|
| |
|
point 130 metres south-east of the junction of Bellmouth Passage |
| |
| |
| In the London Borough of Newham– |
| |
Work No. 1/29A- A conveyor for construction purposes, commencing |
| |
at a point 220 metres south-west of the junction of Brunel Street with |
| 5 |
Victoria Dock Road, passing south-eastwards beneath the viaduct |
| |
carrying the Lower Lea Crossing and terminating in Instone Wharf |
| |
at a point 295 metres south-west of the junction of Lower Lea |
| |
| |
Work No. 1/29B-A conveyor for construction purposes, commencing |
| 10 |
by a junction with the commencement of Work No. 1/29A and |
| |
terminating at a point 125 metres south-west of the junction of Brunel |
| |
Street with Victoria Dock Road; |
| |
Work No. 1/30– A railway (889 metres in length) being a realignment |
| |
of the Docklands Light Railway, commencing by a junction with that |
| 15 |
railway at a point 40 metres south-west of the junction of Munday |
| |
Road with Victoria Dock Road, passing eastwards and terminating |
| |
by a junction with that railway at a point 168 metres east of the |
| |
junction of Chauntler Close with Victoria Dock Road. Work No. 1/ |
| |
30 includes the reconstruction of Docklands Light Railway Custom |
| 20 |
| |
Work No. 1/31– A diversion of the Royal Docks Surface Water Sewer, |
| |
commencing by a junction with that sewer beneath a point 88 metres |
| |
south-west of the junction of Munday Road with Victoria Dock |
| |
Road, and terminating at a junction with that sewer beneath a point |
| 25 |
60 metres south-east of the junction of Chauntler Close with Victoria |
| |
Dock Road. Work No. 1/31 includes shafts for construction and |
| |
| |
Work No. 1/32A– An accommodation road commencing at a point 32 |
| |
metres south-west of the junction of Albert Road with Winifred |
| 30 |
Street and terminating at a point 42 metres south of the junction of |
| |
Albert Road with Fernhill Street; |
| |
Work No. 1/32B– A diversion of the Royal Docks Sewer (Main Line), |
| |
commencing by a junction with that sewer beneath a point 37 metres |
| |
south of the junction of Albert Road with Winifred Street, and |
| 35 |
terminating by a junction with that sewer beneath a point at the |
| |
junction of Factory Road with Store Road. Work No. 1/32B includes |
| |
shafts for construction and maintenance; |
| |
Work No. 1/32C– A diversion of the Albert Road Sewer, commencing |
| |
by a junction with that sewer beneath a point 31 metres south-east of |
| 40 |
the junction of Albert Road with Fernhill Street, and terminating by |
| |
a junction with that sewer beneath a point 104 metres east of that |
| |
| |
Work No. 1/32D– An access road commencing by a junction with |
| |
Albert Road at a point 10 metres south-west of the junction of Albert |
| 45 |
Road with Dockland Street and terminating at the junction of Factory |
| |
| |
Work No. 1/32E– A sewer, being a replacement of part of the Store |
| |
Road Pumping Station Inlet Culvert, commencing by a junction with |
| |
that sewer beneath a point 30 metres east of the junction of Albert |
| 50 |
Road with Dockland Street, and terminating by a junction with that |
| |
sewer beneath a point 32 metres east of the junction of Factory Road |
| |
| |
|
| |
|
| |
|
| In the London Boroughs of Greenwich and Bexley– |
| |
Work No. 1/33A– A railway (3,862 metres in length) being a |
| |
realignment of the North Kent Line (eastbound line), commencing |
| |
by a junction with that railway at a point 133 metres west of the |
| |
junction of Plumstead High Street with Griffin Road, passing |
| 5 |
eastwards and terminating by a junction with that railway at a point |
| |
132 metres north-west of the junction of Abbey Road with Shortlands |
| |
| |
Work No. 1/33B– A railway (3,802 metres in length) being a |
| |
realignment of the North Kent Line (westbound line), commencing |
| 10 |
by a junction with that railway at a point 78 metres west of the |
| |
junction of Plumstead High Street with Griffin Road, passing |
| |
eastwards and terminating by a junction with that railway at a point |
| |
128 metres north-west of the junction of Abbey Road with Shortlands |
| |
| 15 |
| In the London Borough of Greenwich– |
| |
Work No. 1/33C– A railway (408 metres in length), forming a railway |
| |
siding for the North Kent Line railway, commencing by a junction |
| |
with Work No. 1/33A at a point 42 metres north of the junction of |
| |
Plumstead High Street with Griffin Road, passing eastwards and |
| 20 |
terminating at a point 112 metres north-west of the junction of White |
| |
Hart Road with Hartville Road; |
| |
Work No. 1/34– A footbridge, incorporating steps and ramp facilities, |
| |
crossing over Works Nos. 1/7, 1/33A and 1/33B commencing at a |
| |
point 50 metres north-east of the junction of Church Manor Way with |
| 25 |
Marmadon Road and terminating at a point 75 metres south-east of |
| |
the junction of Church Manor Way with Mottisfont Road; |
| |
Work No. 1/35– A diversion of a sewer, commencing by a junction with |
| |
that sewer beneath a point 72 metres north of the junction of |
| |
Woodhurst Road with Bracondale Road, and terminating by a |
| 30 |
junction with that sewer beneath a point 40 metres north-east of that |
| |
| |
Work No. 1/36– A footbridge, incorporating steps and ramp facilities, |
| |
crossing over Works Nos. 1/7, 1/33A and 1/33B commencing at a |
| |
point 55 metres north-west of the junction of Bostal Manorway with |
| 35 |
Abbey Grove and terminating at a point 95 metres north-west of that |
| |
| |
| In the London Borough of Bexley– |
| |
Work No. 1/37A– Reconstruction of the bridge carrying Harrow |
| |
Manor Way over Works Nos. 1/7, 1/33A and 1/33B commencing by |
| 40 |
a junction with Harrow Manor Way at a point 80 metres west of the |
| |
junction of Felixstowe Road with Sydney Road and terminating with |
| |
Harrow Manor Way at a point 25 metres south-west of the junction |
| |
of Florence Road with Fendyke Road; |
| |
| In the London Boroughs of Greenwich and Bexley– |
| 45 |
Work No. 1/37B– A realignment of Felixstowe Road commencing at a |
| |
point 80 metres north of the junction of Wilton Road with Gayton |
| |
Road and terminating at the junction of Felixstowe Road with |
| |
| |
Work No. 1/37C– A realignment of Gayton Road commencing at a |
| 50 |
point 10 metres south of its existing junction with Wilton Road and |
| |
|
| |
|
| |
|
terminating at a point 10 metres north of its existing junction with |
| |
| |
Work No. 1/37D– A diversion of a sewer, commencing by a junction |
| |
with that sewer beneath a point 55 metres northwest of the junction |
| |
of Wilton Road with Gayton Road, and terminating by a junction |
| 5 |
with that sewer beneath a point in Wilton Road at its junction with |
| |
| |
| In the London Borough of Bexley– |
| |
Work No 1/38A– A wharf, comprising the refurbishment of Manor |
| |
Wharf, commencing at a point 18 metres south-east of the centre of |
| 10 |
the dolphin at the western end of Manor Wharf and terminating at a |
| |
point 178 metres east of its commencement; |
| |
Work No. 1/38B– A conveyor, for construction purposes, commencing |
| |
at a point 85 metres south-west of the centre of the dolphin at the |
| |
western end of Manor Wharf, passing eastwards and then |
| 15 |
northwards over the River Thames and terminating by a junction |
| |
with Work No. 1/38A at a point 97 metres south-east of the centre of |
| |
| |
Work No. 1/38C– A road, comprising an alteration of Norman Road, |
| |
commencing by the junction of that road with Picardy Manorway |
| 20 |
and terminating at a point 285 metres north-east of the centre of the |
| |
dolphin at the western end of Manor Wharf; |
| |
Work No. 1/38D- A road commencing by a junction with Work No. 1/ |
| |
38C at a point 318 metres south-west of the centre of the dolphin at |
| |
the western end of Manor Wharf and terminating at a point 95 |
| 25 |
metres south-west of the centre of the said dolphin; |
| |
Work No. 1/38E- A temporary road commencing by a junction with |
| |
Isis Reach at a point 177 metres south of the centre of the dolphin at |
| |
the western end of Manor Wharf and terminating at a point 150 |
| |
metres south of the centre of the said dolphin; |
| 30 |
Work No. 1/38F- A temporary road commencing by a junction with |
| |
Work No 1/38C at a point 363 metres south-west of the centre of the |
| |
dolphin at the western end of Manor Wharf and terminating by a |
| |
junction with Isis Reach at a point 351 metres south-west of the |
| |
centre of the said dolphin; |
| 35 |
| In the London Boroughs of Tower Hamlets and Newham– |
| |
Work No. 2/1A– A railway (3,255 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3A at its termination |
| |
continuing eastwards and terminating at a point 70 metres north of |
| |
the junction of Barbers Road with Pudding Mill Lane; |
| 40 |
Work No. 2/1B– A railway (3,318 metres in length, in tunnel) |
| |
commencing by a junction with Work No. 1/3B at its termination |
| |
continuing eastwards and terminating at a point 65 metres north of |
| |
the junction of Barbers Road with Pudding Mill Lane; |
| |
Works Nos. 2/1A and 2/1B include shafts at Stepney Green, Mile End |
| 45 |
| |
| In the London Borough of Newham– |
| |
Work No. 2/2– A railway (396 metres in length), commencing by a |
| |
junction with Works Nos. 2/1A and 2/1B at their termination |
| |
continuing eastwards and terminating by a junction with the Electric |
| 50 |
|
| |
|
| |
|
Lines of the Great Eastern Main Line Railway at a point 135 metres |
| |
north-west of the junction of Warton Road with Bridgewater Road; |
| |
Work No. 2/3– A railway (835 metres in length), being a deviation of |
| |
the Up Electric Line of the Great Eastern Main Line Railway, |
| |
commencing by a junction with that railway at a point 130 metres |
| 5 |
north of the junction of Wrexham Road with Baldock Street, passing |
| |
north-east and terminating by a junction with that railway at a point |
| |
135 metres north-west of the junction of Warton Road with |
| |
| |
Works Nos. 2/2 and 2/3 include bridges over Marshgate Lane (to be |
| 10 |
realigned, Work No. 2/6A), City Mill River and the Northern Outfall |
| |
| |
Work No. 2/4– A railway (922 metres in length), being a realignment of |
| |
the Docklands Light Railway, commencing by a junction with that |
| |
railway at a point 130 metres north of the junction of Baldock Street |
| 15 |
with Wrexham Road passing eastwards on new viaduct over |
| |
Marshgate Lane to be realigned (Work No. 2/6A), City Mill River |
| |
and the Northern Outfall Sewers and terminating by a junction with |
| |
that railway at a point 120 metres south-west of the junction of |
| |
Rowse Close with Carpenters Road. Work No. 2/4 includes a new |
| 20 |
station for Docklands Light Railway at Pudding Mill Lane; |
| |
Work No. 2/5A– A railway (886 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with the northern |
| |
side of the Great Eastern Main Line Railway at a point 265 metres |
| |
west of the junction of Warton Road with Bridgewater Road, passing |
| 25 |
westwards then northwards and terminating at a point 142 metres |
| |
north-east of the junction of Wick Lane with Iceland Road; |
| |
Work No. 2/5B– A railway (435 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with Work No. 2/ |
| |
5A at a point 175 metres east of the junction of Wick Lane with |
| 30 |
Iceland Road, passing southwards then eastwards and terminating |
| |
at a point 125 metres west of the junction of Barbers Road with |
| |
| |
Work No. 2/5C– A railway (331 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with Work No. 2/ |
| 35 |
5A at a point 175 metres east of the junction of Wick Lane with |
| |
Iceland Road, passing south-east and terminating at a point 152 |
| |
metres west of the junction of Barbers Road and Pudding Mill Lane; |
| |
Work No. 2/5D– A railway (459 metres in length) forming sidings for |
| |
construction purposes, commencing by a junction with Work No. 2/ |
| 40 |
5A at a point 123 metres south-west of the junction of Barbers Road |
| |
with Pudding Mill Lane, passing westwards and terminating at a |
| |
point 160 metres south of the junction of Wick Lane with Autumn |
| |
| |
Work No. 2/6A– A realignment of Marshgate Lane, commencing at a |
| 45 |
point in that road 70 metres east of the junction of Barbers Road with |
| |
Pudding Mill Lane and terminating by a junction with Pudding Mill |
| |
Lane at a point 235 metres north-west of the junction of Pudding Mill |
| |
| |
Work No. 2/6B– A road, commencing by a junction with Pudding Mill |
| 50 |
Lane at a point 140 metres north-west of the junction of Pudding Mill |
| |
Lane with Barbers Road and terminating by a junction with |
| |
Marshgate Lane as proposed to be realigned (Work No. 2/6A) at a |
| |
point 160 metres north-west of that road junction; |
| |
|
| |
|
| |
|
Work No. 2/7– A realignment of Barbers Road, commencing by a |
| |
junction with Marshgate Lane as proposed to be realigned (Work |
| |
No. 2/6A) at a point 55 metres north-east of the junction of Barbers |
| |
Road with Pudding Mill Lane and terminating in Barbers Road (as |
| |
existing) at a point 200 metres south-west of its junction with |
| 5 |
| |
| In the London Borough of Tower Hamlets— |
| |
Work No. 2/8A- A sewer, forming a diversion of the Hackney to Abbey |
| |
Mills sewer and Wick Lane sewer, commencing by a junction with |
| |
the Hackney to Abbey Mills sewer beneath a point in Wick Lane 30 |
| 10 |
metres north-west of the bridge carrying the Great Eastern Main Line |
| |
and Docklands Light Railway over that road and terminating by a |
| |
junction with that sewer beneath a point 54 metres north-east of the |
| |
junction of Payne Road with Bow Road. Work No. 2/8A includes |
| |
shafts for construction and maintenance; |
| 15 |
Work No. 2/8B- A sewer, forming a diversion of the Hackney to Abbey |
| |
Mills sewer and Wick Lane sewer, commencing by a junction with |
| |
Work No. 2/8A beneath a point 32 metres north-east of the junction |
| |
of Payne Road and Bow Road and terminating by a junction with the |
| |
Wick Lane sewer beneath a point 57 metres north-east of that road |
| 20 |
junction. Work No. 2/8B includes a shaft for construction and |
| |
| |
Work No. 2/8C- An access shaft for construction and maintenance of a |
| |
diversion of Wick Lane sewer, at a point in Wick Lane 33 metres |
| |
south-west of the bridge carrying the Great Eastern Main Line and |
| 25 |
Docklands Light Railway over that road; |
| |
Work No. 2/20- A road commencing by a junction with Eleanor Street |
| |
at a point 29 metres south-east of the junction of that road with |
| |
Tidworth Road and terminating at a point in an access road 110 |
| |
metres south of that road junction; |
| 30 |
| In the London Borough of Newham– |
| |
Work No. 2/9 –A railway (168 metres in length) forming a cross-over |
| |
between the Down and Up Electric Lines of the Great Eastern Main |
| |
Line Railway, commencing by a junction with that railway at a point |
| |
130 metres north-east of the junction of Station Road with Carlyle |
| 35 |
Road, passing eastwards and terminating by a junction with that |
| |
railway at a point 280 metres north-east of that road junction; |
| |
| In the London Boroughs of Redbridge and Newham– |
| |
Work No. 2/10– A railway (295 metres in length) forming a siding by a |
| |
junction with the Up Passenger Avoiding Line of the Great Eastern |
| 40 |
Main Line Railway, commencing by a junction with that railway at a |
| |
point 95 metres north of the junction of Aldersbrook Lane with |
| |
Daines Close, passing eastwards and terminating at a point 170 |
| |
metres north of the junction of Lugg Approach with Romford Road; |
| |
| In the London Borough of Newham– |
| 45 |
Work No. 2/11– An access road, including a bridge over Alders Brook, |
| |
commencing in Lugg Approach at a point 40 metres north-west of |
| |
the junction of Lugg Approach with Romford Road and terminating |
| |
at a point 26 metres north-west of its commencement; |
| |
| In the London Boroughs of Redbridge and Barking & Dagenham– |
| 50 |
|
| |
|
| |
|
Work No. 2/12– A railway (2,125 metres in length) forming a freight |
| |
loop line, commencing by a junction with the Up Main Line of the |
| |
Great Eastern Main Line Railway at a point 155 metres west of the |
| |
junction of Ashgrove Road with Granton Road, passing eastwards |
| |
and terminating by a junction with that railway at a point 75 metres |
| 5 |
south-east of the junction of Heath Road with Junction Road West; |
| |
| In the London Boroughs of Barking & Dagenham and Havering– |
| |
Work No. 2/13– A railway (2,273 metres in length, partly in tunnel) |
| |
commencing by a junction with the existing Electric Lines of the |
| |
Great Eastern Main Line Railway at a point 210 metres south of the |
| 10 |
junction of Whalebone Lane South with Morden Road, passing |
| |
eastwards and under that railway and terminating within a |
| |
proposed depot at a point 220 metres north of the junction of |
| |
Oldchurch Road and Nursery Walk. Work No. 2/13 includes a new |
| |
bridge over Jutsums Lane and a depot; |
| 15 |
Work No. 2/13A– A railway (679 metres in length) commencing by a |
| |
junction with Work No. 2/13 at a point 255 metres south-east of the |
| |
junction of Whalebone Lane South with Morden Road, passing |
| |
eastwards and terminating by a junction with the Great Eastern Main |
| |
Line Railway at a point 362 metres south-west of the junction of Eddy |
| 20 |
Close with Bridport Avenue; |
| |
| In the London Borough of Havering– |
| |
Work No. 2/13B– A railway (398 metres in length) commencing by a |
| |
junction with Work No. 2/13 at a point 125 metres south-east of the |
| |
junction of Jutsums Lane with Bridport Avenue, passing westwards |
| 25 |
and terminating by a junction with the Great Eastern Main Line |
| |
Railway at a point 308 metres south-west of the junction of Eddy |
| |
Close with Bridport Avenue. Work No. 2/13B includes a new bridge |
| |
| |
Work No. 2/13C– A railway (960 metres in length) forming sidings |
| 30 |
within the proposed depot (part of Work No. 2/13) commencing by |
| |
a junction with Work No. 2/13 at a point 295 metres north-west of |
| |
the junction of Crow Lane with Beechfield Gardens, passing |
| |
eastwards and terminating at a point 220 metres south-east of the |
| |
junction of St Andrews Road with Queen Street; |
| 35 |
Work No. 2/13D– A railway (733 metres in length) forming sidings |
| |
within the proposed depot (part of Work No. 2/13) commencing by |
| |
a junction with Work No. 2/13C at a point 85 metres south of the |
| |
junction of Sheringham Avenue with Knighton Road and |
| |
terminating at a point 140 metres east of the junction of Waterloo |
| 40 |
Road with Exchange Street; |
| |
Work No. 2/14A– An accommodation road, being a diversion of part |
| |
of Sandgate Close, commencing at a point in that road 185 metres |
| |
north of its junction with Crow Lane and terminating at a point 205 |
| |
metres north-east of that junction; |
| 45 |
Work No. 2/14B– An improvement of Nursery Walk and Footpath |
| |
FP127 including an extension of the footpath subway between that |
| |
road and Stockland Road commencing at a point 10 metres south of |
| |
the junction of Stockland Road with Cotleigh Road and passing |
| |
southwards and terminating at its junction with Oldchurch Road; |
| 50 |
Work No. 2/15A– A diversion of the sewer west of Waterloo Road |
| |
commencing by a junction with that sewer beneath a point 65 metres |
| |
|
| |
|
| |
|
south of the junction of Waterloo Road with Exchange Street and |
| |
terminating by a junction with that sewer beneath a point 30 metres |
| |
south-east of its commencement in Waterloo Road; |
| |
Work No. 2/15B– A widening of the southside bridge carrying the |
| |
Great Eastern Main Line Railway over Waterloo Road, commencing |
| 5 |
at a point 70 metres south of the junction of Waterloo Road with |
| |
Exchange Street and terminating at a point 25 metres south of that |
| |
| |
Work No. 2/15C– A bridge, for vehicular access over the River Rom, |
| |
commencing at a point 210 metres west of the junction of Victoria |
| 10 |
Road with South Street and terminating at a point 20 metres east of |
| |
| |
Work No. 2/15D– A road forming a temporary diversion of Atlanta |
| |
Boulevard commencing in that road at a point 105 metres west of its |
| |
junction with South Street and terminating at a point 49 metres |
| 15 |
south-east of its commencement; |
| |
Work No. 2/15E– An access road, commencing by a junction with |
| |
Havana Close at a point 77 metres south-west of its junction with |
| |
South Street and terminating at a point in The Battis 70 metres south- |
| |
west of its junction with South Street; |
| 20 |
Work No. 2/16A– A railway (1,264 metres in length) being a |
| |
realignment of sidings commencing by a junction with the Electric |
| |
Lines of the Great Eastern Main Line Railway at a point 145 metres |
| |
south-east of the junction of Wallenger Avenue with Cranbrook |
| |
Drive, passing eastwards and terminating by a junction with that |
| 25 |
railway at a point 135 metres south of the junction of Ewan Road |
| |
| |
Work No. 2/16B– A railway (462 metres in length) forming sidings |
| |
commencing by a junction with Work No. 2/16A at a point 60 metres |
| |
south-east of the junction of Clunas Gardens with Amery Gardens, |
| 30 |
passing south-west and terminating at a point 130 metres east of the |
| |
junction of Upper Brentwood Road with South Drive; |
| |
| In the County of Essex, Borough of Brentwood– |
| |
Work No. 2/18A– A railway (704 metres in length) commencing by a |
| |
junction with the Down Electric Line of the Great Eastern Main Line |
| 35 |
Railway at a point 32 metres east of the junction of Woodway with |
| |
Abbots Close, passing northwards and terminating at a point 107 |
| |
metres north-east of the junction of Hutton Road with Crossways; |
| |
Work No. 2/18B– A railway (1,226 metres in length) commencing by a |
| |
junction with the Up Electric Line of the Great Eastern Main Line |
| 40 |
Railway at a point 35 metres east of the junction of Woodway with |
| |
Abbots Close, passing northwards and terminating at a point 305 |
| |
metres north of the junction of Rayleigh Road with Alexander Lane. |
| |
Work No. 2/18B includes the provision of sidings on the western |
| |
side of the Great Eastern Main Line Railway and to the north of |
| 45 |
| |
Work No. 2/18C– A railway (263 metres in length) forming sidings on |
| |
the western side of the Great Eastern Main Line Railway and to the |
| |
south of Shenfield Station, commencing by a junction with Work No. |
| |
2/18A at a point 105 metres east of the junction of Friar’s Avenue |
| 50 |
with Friar’s Close, passing southwards and terminating at a point |
| |
125 metres north-east of the junction of Woodway with Gordon |
| |
| |
|
| |
|