Fourth Report of Session 2013-14 - European Scrutiny Committee Contents


Capital and operating costs over 5 years (this is the same method as used in the Commission IA)

Annex

GB Costs associated with implementation of Roadside Inspection proposal

As at 15 May 2013

Item

Requirement

Original Cost

(£m)


Likely General Approach Cost

(£m)

New Roadside testing vehicles Purchase (will not be needed) £11£0
Meeting 5% Roadside target Extra staff cost (specific target dropped and will not include the N1 — van fleet) £19£0
Annual retraining of testers1 Training cost and trainee time (Roadside inspectors) £18£0
TOTAL £48 £0

All costs are GB only, NI and Gibraltar are not included. Notes (relate to Periodic Testing proposal):

1 Existing training will be sufficient.





 
previous page contents next page


© Parliamentary copyright 2013
Prepared 18 June 2013