DE 06
Further supplementary
memorandum from the Ministry of Defence
The
Department's responses for
information following the Committee's session with the Chief of Defence Materiel on 1 December
2009 are set out below:
(1) A description of the four main areas of skill shortages which CDM started to list in his oral evidence.[Q8]
DE&S in seeking
to continuously improve its skills and is focused on doing so in the following
four areas:
1. Cost Assurance, including:
(a) Cost Forecasting (develop cost models and
forecasts to support decision making around capability options);
(b) Cost Engineering (providing cost estimates
and contract pricing in the absence of competition to support value for money
considerations); and
(c) Cost Certification (including negotiating
and agreeing rates and verifying contractor payments during and post contract).
2. Technical Assurance (Technological and
Engineering advice and support to project teams)
3. Financial skills (in particular Management
Accounting skills); and
4. Complex Programme Management (Managing
projects in their widest context).
(2) How many MoD people are involved in buying helicopters? [Q20]
As at 30 November 2009 the DE&S
Helicopters Operating Centre had 858 crown servants (military and civilian) in
post. Of these approximately 420
directly manage work on Apache, Lynx, Merlin, Sea King and Wildcat helicopters
for which AgustaWestland is the main contractor, addressing "buying" issues
such as: commercial, engineering, finance, in-service support, core and UOR
project management, requirements and safety. The remaining 438 manage
similar work with other Companies, such as Boeing, Eurocopter and Lockheed
Martin, plus Operating Centre business management.
(3) Comments on the data on staff rotation provided in the graph on
p184 of the Gray report, including the MoD's
own data for staff rotation on project teams. [Q 57-68]
Data on staff tenure in project team leader appointments is not held in a
form that would permit meaningful analysis or comparison with the graph on page
184 of the Bernard Gray report. Work
will be undertaken to produce an analysis and the results will be provided to
the Committee in the New Year.
(4) A description of the methodology used to calculate the estimates
of £21 billion and £6 billion for the extent of over-programming. [Q77]
The Defence
Budget until 2010/11 reflects the 2007 Comprehensive Spending Review settlement
(CSR07). The projected Defence Budget thereafter assumes a level budget in
real terms, based on an annual 2.7% increase from 2010/11, adjusted to exclude
an element of ring-fenced expenditure which was provided as part of the CSR 07
settlement.
The future Defence Programme is costed using generic Corporate
Planning Assumptions for inflation. Inflation indices for specific industrial
sectors are used where it is appropriate to do so. It is assumed that, consistent with the 2006
White Paper, the future strategic deterrent will be funded beyond 2010/11 in
such a way that would not be at the expense of the conventional capabilities
our Armed Forces need.
Costs for projects in the
forward Equipment Programme are based on analytically generated estimates. Each project is costed at a 50% confidence
level. Statistically, those projects
exceeding their estimated cost should be balanced by those undershooting.
At the start of Planning Round 09 the cost of the
future Defence Programme exceeded
the projected Defence Budget by £21
billion over the ten year planning horizon. After changes resulting from the Equipment
Examination and Planning Round 09, an excess of £6 billion remained between the
costed programme and assumed budget at the end of Planning Round 09. This is being addressed in the current
planning round and the forthcoming defence review.
(5) Spend to date on the FRES programme. [Q143]
The total spend on the FRES programme to 30 October
2009 was £189M (inclusive of non-recoverable VAT). None of this money has been wasted. The knowledge gained has refined our
understanding of the requirement; reduced technical risk; and up-skilled the project team with specialist
management and integration skills. This all continues to have a direct or
indirect benefit to the FRES programme as it moves forward. The table below gives the breakdown of
this spend for the Utility Vehicle and Specialist Vehicle programmes, and the
benefits derived. The table does not
include the £6M spent on the Concept Phase, which established the baseline for
all subsequent work in the FRES programme.
Category
|
Utility
Vehicle
(£M
inc non-recoverable VAT)
|
Specialist
Vehicle
(£M
inc non-recoverable VAT)
|
Benefits
|
Assessment Phase Activities
|
54
|
44
|
The primary
outputs of the Assessment Phase so far include: the development of the
detailed requirement; technology management; and systems and engineering
integration studies. The outputs of
this work will enable the Utility Vehicle programme to progress rapidly to Demonstration once the programme restarts. Much of the Utility Vehicle Assessment
Phase work was of direct benefit to the Specialist Vehicle programme.
These figures
also include engineering and technical support to the MoD project team in
managing the above activities. These
skills were successfully transferred to MoD personnel in the project team and
are of significant benefit to the management of the programme as it moves
forward.
|
Systems of Systems Integrator (SOSI)
|
9
|
1
|
The SOSI
formed part of the project team and aided the management of the complex
multi-platform and wider battle-space integration issues. SOSI personnel were
engaged to provide Systems Integration, Engineering Integration and Through
Life Capability & Technology Management expertise. Again, these skills
were successfully transferred to MoD personnel in the project team and are of
significant benefit to the management of the programme as it moves forward.
|
Technology Demonstrator
Programmes (TDPs)
|
68
|
5
|
TDPs are studies into
technology that could be used through life on FRES
vehicles. These included Electronic Architecture, Protection, Chassis and
drive concepts. The output of these
studies provides vital technology risk reduction work and technical
information of significant value for all the FRES vehicle families.
|
UV Trials of Truth
|
2
|
N/A
|
These were the assessment of the three
contending vehicles for the Utility Vehicle Design
role. The results of these trials provided a detailed understanding of
capabilities of the vehicles involved, a good insight into the capabilities
of industry, and physical evidence of the further work needed to mature the
vehicles. This will be of significant
value to the Utility Vehicle programme when it restarts.
|
TOTAL
|
133
|
50
|
|
(6) The rationale originally for having 12 Type 45s in the
equipment programme [Q218]
The requirement for 12 Type 45 Destroyers was first set out in the 1998 Strategic Defence Review. The SDR
confirmed the need to maintain plans to modernise the destroyer and frigate
force, but reduced its size from 35 to 32. The need to meet a broad range
of operational demands required a balanced fleet of Destroyers
and Frigates, and it was judged that 12 Destroyers
would be sufficient to meet this requirement with acceptable military risk
against the planning assumptions and policy baseline at that time.
(7) When will the Type 45s be fitted with close
range weapons systems [Q220]
The Phalanx Close in Weapon
System (CIWS) will be fitted to HMS DARING prior to her first operational
deployment. On current plans, this is scheduled to take place during her
first maintenance period in the summer 2010.
(8) What examination has been given to the lack
of accommodation in the Portsmouth
area prior to the base port changes to accommodate additional vessels and also
to the security considerations of having most of the fleet in one location?
[Q231]
Work continues to greater
understand the implications of any potential future change to warship base
porting arrangements at Portsmouth
and Devonport. A number of key stakeholders, including representatives
from Portsmouth and Plymouth City Councils as well as Naval Base staff, are
involved in this work and have been invited to join a Working Group to support
Warwick University in developing a socio-economic model on behalf of MOD.
On current plans, the aim is to have the model ready in early 2010 which will
then be used to inform debate and the decision making process.
Separately, but coherent with this modelling work, the likely impact that base
porting changes might have on accommodation and infrastructure at the two Naval
Bases is also being assessed.
Security measures are
constantly reviewed to take into account the prevailing threat conditions and
number of assets to be protected and, as such, appropriate security measures
will be implemented accordingly.
(9) When
will the full capability of the Nimrod MRA4 programme be available? [Q236]
On current plans, the ninth aircraft is due to be
delivered by the end of 2012. As the Secretary of State announced in the
House on 15 December, however, we
are planning to slow the rate of introduction of the MRA4 force by reducing flying
activity in the early years following delivery of the aircraft. We will
be discussing with industry how this can best be managed, and until this work
has been completed we cannot give a definitive assessment of when Full
Operating Capability will be achieved.
(10) Are
any UK
subcontractors working on the Puma LEP? [Q242]
There is a total of 8 UK sub-contractors working on the
PUMA Life Extension Programme. They
are: Qinetiq, Thales Avionics Ltd, Selex
Sensors and Airborne Systems Ltd, Thales UK Ltd, Chelton Ltd, GE Aviation
Systems Ltd, Rockwell Collins UK Ltd and HR Smith (Technical Developments) Ltd.
16
December 2009
Ministry
of Defence
|