Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 11480 - 11499)

  11480. CHAIRMAN: I will take your word for it!

  11481. MS LIEVEN: Which deals with possession of the land. You will have to take Mr Mould's word for it as he has pointed me to it. What I am not absolutely sure about is whether or not Departures Road would fall within paragraph 2.2 or 2.3 of the policy, but I do not think it matters because they both reach the same end result. That was the only issue I was going to deal with in re-examination. Unless the Committee has anything else for Mr Berryman, I will call Mr Thornely-Taylor.

  11482. CHAIRMAN: Thank you, Mr Berryman, yet again.

The witness withdrew

MR RUPERT THORNELY-TAYLOR, recalled Examined by MS LIEVEN

  11483. MS LIEVEN: Mr Thornely-Taylor, you are well-known to the Committee and, indeed, to PRACT, so I will not reintroduce you. I just want to go back, briefly, over the issues around groundborne noise, particularly at this location. I should say to the Committee I apologise; I misled you in opening when I said that there were no properties that qualified for floating track slab here. First of all, Mr Taylor, can you just recap on the design approach to providing an acceptable level of groundborne noise?

   (Mr Thornely-Taylor) My Lords, as I explained on Day 1, the approach is set out in Information Paper D10, and the important feature of that is that the nominated undertaker and his contractor will be required to select a standard track form that will meet the groundborne noise target for as much of the alignment as possible, so that special track form is restricted to those cases where the standard track form cannot meet the objective set out in Information Paper D10. That, of course, means that the track is selected for the difficult locations. At the other locations where the tunnel is deeper or the trains are slower or for some reason the groundborne noise is less, they will be even better off than the targets in the Information Paper. Indeed, as a consequence of that, in the area between Paddington Station and Hyde Park the contours for standard buildings with a normal basement do not, in any location, go above 29dBA Lmax, and, in fact, fall away to lower levels than that as you move towards the boundary of Hyde Park.

  11484. If we just put up the plan of the tunnels coming out of Paddington Station, 003, first of all, this is the station and the tracks coming out this way across the Hyde Park Estate, and then going in Hyde Park around here.[23] How confident can we be that the design we are proposing will suffice in respect of the groundborne noise environment in those residential areas?

  (Mr Thornely-Taylor) The first thing I will just point to is the location, which is just here, where, as a consequence of the request by the House of Commons Select Committee on the Bill that floating slab should be provided wherever there was less than 15 metres of cover between the tunnel and the residential building, there is a short section there which, although its predicted noise level is actually only 25 without floating slab, as a consequence of that Committee's request, there will be a short section of floating slab. To answer the question in more detail, the process which has been agreed with the London Borough of Camden, and is in the revised Information Paper D10, is one where the design of the track form to be installed in the tunnel takes account of uncertainty, makes predictions for all the buildings taking specific account of their foundations (we have heard that there is a building in Sussex Square with pile foundations—that will be taken into account) and the form of track support selected, so that including the uncertainty allowance the predicted LAmax,S, the prime objective, is below 35, as agreed with Camden, but certainly will not exceed 40 LAmax,S.

  11485. One of the points specifically raised by Mr Zamit was that PRACT has made a request for out-turn reports on the Jubilee Line Extension and the Channel Tunnel, and as we saw in the correspondence that was shown this morning we said there were no reports because, as far as we were aware, there have been no complaints about groundborne noise. Mr Zamit wanted to know whether or not there were any comparable locations in terms of either of those schemes going under residential properties at the kind of depths that we are talking about in the Paddington area.

   (Mr Thornely-Taylor) Yes, indeed, there are, my Lord. The Jubilee Line Extension, as it passes through Bermondsey—into and out of Bermondsey Station—and, also, at Canada Water, is quite comparable. I do not know whether your Lordships remember, but when we were coming back from the visit to the vent shaft we made a little detour actually to look at a vent shaft at the back of Bermondsey Station. You will have seen the residential locations there—quiet, back streets with a relatively shallow depth to the tunnel of the Jubilee Line Extension. After the completion of the Jubilee Line Extension project the previous Crossrail project, which I was also involved with, did commission some work to do some validation exercises on the Crossrail prediction model, and I did in fact attempt to get some groundborne noise measurements from the Bermondsey area. It was not actually possible to measure anything useful in the residential areas either side of that station.

  11486. CHAIRMAN: What sort of depth is the Jubilee Line there?

   (Mr Thornely-Taylor) It is approximately 20 metres, from memory, my Lord.

  11487. MS LIEVEN: Finally, Mr Taylor, construction phase groundborne noise. Can you explain what arrangements we have agreed with the local authorities in respect of that type of noise?

   (Mr Thornely-Taylor) Yes. There are two aspects of that: one is the passage of the tunnel-boring machine, and I think it is generally accepted that it will be clearly audible as it passes through at quite a rapid rate of progress, and there will be short-term disturbance which will quickly pass. Then there is the installation of the temporary construction railway, and that is also subject to the provisions of IPD10, although it will not be possible to have as sophisticated a method of track support for a temporary railway of that kind, and it is more likely that in that case the predicted levels of groundborne noise will come closer to the figures in the table in IPD10 for the alternative test of whether they are greater than the existing groundborne noise from pre-existing underground railways.

  11488. MS LIEVEN: Thank you. Those are all my questions.

Cross-examined by MR WALTON

  11489. MR WALTON: Mr Taylor, can I just be clear that I think you said that standard track form would be used even if the predictions are substantially less than 35 decibels?

   (Mr Thornely-Taylor) That is correct. The important feature of the way Information Paper D10 is structured is that we will not have the case where the contractor, to save money, will put in some cheaper, more rigid, less well-performing track just because in some location he is well improving upon the requirement. The standard track form will be put in everywhere except where special track is needed, as a result of which, where it is much better than the targets in IPD10 it will be much better than the targets in IPD10.

  11490. It is the case, is it not—I believe the Committee know this but I just wanted to be clear—that there are measures in force that whoever operates the railway will be obliged to maintain the track in such as way that the noise transmission is kept to whatever it starts with?

   (Mr Thornely-Taylor) They will, and of course that is a most important part of the whole process because, should the track deteriorate and should there for any reason be want of maintenance, groundborne noise levels would go up; and that is therefore one of the important parts of the process of achieving the required low noise levels.

  11491. In the areas where floating slab track is specified, either because of special needs or because of the tunnels being less than 15 metres, there is a reference I think to the use of floating slab track or similar technology with the same effect. I have probably got the words wrong, but there is certainly a caveat there?

   (Mr Thornely-Taylor) There is indeed. This is in the report of the House of Commons Select Committee in asking for floating slab track where there is less than 15 metres. However, they do provide, quite reasonably of course, for the possibility that an alternative better technology might be available that is not called floating slab track and that would meet their requirements just as well.

  11492. MR WALTON: Is it not the case that in the report of the Select Committee of the House of Commons at the end of paragraph 6 the last sentence is: "We therefore ask the Promoter only to consider implementing floating slab track across the route if the track became cost-effective"? In other words, they had said that they were minded to recommend floating slab track across the entire route. Could I just ask you what the additional cost of that would be?

  11493. MS LIEVEN: My Lords, I think I am the person to answer that because it is a project figure. I do not know if it would be helpful if I read out the cost, because it is not entirely straightforward. The last estimated marginal cost, that is the additional cost to the project if floating slab track was to be installed throughout the tunnels—given that a standard resilient track form would have to be installed in any case, and taking account of the floating slab track already assumed to be provided for the purposes of the Environmental Statement, which is 4.7 kilometres, as well as a further 2.8 kilometres of floating slab track required under the House of Commons Select Committee 15-metre rule, that is what Mr Taylor has just been referring to, and the decisions around the Soho area—is £220 million outturn cost. I read it because it has all been very carefully set out so we give your Lordships an accurate figure.

  11494. LORD YOUNG OF NORWOOD GREEN: That is additional?

  11495. MS LIEVEN: That is additional.

  11496. CHAIRMAN: Is there an additional cost for maintenance as well?

  11497. MS LIEVEN: Yes, there is, my Lord, but we have not quantified that.

  11498. MR WALTON: I do not know who to put the question to; it will have to be to Mr Thornely-Taylor. I have the Government's response to the Crossrail Committee, page 25, paragraph 21, which says, "Consequently the true marginal cost of providing floating slab track in all of the Crossrail running tunnels would be between £53m and £62m".

  11499. MS LIEVEN: My Lord, again I rise because this is an issue that is really engineering rather than Mr Taylor's area. The costs have gone up through a combination of increased engineering costs, so real additional costs, but also the fact that the costs we were using in the House of Commons were all based on the first quarter 2002 costs, and we are now using outturn costs. The real figure has gone up as we have done more work on the subject, but there is also an increase simply because the cost base has changed.



23   Crossrail Ref: P76, Paddington Station-Existing Bus Routes, Stops and Stands (WESTCC-6_04-033) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008