|
|
| |
| |
|
| |
| | |
| Clause 19, page 12, line 27, leave out ‘investigate’ and insert ‘take proportionate |
|
| |
| |
| |
| | |
| Clause 19, page 12, line 32, after ‘authority’, insert ‘or the Environment Agency or |
|
| |
| | Member’s explanatory statement
|
|
| | To allow for Environment Agency or Welsh national investigations in the event of a flood in case |
|
| | the local authority’s response needs to be investigated or in case the flood affects more than one |
|
| | |
| |
| |
| | |
| Clause 19, page 12, line 34, at end add— |
|
| | ‘(c) | lay the report before Parliament, or in Wales, the National Assembly for |
|
| | |
| | Member’s explanatory statement
|
|
| | To ensure any investigation report is publicly available and drawn to public attention. |
|
| |
| |
| |
| | |
| Clause 21, page 13, line 21, leave out subsection (1) and insert— |
|
| | ‘(1) | A lead local flood authority must establish and maintain a register, which in |
|
| | particular, must include information, including mapping, on— |
|
| | (a) | structures or features which, in the opinion of the authority, are likely to |
|
| | have a significant effect on a flood risk in its area, and |
|
| | (b) | Sustainable Urban Drainage Systems in its area. |
|
| | (2) | A lead local flood authority must establish and maintain a record of information |
|
| | in connection with any of the things specified in subsection (1), including |
|
| | information about ownership and state of repair.’. |
|
| |
| |
| | |
| Clause 21, page 13, line 24, leave out ‘and’ and insert ‘or are likely to have a |
|
| significant effect on public health and welfare if flooded, including— |
|
| | ‘(i) | sites and structures critical to energy supply, |
|
| | (ii) | sites and structures critical to water processing and supply, |
|
| | (iii) | critical railway lines, roads and bridges, |
|
| | (iv) | telephone exchanges and other critical communications sites and |
|
| | |
| | (v) | general hospitals, and |
|
| | (vi) | any other local sites and structures considered critical by the |
|
| | |
|
|
| |
| |
|
| | Member’s explanatory statement
|
|
| | To introduce a register of critical infrastructure. |
|
| |
| |
| | |
| Clause 21, page 13, line 26, at end insert ‘and state of resilience to possible failure |
|
| due to flooding or coastal erosion.’. |
|
| | Member’s explanatory statement
|
|
| | Complements inclusion of critical infrastructure. |
|
| |
| |
| | |
| Clause 24, page 14, line 18, at end insert— |
|
| | ‘(2) | The Agency may not implement the regional programme without the consent of |
|
| | the Regional Flood and Coastal Committee for the region concerned.’. |
|
| |
| |
| | |
| Clause 24, page 14, line 29, after ‘selection’, insert ‘, election’. |
|
| |
| |
| | |
| Clause 24, page 14, line 30, after ‘appoint’, insert ‘or elect’. |
|
| | Member’s explanatory statement
|
|
| | |
| |
| | |
| Clause 24, page 14, line 33, at end insert— |
|
| | ‘(2) | In this section the Minister must ensure that— |
|
| | (a) | local authorities elect or appoint their own representatives, and |
|
| | (b) | representatives from local authorities form a majority on each |
|
| | |
| |
| |
| |
| | |
| Clause 27, page 15, line 13, leave out from ‘(1)’ to ‘; and’ in line 14. |
|
| |
| | |
| Clause 27, page 15, line 32, leave out ‘flood and coastal erosion risk management |
|
| in England’ and insert ‘English authorities’. |
|
|
|
| |
| |
|
| |
| | |
| Clause 27, page 15, line 34, leave out ‘flood and coastal erosion risk management |
|
| in Wales’ and insert ‘Welsh authorities’. |
|
| |
| | |
| Clause 27, page 15, line 35, at end add— |
|
| | ‘(6) | For the purposes of subsection (5)— |
|
| | (a) | an “English authority” is— |
|
| | (i) | a lead local flood authority, district council or highway authority |
|
| | for an area in England, and |
|
| | (ii) | an internal drainage board for an internal drainage district that is |
|
| | wholly or mainly in England; |
|
| | (b) | a “Welsh authority” is— |
|
| | (i) | a lead local flood authority or highway authority for an area in |
|
| | |
| | (ii) | an internal drainage board for an internal drainage district that is |
|
| | wholly or mainly in Wales.’. |
|
| |
| |
| | |
| Clause 27, page 15, line 35, at end add— |
|
| | ‘(6) | In this section “sustainable development” means development which enables all |
|
| | people throughout the world to satisfy their basic needs and enjoy a better quality |
|
| | of life, without compromising the quality of life of future generations, pursued in |
|
| | an integrated way through a sustainable, innovative and productive economy that |
|
| | delivers high levels of employment; and a just society that promotes social |
|
| | inclusion, sustainable communities and personal wellbeing and will be done in |
|
| | ways that protect and enhance the physical and natural environment, and use |
|
| | resources and energy as efficiently as possible.’. |
|
| |
| |
| |
| | |
| Page 15, line 36, leave out Clause 28. |
|
| |
| |
| |
| | |
| Clause 29, page 16, line 23, after ‘consult’, leave out to end of subsection (4) and |
|
| |
| | ‘(a) | the authorities that would be affected by it, |
|
|
|
| |
| |
|
| | |
| |
| |
| |
| | |
| Schedule 1, page 32, line 5, after ‘environment’, add ‘; including defined |
|
| geographical areas of landscape.’. |
|
| | Member’s explanatory statement
|
|
| | To make certain that areas of green space important to the avoidance of flooding are clearly able |
|
| | to be designated as well as more obvious physical features such as woods, dykes or watercourses. |
|
| |
| |
| |
| |
| | |
| Schedule 1, page 32, line 7, leave out ‘affects’ and insert ‘is likely to have a |
|
| |
| |
| |
| | |
| Schedule 1, page 32, line 15, at end insert— |
|
| | ‘(6) | Condition 5 is that a designating authority may only designate infrastructure if |
|
| | this does not compromise its primary purpose.’. |
|
| |
| |
| | |
| Schedule 1, page 32, line 18, after ‘authority’, insert ‘except where routine |
|
| maintenance or maintenance for safety purposes is required of a structure, and where |
|
| routine maintenance or use or good management is required of a natural or man-made |
|
| feature of the environment.’. |
|
| | Member’s explanatory statement
|
|
| | To ensure that every act of routine maintenance, agriculture or good land or woodland |
|
| | management in or to a designated feature doesn’t require bureaucratic approval or put the owner |
|
| | or manager at risk of prosecution. |
|
| |
| |
| | |
| Schedule 1, page 32, line 36, leave out ‘affect’ and insert ‘significantly increase’. |
|
| | Member’s explanatory statement
|
|
| | To raise the bar for refusal of consent so that the designating authority has to show the action |
|
| | proposed would actually increase flood risk to the point where other considerations such as |
|
| | ecology, health and safety etc would be outweighed. |
|
| |
| |
| | |
| Schedule 1, page 35, line 24, after second ‘the’, insert ‘reasonable’. |
|
|
|
| |
| |
|
| | Member’s explanatory statement
|
|
| | To prevent this Schedule being a general get-out for any loss or damage caused unreasonably. At |
|
| | present it simply has to be shown that it was the result of a power of entry exercised under 13(1) |
|
| | which will be true in almost every case. |
|
| Dr Roberta Blackman-Woods |
|
| | |
| Schedule 1, page 35, line 42, after ‘consent’, insert ‘or conditions’. |
|
| |
| |
| |
| | |
| Schedule 2, page 39, line 35, after ‘of’, insert ‘re-instating’. |
|
| |
| | |
| Schedule 2, page 40, line 10, leave out ‘Conditions 1 and 3 are satisfied’ and |
|
| |
| | ‘(a) | Conditions 1 and 3 are satisfied, or |
|
| | (b) | Conditions 1 and 4 are satisfied.’. |
|
| |
| | |
| Schedule 2, page 40, line 23, leave out ‘carrying out’. |
|
| |
| | |
| Schedule 2, page 40, line 25, leave out paragraph (a). |
|
| |
| | |
| Schedule 2, page 40, line 29, at end insert— |
|
| | ‘(7A) | Condition 4 is that the purpose of the work is to manage a flood risk in the |
|
| | authority’s area from the sea and either— |
|
| | (a) | the work is within subsection (8)(a), (b) or (f), or |
|
| | (b) | the Environment Agency has consented to the work.’. |
|
| |
| |
| | |
| Schedule 2, page 40, line 33, after ‘structures’, insert ‘and natural or man-made |
|
| features of the environment’. |
|
| | Member’s explanatory statement
|
|
| | To ensure that this Schedule does not slip back into treating flood risk management as the |
|
| | maintenance of hard defences, ignoring natural features. Other subsections refer to natural |
|
| | processes but not features. |
|
|
|
| |
| |
|
| |
| |
| | |
| Schedule 2, page 40, line 44, after ‘of’, insert ‘re-instating’. |
|
| |
| |
| | |
| Schedule 2, page 45, line 38, after ‘structures’, insert ‘and natural or man-made |
|
| features of the environment’. |
|
| | Member’s explanatory statement
|
|
| | To ensure that this Schedule does not slip back into treating flood risk management as the |
|
| | maintenance of hard defences, ignoring natural features. Other subsections refer to natural |
|
| | processes but not features. |
|
| |
| |
| | |
| Schedule 2, page 46, line 3, after ‘of’, insert ‘re-instating’. |
|
| |
| |
| |
| | |
| Schedule 3, page 47, leave out lines 36 to 39 and insert— |
|
| | ‘(1) | In this Schedule “drainage system” means— |
|
| | (a) | a structure designed to receive rainwater except— |
|
| | |
| | (ii) | a natural watercourse; and |
|
| | (b) | any lateral drain or sewer communicating with a drainage system.’. |
|
| |
| |
| | |
| Schedule 3, page 48, leave out lines 4 and 5 and insert— |
|
| | ‘(3) | “Lateral drain”, “sewer” and “public sewer” have the meanings given by section |
|
| | 219(1) of the Water Industry Act 1991.’. |
|
| |
| |
| | |
| Schedule 3, page 48, line 8, leave out paragraph 2 and insert—
|
|
| ‘“Sustainable Urban Drainage System” means a drainage system which— |
|
| | (a) | facilitates attenuation, settlement or treatment of surface water from two |
|
| | or more premises (whether or not together with road water), and |
|
| | (b) | includes one or more of the following: |
|
| | |
| | |
| | |
| | (iv) | constructed wetlands; |
|
|
|
| |
| |
|
| | |
| | |
| | (vii) | attenuation tanks, and |
|
| | (viii) | detention basins (together with any associated pipes and |
|
| | |
| |
| |
| | |
| Schedule 3, page 48, line 37, leave out ‘consult’ and insert ‘as soon as possible |
|
| instigate, publish and have regard to a review undertaken by a panel of independent |
|
| persons pertaining to the costs currently incurred by local authorties in maintaining |
|
| private sewers before the Schedule is commenced’. |
|
| |
| |
| | |
| Schedule 3, page 49, line 3, leave out ‘county council’ and insert ‘local planning |
|
| authority (as defined in section 1 (1)(b) of the Town and Country Planning Act 1990)’. |
|
| |
| |
| | |
| Schedule 3, page 51, line 25, at end insert— |
|
| | ‘(e) | Internal Drainage Boards, if the approving body thinks that the drainage |
|
| | system may directly or indirectly involve the discharge of water into an |
|
| | Internal Drainage District.’. |
|
| |
| | |
| Schedule 3, page 51, line 28, after ‘applicant’ insert ‘or, in the case of a combined |
|
| application, the planning authority,’. |
|
| |
| | |
| Schedule 3, page 52, line 6, at end insert— |
|
| | ‘(6) | The Minister may issue guidance about what amounts may be required by way of |
|
| | non-performance bonds; and approving bodies must have regard to the |
|
| | |
| |
| |
| | |
| Schedule 3, page 52, line 16, leave out ‘significantly’. |
|
| |
| |
| | |
| Schedule 3, page 52, leave out lines 19 and 20 and insert— |
|
| | ‘(1) | The Minister shall by order provide for the enforcement of— |
|
| | (a) | the requirement for approval in paragraph 7(1); and |
|
| | (b) | the duty to maintain in paragraph 21.’. |
|
|