This is a House of Commons Committee report, with recommendations to government. The Government has two months to respond.
Performance of the UK Security Vetting service
Date Published: 12 May 2023
This is the full report, read the report summary.
United Kingdom Security Vetting (UKSV) is the business area within the Cabinet Office that delivers national vetting services for all government departments and a wide range of other public bodies, as well as some private sector industries such as the aviation industry, whose staff need clearance to work in airports. UKSV moved into the Cabinet Office from the Ministry of Defence in April 2020 and later that year launched the Vetting Transformation programme, aiming to overhaul the vetting system, through the introduction of new systems, processes and policies. Security vetting provides assurance on individuals working with government assets and classified information. There are several different types of vetting levels with the most common being Counter Terrorist Checks (CTC), Security Checks (SC) and Developed Vetting (DV). DV is the most complex and allows individuals access to more sensitive government information and assets.
UKSV’s performance deteriorated significantly in 2021–22 as demand for vetting increased with the easing of COVID-19 restrictions. Performance against key customer service targets have not been met since July 2021 and backlogs increased significantly. In January 2022, UKSV launched a delivery stabilisation plan to try and reduce backlogs and improve turnaround times for all clearance levels. Given limited resources, it has had to effectively pause its transformation programme to focus on its recovery plan.
1. The Cabinet Office has failed to get a grip of vetting services since it took over responsibility in 2020. It has not assessed the impact across government that delays to vetting can have when staff are unable to progress work because they do not have the appropriate level of security clearance. UKSV has not meet either of its key performance targets for timely CTC/SC and DV clearances since July 2021 and has also missed its targets for priority clearances in 23 out of 60 months for DV and 30 out of 60 months for CTC/SC clearances. Backlogs have increased over the last two years and UKSV says that it aims to clear the CTC/SC backlog by summer 2023 and the DV renewals one by October 2023. The Cabinet Office could not provide us with information on the impact of UKSV’s poor performance on government, even though ministers have complained to UKSV about delays in clearances. There are also increasing numbers of individuals cancelling their DV applications which would seem unsurprising given that 30% of DV applications in 2022–23 were taking over 180 days to process, almost double the 95-day target. The Cabinet Office, however, had only looked in detail at these numbers after the NAO report came out, arguing that these cancellations did not suggest that the vetting process was responsible for government losing good candidates for roles.
Recommendations 1: The Cabinet Office should set out:
a) When and how UKSV expects to clear the backlogs of CTC/SC and DV clearances, and any changes it intends to make to its working practices to avoid backlogs building up again in the future.
b) When it expects to meet its key performance indicators for CTC/SC and DV routine clearances and deliver the service government departments are paying for.
2. The Cabinet Office is over reliant on customer demand forecasts and failed to predict changes in demand for security vetting. UKSV’s customers provide demand forecasts each October to enable it to assess what level of resources it will need for the following financial year. UKSV relies on customers to provide accurate forecasts but these vary in quality, and it is aiming to work more closely with customers to help them improve their forecasts through better use of data. While it is unsurprising that forecasts for 2020–21 did not anticipate the reduced demand that COVID-19 lockdowns caused, UKSV and its customers failed to anticipate a resurgence of demand once COVID-19 restrictions were lifted. UKSV argues that the changing threat environment and wider societal changes in the employment market added to demand in a way that was not anticipated beforehand. This is not the first time UKSV has been impacted by a sudden increase in demand, for example it saw a similar trend following the Brexit vote in 2016.
Recommendation 2: The Cabinet Office should set out what steps it is taking to help its customers improve their forecasting and to make UKSV more resilient to changes in demand.
3. We are concerned about the level of risk created by the Cabinet Office’s decision to repeatedly defer renewals for DV clearances. Existing DV clearances are normally reviewed after seven years to ensure that individual’s circumstances have not materially changed and that the initial clearance remains valid. Scheduled and unscheduled aftercare checks in the period between renewals should capture any changes in circumstance that might impact on the clearance. However, UKSV has failed to meet its target for aftercare checks since the start of 2018–19; and to manage demand, the Cabinet Office Government Security Board decided to extend most DV renewal clearances in 2018, 2019, and 2020. In 2021–22, the consequent backlog of renewals overwhelmed UKSV and in April 2022 the Government Security Steering Group directed UKSV to extend renewals yet again, so UKSV could focus on reducing the backlog of new DV clearances that had developed. UKSV and its customers acknowledge that continually deferring renewals creates risks that are uncomfortable. UKSV claims that, as it has always adopted a risk-based approach to deferrals, that any renewals with known red flags were still thoroughly reviewed. It also argues that prioritising new DV clearances rather than renewals was a sensible risk-based decision. Focusing on new DV clearances, however, also placed further pressure on UKSV’s processing of CTC/SC clearances, which saw clearance times increase and backlogs grow even higher in 2022.
Recommendation 3: The Cabinet Office should develop a plan for how it intends to avoid repeatedly extending DV renewals going forward, and set out the key elements of this plan in its Treasury Minute response. The plan should include, for example:
4. UKSV cannot deliver timely security vetting across government with its current staff levels. Despite its essential role in protecting national security, UKSV has been under-staffed to meet customer demand forecasts since its inception in 2017. In April 2021, when faced with an upsurge in demand for its services following the relaxation of COVID-19 restrictions, UKSV had a 32% shortfall in staff resources. In November 2022 it was still 23% short of estimated need, including digital staff required for the vetting transformation programme, despite securing additional contingent labour and temporary staff from other departments. UKSV says its resourcing levels meant it had to make difficult decisions as to which service areas it prioritised, with aftercare checks one area that suffered as a consequence. The Cabinet Office expects some of the slack to be addressed through higher pay for digital staff and increased automation as part of its vetting transformation programme, although it accepts that the completion of transformation is some way off. To compound matters, survey results show low levels of engagement among UKSV staff. UKSV’s Chief Executive says that her staff have an immense pride in the organisation but also acknowledges they are suffering from ‘change fatigue’.
Recommendation 4: The Cabinet Office should set out:
5. The governance structure of UKSV within Cabinet Office is a barrier to transformation. UKSV’s chief executive and the government chief security officer have low levels of delegated spending authority which means they require approval from the Cabinet Office Approvals Board for any spending over £500,000. That Board has repeatedly refused to give spending approval for the £40 million vetting transformation business case. UKSV’s Chief Executive cited governance around investment and the change agenda as problematic in replacing the legacy system, and three reviews of the transformation programme included governance in their array of concerns about the deliverability of the programme. The Cabinet Office acknowledges that its cautious approach is delaying the much needed and widely supported transformation programme but says that it is better to be cautious than to spend unwisely.
Recommendation 5: The Cabinet Office should urgently review UKSV’s governance structures to assess whether they provide the correct balance of challenge and support to enable UKSV to achieve the much-needed security vetting transformation programme. It should summarise the findings of this review in its Treasury Minute response.
6. We are not convinced that current plans for the transformation of security vetting are any more likely to succeed than previous failed attempts. The Cabinet Office’s first attempt at modernising the IT infrastructure for national security vetting failed, after unknowingly running almost 50% over budget and resulting in a £2.5 million write off in the Cabinet Office’s 2021–22 annual accounts. Despite broad consensus on the need for the transformation programme across government, which customers have already funded, subsequent attempts at vetting reform have been stymied by the lack of spending approval and the priority given to the stabilisation programme over the transformation programme. After multiple failed attempts to get Cabinet Office spending approval for the whole Vetting Transformation programme, in December 2022 UKSV changed its approach and finally got spending approval for the development of just the first of three new vetting levels. As a result of the delays, UKSV anticipates it will have to refund around £5 million to customers. UKSV’s Chief Executive says she is confident that adopting a more iterative approach will be more successful. We would like to share her confidence but the track record for transformation to date does not bode well for the future. In our view, until such time as the Cabinet Office starts to take its responsibility for national security vetting more seriously, shows more confidence in UKSV and provides more support, it is unlikely that transformation will be fully achieved.
Recommendation 6: The Cabinet Office should set out a clear implementation plan for vetting transformation, with interim milestones for each of the new vetting levels and a realistic completion date. It should set out the key elements of this plan in its Treasury Minute response to this report.
1. On the basis of a report by the Comptroller and Auditor General, we took evidence from the Cabinet Office about the performance of UK Security Vetting (UKSV).1 UKSV, which sits within the Cabinet Office, is the main government provider of national security vetting. Security vetting provides assurance on individuals working with government assets and classified information. There are several different types of vetting levels with the most common being Counter Terrorist Checks (CTC), Security Checks (SC) and Developed Vetting (DV). DV clearance is the most complex and allows individuals access to more sensitive government information and assets than CTC or SC clearance.2
2. UKSV provides vetting services for customers including all government departments, a wide range of other public bodies and some private sector industries such as the aviation industry, whose staff need clearance to work in airports. Since 2018–19, UKSV has received from customers an average of 164,700 CTC and SC clearance applications and 17,900 DV clearance applications per year. UKSV relies on demand forecasts from its customers ahead of each financial year to enable it to plan for the resources it will need. UKSV’s funding costs are covered by its customers on a proportional basis depending on use of the service. Over the past two years, regular service costs have been £43 million on average. The Ministry of Defence (MoD) is UKSV’s largest customer by a considerable margin, making up 56% of all clearance requests.3
3. UKSV was first established at the start of 2017 following a merger of previous vetting services by the then Foreign & Commonwealth Office and Ministry of Defence (MoD). In April 2020, UKSV transitioned from MoD to sit within the Government Security Group within the Cabinet Office. The Cabinet Office appointed a chief executive to run UKSV in January 2021, who reports to the government chief security officer, the head of the Government Security Group. UKSV still has some legacy dependencies on MoD including IT systems and kit, and several locations. UKSV expects to complete these remaining elements of the move in 2022–23. But completing these in parallel with attempts to recover poor performance through a stabilisation plan, and to progress its vetting transformation programme is proving challenging with its limited resources.4
4. UKSV aims to complete 85% of routine CTC/SC clearances within 25 days, and 85% of routine DV clearances within 95 days. UKSV has failed to hit the target for either type of clearance since July 2021 and performance in 2022–23 fell to the lowest it has ever been since it started measuring these targets in 2017 for both CTC/SC (15% in September 2022) and DV (7% in April 2022) clearances.5 In 2022–23, around one in three individuals were waiting more than 180 days to get their clearance processed. Customers can request UKSV to prioritise up to 3% of their clearance requests for faster turnaround times. UKSV also only met its target to clear 95% of priority DV clearances within 30 days in 23 out of 60 months from April 2018 to March 2022, and its target to clear 95% of priority CTC/SC clearances within 10 days in 30 out of 60 months.6 The Cabinet Office acknowledged that the first half of 2022 was a very difficult period and that performance had fallen well below intended levels but said that UKSV had turned things around in the second half of the year, “more or less doubling the total number of vet operations we have carried out” from around 800 DV clearances in December 2021 to over 2,000 in December 2022.7
5. With an increasing proportion of clearances taking significantly longer to clear, backlogs have increased over the last two years. Outstanding DV cases have doubled since the start of 2021–22, with a peak of 14,600 DV clearances in June 2022 (9,900 more clearances than UKSV might expect to hold it if was processing cases within its 95-day target). For CTC/SC, outstanding clearances stood at a high of 27,900 in November 2022, which is 16,600 more than it might expect to hold if it was processing cases within its 25-day target.8 The Cabinet Office told us that more cases were now being processed than received and that it was “eating into that historic backlog”.9 On lower-level security clearances, the Cabinet Office said UKSV was aiming to clear the backlogs by summer 2023. For new DV clearances it felt it had already addressed the backlog, as “we are sitting with a holding level that would deliver us to complete within 60 days as opposed to 95”; and for the backlog of DV renewals it is aiming to address these by October 2023. The Cabinet Office emphasised that this DV renewals backlog was “low-risk renewals”.10 However, UKSV’s chief executive accepted that to address the backlog, UKSV would need additional resources, probably using a contingent labour model, although this brought its own drawbacks given the time required to recruit, vet and train additional staff.11
6. The National Audit Office reported that customers have aired their frustrations with UKSV’s performance in various governance settings, as it can directly impact on their ability to place individuals into important jobs with national security implications. Ministers have also written to UKSV to complain about the service their departments are getting, with over half of vetting related ministerial correspondences in the two years from October 2020 relating to delayed clearances or the impact of delays to employment opportunities and recruitment for national security roles.12 The NAO’s 2018 report on national security vetting said that the Cabinet Office had previously estimated inefficiencies in the vetting IT system used was costing government £17 million per year in relation to recruiting and vetting for government projects.13 When challenged by us, the Cabinet Office was unable to say why it had failed to do an impact assessment of the delays on the work of other government departments, offering only that it held data on the number of cases it was receiving and processing, that it discussed the impact of this on waiting times with customers and that this had led to the introduction of the stabilisation programme.14 UKSV’s chief executive also said that allowing customers to prioritise more than the contracted 3% of cases allowed UKSV to determine where it was potentially impacting employability or programmes.15
7. The Cabinet Office could not provide us with any information on how many people were abandoning jobs due to vetting delays. The NAO reported that cancellations of clearance requests were 19% higher from April to November 2022 compared with the same period in 2021–22, and that requests were most likely cancelled because the individual being vetted secured an alternative job. The Cabinet Office said at our February session that it had done further research following the NAO report and expanded on the list of reasons why individuals may no longer need a clearance, such as retirement, moving to a job with lower security status or simply failing to provide the information in time and therefore being timed out. It claimed that “the cancellations are not people pulling out of the process” and that “for the moment at least, there does not seem to be any evidence that, even in a very competitive job market, the vetting process is losing good candidates”. The Cabinet Office also considered that the increase in cancellations was proportionate to the overall increase in the number of cases received.16
8. UKSV relies on customer demand forecasts in October ahead of each financial year, to enable it to plan for the resources it will need. For 2020–21, customers over-forecast how many clearances they were likely to need, unaware of the coming COVID-19 pandemic, which caused a drop in demand for clearances. Conversely, during 2021–22 customers under-forecast their demand in 11 out of 12 months as the employment market changed as COVID-19 restrictions eased. Overall, in 2021–22, demand for DV clearances increased by 57% and demand for CTC/SC clearances increased by 60%.17 UKSV struggled to cope with this increased demand, in much the same way that it did when there was an increase in demand after the Brexit referendum which required increased resources to plan the UK’s exit from the EU.18
9. The Cabinet Office told us that while some departments are very good at forecasting, others struggle. UKSV has therefore put a lot of effort into improving its management information to help it work with customers on predictive analytics, to improve the accuracy of their forecasts. The Cabinet Office said UKSV now has a better understanding of the policies and programmes that drive customer demand.19 The government chief security officer attributed the significant level of customers’ under-forecasts in 2021–22 to three factors: underestimating the supressed demand post-COVID; a failure to take account of the changing threat environment; and underestimating societal and employment changes in 2021–22, such as the doubling of moves within the Civil Service after COVID-19.20
10. When we asked what was being done to make UKSV more resilient and better able to deal with future upsurges in demand, the Cabinet Office offered us three solutions:
i) improvements in forecasting (see above).
ii) increased automation: it said around 20% of the overall operation is currently digitised, and there are plans to increase that up to 30% and then 40% “over the next few years”, although the Cabinet Office expressed disappointment that its progress on this front was slower than hoped.21 To date the focus has been on automating the lower-level, more transactional, security clearances including the new accreditation checks for the aviation industry.22
iii) a more flexible resourcing model which offers extra capacity through the use of temporary contractors:23 The Cabinet Office referred to its use of staff from other departments including HMRC and military police as well as contractors (see below).24 It explained that it had also secured increases in productivity through changes to process and policy and by setting staff individual targets.25
11. Each DV clearance is normally reviewed after seven years to ensure that individuals’ circumstances have not materially changed and that the initial clearance remains valid. In 2018 the Cabinet Office Government Security Board first took the decision to implement a 12-month extension to some renewals to help UKSV recover performance at that time. It repeated the decision in 2019, and then again in April 2020 to help cope with the impact of the COVID-19 pandemic on operations. In 2021–22, however, all DV renewals that had previously been extended came back up for renewal and were not extended again, meaning that a backlog of cases needed processing.26 In April 2022, the Government Security Steering Group directed UKSV to extend renewals again to focus on reducing the backlog of new DV clearances that had developed. The NAO reported that both UKSV and its customers acknowledge that another extension of renewals carries security risks that are uncomfortable.27
12. The Cabinet Office defended the repeated policy decision to defer renewals on the grounds that it was “risk-based and a decision taken with our customers”. It acknowledged that the cumulative impact of deferring renewals for several years created additional challenges but also said that “if you have a choice between waiting nine months for someone to come in and do a critical job, or extending a renewal that has been in place for seven years and no risks have been identified with the individual, all the customers around the table agreed that that was the preferable way to go”. It said the decision to defer renewals and to prioritise new clearance applications meant that it was able to reduce the processing time for new applications to 177 days at its worst, to the current 98 days.28 However, with limited resources, prioritising one area has inevitably led to deteriorating service levels in other areas; as new DV clearances were prioritised at the start of 2022, the percentage of CTC/SC clearances that were being processed within target times slipped further.29
13. The Cabinet Office sought to reassure us that UKSV did not stop processing renewals altogether, but that it had continued to process renewals at a lower rate, adopting a risk-based, data-driven approach. “Should an adverse indicator arise [from newly introduced automated data checks], we absolutely then moved forward with the full process”.30 One such means of detecting such an indicator is an aftercare check, which should occur between the initial clearance and a full renewal with the aim of capturing any changes in circumstances that might impact on the clearance. UKSV aims to complete 85% of scheduled aftercare checks within 95 days but has failed to meet that target once since the start of 2018–19.31 The Cabinet Office defended this risk-based approach saying that UKSV would rather take time to work with individuals to mitigate risks and achieve the right outcome even if it meant failing to achieve a KPI,32 and that it had introduced a triage approach across national security vetting to ensure a focus on high-risk cases.33
14. UKSV has been under-staffed to meet customer demand forecasts since its inception in 2017, which has had negative impacts on its performance. In April 2021, when demand surged following the relaxation of COVID-19 restrictions, UKSV had 669 full-time equivalent (FTE) staff against the 985 FTE it expected to need to meet forecast demand during 2021–22, a shortfall of 316 FTE (32%). Despite seeking to recruit throughout the financial year, by March 2022 UKSV still had a 237 FTE shortfall against its requirement for that year. Based on customer demand forecasts for 2022–23, UKSV estimated it would require 1,145 staff for that year but by November 2022, UKSV had increased its FTE headcount number to only 877 (23% short of estimated need).34 The gap between actual staff and the forecast need for staff is shown at Figure 1.
Figure 1 – UK Security Vetting’s actual headcount (FTEs) vs forecast required headcount, April 2021 to November 2022
Source: C&AG’s Report, Figure 9 on Page 32
15. Under-staffing has led UKSV to make trade-offs in what service areas it focuses on. For example, the UKSV chief executive told us that by focusing on new DV clearances it was unable to resource aftercare checks to the levels needed.35 Likewise, the focus on new DV clearances saw average clearance times drop for those cases but for DV renewals, average clearance times increased from 190 days in April 2022 to 255 days in November 2022.36
16. The Cabinet Office was keen to point to UKSV’s use of surge staff from other departments,37 although there were just 13 such staff between January and November 2022 alongside about 50 contingent labour staff (see also Figure 1).38 It said the use of more contingent labour solved the need to fit within wider Civil Service aspirations around headcount numbers, although “by the time you recruit, you vet and you train, it takes a long time.”39 The Cabinet Office expects UKSV to maintain its own headcount number at no higher than 832 FTEs at March 2023. It has, however, authorised an additional 163 contingent labour and temporary staff from other government departments, bringing the total to 995, still 160 short of the estimated requirement of 1,145. UKSV aims to bridge that gap through efficiencies and automation of processes coming out of its delivery stabilisation plan.40 As well as internal changes to increase productivity, the Cabinet Office told us UKSV was working with departments to improve the accuracy and completeness of applications, to reduce the amount of remedial action required from UKSV staff, which restricts their productivity.41
17. When asked about the mismatch between UKSV’s claims of increased productivity and staff survey results showing a high level of disengagement, UKSV’s chief executive pointed to the innate pride of its staff in the work they do to protect national security but admitted that many are suffering from change fatigue. Staff have had to contend with the move of vetting services from the former Foreign & Commonwealth Office and MOD to the Cabinet Office, changing systems, processes and policies and most recently, changes to some of the skills and tools staff use for vetting because of digitisation and automation.42 UKSV’s chief executive suggested that staff “would like a bit of stability and some investment” as “they have not had a period of stability for a very long time”.43
18. Recruitment challenges have also hampered progress on the vetting transformation programme. In November 2021, UKSV only managed to fill five out of 44 digital roles despite multiple costly, labour-intensive campaigns, with uncompetitive salaries seen as a key factor. In September 2022, despite a partial exemption for digital roles from the Cabinet Office recruitment freeze, UKSV’s resource modelling still showed a shortfall of 68 full-time equivalents (FTE) for digital roles against a total requirement of 108.44 The Cabinet Office downplayed the issue saying “trying to get the right number of permanent and temporary staff and then to train those up, took a bit longer, so we were a bit below our optimum resourcing level”.45 It told us it had recently moved to strengthen the pay scales across digital, data and technology across the Civil Service, but accepted that progress with the vetting transformation programme had been slower than it would have liked and that transformation was still some way off.46
19. The Cabinet Office took on responsibility for both security vetting policy and operational delivery in April 2020, when UKSV transitioned from the Ministry of Defence to the Government Security Group within the Cabinet Office.47 The Cabinet Office controls UKSV’s headcount, and while UKSV’s funding costs (around £43 million per year) are covered by its customers, it nonetheless requires spending approval from the Cabinet Office Approvals Board (COAB) for any programme spend over £500,000.48 In January 2021, the Cabinet Office appointed a chief executive to run UKSV, who reports to the government chief security officer. Other than COAB, UKSV is also accountable to the Government Security Board, the Vetting Board, and the Vetting Modernisation Portfolio Board for its operations and programmes.49
20. UKSV has been trying, largely unsuccessfully, to modernise the vetting system since it launched a Vetting Reform programme in 2019.50 UKSV’s Chief Executive said, “if we had a magic wand and we could build a new system tomorrow, we absolutely would”.51 Whenever it has taken full business cases for its £40 million transformation programme to COAB, however, these have been rejected. Three reviews of the programme in 2022 raised concerns across multiple areas of programme management, including the governance arrangements with one noting the need for greater support within the Cabinet Office.52 The Cabinet Office defended its cautious approach to the transformation programme, which it attributed to concerns around its deliverability and the need to prioritise performance recovery over transformation, saying it was better to be cautious than to spend unwisely.53
21. When asked about her past experiences, UKSV’s chief executive cited governance as the main difference between her experience of running a government change programme compared with running a private sector change programme.54 She said that there was a lot of governance around investment and the change agenda, as UKSV had to ensure that “every customer is comfortable with everything we are planning to change”.55 This was endorsed by the government chief security officer who said the transformation programme had been “agreed at every step with customers in the security world, through the government security board, but also with chief operating officers and Perm Secs”.56
22. As part of the Vetting Reform programme, the Cabinet Office planned to replace UKSV’s legacy IT system, the National Security Vetting System, through the Future Vetting System programme, by February 2020 at a cost of £19 million. Failures in project management meant that the programme ran £9 million over budget and resulted in a £2.5 million write off in the Cabinet Office’s 2021–22 accounts.57 The IT modernisation programme was subsequently rolled into the wider Vetting Transformation programme. After several failed attempts to get business case approval for the whole transformation programme, in December 2022 UKSV successfully submitted a less ambitious business case for the development of just the first of three new levels of vetting.58 UKSV is expecting to seek approval for the next level of transformation in summer 2023 and agreed that it is unlikely to be completed until 2025.59 When asked what had gone wrong previously and what she would do differently next time, UKSV’s chief executive said that they would replace the previous “big bang approach” with a “very agile, iterative and low-risk rollout approach” and that she had high expectations that the next version of the business case would be approved.60
23. The Cabinet Office told us that following its bad experience with its first attempt to modernise IT, it was now adopting a more cautious approach to transformation, and that it rejected the business plan for the Vetting Transformation programme on a few occasions because it was “not totally happy with the plan” and wanted to “be sure that this one was going to work”. It accepted that it had been a little optimistic about the achievable rate of transformation, but also pointed out that the need to focus on catching up with the level of demand for the day-to-day business, meant that it had had to push the transformation programme to the right, with customers’ agreement.61
24. The Cabinet Office was keen to confirm that it has full customer support for vetting transformation.62 For example, centralised decision making is an important component of the transformation plan whereby UKSV takes the whole decision on clearance rather than allowing departments to make the final decision based on UKSV’s advice.63 The Cabinet Office told us that 70% of all decision are now centralised with customers signed up to this approach.64 It did, however, acknowledge that UKSV may have to offer additional checks to all customers to assuage the concerns of others who consider their business has special requirements and to drive transferability of checks between departments.65 UKSV’s customers are frustrated with the lack of progress on the transformation programme. They fund the programme but have no say in how that funding is used. UKSV was forecasting an underspend of £6.5 million on the programme in 2022–23 due to delays in getting Cabinet Office approval for the business case, delays to progress on the plan and delays in resourcing. With an overspend of £1.5 million elsewhere across the business it was anticipating refunding around £5 million to customers in 2022–23.66
Members present:
Dame Meg Hillier
Mr Jonathan Djanogly
Mr Louie French
Peter Grant
Anne Marie Morris
Sarah Olney
Nick Smith
Draft Report (The performance of UK Security Vetting), proposed by the Chair, brought up and read.
Ordered, That the draft Report be read a second time, paragraph by paragraph.
Paragraphs 1 to 24 read and agreed to.
Summary agreed to.
Introduction agreed to.
Conclusions and recommendations agreed to.
Resolved, That the Report be the Fifty-third of the Committee to the House.
Ordered, That the Chair make the Report to the House.
Adjourned till Wednesday 26 April at 9.30am.
The following witnesses gave evidence. Transcripts can be viewed on the inquiry publications page of the Committee’s website.
Alex Chisholm, Chief Operating Officer for the Civil Service and Permanent Secretary, Cabinet Office; Patricia Dreghorn, Chief Executive, UK Security Vetting Service; Vincent Devine, Government Chief Security Officer, Cabinet OfficeQ1–90
All publications from the Committee are available on the publications page of the Committee’s website.
Number |
Title |
Reference |
1st |
Department for Business, Energy & Industrial Strategy Annual Report and Accounts 2020–21 |
HC 59 |
2nd |
Lessons from implementing IR35 reforms |
HC 60 |
3rd |
The future of the Advanced Gas-cooled Reactors |
HC 118 |
4th |
Use of evaluation and modelling in government |
HC 254 |
5th |
Local economic growth |
HC 252 |
6th |
Department of Health and Social Care 2020–21 Annual Report and Accounts |
HC 253 |
7th |
Armoured Vehicles: the Ajax programme |
HC 259 |
8th |
Financial sustainability of the higher education sector in England |
HC 257 |
9th |
Child Maintenance |
HC 255 |
10th |
Restoration and Renewal of Parliament |
HC 49 |
11th |
The rollout of the COVID-19 vaccine programme in England |
HC 258 |
12th |
Management of PPE contracts |
HC 260 |
13th |
Secure training centres and secure schools |
HC 30 |
14th |
Investigation into the British Steel Pension Scheme |
HC 251 |
15th |
The Police Uplift Programme |
HC 261 |
16th |
Managing cross-border travel during the COVID-19 pandemic |
HC 29 |
17th |
Government’s contracts with Randox Laboratories Ltd |
HC 28 |
18th |
Government actions to combat waste crime |
HC 33 |
19th |
Regulating after EU Exit |
HC 32 |
20th |
Whole of Government Accounts 2019–20 |
HC 31 |
21st |
Transforming electronic monitoring services |
HC 34 |
22nd |
Tackling local air quality breaches |
HC 37 |
23rd |
Measuring and reporting public sector greenhouse gas emissions |
HC 39 |
24th |
Redevelopment of Defra’s animal health infrastructure |
HC 42 |
25th |
Regulation of energy suppliers |
HC 41 |
26th |
The Department for Work and Pensions’ Accounts 2021–22 – Fraud and error in the benefits system |
HC 44 |
27th |
Evaluating innovation projects in children’s social care |
HC 38 |
28th |
Improving the Accounting Officer Assessment process |
HC 43 |
29th |
The Affordable Homes Programme since 2015 |
HC 684 |
30th |
Developing workforce skills for a strong economy |
HC 685 |
31st |
Managing central government property |
HC 48 |
32nd |
Grassroots participation in sport and physical activity |
HC 46 |
33rd |
HMRC performance in 2021–22 |
HC 686 |
34th |
The Creation of the UK Infrastructure Bank |
HC 45 |
35th |
Introducing Integrated Care Systems |
HC 47 |
36th |
The Defence digital strategy |
HC 727 |
37th |
Support for vulnerable adolescents |
HC 730 |
38th |
Managing NHS backlogs and waiting times in England |
HC 729 |
39th |
Excess Votes 2021–22 |
HC 1132 |
40th |
COVID employment support schemes |
HC 810 |
41st |
Driving licence backlogs at the DVLA |
HC 735 |
42nd |
The Restart Scheme for long-term unemployed people |
HC 733 |
43rd |
Progress combatting fraud |
HC 40 |
44th |
The Digital Services Tax |
HC 732 |
45th |
Department for Business, Energy & Industrial Strategy Annual Report and Accounts 2021–22 |
HC 1254 |
46th |
BBC Digital |
HC 736 |
47th |
Investigation into the UK Passport Office |
HC 738 |
48th |
MoD Equipment Plan 2022–2032 |
HC 731 |
49th |
Managing tax compliance following the pandemic |
HC 739 |
50th |
Government Shared Services |
HC 734 |
51st |
Tackling Defra’s ageing digital services |
HC 737 |
1st Special Report |
Sixth Annual Report of the Chair of the Committee of Public Accounts |
HC 50 |
Number |
Title |
Reference |
1st |
Low emission cars |
HC 186 |
2nd |
BBC strategic financial management |
HC 187 |
3rd |
COVID-19: Support for children’s education |
HC 240 |
4th |
COVID-19: Local government finance |
HC 239 |
5th |
COVID-19: Government Support for Charities |
HC 250 |
6th |
Public Sector Pensions |
HC 289 |
7th |
Adult Social Care Markets |
HC 252 |
8th |
COVID 19: Culture Recovery Fund |
HC 340 |
9th |
Fraud and Error |
HC 253 |
10th |
Overview of the English rail system |
HC 170 |
11th |
Local auditor reporting on local government in England |
HC 171 |
12th |
COVID 19: Cost Tracker Update |
HC 173 |
13th |
Initial lessons from the government’s response to the COVID-19 pandemic |
HC 175 |
14th |
Windrush Compensation Scheme |
HC 174 |
15th |
DWP Employment support |
HC 177 |
16th |
Principles of effective regulation |
HC 176 |
17th |
High Speed 2: Progress at Summer 2021 |
HC 329 |
18th |
Government’s delivery through arm’s-length bodies |
HC 181 |
19th |
Protecting consumers from unsafe products |
HC 180 |
20th |
Optimising the defence estate |
HC 179 |
21st |
School Funding |
HC 183 |
22nd |
Improving the performance of major defence equipment contracts |
HC 185 |
23rd |
Test and Trace update |
HC 182 |
24th |
Crossrail: A progress update |
HC 184 |
25th |
The Department for Work and Pensions’ Accounts 2020–21 – Fraud and error in the benefits system |
HC 633 |
26th |
Lessons from Greensill Capital: accreditation to business support schemes |
HC 169 |
27th |
Green Homes Grant Voucher Scheme |
HC 635 |
28th |
Efficiency in government |
HC 636 |
29th |
The National Law Enforcement Data Programme |
HC 638 |
30th |
Challenges in implementing digital change |
HC 637 |
31st |
Environmental Land Management Scheme |
HC 639 |
32nd |
Delivering gigabitcapable broadband |
HC 743 |
33rd |
Underpayments of the State Pension |
HC 654 |
34th |
Local Government Finance System: Overview and Challenges |
HC 646 |
35th |
The pharmacy early payment and salary advance schemes in the NHS |
HC 745 |
36th |
EU Exit: UK Border post transition |
HC 746 |
37th |
HMRC Performance in 2020–21 |
HC 641 |
38th |
COVID-19 cost tracker update |
HC 640 |
39th |
DWP Employment Support: Kickstart Scheme |
HC 655 |
40th |
Excess votes 2020–21: Serious Fraud Office |
HC 1099 |
41st |
Achieving Net Zero: Follow up |
HC 642 |
42nd |
Financial sustainability of schools in England |
HC 650 |
43rd |
Reducing the backlog in criminal courts |
HC 643 |
44th |
NHS backlogs and waiting times in England |
HC 747 |
45th |
Progress with trade negotiations |
HC 993 |
46th |
Government preparedness for the COVID-19 pandemic: lessons for government on risk |
HC 952 |
47th |
Academies Sector Annual Report and Accounts 2019/20 |
HC 994 |
48th |
HMRC’s management of tax debt |
HC 953 |
49th |
Regulation of private renting |
HC 996 |
50th |
Bounce Back Loans Scheme: Follow-up |
HC 951 |
51st |
Improving outcomes for women in the criminal justice system |
HC 997 |
52nd |
Ministry of Defence Equipment Plan 2021–31 |
HC 1164 |
1st Special Report |
Fifth Annual Report of the Chair of the Committee of Public Accounts |
HC 222 |
Number |
Title |
Reference |
1st |
Support for children with special educational needs and disabilities |
HC 85 |
2nd |
Defence Nuclear Infrastructure |
HC 86 |
3rd |
High Speed 2: Spring 2020 Update |
HC 84 |
4th |
EU Exit: Get ready for Brexit Campaign |
HC 131 |
5th |
University technical colleges |
HC 87 |
6th |
Excess votes 2018–19 |
HC 243 |
7th |
Gambling regulation: problem gambling and protecting vulnerable people |
HC 134 |
8th |
NHS capital expenditure and financial management |
HC 344 |
9th |
Water supply and demand management |
HC 378 |
10th |
Defence capability and the Equipment Plan |
HC 247 |
11th |
Local authority investment in commercial property |
HC 312 |
12th |
Management of tax reliefs |
HC 379 |
13th |
Whole of Government Response to COVID-19 |
HC 404 |
14th |
Readying the NHS and social care for the COVID-19 peak |
HC 405 |
15th |
Improving the prison estate |
HC 244 |
16th |
Progress in remediating dangerous cladding |
HC 406 |
17th |
Immigration enforcement |
HC 407 |
18th |
NHS nursing workforce |
HC 408 |
19th |
Restoration and renewal of the Palace of Westminster |
HC 549 |
20th |
Tackling the tax gap |
HC 650 |
21st |
Government support for UK exporters |
HC 679 |
22nd |
Digital transformation in the NHS |
HC 680 |
23rd |
Delivering carrier strike |
HC 684 |
24th |
Selecting towns for the Towns Fund |
HC 651 |
25th |
Asylum accommodation and support transformation programme |
HC 683 |
26th |
Department of Work and Pensions Accounts 2019–20 |
HC 681 |
27th |
Covid-19: Supply of ventilators |
HC 685 |
28th |
The Nuclear Decommissioning Authority’s management of the Magnox contract |
HC 653 |
29th |
Whitehall preparations for EU Exit |
HC 682 |
30th |
The production and distribution of cash |
HC 654 |
31st |
Starter Homes |
HC 88 |
32nd |
Specialist Skills in the civil service |
HC 686 |
33rd |
Covid-19: Bounce Back Loan Scheme |
HC 687 |
34th |
Covid-19: Support for jobs |
HC 920 |
35th |
Improving Broadband |
HC 688 |
36th |
HMRC performance 2019–20 |
HC 690 |
37th |
Whole of Government Accounts 2018–19 |
HC 655 |
38th |
Managing colleges’ financial sustainability |
HC 692 |
39th |
Lessons from major projects and programmes |
HC 694 |
40th |
Achieving government’s long-term environmental goals |
HC 927 |
41st |
COVID 19: the free school meals voucher scheme |
HC 689 |
42nd |
COVID-19: Government procurement and supply of Personal Protective Equipment |
HC 928 |
43rd |
COVID-19: Planning for a vaccine Part 1 |
HC 930 |
44th |
Excess Votes 2019–20 |
HC 1205 |
45th |
Managing flood risk |
HC 931 |
46th |
Achieving Net Zero |
HC 935 |
47th |
COVID-19: Test, track and trace (part 1) |
HC 932 |
48th |
Digital Services at the Border |
HC 936 |
49th |
COVID-19: housing people sleeping rough |
HC 934 |
50th |
Defence Equipment Plan 2020–2030 |
HC 693 |
51st |
Managing the expiry of PFI contracts |
HC 1114 |
52nd |
Key challenges facing the Ministry of Justice |
HC 1190 |
53rd |
Covid 19: supporting the vulnerable during lockdown |
HC 938 |
54th |
Improving single living accommodation for service personnel |
HC 940 |
55th |
Environmental tax measures |
HC 937 |
56th |
Industrial Strategy Challenge Fund |
HC 941 |
1 C&AG’s Report, Investigation into the performance of UK Security Vetting, Session 2022–23, HC 1023, 18 January 2023
2 C&AG’s Report, para 1.3
3 C&AG’s Report, para 1.2
4 C&AG’s Report, para 3.4–3.6
5 C&AG’s Report, paras 1.4, 1.5
6 C&AG’s Report, para 1.8, Figure 5
7 Qq 2, 5
8 C&AG’s Report, paras 1.6, 1.7, Figure 4
9 Q 8
10 Q 36
11 Q 43
12 C&AG’s Report, paras 1.10, 1.11
13 C&AG’s Report, Investigation into national security vetting, Session 2017–2019, HC 1500, 7 September 2018
14 Q 20
15 Q 26
16 Qq 22, 23; C&AG’s 2023 Report, Figures 10 and 11
17 C&AG’s 2023 Report, paras 2.3, 2.4 and Figure 7
18 C&AG’s Report, Investigation into national security vetting, Session 2017–2019, HC 1500, 7 September 2018, para 3.4
19 Q 27
20 Q 28
21 Qq 6, 35
22 Qq 36, 37
23 Q 37
24 Qq 40,41; C&AG’s 2023 Report, paras 2.9, 2.10 and Figure 9
25 Qq 43, 44, 45
26 Q 29; C&AG’s 2023 Report, para 2.5
27 C&AG’s 2023 Report, paras 2.6, 2.7
28 Qq 9, 10, 29
29 C&AG’s Report, Figure 2
30 Q 12
31 C&AG’s Report, para 1.9 and Figure 6
32 Q 30
33 Q 34
34 C&AG’s Report, paras 2.9, 2.10 and Figure 9
35 Q30
36 C&AG Report, Figure 8
37 Qq 40, 41
38 C&AG’s Report, Figure 9
39 Q 43
40 C&AG’s Report, para 2.10
41 Q 50
42 Qq 52, 53; C&AG’s Report, para 2.12, Figure 12
43 Q 55
44 C&AG’s Report, para 3.13
45 Q 72
46 Qq 35, 89
47 C&AG’s Report, para 3.5
48 C&AG’s Report, paras 1.2, 2.10 and Footnote 8
49 C&AG’s Report, para 3.15
50 C&AG’s Report, para 3.3 and paras 3.7 to 3.12
51 Q 62
52 C&AG’s Report, para 3.11 and Figure 15
53 Qq 74, 80; C&AG’s Report, paras 3.11 and 3.12
54 Q 78
55 Q 63
56 Q 82
57 C&AG’s Report, para 3.7
58 C&AG’s Report, para 3.10 and Figure 14
59 Q63; C&AG’s Report, para 3.10 and Figure 14
60 Q 75
61 Qq 74, 80, 82
62 Q 82
63 C&AG’s Report, para 3.8
64 Qq 35, 66
65 Q 67
66 Q 72; C&AG’s Report, paras 3.14 and 3.15