Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 4180 - 4199)

  4180. MR MOULD: I believe there is one two-star along this part of the route. What, I am afraid, I cannot do off the top of my head, is identify which. I think it is 19 Princelet Street. My Lord, the honest answer to your question is I am afraid I do not know whether there is that direct relationship between two-star and notable interiors.

  4181. CHAIRMAN: There is, because that is the whole point of having two stars—or it used to be.

  4182. MR MOULD: Certainly two stars reflects a much smaller sub-group of buildings of historic and architectural importance.

  4183. CHAIRMAN: It relates particularly to interiors.

  4184. MR MOULD: I am very grateful for that.

  4185. CHAIRMAN: That will be part of the information available publicly.

  4186. LORD BROOKE OF ALVERTHORPE: Could you say just how many buildings we are actually talking about? We have never been given the number.

  4187. MR MOULD: It is about 20 along this part of the route, but, of course, along the route as a whole the figure is much larger—it is about 360.

  4188. LORD BROOKE OF ALVERTHORPE: We are talking about Petitioners appealing to us and the number that they are appealing.

  4189. MR MOULD: We are, yes.

  4190. LORD BROOKE OF ALVERTHORPE: That is 20.

  4191. BARONESS FOOKES: My understanding from yesterday, or the day before, was that at some stage later on there will be an internal assessment mainly for the purpose of ascertaining the state of the building against any claims by the proprietors subsequent to the building of the tunnel showing damage.

  4192. MR MOULD: My Lady, that is absolutely right. I was going, at some stage during this afternoon's presentation, to remind the Committee of what comes next, as it were, because this, as your Ladyship has in mind, is very much part of an ongoing process. If it is convenient I can reiterate that now or I can come to that when Professor Mair has completed his evidence—whichever is convenient to you.

  4193. BARONESS FOOKES: I will leave that to you, my Lord Chairman, as to when we deal with this, as long as it is dealt with.

  4194. CHAIRMAN: For the moment, Lord Young also has a question on this point.

  4195. LORD YOUNG OF NORWOOD GREEN: I just want to finish what we have started. Thank you, because I am much more confident now about the validity of the survey now that you have explained the process. As I understand it, armed with the professional reputation of Baxter, which is acknowledged by both sides, their access to all the internal finishes and features of listed buildings, their knowledge of this type of Georgian terrace, they could assess the external, have knowledge of any special features because of the reference, as you say, to London Survey, Pevsner and their own records, which would enable them to make what you say is a reliable assessment of the building and put it in the right category. Am I right in that?

   (Professor Mair) Yes.

  4196. I do not mean to paraphrase.

   (Professor Mair) That is paraphrased very well.

  4197. The only other point that I was recalling from Mr Wheeler that I want to be sure on, is that he said: "Well, for instance, suppose they had gone into the basement of one of these buildings and they had converted the cellar and put a concrete raft in, underpinned or done something." Would that have an effect on assessment?

   (Professor Mair) It is a little hard to answer that question as a generality, but my reaction would be that if they had gone in and done some underpinning or some improvement in some sort of way, as you describe, that would probably make the building less vulnerable and remove a possible sensitive or vulnerable feature.

  4198. LORD YOUNG OF NORWOOD GREEN: Thank you very much.

  4199. MR MOULD: I shall come back to this, because one thing I would like to do, if I am allowed a few moments to do so this afternoon, is to show you one or two detailed aspects of the Settlement Deed I mentioned yesterday because I think it is important that you understand how that works in a little more detail. I would like to continue with Professor Mair, if I may. What we would like to show you, finally, is some relevant extracts from the Alan Baxter Associates report which formed part of the technical background material to the Crossrail Environmental Statement. I hope we have provided you with some extracts of that in hard copy. I think what I shall do, Professor Mair, if it is convenient to you, is I will hand over to you to explain the significance of this. Thank you.
  (Professor Mair) Yes, I would like to have, if we could, page 25, please, of that report? I hope that you all are able to see this page 25.[32] This deals with Phase 3 essentially, which is what we are talking about, of the assessment process. What this specifically relates to is the question of how historic buildings, listed buildings, are dealt with and it describes in the fourth paragraph—and I will not obviously read every word of that—how the assessment incorporates these two extra scores, one score for the behaviour of the building and another score for the question of finishes, and how they may respond. It makes the point that the scores can range from zero for a robust building with no significant features up to four for a delicate building with very fine features because that would give a two and a two, which together would make the four. At the bottom of the page is a table which just recaps what I described earlier, which is the sensitivity classification to do with the structure as to how the whole structure might behave and that is the scoring system, zero, one or two.[33] Then the following page, if we could go to that, please, page 26.[34] The top of that page has a second table which relates to the second part of the scoring system which is the features and the finishes on which we have already spent some time. Again, I have described that and that also shows the zero, the one, and the two scoring. The way in which this is all finally put together is illustrated at the bottom of the page where you see a grid with colours and you will see along the top the words "Building Damage Classification".[35] Those are the categories of building damage which are related directly to the tensile strain calculation and you will see zero, one, two, three and four, the increasing severity of potential damage from the building classification and that work was all carried out by Mott McDonald. In a sense, you can imagine the row going across is the work by Mott McDonald in calculating the maximum tensile strain that the building might experience.



32   Scope and Methodology, Para 4.3.1.1 Phase 3, Alan Baxter Associates (SCN-20080312-017) Back

33   Scope and Methodology, Table 4.2 Building Sensitivity Classification-Structure, Alan Baxter Associates (SCN-20080312-018) Back

34   Scope and Methodology, Table 4.3 Building Sensitivity Classification-Features and Finishes, Alan Baxter Associates (SCN-20080312-019) Back

35   Scope and Methodology, Table 4.4 Matrix for Assessment of Magnitude of Impact, Alan Baxter Associates (SCN-20080312-020) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008