Select Committee on Environment, Food and Rural Affairs Minutes of Evidence


Memorandum submitted by Sheffield City Council (FL 96)

RESPONSE TO FLOODING—JUNE 2007

EXECUTIVE SUMMARY

  1.  The rainfall experienced in Sheffield over 24-25th June came on top of an already saturated water table and Met Office records show that between 22.00 hours on 24th June and 22.00 Monday 25th June 88 mm of rain fell in the Sheffield catchment. The total monthly average for June is 67 mm. This, added to the already saturated ground conditions, created an unprecedented level of water coming off the high ground and into city.

  2.  The major distinguishing feature of the flooding that affected Sheffield was the sheer volume, force and speed of water coming down the fluvial river system in a very short period of time.

  3.  During the floods the Council worked in partnership with a wide range of other authorities to co-ordinate the immediate response and the ongoing recovery process.

  4.  Flooding in Sheffield has previously been seen as low risk. Following the June 2007 floods a number of initial issues have been raised and while the experience in Sheffield highlights some issues that are specific to our own particular location the learning points may also assist other areas in planning and preparation for flooding.

5.  KEY ISSUES:

  5.1  Need for accurate, good quality, timely warnings (para 4.2)

  5.2  Allocation of responsibility for rainfall flash flooding (para 4.2)

  5.4  The need for flood defence and prevention work (para 4.3)

  5.5  Managing public Information and expectations and educating the public (see para 4.8)

  5.6  Resilience of the critical infrastructure (para 4.5)

  5.7  Improved involvement of Utilities in future emergency planning (para 4.5).

  5.8  Confusion caused by split in Utilities ownership and responsibilities (see para 4.5)

  5.9  Clarification on responsibility for Dams in recreational use (para 4.5)

  5.10  Better access to Dam/Reservoir Flood Inundation plans and clarification on responsibility for dams in recreational use (para 4.5)

  5.11  Use of Assistance Centres should be recommended as good practice (para 4.8)

  5.12  Emphasis on benefits of training and exercises

1.  BACKGROUND

  Sheffield is built on "7 hills", intersected by valleys with five rivers converging at or before reaching the City Centre. The rivers drain an extensive upland catchment with moorland rising to 500 metres within the city boundary.

  1.1  Water from all five rivers is then carried by the River Don from the City Centre through the Lower Don Valley to Meadowhall, near the Rotherham boundary, where it is joined by a further tributary (Blackburn Brook, also subject to flood risk). When the surrounding moors become saturated, water passes quickly through to the city and the overall gradients mean that it is not retained in the same way as in more low-lying areas such as Rotherham, Doncaster and Hull.

  1.2  During 14-16th June Sheffield experienced rainfall totalling 136 mm. This caused some localised flooding but was managed effectively within our normal plans and procedures.

  1.3  The rainfall experienced over 24-25th June came on top of an already saturated water table and Met Office records show that between 22.00 hours on 24th June and 22.00 Monday 25th June 88 mm of rain fell in the Sheffield catchment. The monthly average total for June is 67 mm.

2.  IMPACT

  2.1.  The major distinguishing feature of the flooding that affected Sheffield was the sheer volume, force and speed of water coming down the fluvial river system in a very short period of time and this resulted in two fatalities.

  2.2  The effect of the flooding on the City of Sheffield was devastating with the City divided in half by floodwater, along a corridor some 23 km in length, effectively isolating half of the city from access to the main accident and emergency centre. Numerous roads were badly damaged, closed or inaccessible.

  2.3  RAF Sea King helicopters were used for rooftop rescues with other people being rescued by boat and in some cases by a tractor.

  2.4  A large number of people were left stranded and unable to get home; others were evacuated from flooded homes. A number of reception centres were established these included pre-determined and ad hoc centres to accommodate over 1400 people.

  2.5  The City's railway station was closed and passengers were left stranded, needing accommodation and assistance the following day with onward travel arrangements.

  2.6  Power cuts affected the north of the city with 48,000 homes without power.

  2.7  The M1 was closed between Junctions 32 and 35 due to fears that Ulley Dam would burst with the potential for 2 million cubic metres of water cascading across the motorway and damaging the Catcliffe substation with dire predictions of the imminent loss of most of Sheffield's power supply for a considerable period of time.

3.  RESPONSE

  3.1  Sheffield City Council (SCC) operated from the Council's Emergency Control Centre at Silver Command level and the Emergency Plan was activated. The Council has a very clear plan for responding to emergencies, which is supported by training and exercises at all levels.

  3.2  The initial Council response was focused on:

    —  Minimising the impact of the flooding

    —  Dealing with the immediate crisis

    —  Managing the recovery of the city back to normality

  3.3  Our response included:

    —  Full participation in all multi agency structures

    —  Mobilisation of full emergency plan

    —  Deployment of strategic and tactical resources city-wide to prevent harm to the public and to mitigate damage to property and to care for those in need

    —  Liaison with Government, Regional and National

    —  Setting up a network of reception centres

    —  Liaised with other local authorities on mutual aid basis

    —  Direct communications with press and public

    —  Activation of Assistance Centres in accordance with the plan

  3.4  Resilience to continue to deal with the emergency and the need to manage the transition from immediate response to recovery was recognised at an early stage. The following action was taken to ensure this:

    —  Key personnel rested during night of 25th-26th so they could take over on 26th

    —  Handover briefing/debriefing meeting at 6.00 am on 26th June chaired by CEX

    —  Recovery phase structures put in place on Tuesday 26th to operate parallel with the incident management structure.

    —  Recovery objectives set and continuously reviewed

    —  Rota, welfare and support arrangements in place to sustain recovery effort

    —  Key partners actively involved in response and recovery with partner resources secured.

  3.5  Resources were just sufficient, but stretched and consideration should now be given to looking at providing extra resources at alternative strategic locations.

  3.6  Offers of assistance came from many organisations, local authorities, voluntary organisations and members of the public. While mutual aid arrangements are in place locally these should also be formalised at a wider regional and national level.

  3.7  The flooding resulted in significant financial cost to the City Council. The recovery process is lengthy and carries significant longer-term risk for the Council, both financial and reputational.

4.  LESSONS FOR THE FUTURE

4.1  Command and Control

  SCC fully participated in all multi-agency structures and attended Gold Command within 40 minutes of being activated with an officer who has previous experience of operating at Gold Command. The Gold Command incident structure remained in place until 1st July 2007, making it, at the time, the longest-running Gold Command in the UK.

  4.1.1  The Council's Silver Control was activated in the Emergency Control Room in the Town Hall.

  4.1.2  South Yorkshire Police activated multi agency Silver Control, co-located in the SCC Emergency Control Room. A major incident was declared at 14.00 hours.

  4.1.3  A full multi-agency silver control ran 24 hours a day from Monday 25th until Saturday 30th June and then operated on reduced hours over the weekend to deal with predicted severe weather with potential for further flooding.

  4.1.4  The importance of training and exercises should not be underestimated and it was evident during the floods that people who had attended training and exercises, particularly Exercise Loxley in December 2006, were much better prepared for and aware of the role in the response and recovery.

4.1.5  Issues Raised

    —  Location of Gold and Silver controls need to be reassessed

    —  Representation from utility companies needs to be timely and at an appropriate level

    —  Split in utility responsibilities led to confusion and delay

    —  Importance of attending, training and exercises for all levels of command and control should be emphasised

4.2  Warnings—Met Office and Environment Agency

  4.2.1  Although Met Office and Environment Agency (EA) do liaise, more account should be taken of previous weather impact.

  4.2.2  Good quality, accurate and timely information is vital.

  4.2.3  A Severe Flood Warning was not given for Central Sheffield (Kelham Island) until 16.28 hours on the 25th June (water level was already up to windscreens on vehicles).

  4.2.4  In Sheffield the differentiation between Warning and Severe Warning becomes more difficult due to the relatively steep gradient feeding surface water into rivers.

  4.2.5  Warnings need to be easily understood and perhaps converted into something people understand for example flooding likely to extend to x area or y height up key buildings and walls.

  4.2.6  Automated Verbal Warnings on telephones are available from EA but there has been limited take up (only 18% of homes and businesses have registered). Registration is voluntary and could perhaps be compulsory with an opt out clause available. Since flooding there has still been no significant take up.

  4.2.7  There is no warning system for rainfall flash flooding.

  4.2.8  The impact on people who have been flooded is just as devastating whether pluvial or fluvial. Homes or businesses don't really care which type of flood water it is; whichever type the impact for them is just the same.

4.2.9  Issues Raised

    —  Need for accurate and timely information

    —  Consistency between the warnings issued from Met Office and Environment Agency.

    —  Allocation of responsibility for flash flooding.

    —  Need for identification of trigger points for activation and initiation of plans and command structures

    —  Programme of information to the public and businesses on weather warnings

    —  More co-operation between agencies eg EA, Yorkshire Water etc

    —  Locally based telemetry to provide better focussed information

    —  EA to understand their role in the warning and informing process in relation to Cat 1 and Cat 2 responders.

4.3  Flood Prevention

  4.3.1  Discussions with Environment Agency are ongoing. EA are working on a Sheffield Catchment Flood Management Plan. This was originally scheduled for completion in December 2008, but is now delayed and it will be Spring 2009 before all options are considered. It is unlikely that any major EA scheme for Sheffield would commence for at least 4 years.

  4.3.2  Environment Agency Drop in Advice Sessions have been arranged in four locations throughout the affected areas of the City.

  4.3.3  SCC are holding discussions to ensure that links with other agencies are in place in advance of remedial highway repair work to ensure any work is co-ordinated and not piece-meal.

  4.3.4  Work is currently being undertaken to calculate the time of water travel in the River Don to assist in planning flood management.

4.3.6  Issues Raised

    —  Time of water travel through river catchments

    —  Identification and assessment of Flood Management systems

    —  Need for better consultation with affected areas

4.4  Community Impact

  4.4.1  1273 homes were affected by flooding, 200 people were evacuated from Winn Gardens. SCC staff visited all affected homes and financial support packages organised.

  4.4.2  Over 1400 people stayed in a number of reception centres set up throughout the city.

  4.4.3  Power cuts affected 48,000 homes over a number of days and involved rota power cuts.

  4.4.4  SCC provided support to make property habitable and gave a £100 good landlord payment.

  4.4.5  A recovery package of up to £1000 included:

    —  Making safe electricity

    —  Water and sewage checks

    —  Pumping of cellars

    —  Dry vac cleans

    —  Emergency heating/humidifiers

    —  Removal of contaminated items

  4.4.6  Longer term issues are being co-ordinated through a care and support project being undertaken. This will look at immediate issues, signposting to professional help and community wellbeing and rebuilding.

4.4.7  Issues Raised

    —  Public perceived differences in financial support for insured and non-insured and services available to council tenants v private owner-occupiers

    —  Some areas felt isolated and neglected as the main focus of attention went to particular areas

    —  VIP visits need to focus on all areas—not just immediate high profile areas

    —  Floodwater—pluvial/fluvial—people flooded aren't worried whether the water is from rivers or drains—the impact is still as devastating

    —  Clarify identification and availability of information on "vulnerable people"

    —  Importance of addressing the longer term impact and community

4.5  Critical Infrastructure

  4.5.1  During the flooding Sheffield was faced with the prospect of the Ulley Dam in Rotherham bursting its bank. Had it breached, the impact would have been much wider than the flooding itself and would have impacted on other critical infrastructure such as water, sewerage, communications etc.

  4.5.2  Other utility flood defences were also shown to be vulnerable e.g. Service pipes below bridges. The loss of Neepsend substation during the floods led to the power outages to around 48,000 homes in the city. Rota cuts introduced into the city on Wednesday am led to confusion over exactly which premises would be affected.

  4.5.3  Difficulties with the split in utility providers and confusion over ownership of different parts of network and problems accessing contacts numbers for some Category 2 responders caused unnecessary confusion and delay.

  4.5.4  Utilities relied on other emergency responders to supply resources (e.g. sandbags) to defend critical sites when all were fully stretched responding to wide range of flood related emergencies.

4.5.6  Issues Raised

    —  Utilities should be engaging with partner organisations at local level.

    —  Critical infrastructure should have appropriate defences.

    —  Critical links between the different providers should be assessed

    —  Clarity on responsibility for dam and reservoir overtopping plans—who has the statutory duty to warn and inform?

    —  Clarification on responsibility for dams in recreational use.

    —  The split in utility providers and ownership of different parts of network leads to confusion over responsibility and uncoordinated decision making.

4.6  Highways Infrastructure

  4.6.1  The sheer speed and force of the floodwater caused major damage to the city's highways and rural road network.

  4.6.2  Initial work included the clean up and disposal of debris from roads, bridges, culverts and highway drainage systems, removal of abandoned vehicles from roads and rivers, providing sandbags, temporary traffic management, removing major blockages in rivers.

  4.6.3  Work has now been undertaken to make safe and restore the general highway system, repairs to carriage ways, footpaths, street lighting, traffic signals, signs, retaining walls, bridge parapets etc.

  4.6.4  Other work is still outstanding. Two of the main routes from the North into the city the A61 and A6102 remain badly affected.

4.6.6  Issues Raised

    —  The need for liaison with EA and Utilities to ensure co-ordinated approach

    —  Impact on work programmes and the knock on effect on areas of the city's performance over the next 12 months

    —  Problems identifying the location of major services under bridges

    —  Ensuring Health and Safety Issues are complied with for people working in exceptional conditions eg Working in Water.

4.7  Business

  4.7.1  There has been significant impact on many businesses in the city as the flooding affected the city's main industrial area. Over 1000 business were affect amongst which are a number of large business and major employers directly and indirectly.

  4.7.2  There is likely to be a significant long-term effect on business in the city.

  4.7.3  The Sheffield Recovery Group immediately established a business helpline in conjunction with the Assistance Centre and appointed a business champion to lead on business related issues.

  4.7.4  Meadowhall closed for first time in its history (except for Christmas and Easter).

4.7.5  Issues Raised

    —  Impact of redundancies—direct and indirect

    —  Confidence and the need to counteract negative publicity

    —  Impact on local trades

    —  Impact on suppliers

4.8  Public Information

  4.8.1  An Assistance Centre was set up at the Customer Service centre and also based locally in affected areas. This was publicised and face to face, phone and email information and advice was provided.

  4.8.2  The 101 system proved invaluable as a first line information point.

  4.8.3  There were 22,000 phone contracts between 25th June to 19th July.

  4.8.4  The Assistance Centre continues to operate at reduced hours.

  4.8.5  Questionnaires have been delivered to 2,378 affected addresses and published on the website. Results of the public consultation will be published on the website.

  4.8.6  A regular information Flood Newsletter is being distributed to affected properties.

  4.8.7  Public information is particularly important not least around raising awareness for the public to make their own preparations and not rely totally on the local authority to supply resources for everyone, for example sandbags. The public need also to be made aware of other options of flood protection for their properties.

4.8.8  Issues Raised

    —  Ensuring that the public are informed on how to:

    —  prepare for flooding

    —  understand their responsibilities

    —  understand the roles of different agencies and what they can do

    —  Managing public expectations

    —  Assistance Centres and representation in the community should be followed as good practice

    —  How do we get people to recognise they could be affected by flooding?

Sheffield City Council