A Robust Grid for 21st Century Scotland - Scottish Affairs Committee Contents


Conclusions and recommendations


Robustness of the grid

1.  We regard SSE's recent performance on Islay as unacceptable. We are, however, pleased that, after a sustained period of poor service, SSE is now providing the necessary investment in Islay's electricity infrastructure. SSE should keep us informed of its progress in completing the four major investment projects it has planned. (Paragraph 19)

Monitoring at a finer level

2.  We recommend that Ofgem monitor and regulate network performance on a more detailed geographic scale, particularly for areas which are known to have experienced poor service or are exempt from some of the usual performance safeguards such as the Guaranteed Service Standards. These performance measures should as far as possible be made available to the public in an easily accessible and understandable form. (Paragraph 23)

Reinforcement

3.  Ofgem should report to the Committee of how well transmission and distribution network operators are working together to ensure that when new transmission lines are constructed, distribution lines are linked at points to bypass the existing vulnerable lines to take electricity to the communities which suffered the most during recent storms. It should also advise the Committee on what steps it is taking to strengthen cooperation in this area. (Paragraph 28)

Emergency communication

4.  The relationship between communities, the local authorities and their energy supplier is extremely important, particularly in rural areas such as Islay. SSE should review how it engages with communities and local authorities during emergencies to ensure that the information relayed back to its customers is accurate. (Paragraph 42)

5.  The identification of vulnerable individuals in an emergency situation is paramount. Ofgem, power companies and local authorities should work together to ensure the maximum flow of information within the constraints of the Data Protection Act. (Paragraph 47)

When compensation applies

6.  It should be noted that SSE went beyond statutory requirements and decided to compensate those customers in the Highlands and Islands worst affected by the recent storms. We recognise that severe weather conditions pose particular challenges to distribution network operators serving the Highlands and Islands but believe that customers in those areas should still expect to receive compensation if minimum standards of service are not met. We recommend that Ofgem introduce best practice guidance for DNOs serving the Highlands and Islands, setting out minimum levels of service their customers can expect and corresponding levels of compensation. (Paragraph 50)

The level of compensation

7.  While compensation levels may be set at an appropriate level to incentivise good quality of service from DNOs, we do not believe that they adequately compensate consumers for the consequences of power cuts. We recommend that Ofgem consider increasing compensation levels so that they more realistically reflect the effect on consumers. (Paragraph 56)


 
previous page contents next page


© Parliamentary copyright 2012
Prepared 27 August 2012