CHRONOLOGY OF THE MAIN EVENTS IN THE PROCUREMENT OF IRAN'S CENTRIFUGE AND URANIUM ENRICHMENT PROGRAMME

  1985 = The decision was made by Iran to launch a centrifuge enrichment programme.

  1987 = Iran received drawings of the centrifuge P-1 type along with samples of centrifuge components through a foreign intermediary.

  1988-95 = The start of the first phase of the centrifuge programme, during which basic research and initial development work was located mainly at the Atomic Energy Organisation of Iran premises in Tehran, with laboratory work conducted at the Plasma Physics Laboratories of Tehran Nuclear Research Centre. There were also tests of centrifuge rotors at the Amir Kabir University in Tehran and on the premises of the Atomic Energy Organisation of Iran in Tehran without insertion of any nuclear material. Some 2,000 components and some subassemblies were obtained from abroad through foreign intermediaries or by Iranian entities between 1993 and 1995.

  1994-96 = Iran received a duplicate set of the P-1 drawings along with components for 500 P-1 type centrifuges as well as design drawings for a P-2 type centrifuge from foreign sources in 1994.

  1995-2002 = Prototype testing and development work of the P-1 type centrifuges was relocated to the Kalaye Electric Company in Tehran. Some mechanically testing of P-1 type centrifuges as well as the testing with UF6 was carried out in 19 machines in 1999 and 2002.

  1998 = The first test of the centrifuges using an inert gas (xenon) was conducted.

  1999-2002 = Series of tests using UF6 were performed in the centrifuges by Iran and an enrichment level of 1.2% U-235 was achieved.

  2001 = Iran began the construction of two facilities at Natanz about 250 km (150 miles) south west of the capital Tehran. The smaller scale Pilot Fuel Enrichment Plant, planned to have some 1,000 centrifuges for enrichment up to 5% U235. The large scale commercial Fuel Enrichment Plant was planned to contain over 50,000 centrifuges for enrichment up to 5% U-235.

  2002-03 = Some basic manufacturing and mechanical testing of a small number of modified P-2 type centrifuges was carried out at the workshop of a private company under contract with the Atomic Energy Organisation of Iran.

  2003 = All centrifuge equipment related to P-2 type centrifuges were moved to Pars Trash from the private company, which had been under the contract with the Atomic Energy Organisation of Iran.

  2003 = Research and development activities on centrifuges were moved from the Kalaye Electric company workshop in Tehran to Natanz about 250 km (150 miles) south west of the capital Tehran.

  25 June 2003 = Iran introduced UF6 into the first centrifuge at the Pilot Fuel Enrichment Plant at Natanz in a single machine testing.

  19 August 2003 = Iran began the testing of a small ten-machine cascade at Pilot Fuel Enrichment Plant at Natanz using UF6.

  October 2003 = Some single machine testing using UF6 was carried out at Pilot Fuel Enrichment Plant in Natanz. The installation of a 164 machine cascade was finalised.

  21 October 2003 = The Iranian Government and the Foreign Ministers of France, Germany and the United Kingdom issued in Tehran an agreed statement on Iran's nuclear programme. In that statement, Iran indicated that it had "decided voluntarily to suspend all uranium enrichment and reprocessing activities as defined by the IAEA."

  10 November 2003 = Iran accepted to sign the enhanced safeguard agreement of the IAEA, known as the Additional Protocol. Iran indicated that pending the entry into force of Protocol, Iran would voluntarily act in accordance with the provisions of that Protocol.

  18 December 2003 = Iran signed the enhanced IAEA safeguards measure, known as the Additional Protocol.

  29 December 2003 = Iran voluntarily agreed to suspend manufacturing, assembling and testing of gas centrifuges.

  29 June 2004 = Iran resumed manufacturing, assembly and testing of centrifuges after a voluntary suspension period of six months.

  14 November 2004 = Agreement reached between Iran, France, Germany and the United Kingdom, and the High Representative of the European Union, so that Iran on voluntary basis and as further confidence building measure, continue and extend its suspension to include all enrichment related and reprocessing activities, and specially manufacture and import of gas centrifuges and their components, the assembly installation, testing or operation of gas centrifuges and all tests and production for conversion at any uranium conversion installation.

  1 August 2005 = Iran notified the IAEA that Iran had decided to resume the uranium conversion activities to produce UF6 gas at Esfahan Uranium Conversion Facility, which is the feed material use in the gas centrifuges at Natanz.

  10-11 January 2006 = After notifying the IAEA in the early January 2006, Iran resumed the uranium enrichment process at the above ground Pilot Enrichment Plant after a long voluntary suspension period which was in force since October 2003. 52 IAEA safeguards seals on the P-1 type gas centrifuges were removed in the presence of the IAEA inspectors at Natanz, and at two other workshops in Tehran—Pars Trash and Farayand Technique sites.

  11  January 2006 = Iran started enrichment tests by feeding a single P-1 type machine with UF6 gas.

  10 January 2006—11 February 2007 = Iran began a substantial renovation of the gas handling system at the Pilot Fuel Enrichment Plant at Natanz. Quality control of components and some rotor testing carried out at Farayand Technique centrifuge workshop in Tehran and at Natanz. Equipment such as process tanks and an autoclave were moved into the underground Fuel Enrichment Plant at Natanz.

  4 February 2006 = The Board of Governors of the IAEA decided to refer Iran's non-compliance with its IAEA safeguards agreement to the Security Council of the United Nations.

  5 February 2006 = Iran withdrew from the IAEA's enhanced safeguards system called the Additional Protocol.

  15 February 2006 = Iran began testing a 10-machine centrifuge cascade.

  22 February 2006 = Iran began testing with a 20 machine centrifuge cascade.

  March 2006 = Iran completed installation of 164-machine cascade and initiated to introduce UF6 into it. Iran also began construction of a second centrifuge cascade.

  29 March 2006 = The President of the United Nations Security of Council made a non-binding statement on behalf of the Security Council in which it called on Iran to re-establish full and sustained suspension of all enrichment related and reprocessing activities, including research and development, to be verified by the IAEA.

  13 April 2006 = Iran declared to the IAEA that Iran had successfully obtained an enrichment level of 3.6% U235 in its centrifuges.

  15 April 2006 = Iranian officials announced that Iran has been engaged in the research and development of the advanced P-2 type centrifuge, which could enrich uranium faster than the older type P-1 design currently being installed at the Fuel Enrichment Plant at Natanz.

  June 2006 = Iran stated that it had achieved enrichment levels of 5% U-235 in a test run in the 164-machine cascade.

  June-July 2006 = The period of intense diplomatic negotiations with Iran. The permanent members of the Security Council plus Germany (often referred to as P5+1) offered a package of incentives to Iran in exchange for Iran's permanent suspension of its uranium enrichment programme.

  12 July 2006 = Start of the war between Lebanon and Israel.

  31 July 2006 = The United Nations Security Council adopted resolution 1696 under Article 40, Chapter Seven of the United Nations Charter by a vote of 14 in favour and one against (Qatar), demanding that Iran should suspend all enrichment related and reprocessing activities, including research and development, to be verified by the IAEA by 31 August 2006 or face possible economic and diplomatic sanctions under Article 41, Chapter Seven of the United Nations Charter.

  14 August 2006 = The ceasefire between Israel and Lebanon came into effect following the UN Security Council Resolution 1710 adopted on Friday 11 August 2007.

  22 August 2006 = Iran provided a 21 pages long counter proposal to the packaged proposal offered by the P5+1 to Iran on 6 June 2006. Iran welcomed some aspects of the P5+1 offer. Iran proposed a joint venture with the European nuclear energy consortium EURODIF to conduct uranium enrichment on Iranian soil. Iran indicated that it would be prepared to discuss suspension of uranium enrichment during the negotiations and not prior to it.

  15 September 2006 = Iran's proposal for the establishment of an international consortium was considered very promising by the EU High Representative for the Common Foreign and Security Policy, Javier Solana, leading to public statements of progress following his meetings with Iran's nuclear negotiator.

  4 October 2006 = Iran's proposal of 22 August 2006 was rejected by the Permanent members of the Security Council plus Germany (P5+1) because Iran was not prepared to suspend its uranium enrichment activities prior to the start of the negotiations.

  9 October 2006 = The North Korean nuclear test.

  11 October 2006 = Iran in a letter to the Secretary General of the United Nations indicated that to address concerns about Iran's commitment to the NPT, Iran would be prepared to provide guarantees that it would never withdraw from the NPT, once it reached a certain level of advancement. Iran offered to resume the implementation of the intrusive inspection regime of the Additional Protocol in the context of a negotiated settlement. Using the model suggested by the IAEA experts, Iran proposed to convert its enrichment facilities to regional and multinational schemes, which would have provided the greatest degree of transparency by allowing the concerned parties to participate in the ownership and operation of these facilities.

  Mid-October 2006 = Iran brought a second cascade of centrifuges on line.

  November 2006 = The mid-term elections in the United States brought both the Congress and Senate under the control of the Democrats who had been critical of the Bush administration's foreign policy.

  December 2006 = The publication of the recommendations of the Iraq Study Group, a bipartisan panel of experts convened at the request of the United States Congress, to assess the situation in Iraq and make policy recommendations. One of the 79 recommendations offered in the report was the need for the United States to start negotiations with Iran to stabilise the security of Iraq.

  15 December 2006 = The Assembly of Experts and municipal councils elections were held in Iran. The religious conservatives and reformists gained significant victory at the expense of religious hard-line fundamentalists allied with President Ahmadinejad.

  23 December 2006 = The United Nations Security Council unanimously adopted the legally binding resolution 1737 under Article 41 of Chapter Seven of the United Nations Charter imposing sanctions on Iran's import or export of sensitive nuclear material and equipment and freezing the financial assets of persons or entities supporting its proliferation sensitive nuclear activities or the development of nuclear weapons delivery systems.

  27 December 2006 = The Iranian parliament passed a bill to oblige the government to review its cooperation with the IAEA and accelerate Iran's nuclear programme only four days after the imposition of sanctions on Iran by the Security Council Resolution 1737 on 23 December 2007. The bill, which was approved by the Council of Guardians, also permits the government to withdraw from the NPT or to stop IAEA inspections in Iran. The bill was passed by an overwhelming majority of 203 deputies who were present with 161 voted in favour, and only 15 against and 15 abstained.

  January 2007 = Iran started to install about 3000 centrifuges at the underground Fuel Enrichment Plant in Natanz. The centrifuges were slated to be organised into eighteen 164-machine cascades that operated low enriched uranium, known as "module". The underground Fuel Enrichment Plant could hold about 17-18 modules (each module consists of 3000 cascade centrifuges) for a total of 50,000 to 53,000 centrifuges.

  22 February 2007 = Iran continued to test single machines, as well as the 10-and 20 machine cascades and the two 164-machine cascades (one of which Iran has since disconnected) at the above ground Pilot Fuel Enrichment Plant.

  21 February-17 March 2007 = Iran fed 4.8 kg of UF6 into the single machines and the 10-machine cascade at the above ground Pilot Fuel Enrichment Plant.

  Mid-February 2007 = Iran informed the IAEA that two 164-machine cascades were installed at the underground Fuel Enrichment Plant and that they were operating under vacuum, an operational state established prior to enriching uranium. Two other 164-machine cascades were in the final stages of installation.

  23 February 2007 = The Director General of IAEA's report on Iran's nuclear programme submitted to the Board of Governors of the IAEA and to the Security Council of the United Nations.

  Late February 2007 = No uranium hexafluoride had been introduced into either of the two cascade centrifuges which were installed and operating under vacuum at the under ground Fuel Enrichment Plant at Natanz. The area where uranium hexafluoride would be introduced was still under the IAEA seal. There were two 164 centrifuge cascades and a few small cascades installed at the under ground Fuel Enrichment Plant at Natanz.

  March 2007 = The two 164 centrifuge cascades at the under-ground Fuel Enrichment Plant at Natanz started to enrich uranium periodically and produce only small amounts of low enriched uranium. The enriched uranium product of one 164-machine cascade was being dumped into the same tank as the waste or "tails." The product from the second cascade was collected and saved.

  24 March 2007 = The United Nations Security Council unanimously adopted the legally binding resolution 1747 under Article 41 of Chapter Seven of the United Nations Charter imposing further sanctions on Iran.

  March 2007 = Iran stated that it had plans to complete installation of all 3,000 centrifuges at the underground Fuel Enrichment Plant at Natanz in May 2007.

  9 April 2007 = Dr. Gholamreza Aghazadeh, the Director of Atomic Organisation of Iran officially announced the industrial scale production of enrichment at the underground Fuel Enrichment Plant in Natanz—about 250 km (150 miles) south west of the capital Tehran, during a ceremony called "the nuclear day", the first anniversary of uranium enrichment in Iran. President Ahmadinejad also announced the industrial scale production of nuclear fuel by Iran during the same ceremony.

  18 April 2007 = In a letter from the IAEA to Iran, the IAEA confirms that according to the information provided by Iran, there are eight cascades of centrifuges (every cascade consists of about 164 centrifuges) at the underground Fuel Enrichment Plant (FEP) in Natanz and that some nuclear material UF6 was being fed into those cascades. The total number of centrifuges was believed to have been 1,312.

  Mid April—13 May 2007 = Iran fed 260 kilograms of uranium hexafluoride UF6) in the eight cascades (a total of 1,312 centrifuges) of uranium at the under-ground Fuel Enrichment Plant in Natanz. This was the first occasion that Iran had operated more than one cascade (164 centrifuges) simultaneously.

  13 May 2007 = Iran agreed to an unannounced (short-notice of two hours) inspection of Iran's underground uranium enrichment facility in Natanz by the IAEA inspectors. The IAEA found that Iran was operating eight 164-machine cascades simultaneously (a total of 1,312 centrifuges). These centrifuges were being fed with UF6. Two other similar cascades (164 centrifuges each) had been vacuum tested and three more were under construction.



 