Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 11160 - 11179)

  11160. Perhaps I can then move on to another part of this part of the route—

  11161. LORD BROOKE OF ALVERTHORPE: Sorry, but what do Westminster want?

  11162. MS LIEVEN: I believe, my Lord, that Westminster think that very serious consideration should be given to moving the boundary possibly to Westbourne Terrace. I do not think anybody has come to an absolutely final and fixed position, but they can clearly see the benefits of that.

  11163. BARONESS FOOKES: Why is it such a big deal that it takes so long?

  11164. MS LIEVEN: Well, it is a big deal, I think, my Lady, for two reasons. One is that there is a concern that, with the limited space on Eastbourne Terrace, it should not be a boundary road, but there is also, I think, a concern that moving a boundary is not a straightforward thing for the CCZ. Cameras have to be moved, signs have to be moved, lines have to be moved, computers have to be changed, so it is quite a major enterprise moving a boundary, and I think it would be fair to say that it is not clear at this stage that there would actually be very significant benefits from doing so.

  11165. CHAIRMAN: Does it need an amendment to the Bill?

  11166. MS LIEVEN: My Lord, it would need a new Order in the CCZ Orders promoted by TfL. If your Lordships were going to deal with it under the powers in the Bill, then yes, it would need it.

  11167. CHAIRMAN: I do not think we can, can we?

  11168. MS LIEVEN: Well, whether you can in some absolutely far-fetched legal way, I am not sure, my Lord, but, in my submission, it would be wholly inappropriate for this Committee to start changing the CCZ boundaries. You might make all sorts of suggestions! In my submission, the matter has gone as far as it can as far as this Bill is concerned, which is that TfL have undertaken a study and there are discussions going on between all those concerned.

  11169. If I can move to another part of the Paddington area, which is the issues around Paddington New Yard, perhaps we can put up 027.[3] Those members of the Committee who came on the site visit will remember that we went into Paddington New Yard going through the existing bus garage, and it is a large area of land that lies on the north side of the railway line largely underneath the Westway. The existing bus garage, though very difficult to see, is there (indicating), the Great Western Studios, where the artists currently reside, is there (indicating) and there is an existing concrete batching plant operated by Tarmac. Now, this is going to be an area where there are two plans because the site actually stretches all the way down here (indicating) and then, if we put the next plan up, 028, so that the Committee get a sense of it, it stretches on all the way down here into the former goods yard (indicating) and then you can see that we have linked in because there is Paddington Station and there is the Bishop's Bridge Road site service area (indicating), so it is a very long, thin worksite which is needed for a large amount of work for the Bill.[4] Effectively, we have got to do considerable work to the tracks in this location. I do not know if the Committee can see, but here is the Royal Oak portal (indicating) and that is where the Crossrail trains plunge underground into the start, the west side, of the tunnel to go down underground under the existing tracks and into the Crossrail station at Eastbourne Terrace. Perhaps that explains why we have to knock down the building in Bishop's Bridge Road because, as your Lordships can see, we have got to get down quite quickly to get into Eastbourne Terrace. Therefore, we have to construct the portal, we have got to reconfigure the tracks, we have got to bring the spoil out from the massive hole in Eastbourne Terrace and we have got to stockpile all the kit we need to build the station in Eastbourne Terrace, so there is a huge amount of work going on in this location. If we go back to the first one, please, 027, there is a number of existing users who have to be appropriately dealt with.[5] There is the bus garage that I have mentioned which we are in discussions to locate.

  11170. CHAIRMAN: It is not actually a garage, it is a standing, is it not?

  11171. MS LIEVEN: There is a garage as well, my Lord. Where we come in off the bridge there is a big—it would be fair to say—not very pretty red building which is a bus garage and then the buses overspill from the garage all down the bus hard standing area. They have to be relocated. The studio is being relocated into Alfred Road and, happily, we have reached the point with the studio that they are not going to attend before your Lordships. The Tarmac batching plant has to be dealt with. As far as the batching plant is concerned, there is going to be a temporary batching plant built and then once the work is completed there is going to be a permanent batching plant put back on the site as well. We may come to this tomorrow in more detail with Westbourne Park residents, but I am sure it is easy for the Committee to understand this is a rail-served batching plant and, as such, is a very important facility for London because it is one of the closest in concrete batching plants to central London that is rail served. It is extremely important in planning policy to make sure it is reinstated so all the materials used in it continue to go by rail rather than on the roads. There is a great deal of work going on in the Paddington New Yard area. There are more issues about the batching plant but, I think given we have reached agreement with Westminster, all I need to say at this stage is that the existing batching plant operates largely outside planning controls because it has been there for so long and there have been very close discussions with Westminster and with the owners and operators of the batching plant, Tarmac, about the conditions that will attach to the reconstituted facilities. Your Lordships can see that those issues all feed down into Paddington Station.

  11172. My Lords, I was going to leave it there. That is a brief outline. If there are more detailed issues which arise—I do not think they will arise from Westminster but from PRACT later on in the day—I will call Mr Berryman and Mr Anderson. Mr Berryman to talk about the engineering; Mr Anderson to talk about the traffic arrangements. I was going to stop there in terms of my introduction.

  11173. Could I run through then who the Committee may or may not hear from this week. Westminster City Council, I have mentioned, I think at the most will be a short statement. Paddington Residents Active Concern on Transport are here, I saw them outside, and will be touching on some of the issues I have just gone through. I understand that the Woodseer and Hanbury Street Residents are coming this afternoon/this evening.

  11174. CHAIRMAN: I think they are coming this evening.

  11175. MS LIEVEN: Yes. Tomorrow Westbourne Park Villa Residents Association represented by Lady Bright will, I am sure, be attending and talking largely about the batching plant and also about the footbridge, which I should have mentioned. The footbridge which the Committee walked over is here (Indicating), described by somebody concerned in this process as probably the footbridge that has taken up more parliamentary time than any other footbridge in Parliament's history. It is a footbridge that runs between the residential area south of the tracks and the new Westminster Academy—which I think is now built here—and there are fairly vexed issues about this footbridge which I am not going to go into now because they are not vexed with Westminster, but I will describe those tomorrow.

  11176. LORD JAMES OF BLACKHEATH: On that map it says below it "footbridge reconstructed". Does it imply that is exactly the line of the reconstructed bridge or the current bridge as it is?

  11177. MS LIEVEN: It is both because the bridge is not being reconstructed in its totality, it is only being partially reconstructed. The only thing that is changing in terms of its line—the line across the tracks remains exactly the same—is following on from the House of Commons recommendations we are putting in a ramp that allows people with restricted mobility to get up to the footbridge and that is going into this area here (Indicating). The line of the bridge stays exactly the same.

  11178. LORD JAMES OF BLACKHEATH: Ms Lieven, it is quite an important point because the bridge as shown on that map is straight and, therefore, eliminates the hidden angles which people were concerned about for the line and if that is the case it would be important for us to know whether that is going to be it when we come to that.

  11179. MS LIEVEN: My Lord, I think that is just a product of the very small scale of this plan because we are not intending to reconstruct that bridge so the very slight kink, which your Lordships saw on the site visit, remains. Could we put up 009.[6]



3   Crossrail Ref: P76, Westbourne Park-Crossrail proposals (WESTCC-56_04-027) Back

4   Crossrail Ref: P76, Royal Oak Portal-Crossrail proposals (WESTCC-56_04-028) Back

5   Crossrail Ref: P76, Westbourne Park-Crossrail proposals (WESTCC-56_04-027) Back

6   Crossrail Ref: P76, Westbourne Park Passage-Footbridge plan (WESTCC-40_04-009) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008