  Q60  Mr Wilshire: Page 183, paragraph 11.71, is where you are reporting on aviation safety and your involvement in the switch towards European safety arrangements as distinct from the United Kingdom. One understands that. There has been, as I am sure you know, a degree of anxiety expressed within the aviation industry about European standards being at risk of being lower than national standards. In four you say you have been working through our seat on the management board of the EASA. Can you assure us that at no point in all of what has happened during the period of this report that we now have any lower standards than we used to have under national arrangements?

  Mr Devereux: I think I can. All that has passed to EASA so far from memory is approval of aircraft type, the A380. Nothing else has so far passed. I am well aware of your views that we share about the importance of EASA having the right confidence to take anything else beyond what they have already got and that is exactly what the United Kingdom is intending to do.

  Q61  Chairman: Is there a clear indication they have a proper budget now?

  Mr Devereux: I believe they do. We put a lot of effort into ensuring that they have proper business planning arrangements, budgetary control and also some growing—

  Chairman: As a supplementary to Mr Wilshire's question on that, you are aware that EASA, unlike its predecessor, has increased the costs of engineering checks on aircraft to such an extent that it may be many people will try and avoid building them in. This has been raised by the department. I am not going to ask you too much about it now but I have raised this personally with the department and if it has a direct effect on safety it will not be helpful.

  Q62  Mr Wilshire: For the next one I cannot give you a reference because I cannot find it. It is a question of why I cannot find it because I have looked in your environment section and your rail section. You are seeking to improve the environment. One of the ways is to deal with surface access problems at Heathrow. Why does not Airtrack figure in any of your thinking and planning in this report?

  Ruth Kelly: It does. I do not know whether it is in this report and I am afraid I cannot answer that question but we do see Airtrack as making an important contribution to passenger access to Heathrow.

  Q63  Mr Wilshire: Does that mean that in the next report we will see a commitment to funding it?

  Mr Devereux: At the moment I believe the Airport Authority is working with Network Rail to decide exactly what the scheme is and what it would cost. When we know what it does and whether it is worth it, we will give you an answer to the question.

  Q64  Mr Wilshire: Finally, can I draw your attention to pages 134 and 135 which are very specific Heathrow matters? At the bottom of 134, paragraph 8.24, you are talking about modelling work and you say, " ... which we expect to complete in spring 2007." Have you completed it?

  Mr Devereux: We have completed it. It is a prerequisite for any consultation on development at Heathrow.

  Q65  Mr Wilshire: It is done and ready?

  Ruth Kelly: It is done and the full evidence will be presented in a consultation paper I hope later this year.

  Mr Devereux: It took longer than spring 2007 but it is done by October 2007.

  Q66  Mr Wilshire: In paragraph 8.25 at the top of the next page you say, "In parallel, we have worked with BAA." I believe that to be sensible but I am sure you will be aware that there are those who say it was entirely wrong and a matter for judicial review that you worked with BAA. Are you comfortable with the fact that you did the right thing?

  Ruth Kelly: When I came to this department one of my priorities was and is to get the department to work better with outside organisations rather than be closed to their input in the development of policy. I see working with BAA and other people who know what is happening in the Heathrow area and can provide and help us get the best possible evidence base as absolutely essential to the development of good policy and, incidentally, not just at Heathrow but in any area of policy that the department may look at.

  Q67  Mr Wilshire: You will therefore have looked at the criticism levied at you and you are content that you can answer that satisfactorily?

  Ruth Kelly: Indeed.

  Mr Devereux: The Air Transport White Paper made perfectly clear that in order to develop propositions about Heathrow we would have to work with people who had some of the data. If you think about this paragraph, it is talking about public road traffic modelling and what the Airport Authority can and cannot do with parking, drop offs etc., is immaterial in effect to what happens to road traffic. It is simply not in the gift of people sitting in Whitehall to say, "It will work like this."

  Q68  Mr Wilshire: I can only repeat that I agree with you but there are those who do not and I think it is important that we address the criticism from those who think you should not be doing it. Paragraph 8.26 on page 135: "We are planning full public consultation in 2007." When are you going to start it? What form is it going to take and for how long will it run?

  Ruth Kelly: The precise date has not been set yet but I expect to proceed to consultation later this year.

  Q69  Mr Wilshire: It still will be this year? That has not slipped?

  Ruth Kelly: No.

  Q70  Mr Martlew: I was thinking what I had to moan about. I was looking round the constituency and the A74 between my constituency and the Scottish border is being made into a motorway. You have just given the go ahead for a northern development road and the village called Temple Sowerby on the A66 has just had a bypass and they have been waiting 30 years. It was ahead of schedule. I did come up with something. When you were first made Secretary of State—I think it was your first Question Time—I asked you a question about the high speed link to the north and you were very dismissive of that. If you look at the Eddington report, while he dismisses Maglev, he does not dismiss the high speed train at all. The reality is that we have a capacity problem on the west coast main line. There will be some improvements in the future but we do need to increase capacity. A high speed line is not unusual in this country because we have got one of course and the Queen will hopefully be opening St Pancras very soon. It is a tried and tested type of technology. Why is your department dead set against a high speed train to the north?

  Ruth Kelly: We are not dead set against a high speed rail link. It was not the right answer for now.

  Q71  Chairman: Half dead set?

  Ruth Kelly: Let me explain myself more fully. If you follow the Eddington analysis, his basic point was that, as an island nation which is relatively small, we have pretty good connectivity between our major cities. You can get from London to Manchester and back in a day, for example. In other countries such as France, for example, that is not necessarily the case. Our basic connectivity is good. The big challenges that he identified for our system going forward were capacity and how we meet the challenge of increasing capacity but also improving reliability for people. He identified reliability, which I do not think we thought about nearly enough in the past, as a really big issue for passengers. It is something that we intend to correct going forward. The question is: if you have a finite transport budget which of course we do, even though we now have the long term funding guideline in place, what is the best way to use that to maximise the increase in capacity and to maximise the effect on reliability? We set out a funding plan for five years which I think tackles those pinch points, invests in the necessary infrastructure and signalling which will help improve train frequencies, which puts on additional carriages, platform lengthening and so forth. As we move forward to the next period, if the railway continues to grow as it is growing at the moment, which is very rapidly after decades of decline, it may be that a high speed link is the appropriate answer to that. I am completely with Eddington here. Rather than jumping to the solution, we should think about what the actual problem is. If the problem for instance is the link between London and Birmingham, we should look at the high speed option against the road widening option, against better use of the road network, and think about what stacks up best in value for money benefit cost terms. It may be that high speed is the answer but we do not need to make that decision yet and we will make it at the appropriate time.

  Q72  Mr Martlew: It is the time that worries me, Secretary of State. I accept that we can overcome the capacity problems on the railway in the medium term but a project of, say, building a high speed link from London to Manchester would take, I would think, beyond ten years. Can you give us some indication of what the timescale will be, when that decision will be taken about how we are going to deal with the capacity problems of the future?

  Ruth Kelly: Again, it very much depends on what happens to rail growth per se. One thing we are not very good at is trying to predict what is happening to rail patronage 10, 20 or 30 years from now, which is why we deliberately took the view: let us concentrate on getting the first five year period right up to 2014 and then think again, before the end of that period clearly, about what the next investment should be. If rail continues to grow or indeed grows faster than we predict, it may be that we will need to consider this for the next control period. What I am not going to do now is somehow anticipate what is likely to happen to rail patronage over the next seven years.

  Q73  Mr Martlew: When you gave the negative answer to the Chamber, you have now looked at it again and it is not being ruled out.

  Ruth Kelly: I hope I did not give the impression that it was ruled out. It did not seem the best use of £30 billion in the first control period, the period of the Rail White Paper and funding commitments. I think people often assume that a high speed rail link is incredibly good for journey times and the environment. Neither of those is necessarily the case. The high speed rail link that stops at every station, no matter what speed it does between stops, is not going to shorten your end to end journey time that much. It will be good or bad for the environment depending on the power source that is used to make it go.

  Q74  Mr Martlew: This is the bit that worries me about the thinking of the department. You threw in a figure of £30 billion. Where does that figure come from?

  Ruth Kelly: That is officials' best estimate.

  Q75  Mr Martlew: Where will this high speed link go?

  Ruth Kelly: I think that is assuming a high speed link right up to Scotland.

  Q76  Mr Martlew: This is all the way to Glasgow?

  Ruth Kelly: In the Rail White Paper we specifically said that we need to look at the London/Birmingham corridor if there was a significant increase in rail patronage.

  Q77  Mr Martlew: That would not be £30 billion?

  Ruth Kelly: Clearly not. That is why it might be a more viable option.

  Q78  Mr Hollobone: Can I bring you back to the infamous table A8 on page 218 and draw your attention to the funding per head for the East Midlands and the eastern region compared to the south east and the English average? You will see that in 2001/2 the figures were broadly the same for all of those, ranging between £86 to £89 per head. In 2006/7 the numbers are of course much higher, which is to be welcomed, but the south east figure has zoomed up to £198 a head compared to just 112 for eastern and 145 for the East Midlands. I have two questions relating to this. One is why has the south east been moved so much further ahead? The second is why is the East Midlands and the eastern region going to see their funding effectively cut for 2007/8?

  Ruth Kelly: Clearly, different regions will fare differently from one period to the next period, depending on what the most cost effective investments are at any one time. I also do not think this table includes local transport spending which over that period has doubled in the East Midlands and has doubled in every region. In the future we have, as has been done in the last couple of years, committed to a regional funding allocation process which is based on the number of people in each region rather than on any other, more sophisticated metric. The issue is, I suppose, looking at this that that is where the problems have been identified and where the investment has taken place accordingly. It is very difficult to read too much into this table because partly investment in any year will depend on what the historic investment levels have been, whether or not there are motorway networks for example in the region and what the needs are at any particular time.

  Q79  Mr Hollobone: What I put to you, Secretary of State, is that people in the East Midlands, which is where I am from, and the eastern region are feeling huge transport pressures at the moment not least because these are the two regions affected particularly harshly by immigration. How quickly do you feed into your future funding plans the figures from the Office of National Statistics, some more of which we have had today?

  Ruth Kelly: We always use the best possible available figures from the ONS. For instance, the latest projections for housing growth will have fed into the high level output specification for the railways and of course we use the best figures that are available.


 