Submission
from Mr Peter Mulley, B.Sc.Eng
1 Cornwall needs the missing
links of the A30 to be dualled ASAP,
primarily the Temple section but also the Carland Cross to
Chiverton Cross section. Similarly the Liskeard dual carriageway section of the
A38 needs to be continued eastwards towards Saltash and westwards to join the
A30.
2 The
A30 in Devon needs additionally to form an Exeter northern
bypass to link with the Honiton Bypass in
the east and the A30 in the West with a new junction with the M5, otherwise the
M5 at Exeter is
likely to become extremely congested. It could also provide a much better link
with St Davids Railway Station which is desperately needed.
3 The
West Country needs two trunk routes from the rest of England
as it is unacceptable to have to rely on
just the one from Taunton to Exeter. The proposed A303/M5 link at Taunton would help short term, but the A303/A30 needs to
be dual throughout to Exeter without a tunnel at
Stonehenge which is an extravagance too far.
|