A20 for port traffic and lorry parking facilities.

Thanet

East Kent Access Phase 2

  While it was acknowledged (at Para 18.85) that most of the schemes above are related to housing and employment development, it was also stated, "there are additional priorities in this sub-region relating to its gateway function. Hence we consider landside access issues to Dover port to be particularly important. Several schemes are included in the SRIF table, and the need for progress is made more urgent because freight traffic is now running at levels previously forecast to be reached in 2014 and there are air quality concerns in the port's vicinity. Of particular concern in the short-term is the extensive disruption that accompanies Operation Stack. We hope that a satisfactory management system and longer-term solution will emerge quickly from the co-ordinated work currently being undertaken by the HA and Kent CC. We also share the concerns of Dover Harbour Board that lack of progress on road improvements around and through Dover might inhibit redevelopment of the Western Docks.

  It was further noted (at Para18.86):

    " . . . while there are serious localised problems associated with access to the port of Dover the rest of the strategic road network currently shows little sign of `stress'. However, the HA commented that, given their trans-European role, in the longer term it may be necessary to consider forms of traffic management on the A2/M2 and A20/M20 . . . "

  Dover Harbour Board has recently announced plans for the expansion of the Port of Dover that propose a second Terminal at the Western Docks. The proposals are being developed through a process of stakeholder consultation and are being aligned with development proposals on the continent in recognition of the ever-expanding market demands and are fully supported by the District Council in partnership with the Regional Development Agencies and the County Council.

  DHB's plans for a second terminal (T2) also bring potential added value. Not only will they facilitate an improvement to the many current traffic related problems in the town centre, they should provide Dover with much needed stimulation for regeneration.

  The circumstances arise partly because the Terminal 2 plans have identified important areas of Dover waterfront as being surplus to operational requirements and that these could be released for alternative development to assist this regeneration.

  However, while the market should be able to deliver an attractive waterfront development, it must be recognised that it will remain sub-optimal in terms of regeneration so long as the barrier of the A20 main trunk road continues to divide the town centre from the waterfront. The presence of this road, which is an important part of the Trans-European Network, has the effect of exacerbating the disparity between the economic activities of the town centre and the waterfront.

  Ideally the solution would be available from removing the trunk road from the town centre and bypassing the town. However, the constraints of the designation of outstanding natural beauty of the surrounding countryside and the costs, which would be involved, mean that solution is totally unviable.

  Running in parallel with Dover Harbour Board's proposals, the work on the earlier mentioned transportation study is drawing to a conclusion. The Transportation Study, which is a public/private sector partnership involving the District Council, County Council, Regeneration Agencies, Dover Harbour Board, The Highways Agency and key landowners has examined all the potential growth options together with committed and anticipated development proposals. Key findings emerging from this work indicate that:

    —  the District needs to maximise growth to achieve critical mass;

    —  there is a compatibility of major growth at Whitfield and the Port Growth;

    —  a diversion of A2 could be considered; and

    —  transport and land-use strategy is fundamentally linked.

  In addition to this, it is also understood that the County Council is progressing proposals for a solution to "Operation Stack", which may lead to a scheme for a lorry park being developed adjacent to the A20 at Sellindge. Again the District Council welcomes such proposals but would be seeking assurances that traffic using the A2/M2 route can be adequately catered for.

CONCLUSIONS

  The District Council asks that the Select Committee take the following matters into account, which will assist with the planning and delivery of infrastructure and the free movement of goods:

    —  there are substantial acknowledged difficulties arising within and around Dover as a consequence of the ever-expanding trading patterns between the UK and the continent which generate a pressing need to ensure the existing infrastructure is improved and future proofed;

    —  without prejudice to the formal processes that need to be followed, the District Council welcomes the proposals by Dover Harbour Board for the development of Terminal 2;

    —  there is an acknowledged need for improvements, as highlighted in the Panel Report on the South East Plan, to the A2 (including the improvements in Canterbury) and A20 routes which should be out in place to compliment and support proposals by Dover Harbour Board and by the District Council through the Local Development Framework;

    —  the District Council requires that a solution to the problems arising from "Operation Stack" and overnight lorry parking is taken forward as a matter of urgency;

    —  the District Council commends the need to consider the A20/M20 and A2/M2 route corridors as a comprehensive package of infrastructure rather than separate entities; and

    —  the Highways Agency should take forward traffic management proposals to ensure that traffic using the strategic route corridors is channelled along either the A20/M20 or A2/M2 corridor relative to the end destinations at either Terminal 1 (the Eastern Docks) or in due course Terminal 2 (the Western Docks) thereby benefiting the users of the town centre and helping to remove the severance of the town from the seafront, reduce congestion and improve air quality and environmental conditions generally.

October 2007





 