Select Committee on Public Accounts Thirtieth Report


2  IMPROVING PASSENGER SERVICES

10. Prolonged access to the track for maintenance and renewal work disrupts services for passengers. Some disruption is inevitable, as there are stringent health and safety arrangements associated with track operating restrictions or closure. Work could be undertaken overnight or off peak during the week on some lines, but there was less opportunity to do so on the West Coast Main Line and other busy mixed rail traffic lines. The problems experienced and the lessons learnt from the West Coast Main Line upgrade are applicable network wide. In a typical six-hour period between gaining access to the track and giving it back, just four hours would be available for heavy engineering work. Rather than close lines during the working week, most heavy engineering work took place at weekends, usually starting on Friday evening with hand back on Sunday night, giving around 36 hours access or more on a Bank Holiday.[13]

11. One of Network Rail's longer term objectives was to complete work earlier, so that track could be handed back by midday on Sunday. Weekend engineering work was more efficient for the rail industry, but passengers travelling on a Saturday or Sunday were faced with less frequent services and longer journey times than on weekdays, sometimes with the prospect of using bus or coach rail replacement services. Passengers wanted a 'seven day' rail service, but Network Rail conceded that there was no prospect of weekend working reducing across the network for at least the next five years. In places, additional track had been laid to enable track work to be carried out while passenger services continued. Network Rail was also seeking to reduce the time taken to undertake some repair and replacement work by using prefabrication and modularisation. The experience on the West Coast upgrade was that fewer passengers than anticipated used rail replacement services when rail services were affected by engineering works as some passengers switched to the nearest station operating normal services. [14]

12. Disruption to services could be reduced by starting and completing planned engineering work on time. In 2005-06, around 22% of booked track access did not start on time, mainly because the last train of the evening ran late. Delays reduced the available working time and increased the likelihood of the work overrunning. In around 30% of the 14% of cases where engineering work overran, there was an impact on the start of the next morning's passenger service. Network Rail monitored handback of track closely. It estimated that on Monday mornings it achieved around 90% punctuality.[15]

13. Modernisation of the West Coast Main Line was originally intended to increase capacity to meet anticipated growth in passenger and freight numbers over the next 20 to 30 years. Demand for the service has, however, grown more quickly than forecast and by 2006 some parts of the route were already operating at or near capacity, with further increases in demand expected following step changes in journey times and service frequency after December 2008. Completion of enhancements at Rugby and Trent Valley in 2008 and at Stafford in 2012-15 were expected to ease capacity pressures but the consensus in the rail industry was that by 2015-20 the line might have insufficient capacity to meet expected demand. Other options under consideration included operating additional services following completion of proposed congestion relief works at Stafford (Figure 3) and increasing the length of Pendolino trains from 9 to 10 or 11 cars. This option might require some platform and depot lengthening. Some £100 million has been spent so far, on extending platforms or building extra platforms at some stations and enlarging other stations so that they can accommodate longer London commuter trains. [16]

Figure 3 - Hourly seating capacity available on the West Coast Main Line



Source: Department for Transport

14. Problems of capacity were particularly acute on services into and out of London. Longer trains alleviated overcrowding, but the principal constraint at the present time was the number of slots in the timetable and tracks available, in a similar way to the constraints posed by the availability of landing slots at airports. More passengers than seats is commonplace on some peak services. The Department considered that standing times of 30 minutes or less were not unreasonable on suburban services. Faced with limited scope in the short term to provide more trains, better use was needed of existing capacity. Options cited included encouraging passengers to travel off peak and varying the proportion of first class to standard seating on popular trains. In the longer term, capacity could be increased by running more and longer trains on the network, through making some infrastructure changes such as lengthening platforms and tackling bottlenecks, and by running trains closer together through improvements to signalling.[17]

15. Rail fares are already seen as high by many. There is a risk that train operators might raise fares on the West Coast Main Line to "choke off" demand. The Department considered that passenger demand for train services could be influenced by offering cheaper fares for those prepared to travel on less busy services and higher prices for those travelling at peak times.[18] It reported that the average fare per passenger kilometre had fallen from 25p in 2001 to 20p today. The fall resulted from an increasing proportion of tickets being bought in advance via the internet to take advantage of the cheapest deals. In the Committee's experience, passengers buying tickets at train stations are not always offered the lower fares which are available on the internet. Booking staff are instructed to offer the lowest fare available. Recent checks by the Department on 33 routes show that for 21 medium to long distance journeys, the walk-up return fare offered was on average 54% lower than the most expensive standard fare, but for 14 of these journeys, the advance tickets were on average 67% cheaper.[19] There is a risk that the lowest prices are only available to those with internet access or who are able to plan their journeys in advance, putting low fares beyond the reach of vulnerable and disadvantaged members of society.[20]


13   Q 166 Back

14   Q 46; C&AG's Report, para 2.12 Back

15   Q 167 Back

16   Ev 22 Back

17   Q 164 Back

18   Q 140 Back

19   Ev 26 Back

20   Q 125 Back


 