Submission from
Railfuture Devon &
1 Restructure the West Country Passenger Timetable making it 'clock face'
1.1 An
hourly Paddington to
1.2 A
semi-fast service from Paddington every hour either to Paignton or to
1.3 An
half hourly Exmouth to
1.4 A
two hourly service from Paignton to Newquay alternating with a two hourly
service from Newquay to
1.5 A
regular service filling the gaps from
1.6 Cross
Country services much as now but with more accommodation and with the
re-introduction of services to the
1.7 Two
trains per hour on the
1.8 Park
and Ride at Meldon for
2 Infrastructure
2.1 Raising of speed restrictions and removal of level crossings
2.2 Newquay Branch to resolve conflict between services.
2.3 Electrification
of the Berks and Hants and Basingstoke to
2.4 Construction a new route from Stoke Canon to Newton Abbot because of flooding problems at
3 Rolling Stock
3.1 More is needed, could not Mk2's or Mk3's be revamped with one loco' and one DVT for longer journeys?
3.2 First Class needs to be provided for connections off long distance trains which provide First Class.
Peter Mulley, Secretary, Railfuture Devon