Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 2040 - 2059)

  2040. CHAIRMAN: Mr Drabble, I think some of my colleagues might be helped if there was a plan.

  2041. MR DRABBLE: That is a good question, whether there is a plan.

  2042. CHAIRMAN: I know we did go there, but it does not necessarily follow that we remember exactly which street was which.

  2043. MR DRABBLE: Absolutely. Mr Mould may assist us with a plan. While that is being found, perhaps I can just put up on the screen a couple of photographs because you have, I think, all been on the site visit and you may remember the location of Fulbourne Street and the proposed station entrance. This is the view from the hospital side of Whitechapel Road looking down, as I understand it, Fulbourne Street—and I need to make sure I am getting it correct—past McDonald's. You will recall from the site visit that the proposed new entrance for the station is in an area behind the McDonald's, and the part of the presentation that I have just been reading is stressing the Council's concern to ensure that there is a visible and open entrance, linking Whitechapel Station with the main road and more particularly with the hospital, and I was just going on to explain what happened to those concerns in the hearing of our Petition in the other place and indicate what our present position is. I do not know whether we have now got to a plan, but I hope that is sufficient to jog the memory of members on the Committee as to what we are talking about. Durward Street, which I have also been talking about, which is the site of major construction impacts, runs parallel to the Whitechapel Road round the back, and you will recall from the site visit the school which obviously has a number of major issues with the construction programme which are addressed in the undertakings. We can now put up a plan.[4]

  2044. CHAIRMAN: Cambridge Heath Road?

  2045. MR DRABBLE: It is on the corner at the east. There is Whitechapel Road, if Mr Mould can show us, and the hospital is the other side of Whitechapel Road and I suspect that the logo for Whitechapel Station is roughly in the position of the existing entrance, and then Fulbourne Street, so the McDonald's in the photograph we were just looking at is on the corner there (indicating). My Lord, I hope that is sufficient to put my bare words in context.

  2046. CHAIRMAN: Yes, thank you very much. The bus did rather go round and round and we were never quite sure where we were at any one time!

  2047. MR DRABBLE: Having been on site visits myself, I have every sympathy. I will return to the text, my Lord, and I hope it makes sense. Since there will only be one entrance to the station in the foreseeable future and bearing in mind its somewhat hidden location, the Council consider it essential that this entrance is as accessible and visible as possible. For that reason, we gave evidence at the House of Commons Select Committee that the building on the corner of Fulbourne Street and Whitechapel Road currently occupied by a McDonald's restaurant, and we have just seen that in the photograph, should be included within the station site. This will provide a spacious concourse and entrance area suitably in keeping with the high quality of the new station itself. Unfortunately the Select Committee did not agree with us. However, we are still attempting to secure improvements to both the existing station in Whitechapel Road as well as the new entrance in discussions with Transport for London, and we would welcome the Select Committee's support in achieving this objective.

  2048. CHAIRMAN: Is the McDonald's within the limits of deviation?

  2049. MR DRABBLE: No, it is not within the limits of deviation.

  2050. CHAIRMAN: So it is not within the Bill?

  2051. MR DRABBLE: It is not within the Bill. The Bill could be adjusted to provide for its purchase, if appropriate.

  2052. CHAIRMAN: I do not think so. I think that starts all sorts of things going on.

  2053. MR DRABBLE: To be crystal clear, we have not petitioned in this House on this issue, but we thought it was helpful for the Committee to know what our continuing stance is.

  2054. Turning to the route itself, the whole of Crossrail is in tunnel throughout the borough. However, as you will have been made aware, there is a requirement for ventilation and evacuation shafts to be located at one-kilometre intervals throughout the length of the tunnel. So far as the borough is concerned, this means that, as well as the two major station sites, there will be a further ten construction sites, including a major construction site at Stepney Green in the junction of the two arms of Crossrail. You may not yet have been made aware of it, but there will be another major tunnel running north-south in the Bow area which will carry the diverted Ham and Wick sewer, which presents its own serious construction impacts. Inevitably, in such a heavily built-up area, these construction sites will have major adverse environmental impacts during the construction period.

  2055. One of the shaft sites is in Hanbury Street, which you have already visited. You will have seen that it is in a very congested residential area and will result in significant property demolition. Not surprisingly, there is considerable local opposition to this proposed shaft. As you will be aware, it was originally proposed as a major tunnelling launch site which the Council very strongly opposed, but fortunately, shortly before the House of Commons Select Committee commenced hearing evidence, the Promoters adopted a revised tunnelling strategy which no longer necessitated a launch site in the area.

  2056. However, the Council considered that Crossrail had not fully justified the case for the use of Hanbury Street as the optimum location for a shaft in Spitalfields and gave expert evidence that serious consideration should be given to an alternative site in Woodseer Street just to the north. This would have involved a minor variation in the route alignment which the Council considered would cause no serious construction or operation problems. Unfortunately, the Select Committee did not agree with the Council and decided that Hanbury Street was the better location for the intervention shaft.

  2057. The Council still seeks to mitigate the construction impacts and, to this end, has secured undertakings that Crossrail will minimise the size of the intervention site and that it will continue to review the Crossrail ventilation and evacuation strategy which could obviate the need for any shaft in Hanbury Street. In this respect, we were pleased to have been advised by Crossrail that it seems likely the site will no longer be required as a ventilation shaft which would reduce the size of the site and period of construction. The Council will continue to press Crossrail to consider the possibility of eliminating the Hanbury Street shaft. Although the Hanbury Street shaft has caused most local opposition, there are a number of other sites where the construction of intervention shafts will cause serious disruption and disturbance.

  2058. The site in Eleanor Street involves the displacement of the Council's only permanent travellers' site in the borough, and originally there were no proposals for its replacement or relocation. The Council first secured a commitment to relocate the site and then, following further pressure from the Council and the travellers themselves, Crossrail agreed to include additional land within the Bill proposals in order to ensure that the travellers could be relocated in a single move rather than in two moves, as was originally proposed. Since then, we have been working with Crossrail in order to agree a project plan which deals with both the design of the new site and the relocation process. We are pleased to say that in the last few days we have reached agreement with Crossrail that the design of the site will comply with the recently published guidance on the design of gypsy and travellers' sites produced by the Department of Communities and Local Government, and that the Council will have the right of approval over the final detailed design of the site, and, as Mr Mould explained first thing, final agreement on the way forward has been reached in the way that he explained.

  2059. A number of other construction sites have been located in the borough's very scarce open spaces at Stepney Green and Mile End Park. In addition, one of the construction sites for the Ham and Wick sewer is located in the middle of Grove Hall Park in Bow. As a result of the construction works, two of the borough's few and heavily used football pitches will need to be relocated, and Stepping Stones City Farm will lose part of its site during the construction period. We have secured undertakings to ensure that the football pitches are relocated prior to construction work commencing so that there will be no short-term loss of a very scarce local facility. At Stepping Stones Farm, Crossrail will finance the reconfiguration of the site to enable the farm to continue in operation during construction works. At Grove Hall Park, we have secured undertakings to minimise the impact of the construction works on the use of the park and to secure its full reinstatement after completion of the works.



4   Crossrail Environmental Statement, Impacts arising from the Amendments of Provisions (SCN-20080304-002) Back


 
previous page contents next page