Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 2880 - 2899)

  2880. We are just putting up the example of 3-5 Princelet Street, the report there, and your Lordships may be interested to see it covers not only matters of sensitivity and importance but also matters which appear in the interior of the building, because some Petitioners have suggested, or at least suggested in the past, that the reports have not looked at interior features of importance, because as you can see I hope—as I cannot—the report for Princelet Street which does deal with decorative features as well.[7]

  2881. CHAIRMAN: Yes, the Petition certainly talks about various decorative work inside the buildings.

  2882. MR ELVIN: Other buildings which are not listed buildings have been considered in a series of settlement reports which calculate potential settlement and building impacts in the same way as the individual reports do for listed buildings. The settlement reports underpin the Environmental Statement as technical reports and relevant extracts can be made available as required. It is fair to say that the technical reports that do the more general settlement appraisal of the non-listed buildings have been part of the technical reports which have been available publicly as the background to the ES, both on the website and in paper copy form since Bill deposit, so they have been available for some three years.

  2883. Proposed mitigation in the Spitalfields area consists of monitoring and following best practice during tunnelling works to minimise the generation of ground movements at source. In particular as regards listed buildings, the selection of mitigation measures has been and will be guided by the sensitivity of particular features which are of historic or architectural interest and the sensitivity of the structure of the building to ground movement. Assessments will continue to be reviewed as appropriate as the design process continues. The Promoter will also undertake an internal inspection of buildings on the English Heritage Buildings at Risk Register to ensure that any particularly sensitive aspects of these properties are considered as part of the assessment process.

  2884. Internal inspections will be undertaken for all buildings within the 10 millimetres contours as part of the production of schedules of defects prior to commencement of the works. The Promoter has agreed, subject to securing the necessary consent, to continue to undertake settlement monitoring in Spitalfields, not only during construction of Crossrail but also for an extended period of seven years following the completion of tunnelling excavation works, so that monitoring will continue for a significant period beyond the finishing of the tunnels.

  2885. None of the Spitalfields Petitioners' properties is assessed as being at greater than a negotiable risk of damage from settlement arising from the construction of Crossrail . Nevertheless under the settlement policy, which is found in Information Paper D12, "In the event that material or physical damage to buildings in Spitalfields does arise from ground settlement associated with the nominated undertakers' tunnelling work, it will be remedied, of course, at no expense to those owning or occupying the buildings. Any repairs required will be carried out to a standard and quality commensurate with the age and fabric of the building".

  2886. The Committee will also be hearing from Professor Mair on Wednesday, we hope, to assist the Committee with any of the issues which the Committee would like to hear evidence from ourselves and for any further explanation of these issues following Professor Mair's initial general presentation on day two.

  2887. On the issue of lorries, lorries will access the worksite from Whitechapel Road via Greatorex Street and Hanbury Street and I think a plan is being put up now to show you that and they will return to Whitechapel Road by Spital Street, Buxton Street and Vallance Road.[8] Overall there will be a reduction in the number of lorries over those originally reported in the first Environmental Statement as a result, as I explained to the Committee earlier, of the revised tunnelling strategy which meant that the worksite at Hanbury Street for the new shaft could be reduced. Lorry numbers will vary over the construction period, so the Committee has the numbers. What is being assessed is as follows.[9] During peak construction period, which is the nine months required for sinking the shaft, what is expected is on average 16 lorries entering and leaving the worksite each day, working hours being approximately 8.00 in morning to 6.00 in the evening weekdays and until 1.00 in the afternoon on Saturdays. The remainder of the work period, the number is expected to fall to something of the order to six lorries per day.

  2888. CHAIRMAN: But they are not going to run during the period when the school children are on their way home?

  2889. MR ELVIN: There is a separate arrangement regarding the schools and I am going to show your Lordships the undertaking in a moment.

  2890. CHAIRMAN: I think one of the things people want to know is whether the lorries are going to be backing up waiting for the deadline to pass.

  2891. MR ELVIN: Can we turn to undertaking 187, which is the undertaking regarding schools and lorries.[10] There is an undertaking which has been given to restrict the hours in which traffic will operate and allows for the introduction of traffic management measures, which, of course, should deal also with the issue of lorries which are pulled up on the side of the road—measures to be agreed with the Council. In fact, the issue of routing is specifically a matter which requires or allows the Council's intervention under Schedule 7, paragraph 7 of the Bill, so in addition to the undertaking there will be statutory controls in Schedule 7 of the Bill which will allow lorries to be controlled, both in terms of timing and in terms of the management of their movement. I also should say, and Mr Berryman can explain this to you when he gives evidence and he can explain in a little bit more detail the position with regards to lorries, a lorry holding area is proposed at Burdett Road, which is sufficiently far away from the schools to ensure that the lorries are being held in a location which should not conflict with school children either going to or coming from the school.

  2892. I should also say in this context that a Schools' Liaison Panel has been set up and has been running for over a year now and it appears to be working smoothly and provides a proper forum in which the school can pass on its concerns and these issues can be discussed and agreed between the schools and Tower Hamlets and ourselves. Turning briefly to the issues of noise.

  2893. CHAIRMAN: Sorry to interrupt, but this is another European directive which has been referred to by the Residents' Association, 2002/49.

  2894. MR ELVIN: That has gone into regulation form and our view is that it does not significantly alter the position with regard to Hanbury Street. We can give a little more information on this in due course, but what the noise directive does, and what the new regulations do, is to place an obligation on the United Kingdom to measure ambient noise levels throughout the country and to produce a noise contour map which is a basis for judging impacts. That does not impact on this particular proposal because the issue is not a concern about the contours to be placed on a new ambient noise map but what the actual impact of the proposals will be.

  2895. Our position on this is as follows: there is not any basis, we say, for considering that any noise or vibration issues will arise with regard to the operation of the tunnels once they have been constructed. It is predicted that the level of groundborne noise that would be experienced within any of the residential properties listed in the Spitalfields Petitions will be less than 30 dB LAmax. Mr Thornely-Taylor will assist the Committee and give evidence with regard to those issues to the extent that the Committee wishes to ask detailed questions and just to remind the Committee at this stage, of course, the tunnels are deep under the Spitalfields area, as I said, on average some 30 metres down. So far as the construction noise is concerned, the residential properties listed in the Spitalfields—

  2896. CHAIRMAN: I am so sorry, the point that is being made is that the directive provides noise requirements.

  2897. MR ELVIN: Well it does, it requires mapping of ambient noise levels, but that does not actually impact—and clearly that has to be done on a national basis—on the assessment of the specific noise effects of the proposal.

  2898. CHAIRMAN: I think Mr Thornely-Taylor will be able to tell us about that.

  2899. MR ELVIN: I am quite happy to produce a short note to the Committee to explain the basis of the directive and regulations, but our understanding, and we looked at this some weeks ago, was that although there is a national obligation to produce noise contour maps, that does not impinge on the issues which the Committee has to consider, that is to say individual impacts on the community and specific residential properties of the proposals.



7   Crossrail Ref: P23, 3 and 5 Princelet Street, Listed Building Assessments, Mott MacDonald (TOWHLB-XR5A-003) Back

8   Crossrail Ref: P23, Hanbury Street-Proposed Lorry Routes (TOWHLB-XR5E-001) Back

9   Crossrail Ref: P23, Table 8.1-Estimated Lorry Movements on Local Roads (LINEWD-SES308-006) Back

10   Crossrail Ref: P23, Extract from the Register of Undertakings and Assurances, No. 187 (TOWHLB-XR5C-013) Back


 