The Economics of Renewable Energy - Economic Affairs Committee - Contents


APPENDIX 2

OPTIONS FOR CONNECTING SCOTTISH RENEWABLES


ONSHORE INVESTMENT CONNECTING EAST COAST OFFSHORE WIND


    —  Facilitating large volumes of offshore wind generation on the East coast in an already congested

    part of the network.

    —  3-4GW of renewables connected to North of Humber at an estimated cost of £300 million.

    —  10-12GW of renewables connected to South of Humber at an estimated cost of £500 million.[4]

    —  Cable connections between Sizewell and Bradwell with 2.5GW of renewables connected at

    an estimated cost of £500 million.

CONNECTING ONSHORE WINDFARMS TO DELIVER WIND FROM CENTRAL WALES





4   The estimated £500 million for the South of Humber connections includes both the cost of connecting renewables as well as boundary capacity. Back


 
previous page contents next page