Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 5620 - 5639)

  5620. MS JONES: Thank you. Would you like me to do that now, or shall I go on to my settlement issues?

  5621. CHAIRMAN: I should deal with it now.

  5622. MR TAYLOR: My Lords and my Lady, I am going to call Mr Thornely-Taylor to give some evidence in response to the points raised by Ms Jones, if I may.

  5623. CHAIRMAN: Have you got a particular proof of evidence for this point?

  5624. MR TAYLOR: We do not. I was going to proceed in the way we did last week and ask a number of short questions and ask him to verify them.

  5625. CHAIRMAN: You do that and then Ms Jones can ask hers.

MR RUPERT THORNELY-TAYLOR, recalled Examined by MR TAYLOR

  5626. MR TAYLOR: Mr Thornely-Taylor, can we start please by referring to Information Paper D10.[3] I want to begin by looking at paragraph 2.9. Here is set out the policy that is to be adopted with regard to the design of the permanent track support system. We are going to require the nominated undertaker to design the permanent track support system so the level of groundborne noise near the centre of any noise-sensitive route is predicted in all reasonably foreseeable circumstances not to exceed the levels in Table 1. If we can turn please to the previous page to Table 1 we can see the first criterion set out for residential buildings, reference to 40 dBLAMax,S?

  (Mr Thornely-Taylor) Yes, indeed.

  5627. The first question, Mr Thornely-Taylor: is that 40 figure a target to design to, or not?

   (Mr Thornely-Taylor) It is a target to design to for as much of the tunnel between the portals as possible. It is not the target that will apply piecemeal along the route. It will not be possible for a contractor to choose cheaper and cheaper track because he has got more and more headroom above the predicted noise level. He will be required to select, as is said in 2.9, a track support system which as much as possible from end to end of the tunnel section will achieve 40. It follows from that that for most of the length between the tunnel portals it will be much better, because it will have been selected to achieve 40 in the most difficult circumstances.

  5628. Thank you. Why has 40 been selected as the appropriate noise criterion?

   (Mr Thornely-Taylor) 40 is a level above which complaints have occurred in the past from groundborne noise from underground railways. It has to be said the situation in the past has been that when that has arisen there has also been vibration that you feel with the sense of touch. Vibration is not expected to be discernable by people above Crossrail. In any case where we did come close to 40 the position would not be the same as in those cases I referred to where there have been complaints in the past from the older style of railway.

  5629. Before we leave IP10, there is reference in paragraph 2.9 as we have seen to a prediction in all reasonably foreseeable circumstances. On the third line of paragraph 2.9 you can see a reference to a prediction "in all reasonably foreseeable circumstances". Why are those words included in the policy?

   (Mr Thornely-Taylor) Because it is not impossible that, in the course of constructing the tunnel, a feature is encountered underground which was not foreseen, not on the drawings, not known about, which has the effect of transmitting groundborne noise and vibration more efficiently than the normal ground conditions that were assumed. It is not impossible that in a particular location a higher level of groundborne noise might occur than was the design objective.

  5630. CHAIRMAN: Can you give us an example? I know this could happen with piles but we are not talking about piles here.

   (Mr Thornely-Taylor) A good example would be either the appearance of a boulder within the clay that the tunnel was being bored through, which lay between the tunnel and some building foundations, or a feature of underground London is that there are many old, forgotten, disused other tunnels, other structures buried beneath the ground that we do not know about, and we could find unexpectedly that there was a rigid structure between the top of the tunnel and a building that was noise-sensitive, hypothetically.

  5631. MR TAYLOR: In the modelling work that has been done to date what approach has been adopted to address that sort of uncertainty?

   (Mr Thornely-Taylor) The modelling work, as I explained on day one, has addressed uncertainty by comparing modelled results for existing railways using the same model in more than one set of circumstances; and the conclusion of that approach was to decide that an uncertainty margin of 5 dB LAMax,s was necessary to add to the predictions that have been made to allow for unforeseeable influences which might result in higher noise levels than those which the model predicts.

  5632. CHAIRMAN: Is that within the 40?

   (Mr Thornely-Taylor) Yes, what flows from that is when a prediction presented in the Environmental Statement is, for example, 40—in fact there are very few as high as that—then the actual model prediction was 35, it had a blanket 5 added for uncertainty.

  5633. MR TAYLOR: Thank you. While we are still in the Information Paper D10, can we just deal briefly with the point about the maintenance of wheels and track. We can see at paragraph 2.10, Mr Thornely-Taylor, that the Information Paper explains that: "the nominated undertaker will put in place measures that will ensure that the track of the underground sections and the wheels of the vehicles operating the Crossrail passenger service are maintained in a state which under all reasonably conceivable circumstances will lead to adequate control of groundborne noise and vibration arising from the railway". If we go over the page to paragraph 2.11 there is a reference to requiring the nominated undertaker to ensure that the "rails of the underground sections are conditioned by grinding or other suitable means and are appropriately maintained thereafter". What is the approach that the Crossrail project is taking to the issues of maintenance of track and wheels?[4]

  (Mr Thornely-Taylor) These are important issues because the level of groundborne noise above an underground railway is very strongly dependent on the condition of the rail running surface and the wheel treads and this commitment in IP D10 is an important part of the whole approach to achieving actual low groundborne noise and vibration levels.

  5634. Thank you. I am going to ask for the noise contour map to be put up.[5] Again, I believe you referred to this last week, Mr Thornely-Taylor, on Day Eleven at paragraph 4275, for those who are interested, and if we can move the map slightly to the right so we can focus on it that way. Thank you. We can see Hanbury Street and Princelet Street and it is a little difficult to see it, hopefully we might zoom in slightly. Thank you. Here we have a map of the groundborne noise contours that are forecast from the modelling work that has been done. Can you explain what is shown on this drawing, please?

  (Mr Thornely-Taylor) This is the result of computer modelling, using the methods I described on previous occasions. With the five units added that I just explained for uncertainty and it gives the predicted level of groundborne noise in a standard residential building, very similar to the kind of buildings in the Spitalfields area, it does actually allow for a single basement to the building. What is plotted is rather like airport noise contour, except it is an underground source and not an overground source and the outermost contour represents 25dB LAMax,s and each contour interval is one unit. If you look across the Spitalfields area you will not find any contours as high as 30 so, as a general statement, one would say the prediction including the five units for uncertainty for the Spitalfields area is less than 30 LAMax,s.

  5635. MR TAYLOR: Thank you very much indeed. What you are saying to the Committee is that the modelling work that has been done to date demonstrates that the likely forecast of impact on groundborne noise within a standard residential property in Spitalfields is substantially below the 40 criteria in table 1?[6]

  (Mr Thornely-Taylor) It is very substantially below. As we heard in the hotel demonstration, the difference between the quietest of the trains there which were down around the low 30s and the loudest that we heard is quite a lot.

  5636. CHAIRMAN: Can you remember what the figure was for the loudest?

   (Mr Thornely-Taylor) The loudest was 41.

  5637. That is what we thought.

   (Mr Thornely-Taylor) My Lord, if I could explain the reference to 47. I also made a mention when I was last in this chair, I think, about a property in Spital Square, which I had been in, over the Central Line and I went there because one of the residents of Spitalfields had mentioned you could hear the Central Line in there and it was in the basement of building that I said the maximum level was about 47. I did not do a formal survey. That is where the 47 came from. We did not hear anything like as much as 47 in the Chancery Court Hotel. The loudest was 41.

  5638. CHAIRMAN: I think it is just as well to get that cleared up, thank you very much.

  5639. MR TAYLOR: I think I am right in saying that one of the inputs to the modelling work is an assumption about the form of the track support that is going to be utilised.

   (Mr Thornely-Taylor) That is one of the most important assumptions. Going back to the original Crossrail scheme in 1992 a stiffer form of rail support was assumed then than is the current assumption in the Environmental Statement and, indeed, as engineering work progresses, it is quite possible that the stiffness of the rail support for the standard system will be lower than was assumed in the Environmental Statement and noise levels will ultimately be less than those included in these contours.



3   Crossrail Information Paper D10-Groundborne Noise and Vibration, http://billdocuments.crossrail.co.uk (LINEWD-IPD10-004) Back

4   Crossrail Information Paper D10-Groundborne Noise and Vibration, http://billdocuments.crossrail.co.uk (LINEWD-IPD10-005) Back

5   Crossrail Ref: P23, Noise Technical Report, Hanbury Street/Princelet Street area (SCN-20080312-023) Back

6   Crossrail Information Paper D10-Groundborne Noise and Vibration, Table 1 Construction and Operational Groundborne Noise Criteria, http://billdocuments.crossrail.co.uk (LINEWD-IPD10-005) Back


 