Supplementary memorandum submitted by Kirklees Council (EEFP 47a)

SOCIAL HOUSING STOCK SAP PERFORMANCE

  Kirklees Neighbourhood Housing (KNH) is an arms length social housing landlord and manage 23500 properties on behalf of Kirklees Council.

  SAP ratings have been calculated from 2003 using a stand alone database. The SAP results are based on the SAP 2001 methodology (scale 0-150).

  SAP performance

April 2003    45 SAP

April 2004    53 SAP

April 2005    60 SAP

April 2006    66 SAP

April 2007    76 SAP

April 2008    76 SAP

April 2009    77 SAP

  Before 2003 much investment was carried out to install loft insulation (up to 100mm and later 150mm), cavity wall insulation where it was possible and external cladding to some non traditionally built properties.

  The main reasons for the improving SAP score are (probably in order of impact)

    —  Installation of new and replacement gas central heating.

o 13 200 new/replacement gas heating systems have been installed since 2002.

o 11 400 of these were done through decent homes (2003-2007) at a cost of £34M.

o Before and since decent homes 1 800 additional systems have been done. Costs £1.25M 2002/03 £1.5M 2007/08.

o From early 2004 condensing models were installed as standard.

    —  External cladding work on non traditional build properties.

o Before decent homes around 880 properties were external clad. External funding of £176K.

o 1100 properties are to be clad between 2008 and 2013, at a cost of £ 8.0 M. External funding of £750K has been identified.

    —  Internal insulation loft top ups.

o The Kirklees minimum standard is 150 mm (electric properties 200 mm).

o Due to previous investment top ups on decent homes was low circa 1200, cost £250K, funding received £85K.

    —  Double glazing.

o All homes were upgraded to double glazing as part of decent homes around 13000 at a cost of £ 26 M.

    —  District/Sheltered heating boiler replacements.

o 20 commercial sized gas boilers have been replaced with modern gas condensing models, cost £ 1.1 M.

    —  Renewable energy systems.

o Solar Thermal 61, £171K.

o Solar Photovoltaic 188, £1.03M.

o Air Source Heat Pumps 70, £294K.

o External funding received for above £1.02M.

o A budget of £13.9 M (including funding) was approved in December 2008 for additional renewable systems.

  The delivery of these measures has been supported at cabinet level by members who have a strong green agenda and green ambition. KNH also has a dedicated energy team that is technically strong and can develop focused strategies that maximise current technologies and funding. They also deliver, or at least advise on, the energy schemes that are generated.

Energy Team Manager