Mr. Mike O'Brien: The Department of Energy and Climate Change was established on 3 October 2008, bringing together parts of the Department for the Environment, Food and Rural Affairs and the Department for Business, Enterprise and Regulatory Reform. It is now engaged in business planning for the period 2009-10 to 2010-11 which will result in agreed resource allocations for the Department's business units. This will determine the number of vacancies there are to be filled. Local business managers will then determine the appropriate grade to recruit based on business need and available budget.

This process was on going on the 1 March, 2009.

Electricity Generation

Greg Clark: To ask the Secretary of State for Energy and Climate Change for what electricity generating plants of each fuel type planning consent has been (a) sought and (b) granted in each of the last five years. [266627]


2 Apr 2009 : Column 1355W

Mr. Mike O'Brien: The following table shows the applications for consent for electricity generating stations in England and Wales made to the Department of Energy and Climate Change (and previously the Department for Business, Enterprise and Regulatory Reform and the Department of Trade and Industry) within the previous five years and those that were granted. These include applications made under Section 36 of the Electricity Act 1989 (i.e. for generating stations over 50 MW in England and Wales) as well as applications
2 Apr 2009 : Column 1356W
made under the Transport and Works Act 1992 and certain appeals under the Town and Country Planning Act 1990 which were decided jointly with the Secretary of State for Communities and Local Government.

Applications for consent for onshore electricity generating stations of up to and including 50 MW are made to local planning authorities under the Town and Country Planning Act 1990 and these are not included in the table.


2 Apr 2009 : Column 1357W

2 Apr 2009 : Column 1358W
Applications received and consented in previous five years
Date of application Company / location Type Max output Status

February 2009

Helius Energy plc Bristol Dock Avonmouth

Biomass

100 MW

Under consideration

January 2009

Centrica (RBW) Ltd Race Bank Greater Wash

Offshore wind farm

620 MW

Under consideration

December 2008

Npower Renewables Ltd Carnedd Wen Powys

Onshore wind farm

130-250 MW

Under consideration

December 2008

Centrica (DSW) Ltd Docking Shoal Greater Wash

Offshore wind farm

540 MW

Under consideration

October 2008

Marshland Windfarm Ltd Norfolk

Onshore Windfarm

57 MW

Application withdrawn -February 2009

September 2008

Renewable Energy Ltd Peterborough Fengate

Biomass/ EFW

66 MW

Under consideration

August 2008

Port Talbot P/Stn, ESBI/Acorn Power, Neath, Port Talbot, Wales

CCGT + black start

1,100 MW

Application withdrawn -November 2008

August 2008

Abernedd Power Co Ltd Abernedd Power Plant Baglan Bay

CCGT

870 MW

Under consideration

July 2008

MGT Teesside Limited Teesside Renewable Energy Plant Teesport

Biomass

295 MW

Under consideration

May 2008

CeltPower Limited Llandinam nr Newtown Powys

Onshore wind farm (repowering and extension)

126 MW

Under consideration

May 2008

Fferm Wynt Llaithddu Cyf Llaithddu Powys

Onshore wind farm

66.7 MW

Under consideration

April 2008

Centrica Leasing (KL) Kings Lynn B Norfolk

CCGT

1,020 MW

Granted - February 2009

March 2008

Humber Wind Limited Humber Gateway

Offshore wind farm

300 MW

Under consideration

March 2008

Powerfuel Power Hatfield Park Doncaster

CCGT and ICGCC

900 MW

Granted - February 2009

February 2008

Ormonde Energy Ormonde - East Irish Sea(1)

Offshore wind farm

150 MW

Granted -September 2008

February 2008

Tilbury Green Power Ltd Tilbury Docks Essex

Biomass and Energy from Waste

60 MW

Under consideration

December 2007

Pulse Tidal Upper Burcom River Humber

Tidal power

0.15 MW

Granted - April 2008

November 2007

Nuon UK Ltd Llanbadarn Fynydd Powys

Onshore wind farm

59.5 MW

Under consideration

Appeal recovered - October 2007

CRE Energy Land adjacent to Alcan Smelter Lynemouth Northumberland

Onshore wind farm TCPA Appeal (joint decision by DECC and CLG SoS)

16.1 MW

Granted - January 2001

July 2007

Bridestones Developments Ltd Carrington

CCGT (ext from previous 380MW)

860 MW

Granted-July 2008

July 2007

Norsea Pipelines Ltd Seal Sands Teesside

CHP CCGT

800 MW

Under consideration

June 2007

Dong Energy Gunfleet Sands II - Outer Thames Estuary

Offshore wind farm

64 MW

Granted - February 2008

April 2007

Wave Dragon Wales Ltd Wave Dragon

Wave energy

7MW

Under consideration

February 2007

Helius Energy Hobson Way Stallingborough, Lincs

Bio-mass

65 MW

Granted - June 2008

January 2007

Thor Cogeneration Seal Sands, Teeside

CHP-CCGT

1.020 MW

Granted - August 2008

January 2007

Centrica (Lines) Off Lincolnshire

Offshore wind farm

250 MW

Granted - October 2008

January 2007

Cirrus Energy Cirrus Shell Flat Array

Offshore wind farm

270 MW

Withdrawn -November 2008

January 2007

Ineos Chlor West Point Runcorn

CHP - EFW

100 MW

Granted -September 2008

December 2006

E.ON UK Plc, Kingsnorth, Medway

Coal-fired

1,600 MW+50 MW 'black start'

Under consideration

October 2006

PrenergyPower Ltd Puckey House Port Talbot Docks

Bio-mass

350 MW

Granted -November 2007

August 2006

Barking Power Ltd Barking Power Station Dagenham, Essex

CCGT (ext from previous 470MW)

1,000 MW

Granted -December 2007

June 2006

SWRDA Wave Hub Off North Cornwall

Wave energy

20 MW

Granted -September 2007

May 2006

Scira Offshore Energy Greater Wash

Offshore wind farm

315 MW

Granted - August 2008

May 2006

Severn Power Ltd Uskmouth Newport

CCGT

800 MW

Granted -September 2007

April 2006

Steadings Windfarm Ltd Steadings nr Kirkwhelpington Northumberland

Onshore wind farm

66 MW

Under consideration

March 2006

Bridestones Power Ltd Carrington Manchester

CCGT

380 MW

Granted-July 2007

March 2006

Walney Dong Ltd Walney - East Irish Sea

Offshore wind farm

600 MW

Granted -November 2007

March 2006

Morecambe Wind Ltd West of Duddon Sands - East Irish Sea

Offshore wind farm

500 MW

Granted -September 2008

January 2006

Peel Environmental Ince Ltd Ince Cheshire

Refuse Derived Fuel

95 MW

Under consideration

December 2005

EDF Energy West Burton Power Station Nottinghamshire

CCGT

1,270 MW

Granted - October 2007

December 2005

EDF Energy Sutton Bridge B

CCGT Gas Turbine

1260MW+20 MW 'black start'

Under consideration

December 2005

Npower Renewables Middlemoor Northumberland

Onshore windfarm

75 MW

Granted - August 2008

December 2005

E.ON UK Isle of Grain Kent

CCGT-CHP

1,260 MW

Granted - October 2006

December 2005

Amec Project Investments Ltd Ray wind Nr Kirkwhelpington Northumberland

Onshore wind farm

60 MW

Under consideration

November 2005

Conoco Refinery (Immingham CHP) South Killingholme

CHP CCGT

1,230 MW

Granted - August 2006

November 2005

Thanet Offshore Wind Ltd Outer Thames Estuary

Offshore wind farm

300 MW

Granted-December 2006

November 2005

Gwynt y Mor Offshore Wind Farm Ltd Gwynt y Mor - off North Wales

Offshore wind farm

750 MW

Granted - December 2008

October 2005

Greater Gabbard Offshore Wind Ltd Outer Thames Estuary

Offshore wind farm

500 MW

Granted — February 2007

September 2005

Mark Caudwell Limited Orby Marsh, Skegness

Onshore wind farm

54MW

Application Withdrawn -2008

September 2005

Scottish and Southern Energy Fiddler's Ferry Warrington

Retrofit of FGD

1,200 MW

Granted - April 2006

September 2005

E.on UK Drakelow South Derbyshire

CCGT

1,220 MW

Granted - October 2007

July 2005

Ormonde Energy Limited Ormonde - East Irish Sea

Offshore wind farm

108 MW

Granted - February 2007

July 2005

Eclipse Energy Limited Ormonde - East Irish Sea

Offshore gas station

93 MW

Granted - February 2007

June 2005

London Array Ltd Outer Thames Estuary

Offshore wind farm

1,000 MW

Granted -December 2006

April 2005

RWE Didcot B Oxfordshire

Extension - new CCGT turbines

120 MW

Granted - January 2006

February 2005

Milford Power Ltd Milford Haven, Haverfordwest, Wales

CCGT

1,600 MW

Application withdrawn - June 2005

February 2005

CDCE Ltd, Purland Road, W Thamesmead,

CHP-GT

100 MW

Application withdrawn -October 2006

January 2005

RWE Npower Pembroke

CCGT

2,000 MW

Granted - February 2009

November 2004

Corus Strip Products UK Corus Steel Works Port Talbot

ext: turbo-alternator

20 MW

Granted - March 2005

September 2004

Devon Wind Power Fullabrook Down North Devon

Onshore wind farm

66 MW

Granted - October 2007

August 2004

RWE Npower Little Barford Bedfordshire

OCGT-Black Start

20 MW

Granted-November 2004

March 2004

EDF (Northern Offshore Wind) Teesside

Offshore wind farm

100MW

Granted -September 2007

1 replaces previous wind farm consent issued on February 2007