Select Committee on Environment, Food and Rural Affairs Written Evidence


Memorandum submitted by United Utilities (FL 89)

EXECUTIVE SUMMARY

  1.  United Utilities welcomes the Committee's Inquiry into flood management and recognises the need for a joined up and long term strategy to protect the UK from future flooding incidents. United Utilities welcomes the opportunity to illustrate to the committee the lessons the company has learned from recent experiences in Cumbria in relation to flooding as well as providing more general observations about flood prevention, alleviation and mitigation.

  2.  Climate change is expected to lead to an increase in extreme weather events in the UK with drought and flooding becoming more common. In response, Government, regulators and infrastructure providers have now sensibly begun to consider long term weather patterns when planning infrastructure investment and development.

  3.  While the North West was not affected by this summer's heavy rainfall, the storms and flooding that occurred in Cumbria in 2005 provided United Utilities with considerable experience of dealing with such issues. The significant disruption caused to water, wastewater and electricity services prompted United Utilities to undertake a number of studies designed to enable the prioritising of investment across all the company's infrastructure networks.

  4.  United Utilities recognise that significant investment is needed in order to fully prepare for, prevent and mitigate flooding. The company acknowledges that in order to properly plan ahead, a more coordinated approach by the Environment Agency, the Government and the utility sector is needed to ensure that all the appropriate information is being shared and put into practice.

  5.  United Utilities are carrying out further study and assessment in order to determine the level of risk, prioritise investment enabling the company to minimise disruption by putting in place adequate measures to defend infrastructure. The economic regulators must also acknowledge their role in the creation of a future flood defence strategy and enable adequate funding for utility providers in future regulatory price reviews.

INTRODUCTION

  6.  United Utilities welcomes the Committee's inquiry into flood management and recognises the need for a joined up and long term strategy to protect the UK from future flooding incidents. As the UK's largest water company and multi-utility provider, United Utilities is acutely aware of the problems caused by the flooding of utility infrastructure and is committed to working closely with the Government, regulators and other industry stakeholders to avoid damage to infrastructure and disruption to customers wherever this is possible.

  7.  United Utilities welcomes the opportunity to illustrate to the Committee lessons learned from our recent experiences in relation to flooding, as well as more general observations about flood prevention, alleviation and mitigation.

ABOUT UNITED UTILITIES

  8.  United Utilities owns and operates the regulated water, wastewater and electricity distribution networks in North West England, providing services to approximately 7 million people. United Utilities recently announced proposals to sell its electricity assets. Once the sale of these assets has been completed, responsibility for the protection of those assets will transfer to the new owner.

  9.  Last year, United Utilities invested almost £600 million in its regulated businesses in the North West, with investment exceeding profits for the sixteenth consecutive year.

THE IMPACT OF CLIMATE CHANGE ON UTILITY INFRASTRUCTURE

  10.  Climate change is widely expected to lead to an increase in extreme weather events in the UK with drought and flooding becoming more common. While no individual cases of extreme weather can be incontrovertibly linked to climate change, it is clearly sensible for the Government, regulators and infrastructure providers to consider long term weather patterns when planning infrastructure investment and development.

  11.  United Utilities is committed to reducing the overall environmental impact of its business and its customers and is at the forefront of managing the reduction of carbon emissions in the utility sector. In March 2007 United Utilities was the first water company to set out an action plan to reduce CO2 emissions.

  12.  United Utilities' plans for investment across the company's infrastructure therefore have the twin aims of reducing emissions from the company's operations while also preparing to adapt to the impacts of climate change, including changing weather patterns, wherever this is possible and economically viable.

  13.  It should be noted that because these businesses are regulated, any plans for investment in the company's infrastructure assets, including investment in flood defences, needs to be approved through the appropriate regulatory processes.

PROTECTING OUR CUSTOMERS AND FACILITIES FROM FLOODING IN THE FUTURE

  14.  United Utilities is acutely aware of the problems that flooding can cause to utility infrastructure. While the North West was not affected by this summer's heavy rainfall, United Utilities has considerable experience of these issues following storms and flooding in Cumbria in 2005. These storms caused significant disruption to water, wastewater and electricity services and prompted United Utilities to undertake a number of studies designed to prioritise investment in flood defences. With regard to this summer's floods, United Utilities supplied logistical and personnel support to Severn Trent to assist its emergency response.

  15.  The studies and investigations carried out after the 2005 Cumbria floods have been used to inform the ongoing investment programmes across all the company's infrastructure networks to prepare for and defend against flooding. This continues to be an investment priority for the company.

Protecting infrastructure through flood defences

  16.  United Utilities has long adopted the approach of "building in" resilience to shallow flooding in certain assets. This has minimised the cost to the customer and to the company. Clearly, as weather patterns change, climate change will increase the engineering costs necessary to avoid flooding of assets.

  17.  Where flood defences are not part of the construction of an asset, or when there is a short-term risk of flooding, temporary flood defences are sometimes used. However, these temporary flood defences are likely to be inappropriate in many situations because of the difficulties of transporting them to a site and the availability of personnel to erect them during a crisis. Additionally, because temporary defences tend to be lightweight, theft can be a problem if they are left unsupervised. Supervision of temporary flood defences by United Utilities is not an option given the demands on resources in a crisis and the obvious potential risk to personnel in a flood situation.

  18.  These problems were evident in the events of July and August this year, when temporary flood defences failed to arrive in time and there was interference with them and theft. Utility companies cannot expect to rely on the emergency services at times like this, as saving lives will always take priority.

  19.  It is clear that more permanent methods of protection will offer better value for money. However, planning for such permanent methods requires more comprehensive predictions of the impacts of climate change and weather patterns and regularly updated flooding data from the Government and its agencies.

REDUCING THE IMPACT ON WASTEWATER INFRASTRUCTURE

  20.  United Utilities operates a number of different types of wastewater facilities, including wastewater treatment works, which discharge treated sewage and storm water flows to rivers, as well as combined sewer overflows, which divert excess storm flows from sewerage systems to adjacent watercourses in times of excessive rainfall. United Utilities network treats 2,200 million litres of wastewater every day via a network of around 39,000 kilometres of sewers.

Assessing the Risks to Wastewater Facilities

  21.  Extreme weather can have a detrimental effect on wastewater facilities, increasing the risk of pollution incidents in waterways and sewer flooding of homes. As part of the previously mentioned studies by United Utilities on the impact of floods, the company assessed the vulnerability of wastewater facilities against the effects of flooding and determined that a significant number of facilities are sited within the Environment Agency's defined indicative floodplain maps.

  22.  If facilities are directly submerged from flood waters this can lead to loss of sewage treatment capacity, pollution of the flood water and damage to the facilities, leading to an increase in the time taken to return service to normal once flood waters subside.

  23.  Additionally, even when the storms are not extreme enough for the facilities themselves to become flooded, increasing river levels can result in combined sewer overflows being unable to discharge excess storm flows to watercourses, which in turn leads to flooding within and from the local sewerage system.

Measures required for protection

  24.  Provisional assessments of the cost of providing a blanket high level of flood defences for wastewater facilities are considerable. If United Utilities was to invest in full flood defence protection for all waste water facilities at risk of a "1:100 years" flood event, the cost would be in the region of £800 million. To protect all facilities at risk of a "1:1000 years" flood event, the cost would be in excess of £1.1 billion.

  25.  United Utilities is carrying out a criticality assessment of each of its facilities to determine the impact on service due to the failure of each facility as a result of both raised river levels and direct flooding. Once the criticality of each facility has been identified and the costs to protect the facilities from flooding have been determined, United Utilities will carry out a cost/benefit analysis to establish the most appropriate solution in each case.

  26.  For example, following the flooding in Cumbria, which demonstrated the risks to wastewater assets from river flooding, United Utilities is currently investing approximately £20 million to upgrade the sewerage system and ensure that the performance of the local wastewater treatment works and combined sewerage overflows are suitably protected from flooding and raised river levels. This work is being developed in conjunction with the Environment Agency's ongoing flood defence project and will be completed by 2010.

United Utilities' Strategy in the Future

  27.  United Utilities believes that while some of the necessary flood protection can be implemented by the water companies, the regulator, Ofwat, should ensure that adequate funding for flood defence work at high risk assets is properly considered in the periodic price review for 2010 onwards.

  28.  United Utilities has appointed a consultant to assist the company in developing solutions and produce robust cost estimates to allow a programme of work for flood protection to be submitted to Ofwat in the forthcoming regulatory price review. United Utilities has identified in the region of £200 million of investment, which will address ten high-risk areas at a cost of £20 million per area. This may be phased over more than one regulatory period.

  29.  Flood protection of United Utilities' facilities or Environment Agency driven flood defence work in isolation will not address the entire flood risk. Integrated schemes addressing all flood risks across the various asset owners need to be developed and implemented. The company would like to streamline the responsibilities and ownership of these asset types ideally with the Environment Agency still having responsibility for fluvial flood protection but by moving towards water companies being given responsibility for development of overall improvement plans for non fluvial drainage systems in urban areas and potentially transferring responsibility and ownership of additional assets types to water company ownership, such as highway drainage systems and sustainable drainage systems (SUDS).

  30.  This approach would be a significant step forward in effectively allowing integrated urban drainage schemes to be developed, funded and implemented.

PROTECTION OF WATER INFRASTRUCTURE

  31.  United Utilities owns and operates the water network in the North West of England supplying 2,000 million litres of water every day via a network of around 40,000 kilometres of water mains, 1,444 kilometres of aqueduct and over 100 water treatment works. United Utilities has a number of different types of water facilities in the North West, including impounding reservoirs water treatment works, pumping stations and service reservoirs.

The Vulnerability of Water Facilities

  32.  The storms in Cumbria in 2005 caused significant disruption to water, wastewater and electricity services. Following the studies mentioned previously, which were undertaken by United Utilities to investigate the risks of disruption from flooding of infrastructure assets, the company undertook a further study into the particular vulnerability of water facilities. This study concluded that the most significant risk to water assets would be due to excessive rainfall, potentially leading to fluvial and/or tidal flooding. United Utilities carried out spatial analysis to identify which of its water facilities fall within the Environment Agency's predicted floodplains in order to inform policy and investment.

Mitigating the risk

  33.  The analysis carried out by United Utilities led to the creation and "approval in principle" of various policies. These policies, which are still subject to qualification of costs and the impact on risks, propose that all new or critical existing facilities at risk from flooding are to be designed to withstand a 1:1000 year flood event while all existing non-critical facilities at risk of flooding are to be designed to withstand a 1:100 year flood event. `Critical' has been defined as a facility that if it failed, it would have an impact on over 25,000 customers. This has been determined using the SEMD guidelines (Standard for Security Arrangements at Operational Sites), which has been approved by the Council of Water UK and endorsed by DEFRA.

  34.  United Utilities is currently carrying out a study to assess the current levels of flood protection at each of the facilities deemed to be at risk from flooding. This work will determine the most appropriate flood defence and associated investment required to mitigate the risk caused by 1:100 and 1:1000 year flood events. The study, which is being carried out by a professional support services company, is due to be completed later in 2007. Impounding reservoirs were not included in this study as a separate programme of work is in place to identify whether the impounding reservoirs can withstand a Probable Maximum Flood (PMF) event, and if not, to determine the investment required to protect the dams.

  35.  Throughout the course of the study, United Utilities has worked closely with the Environment Agency to establish whether there are existing Environment Agency flood defences in place to protect these facilities from flooding. Furthermore, this work has sought to authenticate the quality of the Environment Agency's predicted floodplain data at each facility in order to determine the levels of risk.

Implementing the Necessary Protections

  36.  United Utilities is also carrying out a criticality assessment of each of its facilities to determine the impact on service due to the failure of each facility as a result of flooding. Once the criticality of each facility has been identified and the costs to protect the facilities from flooding have been determined, United Utilities will carry out a cost/benefit analysis to establish whether the policy is suitable and, if not, will amend it as appropriate. While some of the necessary flood protection can be implemented by the water companies, United Utilities will be making the case for adequate funding for flood defence work in the next Ofwat price review.

  37.  In the meantime, United Utilities is currently investing £2.1 million to protect Huntington intake pumping station, which is situated next to the River Dee, near Chester. The pumping station feeds Huntington water treatment works, which is one of United Utilities' most strategic works supplying water to a large number of industrial users and 1.7 million domestic customers. The pumping station has been close to flooding on a number of occasions and thus following a cost/benefit analysis, as mentioned above, a decision was made to protect the pumping station from the future risk of flooding.

FLOOD DEFENCES FOR ELECTRICITY INFRASTRUCTURE

  38.  With regard to electricity infrastructure, United Utilities operates and maintains electricity substations in North West England, delivering electricity annually to approximately 2.2 million residential, commercial and industrial customers.

Impact of Flooding on Electricity

  39.  Many electricity assets, such as major substations, are sited near riverbanks and watercourses due to the historical need for cooling water for predecessor power stations (ie power stations that existed on the site but have since been replaced by substations connected to the national grid). As a result, over the years there have been a number of incidents of flooding of electricity assets, especially where they are either located on floodplains or where there is a risk of flash floods. In the past, the industry was able to rely on publicly funded flood defences to protect infrastructure. However, the increase in the number of incidents due to more variable weather patterns there is a greater need for the industry to do more to protect assets from flooding in order to limit disruption to customers, ensure continuity of supply in non-affected areas and minimise insurance costs related to the assets.

  40.  As mentioned above, the first step in United Utilities' strategy to manage the risk of flooding was to carry out studies to identify and understand the depth and likely frequency of potential flooding of electricity assets.

  41.  In order to protect electricity assets United Utilities and other electricity network operators must determine at what depth a flood will adversely affect the electricity plant's ability to continue to provide supply. The nature of substations means that the higher the operating voltage, the shallower the flood likely to have a detrimental impact and the greater the loss of supply in terms of numbers of customers affected and the geographical spread of the loss. Currently, some substation sites are able to flood to some degree providing that the control room and indoor switch houses are protected. However, if this indoor equipment is inundated, it will result in loss of supplies and electrical danger to operators.

The Response of United Utilities

  42.  To demonstrate compliance with the relevant electricity statutory regulations (based on guidance given by the then DTI in 2006) United Utilities policy includes for flood protection of 132,000V substations for 1:1000 year flood risk as these sites feed between 250,000 and 10,000 customers. 33,000V substations are now required to have flood protection for a 1:100 flood risk as they feed between 15,000 and 1,000 customers. Low voltage substations were not specifically mentioned in the DTI guidance and these tend to supply only a small number of customers meaning that any disruption should be localised. However, United Utilities' risk assessment process will identify and protect low voltage substations that merited special consideration, such as where there is something unusual or unique about the customers being supplied.

  43.  United Utilities has already adopted the principal requirements of the National Planning Guidance PSS25 in terms of new substations operating at 33,000V and above and attempts as far as possible not to site these in areas of flooding risk. Such substations typically serve approximately 10,000 customers. In contrast, 11,000V substations need to be sited close to the developments they serve (typically 300 customers); therefore when local authorities approve such developments on flood plains utility companies need to respond accordingly.

  44.  As part of the measures for longer term flood defences, United Utilities is ensuring that the external walls of its buildings are properly rendered, bunded (ie coffer dam) areas are installed around the doors and above-ground access ways, while sealing all the underground access ducts. United Utilities is working with specialist consultants to determine the further specifications required for defending key assets and to ensure that all measures are carried out correctly.

  45.  United Utilities has recently invested approximately £0.5 million in actively addressing known high risk sites, specifically Lancaster 132kV substation, Carlisle 132kV substation and Willowholme primary substation (also in Carlisle). United Utilities has also made specific investments where other new build work has been constructed, taking account of the perceived flood risk at the time of installation and retro-fitting flood protection to existing assets proven to be at risk. There are plans to invest at least a further £1m in the current regulatory review period up to March 2010.

  46.  In order to put in place long term and adequately designed flood defences, it is vital that the electricity industry works with the Government and the Environment Agency in order to ensure the provision of flood depth data predictions. Better coordination is required between companies, the Environment Agency and other appropriate bodies in order to plan flood defences and relationships would benefit from being formalised as part of the overall strategy.

  47.  While United Utilities recognises its responsibility to tackle this problem, the regulator must also be willing to play its part and allow for extra and effective funding for flood defences in regulatory settlements as companies look to put in place permanent measures.

  48.  Regulators and the Government must recognise that utility companies should not be reliant on the emergency services, or indeed the military, to assist in the event of extreme weather and need to have appropriate funding to be able to respond appropriately and independently.

  49.  For the next regulatory period United Utilities is proposing to seek funding to address the flood risk at all the grid, bulk and primary substations but target investment at the highest risk distribution substations that supply strategic infrastructure or emergency services on condition that the strategic infrastructure is itself flood protected. This would address 20% of the distribution stations at a cost of £5.2 million and gives a proposed total programme of £8.9 million in the period 2010-2015. This approach will be reviewed in light of industry work that the Department for Business, Enterprise & Regulatory Reform has just commenced.

CONCLUSIONS

  50.  If, as predicted, weather patterns continue to change, scenarios such as the flooding in Cumbria in 2005 and the extreme weather of the recent months will become more frequent and water, wastewater and electricity assets will continue to be at risk of severe damage.

  51.  There is a consensus that significant investment is needed in order to fully prepare for, prevent and mitigate flooding. While United Utilities recognises that temporary protection can alleviate some of the immediate problems caused by extreme weather, due to the generally unreliable nature of such measures, it is necessary to put in place longer term plans in order to mitigate against such risks.

  52.  Further study and assessment is required of individual facilities in order to determine the level of risk and the vulnerability of particular assets, and all utility companies must recognise that in order to minimise disruption and ensure continuity of supply to non-affected areas, they have a responsibility to put in place measures to adequately defend infrastructure. As such, each company must be prepared to carry out its own cost-benefit analysis in order to properly define the potential costs.

  53.  In response, the economic regulators, Ofwat and Ofgem, alongside the Government and the Environment Agency, must acknowledge their role in creating a future flood defence strategy and provide adequate funding to support the work of the utility providers.

  54.  Finally, in order to properly plan ahead, a more formalised joined up approach by the Environment Agency, the Government and the utility sector must be created in order to ensure that all the appropriate information is being shared and put into practice.

United Utilities

September 2007



 