  8180. Now, since that time, the Rail Regulator has in fact reduced by a small amount the freight paths which Crossrail were seeking, has he not, so that he has knocked off two per hour over the weekend and two per hour in most of the off-peak period?
  (Mr Berryman) No, that is not quite right. It is the passenger paths which he has reduced.

  8181. Yes, that is what I hope I said.
  (Mr Berryman) You said "freight paths".

  8182. I am sorry, that is entirely wrong. He has knocked off two of the Crossrail passenger paths which you are seeking.
  (Mr Berryman) Yes, that is correct, yes.

  8183. When that works through, my clients welcome that and are pleased with that because in fact with the spare capacity opened up by that, we could achieve either all, or very nearly all, of those 39 extra paths, so, to that extent, that would be extremely satisfactory.
  (Mr Berryman) Yes, of course, but, as you heard from what I said earlier on, that assumes that those paths were all allocated to freight and that is by no means certain at this stage, but it certainly does leave that opportunity open, yes.

  8184. That I appreciate because, if there is not a demand for the paths, the freight paths will not be allocated to freight, but, as I say, so far, so good. What has to be achieved in some way is the performance improvement which gets one up from the 71 per cent PPM to the 92 PPM minimum, that being the figure, as I say, that the Regulator set and which Crossrail is now set to achieve.
  (Mr Berryman) Yes, that is right. In fact, we are obviously aiming considerably higher than 92 PPM as we need to for the effective operation of such a high-density railway.

  8185. In the decision as to whether you can achieve 92 per PPM, the modelling will have to take into account the requirements of the industry for maintenance of track, will it not; this will be not only the track for the passengers but also for freight trains?
  (Mr Berryman) Yes, of course it will.

  8186. Also for the access and egress into the various freight terminals which lie off the Main Lines to the side?
  (Mr Berryman) Yes, that is right.

  8187. If, at the end of the day, the 92 PPM figure cannot be achieved then the rail regulator will have to make a decision as to whether actually he cuts down further on the paths for Crossrail, or whether he cuts down on the paths for everyone else. Is that not right? That is, if that situation were to be reached?
  (Mr Berryman) Yes, that is correct, broadly speaking.

  8188. As far as we are aware, there has been no modelling at all to date which has excluded those infrastructure works, which I referred to at the beginning of my cross-examination. All the modelling has included works such as those Greenford works and such as those Heathrow works?
  (Mr Berryman) Certainly the modelling has included those two items that you mentioned; but a number of other items which are scheduled here have been omitted from the model—I think one of them at the request of your clients in the case of the Maidenhead sidings realignment—because your clients felt, quite rightly in retrospect, that the amendments proposed would prevent them getting proper access to the Slough trading estates.

  8189. So far as, for instance, the West Drayton/Langley works, that is the relief line from Langley to West Drayton, the other works at West Drayton for the up-relief platform, the airport junction, the works at Southall, the works at West Ealing, those have all always been included in the modelling, have they not?   (Mr Berryman) They have always been included in the modelling, yes, that is right.

  8190. There has been no modelling whatever done of a scheme in which either they were left out or in which other works were put in, in their place?

  (Mr Berryman) No, that is correct.

  8191. We are not aware of having seen any list of any alternatives to those works, or any report suggesting and showing how it might be possible to achieve the proper functioning of Crossrail, and that 92 PPM, and a proper amount of other passenger services and freight without those particular works which I have just identified to you?
  (Mr Berryman) That is true. There is no such modelling that has been done. What we are saying is that, if such modelling were done, and if such modelling provided equivalent or perhaps even better performance then that should not be a barrier to doing those works in an alternative way. That is all we are saying. We are not saying what bits we are going to do and what bits we are not doing to do. What we are saying is that we intend to achieve a 92 PPM at least and the necessary works will be input into the system, if you like, to achieve that output.

  8192. Mr Berryman, we entirely understand the ORR's approach, but what we do not understand is why this Committee should necessarily reach the same conclusion on these matters. If a), and I think we are all agreed, it is desirable to achieve the 92 PPM, and b) it is desirable to have not only the Crossrail services but the other services I have spoken of, that is a reasonable number of other passenger and freight services, it seems to us that at the present time there is no evidence at all that that can be achieved without these key freight infrastructure works which we have been talking about?
  (Mr Berryman) Yes, you are absolutely right; there is no evidence that that could be achieved without doing the works which you have outlined. If we were to delete any of these works it would be only on the basis of modelling agreed with all the parties through the Timetable Reference Group, as I think it is now called.

  8193. Mr Berryman, what we are asking the Committee to do is simply to require Crossrail to construct those works, as I say it is the principal infrastructure works, the ones which have been modelled, unless they were able to demonstrate something else, because otherwise you have got a possibility that time moves on, you do not start away on these works in a timely manner, because you are keeping all your options open, and time moves on and then suddenly in 2015 or 2016, with opening date coming in 2017, you are back to the rail regulator saying, "Can't do it; there isn't time to do all those works. Crossrail's terribly important, can we cut the cake in a different way?" Whereas it seems to us, that provided you are tied to doing the works which you have relied on so far, the only ones which are in the Environmental Statement, the only ones which have so far been modelled and which have been repeatedly included in the model for the last two and a half years since the Bill was deposited, then that can give some reassurance to freight, to freight customers and the public at large. Do you understand the point?
  (Mr Berryman) I understand the point, but I would put it to you another way: as you said earlier in your remarks a moment ago, it would be up to the discretion of the rail regulator to decide how the capacity that had been created was allocated. If, through some oversight or mischance, we failed to build all of the bits and pieces which were necessary, then it would be up to him to allocate the space that we could have and the space that other operators could have. I have found, and I am sure your clients have found, that the rail regulator takes a fairly robust line with the infrastructure owner about matters of these sorts; and I have no doubt he would take an equally robust line with us.

  8194. Mr Berryman, the rail regulator has no power to make you construct the works. All he can say is, "I won't give you the paths". If he was doing that he might say, "You can have X paths but there will have to be a contraction in the freight paths". Is it not, frankly, much the simpler course and the clearer course that you commit now to those works which are the only works you have modelled—you have had time to think about other ones and have not done so—that you now commit to them so that we and everyone knows what the Crossrail scheme is? That is the simple point.
  (Mr Berryman) I think my personal response to that would be, as you just said, circumstances can change between now and 2017; all sorts of things could happen. I will give you a good example: supposing the Greenford Line, the branch to Greenford, was converted into a tram train, which is one of the possibilities which has been considered in the past, then it would be silly to do all the works which you have just drawn attention to at West Ealing because it would be no longer needed. Of course that work is neutral as regards freight movements anyway. Circumstances may change between now and 2017 as you describe, but the point is that the mechanism has been set up to use a normal industry process through the rail regulator to make sure that the paths which are available are allocated properly in line with national priorities and with the requirements of the other operators.

  8195. CHAIRMAN: Mr George, sooner or later, you will have to tell us what it is that you want us to do. The Rail Regulator will be there in 2017, I dare say, but I can tell you that the Select Committee will not, so therefore you will have to make it clear what it is that you are asking.

  8196. MR GEORGE: We will give you the precise words of the undertaking we want, but Mr Berryman, I cannot let you off about Greenford and a tram just for a moment. Let us just pause for a second. There is no proposal in the Mayor's Transport Strategy for a tram to Greenford, is there?
  (Mr Berryman) Not at the moment, no.

  8197. And the Mayor has just delayed work on the West London Tram and there are at present no proposals for trams anywhere in west London, are there, within the sort of horizons which we are thinking about, i.e. up to 2020?
  (Mr Berryman) No, of course there are not and I was taking that as merely a hypothetical example of something which may change. It just happened to be the slide that is in front of me. The point you were making and the point that I would agree with you on is that things may change between now and 2017 and it is up to the people at the time to make those kinds of decisions. If we have not achieved or demonstrated that we can achieve 92 per cent PPM by infrastructure improvements and other mechanisms then, as you know, we are not entitled to those paths which the Regulator has allocated to us. They are only allocated to us on the basis that we achieve that level of output.

  8198. Completely theoretically all sorts of things could change. Indeed, there might not be a need for Crossrail then but we have to plan on the basis of this. Take that flyover into Heathrow, there may be a Sunday Times campaign to shut it down but it is likely that Heathrow is going to be there, and this Committee can sensibly plan on the basis that Heathrow will be there with rail services into it, and in that connection that particular work in your Bill is going to be necessary, is it not, because otherwise one is going to have chaos on the line?
  (Mr Berryman) Yes, absolutely.

  8199. All we are saying is if there is going to be chaos without them, why do you not commit to it? That is really the limit of the point and you say no, we want flexibility, is that not right?
  (Mr Berryman) That is right, yes.



 