1.  INTRODUCTION

  1.1  This Memorandum covers the Winter Supplementary Estimate for the Ministry of Defence (MoD) and should be read in conjunction with the Department's Winter Supplementary Estimate (2008-09). The Introduction to the Estimate lists the changes being made since the Main Estimate. This is shown by Request for Resources (RfR), and the section number shown in brackets after the detail for each change is a reference to the line(s) that are affected by the change in Part II of the Estimate.

  1.2  There is a separate Estimates Memorandum for the Armed Forces Retired Pay and Pensions Vote.

2.  SUMMARY OF RESOURCES SOUGHT IN THE ESTIMATE

  2.1  The Introduction to the Estimate shows a net increase in Voted DEL resources of £3,560 million from £33,567 million at Main Estimates to £37,127 million. There are two principal elements to this:

    a) When Main Estimates were submitted to Parliament, the Department's internal planning round had not been completed and a number of changes to the Defence Budget from that announced in the Government's 2007 Comprehensive Spending Review had not been finalized. The figures in Main Estimates were thus to some extent provisional. The Winter Supplementary Estimate reflects the outcome of the planning round and the changes to the Budget. The main change in RfR1 is a reallocation of £1 billion from Single Use Military Equipment (SUME) Capital DEL to near cash Resource DEL; and an addition of £50 million (fiscal) Capital DEL. These changes align the budget more closely to the cost of the Defence programme in 2008-09 resulting from the Department's 2008 planning round. Further details are at paragraph 4.3.

    b) The RfR2 (Operations and Peace Keeping[1]) resources net request of £2,636 million is additional funding for military operations in Iraq, Afghanistan and the Balkans and comprises net direct resource costs of £2,286 million and indirect resources of £350 million. The RfR2 capital request of £1,063 million is mainly for Urgent Operational Requirements (UORs) in Iraq and Afghanistan. Further details are provided at paragraphs 4 and 5.

  2.2  The Voted Resource and Capital changes are summarised in the following tables:

Table 1

CHANGES IN RESOURCE AND CAPITAL EXPENDITURE


Resource Expenditure£ M


Provision of Defence Capability (RfR1) 989.692
Operations and Peace Keeping (RfR2)2,636.430
Total Net Request for Resources 3,626.122





Capital Expenditure£ M


Net Provision of Defence Capability (RfR1) (950.000)
Operations and Peace Keeping (RfR2)1,063.000
Total Net Request for Capital113.000





£ M


Total Change in Capital and Resource 3,739.122




  2.3  The total change in the Estimate is £3,739.112 million, which generates an additional net cash requirement of £3,389.122 million. The cash requirement is analysed in the following table, and a reconciliation between the changes in the Estimate and the net cash requirement is shown in Part II of the Estimate, "Resource to Cash Reconciliation".

Table 2

CHANGE IN VOTED CASH REQUIREMENT


£ M


Near Cash (Voted) in Resource DEL 3,210.019
Near Cash Non Budget66.103
Near Cash in Capital DEL113.000
Net Cash Requirement 3,389.122




  2.4  In addition to the changes outlined in paragraphs 2.1 above, the changes to the Winter Supplementary Estimate comprise:

    —  additional Non Operating Capital receipts arising from the sale of MoD' s interests in DARA (£60 million) and QinetiQ (£200 million), offset by a corresponding increase in gross capital expenditure;

    —  net budgetary transfers out of £16.646 million to Other Government Departments under RfR1 and RfR2 (Table 4). The largest transfers are to the FCO for the Stabilisation Fund, and from the FCO for helicopter pilot training for counter-narcotics;

    —  Various technical changes relating to Non Departmental Public Bodies (NDPBs) which have been re-classified from Voted DEL to Non Budget and Non-Voted DEL;

    —  Re-alignment of Resource and Capital Sub Head provisions to reflect the finalisation of MOD plans (see para 2.1(a) above), and changes in budgetary responsibility, with no overall impact on DEL.

3.  DETAILED EXPLANATION OF CHANGES

  3.1  Part I of the Estimate summarises the changes described above and provides detail about the costs included in each RfR.

  3.2  Part II of the Estimate shows the changes proposed in the Estimate, by Top Level Budget Holder (TLB). This shows the present net position (the position at Main Estimates), the changes in the position, and the new net provision (Winter Supplementary Estimates). Again this is set out by Request for Resources. The transfers and other changes outlined in the Introduction to the Estimate are analysed in this section of the Memorandum.

  3.3  The table overleaf shows how the Winter Supplementary Estimate is compiled, identifying changes since 2008-09 Main Estimates.

Table 3

SHOWING CHANGES TO VOTED RESOURCES AND CAPITAL AT WINTER SUPPLEMENTARY ESTIMATES

£M
Direct R
DEL
Indirect R
DEL
Total
R DEL
AMENon
budget
Near
cash
Total Net
Resources
Net
Capital
DEL
Capital
Non
Budget/
AME
Total
Net
Capital

[1]
12 345 6789
RfR1 Provision at Main Estimates22,537.2 10,940.533,477.7-84.8 28.433,421.37,870.1 27,872.1
Switch £1Bn from C DEL to R DEL1,000.0 1,000.0 1,000.0-1,000.0 -1,000.0
Additional C DEL Provision 50.0 50.0
Transfers In3.0 3.0 3.0
Transfers Out-4.1 -4.1 -4.1
Reallocation of NDPBs-73.3 -73.3 64.2-9.2
Additional Grants to NDPBs-2 2 0
RFR1 at Winter Supplementary Estimates 23,460.810,940.5 34,401.3-84.8 94.534,411.0 6,920.12 6,922.1
RfR2 Provision at Main Estimates 89.6 086.60 089.600 0
Additional Provision at Winter Supplementary Estimates 2,302.0350.02,652.0 2,652.0 1,063.001,063
Transfers In2.4 2.4 2.4
Transfers Out-18.0 -18.0
RFR2 at Winter Supplementary Estimates 2,376.0350.0 2726.00 02,726.01,063.0 01,063.0
RfR3 Provision at Main Estimates 1,015.1 1,105.1
RFR3 at Winter Supplementary Estimates 1.015.1 1.015.1
Winter Supplementary Estimates Total* 25,836.811,290.5 37,127.3930.3 94.538,152.1 7,983.12 7,985.1

[1]  Definitions of the column headings are shown at Annex 1.

[2]  Minimal differences may occur due to roundings.

4.  RFR1 PROVISION OF DEFENCE CAPABILITY- EXPLANATION OF CHANGES

Transfers In/Out

  4.1  The Estimate includes three transfers in from Other Government Departments and five transfers out, which are detailed in Table 4.

Table 4

SHOWING TRANSFERS BETWEEN MOD AND OTHER GOVERNMENT DEPARTMENTS

Transfers Out
RfR £MPurpose

Her Majesty's Treasury
1 (0.045)Transfer to the Centre of Expertise for Sustainable Procurement administration costs—a pan-Government initiative.
Cabinet Office1(0.040) Transfer for contribution to the Government's Secure Zone Fund costs.
Department for Business, Enterprise and Regulatory Reform (BERR) 1(4.000)MoD Contribution to the Chemical and Nuclear Weapons Disposal Pool.
Foreign and Commonwealth Office (FCO)2 (16.000)Stabilisation Aid Fund costs transfer for Iraq & Afghanistan.
Department for International Development (DIFD) 2(1.970)Stabilisation Aid Fund costs transfer for Iraq and Afghanistan.
Transfers In
Foreign & Commonwealth Office 1 2.800Contribution for Helicopter pilot training costs.
Cabinet Office10.209 Transfer for the Parliamentary Counsel costs.
Foreign & Commonwealth Office2 2.400Contribution to the Balkan Conflict Prevention Pool Costs.
Total Net Transfers Out (16.646)



End Year Flexibility

  4.2  The Department may draw down its end year flexibility for resource and capital in the Spring Supplementary round.

Transfer of £1 billion Budgetary Flexibility from Capital DEL (SUME) to Resource DEL

  4.3  Spending on Single Use Military Equipment (SUME) is classified in the National Accounts as resource rather than capital expenditure. Under the terms of the Comprehensive Spending Review (CSR), MoD has been permitted to transfer elements of its budget from SUME to near-cash resource DEL. For 2007-08 the transfer amounted to some £400 million. At the time of 2008-09 Main Estimates the level of any transfer required for 2008-09 had still to be agreed between MoD and HM Treasury. In Winter Supplementary Estimates a transfer of £1 billion for the current year is sought. A further transfer is likely to be sought in the course of the next financial year.

Additional Fiscal Capital Request of £50 million

  4.4  The Winter Supplementary Estimate includes a request for an additional £50 million fiscal Capital. This is primarily to cover for the forecast down turn in expected receipts from the disposal of MoD land by Defence Estates.

Other Changes

AME Items

  4.5  There are no changes to RfR1 Resource AME at Winter Supplementary Estimates.

Non Budget Items

  4.6  The changes to Non Budget at the Winter Supplementary Estimate reflect the re-classification of the museums from Voted DEL to Non Budget.

Neutral Sub Head Budget Transfers

  4.7  The changes under these sub-headings reflect alterations to TLB allocations of Resource and Capital funding to bring the allocations into line with responsibility transfers between TLBs, and other funding adjustments to align TLB provision with the outcome of the Department's planning round which was finalised after Main Estimates. The capital transfers between sub heads are principally for transfers of budgetary provision from "customer" budgets to Defence Estates, which is responsible for most estate expenditure. There are related IRDEL cost re-allocations associated with the Capital budget re-allocations.

Non Operating Appropriations in Aid

  4.8  The Non-Operating Appropriations in Aid changes to the Winter Supplementary Estimate reflect the anticipated receipts from the sale of the Defence Aviation Repair Agency (DARA), and QinetiQ, with a corresponding increase in gross capital expenditure.

Grants in Aid

  4.9  There are five Grants in Aid increases recognised in the Winter Supplementary Estimates. The grant in aid of £0.075 million to the Royal Naval Museum (for the single RN museums project set up costs); £1 million for the Royal Hospital Chelsea (superannuation payments and additional running costs for the new infirmary); £0.400 million for the Royal Air Force Museum (roof repairs and maintenance for the Hendon Museum); £0.395 million for the National Army Museum (mainly for asbestos removal, increased fuel costs and a special exhibition on the relationship between the Army and the public); and £0.080 million for the Armed Forces Memorial (in-year maintenance costs). The Grants in Aid have been allocated within the existing provision of the TLBs' current DEL.

Implementation of stage 1 of the International Financial Reporting Standards

  4.10  The Department has implemented part of the IFRS requirements at Winter Supplementary Estimates. The first stage of the IFRS implementation relates to discounting of long-term debtors/liabilities and the movement on financial derivatives on forward purchase contracts. The impact of these changes score to IRDEL. The Department has estimated a neutral impact overall at Winter Supplementary Estimates, and will revise its forecasts in the Spring Supplementary Estimates because of the high volatility of these transactions at present. The impact of FRS 23, which relates to valuing all foreign currency transactions at spot rate rather than using the General Accounting Rate (which was aligned to the buy forward rate) will be implemented in the Spring Supplementary Estimates.

5.  REQUEST FOR RESOURCES 2: OPERATIONS AND PEACE KEEPING

  5.1  The Winter Supplementary Estimate requests an additional £1,397 million for peace keeping operations in Iraq and £2,318 million for peace keeping operations in Afghanistan. This is summarised in Table 5 below, with a more detailed analysis is shown in Table 6. The increase reflects the demands of the operations concerned, in particular the need for Urgent Operational Requirements. There are transfers of funding out to FCO (£16 million) and DIFD (£1.97 million) being the MoD's contribution to the Government's Stabilisation Fund. There is also a transfer in of £2.4 million from the FCO as a contribution to the Balkans cost of operations. A further transfer in from DIFD will be made in the Spring Supplementary round for their contribution to the Global Pool costs.

Table 5

SUMMARY COST OF OPERATIONS AND PEACE KEEPING CLAIM AT 2008-09 WSE

Operation
Direct
Resource
DEL £M
Indirect
Resource
DEL £M
Capital
DEL £M
Total WSE
request
2008-09 £M
Outturn
2007-08

Iraq
971170 2561,3971,457
Afghanistan1,331180 8072,3181,504
Balkans2 226
Stabilisation Fund contribution out to FCO and DIFD -18 -180
Total2,286 3501,0633,699 2,987



  5.2  The current cost estimate for operations in Iraq, Afghanistan and the Balkans for the 2008-09 Winter Supplementary Estimates is shown in Table 6.

  5.3  The Department has requested the £350 million Indirect Resource DEL from the Treasury Reserve to cover cost of capital, depreciation and impairment charges associated with fixed assets purchased under Urgent Operational Requirement arrangements. These are continuing non-cash charges associated with holding these assets and are charged to RfR2 for as long as they are deployed on operations.

Table 6

THE ESTIMATED COST OF OPERATIONS IN AFGHANISTAN, IRAQ AND THE BALKANS AT WSE 2008-09
Cost TypeIraq £M Afghanistan £MBalkans £M
Direct Resource DEL
Civilian Personnel 17 101
Military Personnel116 1061
Stock/Other Consumption195 3796
Infrastructure Costs119 1475
Equipment Support Costs332 3856
Other Costs and Services194 3112
Income Foregone/ Generated (-) -2 -7-2
Total Direct Resource DEL 971 1,33119
Indirect Resource DEL170 1800
Total Resource DEL1,141 1,51119
Capital DEL
Capital Additions 256 8070
Total Capital DEL256 8070
Total Estimated Costs1,397 2,31819


  5.4  The Department has revised the Estimate ambit for RfR2 to reflect the Committee's 2007-08 Spring Supplementary Estimates recommendations for a more detailed description of our RfR2 activities.

6.  RFR3 WAR PENSION BENEFIT (WPB)

  6.1  There are no changes to the RfR3 War Pension Benefit at Winter Supplementary Estimates.

7.  THE DEPARTMENTAL EXPENDITURE LIMIT (DEL)

  7.1  Table 8 shows the DEL from 2005-06 to 2008-09 for all RfRs. The Total DEL is calculated by adding Resource DEL, Capital DEL and deducting depreciation, which forms part of Resource DEL. Depreciation is excluded from Total DEL; including this as well as Capital DEL would be double counting. The figures are for Voted and Non-voted DEL; the Non voted DEL figure for 2008-09 is £137.561 million net of depreciation, and this is shown in more detail in the Notes to the Winter Supplementary Estimate.

Table 8

CHANGES TO MOD DEPARTMENTAL EXPENDITURE LIMITS

2005-06
SSE £M
2006-07
SSE £M
2007-08
SSE £M
2008-09
ME £M
2008-09
WSE

Resource DEL
33,727 34,10436,94033,623 37,273
Capital DEL6,7987,448 8,1207,8717,984
Depreciation-8,168-7,401 -8,218-7,418-7,747
Total DEL32,357 34,15136,842 34,07637,510


8.  ADMINISTRATION COSTS LIMIT

  8.1  The Department introduced an Administration Costs Limit in its 2008-09 Main Estimates for the first time. There is a small reduction of £0.045 million reflecting a budgetary transfer to the Treasury, reflecting the MoD's contribution to the Centre of Expertise for Sustainable Procurement.

9.  PROVISIONS AND CONTINGENT LIABILITIES

  9.1  No changes have been made at WSE.

10.  MACHINERY OF GOVERNMENT CHANGES

  10.1  There are no Machinery of Government Changes.

11.  IMPACT ON PSA TARGETS

  11.1  The changes in provision sought are not linked to the overall achievement of the PSA targets to which the Department contributes our Departmental Strategic Objectives (DSO) but rather enables delivery across the range of outputs in accordance with our plans. However, a failure to grant the additional RfR2 allocation would undermine the prosecution of operations in Iraq and Afghanistan (PSA 30 and DSO 1).

12.  NET ADDITIONAL CASH REQUIREMENT

  12.1  The Net Cash impact for the Winter Supplementary Estimate is an increased requirement of £3,389.122 million. This is broken down in Table 2.



1   Now re-named from Conflict Prevention to Operations and Peace Keeping. Back


 
previous page contents next page

House of Commons home page Parliament home page House of Lords home page search page enquiries index

© Parliamentary copyright 2008
Prepared 15 December 2008