| Flood and Water Management Bill
|
|
| [Ninth and Tenth SittingS]
|
|
| | |
| | Amendment 149 proposed, in page 47, to leave out lines 36 to 39 and insert— |
|
| | ‘(1) | In this Schedule “drainage system” means— |
|
| | (a) | a structure designed to receive rainwater except— |
|
| | |
| | (ii) | a natural watercourse; and |
|
| | (b) | any lateral drain or sewer communicating with a drainage system.’.— |
|
| | |
| | Question proposed, That the Amendment be made. |
|
| | |
| |
| |
| | Negatived on division 150 |
|
| Schedule 3, page 48, leave out lines 4 and 5 and insert— |
|
| | ‘(3) | “Lateral drain”, “sewer” and “public sewer” have the meanings given by section |
|
| | 219(1) of the Water Industry Act 1991.’. |
|
| |
| |
| | |
| Schedule 3, page 48, line 8, leave out paragraph 2 and insert—
|
|
| ‘“Sustainable Urban Drainage System” means a drainage system which— |
|
| | (a) | facilitates attenuation, settlement or treatment of surface water from two |
|
| | or more premises (whether or not together with road water), and |
|
| | (b) | includes one or more of the following: |
|
| | |
| | |
| | |
| | (iv) | constructed wetlands; |
|
| | |
| | |
| | (vii) | attenuation tanks, and |
|
|
|
| |
| |
|
| | (viii) | detention basins (together with any associated pipes and |
|
| | |
| |
| |
| | |
| Schedule 3, page 48, line 12, after ‘the’, insert ‘natural’. |
|
| |
| |
| | |
| Schedule 3, page 48, line 37, leave out ‘consult’ and insert ‘as soon as possible |
|
| instigate, publish and have regard to a review undertaken by a panel of independent |
|
| persons pertaining to the costs currently incurred by local authorties in maintaining |
|
| private sewers before the Schedule is commenced’. |
|
| |
| |
| | |
| Schedule 3, page 49, line 3, leave out ‘county council’ and insert ‘local planning |
|
| authority (as defined in section 1 (1)(b) of the Town and Country Planning Act 1990)’. |
|
| |
| |
| | |
| Schedule 3, page 51, line 25, at end insert— |
|
| | ‘(e) | Internal Drainage Boards, if the approving body thinks that the drainage |
|
| | system may directly or indirectly involve the discharge of water into an |
|
| | Internal Drainage District.’. |
|
| |
| | |
| Schedule 3, page 51, line 28, after ‘applicant’ insert ‘or, in the case of a combined |
|
| application, the planning authority,’. |
|
| Dr Roberta Blackman-Woods |
|
| | |
| Schedule 3, page 51, line 29, at end insert— |
|
| | ‘(5) | The Minister may make regulations about timing and procedure for determination |
|
| | of applications for approval; and the regulations may, in particular, specify the |
|
| | consequence of failure to comply with them.’. |
|
| |
| | |
| Schedule 3, page 52, line 6, at end insert— |
|
| | ‘(6) | The Minister may issue guidance about what amounts may be required by way of |
|
| | non-performance bonds; and approving bodies must have regard to the |
|
| | |
| |
| |
| | |
| Schedule 3, page 52, line 16, leave out ‘significantly’. |
|
|
|
| |
| |
|
| |
| |
| | Negatived on division 151 |
|
| Schedule 3, page 52, leave out lines 19 and 20 and insert— |
|
| | ‘(1) | The Minister shall by order provide for the enforcement of— |
|
| | (a) | the requirement for approval in paragraph 7(1); and |
|
| | (b) | the duty to maintain in paragraph 21.’. |
|
| |
| | |
| Schedule 3, page 53, line 3, at end insert— |
|
| | |
| | 14A | The Minister may issue guidance about the process of seeking and obtaining |
|
| | approval; and approving bodies must have regard to the guidance.’. |
|
| |
| |
| | Negatived on division 152 |
|
| Schedule 3, page 53, line 19, leave out ‘Where’ and insert ‘Subject to section |
|
| |
| |
| |
| | |
| Schedule 3, page 53, line 24, at end insert— |
|
| | ‘106AA | Communication with sustainable drainage systems |
|
| | (1) | This section applies to drainage systems the construction of which requires |
|
| | approval under Schedule 3 to the Flood and Water Management Act 2010 |
|
| | |
| | (2) | Terms and expressions used in Schedule 3 to the Flood and Water Management |
|
| | Act 2010 shall have the same meanings in this section. |
|
| | (3) | The communication of a drainage system with a public sewer or other works |
|
| | owned by or vested in a sewerage undertaker may not be approved or effected by |
|
| | an approving body or other person except in accordance with this section. |
|
| | (4) | An approving body or other person wishing to approve or effect the |
|
| | communication of a drainage system with a public sewer or other works of a |
|
| | sewerage undertaker shall give notice of its or his proposals to the sewerage |
|
| | |
| | (5) | At any time within 21 days after a sewerage undertaker receives a notice under |
|
| | subsection (4) above, the undertaker may by notice to the person who gave the |
|
| | notice refuse permission for the communication to be made, or grant permission |
|
| | for the communication subject to such conditions as it thinks fit, subject to taking |
|
| | into account the considerations set out in subsection (6) below. |
|
| | (6) | The considerations which the sewerage undertaker is to take into account include |
|
| | whether the communication of the drainage system with the public sewer or other |
|
| | works of the sewerage undertaker may contribute towards one or more of the |
|
| | |
| | (a) | the overloading of the public sewer or other works of the sewerage |
|
| | undertaker, and the consequential overflowing of its or their contents and |
|
| | the flooding of adjoining property or land; |
|
|
|
| |
| |
|
| | (b) | the overloading of any sewage disposal works, so adversely affecting |
|
| | such works’ capacity to treat or dispose of sewage in compliance with |
|
| | any statutory requirement or consent applicable to it; |
|
| | (c) | increased flows in and resulting overflows and discharges from |
|
| | combined foul and surface water sewers, which may have adverse effects |
|
| | on the aquatic environment, or which may cause the undertaker to be in |
|
| | breach of a statutory requirement or consent applicable to the discharge; |
|
| | (d) | the pollution of inland waters, the flooding of property or land, or the |
|
| | impairment of river or drainage systems, whether or not arising from any |
|
| | of the matters described in paragraphs (a) to (c) above. |
|
| | (7) | Any question arising under subsections (4) to (6) above between a sewerage |
|
| | undertaker and any other person as to the reasonableness of the undertaker’s |
|
| | refusal to permit a communication to be made, or the reasonableness of the |
|
| | conditions on which the undertaker is prepared to permit a communication to be |
|
| | made may, on the applications of that person, be determined in accordance with |
|
| | regulations made under paragraph 24 of Schedule 3 to the Flood and Water |
|
| | |
| | (8) | In this section, “inland waters” has the meaning given by the Water Resources |
|
| | |
| |
| |
| | |
| Schedule 3, page 53, line 25, leave out ‘After’ and insert ‘Subject to section |
|
| |
| |
| | |
| Schedule 3, page 54, line 19, at beginning insert ‘Sub-paragraphs (3A) and (3B) |
|
| |
| |
| | |
| Schedule 3, page 54, line 20, after ‘adopted)’, insert— |
|
| | |
| |
| | |
| Schedule 3, page 54, line 24, at end insert— |
|
| | ‘(3B) | The maintaining authority must designate the road under section 63 of the New |
|
| | Roads and Street Works Act 1991 (streets with special engineering difficulties).’. |
|
| |
| | |
| Schedule 3, page 54, line 27, at end insert ‘(and a reference to a road includes a |
|
| reference to part of a road).’. |
|
| |
| |
| | |
| Schedule 3, page 54, line 36, leave out ‘becomes responsible for maintaining’ and |
|
| insert ‘shall be under a duty to maintain’. |
|
|
|
| |
| |
|
| |
| | |
| Schedule 3, page 55, line 34, leave out ‘and’. |
|
| |
| | |
| Schedule 3, page 55, line 37, at end insert ‘, and |
|
| | (i) | designate under section 63 of the New Roads and Street Works |
|
| | Act 1991 (streets with special engineering difficulties) any |
|
| | adopted part of the drainage system that is a street within the |
|
| | meaning of section 48 of that Act.’. |
|
| |
| |
| | |
| Schedule 3, page 55, line 39, at end insert— |
|
| | ‘(8) | The Minister must consult persons who in the Minister’s opinion represent |
|
| | interests likely to be affected by this Schedule and publish a report detailing how |
|
| | the adoption and maintenance of drainage systems is to be funded before the |
|
| | |
| |
| | |
| Schedule 3, page 56, line 38, at end insert— |
|
| | ‘(2A) | At the end of section 59 add— |
|
| | “(7) | Schedule 3 to the Flood and Water Management Act 2010 extends the |
|
| | power under subsection (1)(c) of this section to sustainable drainage |
|
| | systems as defined in regulations under that Schedule.”’. |
|
| |
| | |
| Schedule 3, page 56, line 40, leave out ‘omit’ and insert ‘for’. |
|
| |
| | |
| Schedule 3, page 56, line 40, at end insert ‘substitute “(having regard both to the |
|
| need to remove water from the court, yard or passage and also to the need to dispose of it |
|
| satisfactorily in the course of or after its removal)”.’. |
|
| |
| | |
| Schedule 3, page 56, line 40, at end insert— |
|
| | ‘New Roads and Street Works Act 1991 |
|
| | 26 | At the end of section 63 of the New Roads and Street Works Act 1991 (streets |
|
| | with special engineering difficulties) insert— |
|
| | “(5) | In addition to criteria for designation prescribed under subsection |
|
| | (2)(a), Schedule 3 to the Flood and Water Management Act 2010 |
|
| | requires designation in certain circumstances (relating to sustainable |
|
| | |
|
|
| |
| |
|
| |
| | |
| Schedule 3, page 56, line 40, at end insert— |
|
| | |
| | 27 (1) | The Minister may make regulations requiring a statutory undertaker to notify |
|
| | the approving body before commencing statutory works on public land where |
|
| | the works will or may affect the operation of a drainage system on that land. |
|
| | (2) | “Public land” means land owned or occupied by a designating authority for the |
|
| | |
| | (3) | The regulations shall define— |
|
| | (a) | “statutory undertaker”, and |
|
| | |
| | (4) | The regulations may specify criteria for determining what works are to be |
|
| | treated as works that will or may affect the operation of a drainage system. |
|
| | (5) | The regulations may include provision about— |
|
| | |
| | |
| | |
| | (a) | specify consequences of failure to comply with a provision of the |
|
| | |
| | (b) | include provision requiring, or enabling an approving body to require, |
|
| | a statutory undertaker who is carrying out or has carried out works |
|
| | affecting a drainage system to carry out further work in relation to the |
|
| | system (which may include, in particular, a requirement to leave the |
|
| | system in a state approved by the approving body, having regard to |
|
| | national standards on sustainable drainage); |
|
| | (c) | give approving bodies default powers to undertake work and recover |
|
| | |
| | (7) | The regulations may amend an enactment so as to introduce a cross-reference |
|
| | |
| | Schedule 3, as amended, agreed to |
|
| | |
| |
| |
| |
| | |
| Schedule 4, page 57, line 15, leave out ‘10,000’ and insert ‘15,000’. |
|
| |
| |
| |
| |
| | |
| Schedule 4, page 71, line 27, at end add— |
|
| | ‘43 | One year after this Act coming into force the Minister shall carry out a review |
|
| | of the regulatory impact of this Schedule on undertakers.’. |
|
|
|
| |
| |
|
| | |
| | |
| | |
| |
| |
| |
| | |
| Clause 35, page 18, line 1, leave out subsection (2) and insert— |
|
| | ‘(2) | The regulations must allow a water undertaker or sewerage undertaker to |
|
| | undertake an infrastructure project which is to be put out to tender in accordance |
|
| | |
| |
| |
| | |
| Clause 35, page 18, line 1, leave out subsection (2) and insert— |
|
| | ‘(2) | The regulations may allow the Minister to prohibit a water undertaker or |
|
| | sewerage undertaker from undertaking a specified infrastructure project which is |
|
| | to be put out to tender in accordance with the regulations for a period of no more |
|
| | than one year from the date of specification.’. |
|
| |
| |
| | |
| Clause 35, page 18, line 6, at end insert ‘and shall not prohibit the water or |
|
| sewerage undertaker from preparing its own plan in relation to a specified infrastructure |
|
| |
| | |
| |
| |
| |
| | |
| Clause 36, page 20, leave out lines 25 to 27 and insert— |
|
| | ‘(2) | The following uses of water using a hosepipe or similar apparatus may be |
|
| | |
| | (a) | watering gardens, lawns and landscaped areas; |
|
| | (b) | operating ornamental fountains and cascades; |
|
| | (c) | cleaning private motor vehicles; |
|
| | (d) | cleaning private boats, other vessels and watercraft; |
|
| | (e) | cleaning patios, drives, paths, pavements and other similar artificial |
|
| | |
| | (f) | operating private water slides and other water-based facilities designed |
|
| | for the entertainment of children; |
|
| | (g) | filling private ponds (other than fish ponds); |
|
|