Here you can browse the report together with the Proceedings of the Committee. The published report was ordered by the House of Commons to be printed 3 March 2015.
Terms of Reference
Summary
1 Introduction
Phase 1: the foundation phase 2013-2015
Phase 2: the mass roll-out phase 2015-2020
Our inquiries
2 The remaining challenges
Experiences in the foundation phase
Technical challenges
Multiple occupancy and tall buildings
Interoperability
In-Home Displays
The DCC Delay
Installation challenges
Shortage of installation engineers
The role of Distribution Network Operators
Public engagement with smart meters
Mandatory Time of Use tariffs
3 Conclusion
Conclusions and recommendations
Formal Minutes
Witnesses
Published written evidence
List of Reports from the Committee during the current Parliament