Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 60 - 79)

  60. The Bill includes powers to construct a new station at Woolwich.[21] The section is effectively on the area of the car park of the Royal Arsenal which I am indicating to your Lordships now. The construction of the station box is dependent on the successful completion of a binding agreement between the Department of Transport and Berkeley Homes, who are the major residential developers in the area. The subsequent fit-out of the box is dependent on receiving sufficient funding from businesses and developers in the area that stand to benefit from the station.

  61. If we then go back to the route map for the southeast, the southeastern terminus is at Abbey Wood, where there will be new tracks, new platforms and a newly rebuilt station to allow 12 Crossrail trains an hour to terminate at Abbey Wood. At Abbey Wood there will be cross-station interchange with existing lines coming from Dartford further in the southeast.

  62. The whole route section is proposed to be subject to overhead line electrification and powers are being sought to do that. Along the surface section portal masts will be erected to cover the electric lines approximately every 50m.

  63. On the service pattern, once Crossrail is constructed and operating it is expected that there will be, unsurprisingly, a considerable level of demand, and so 24 trains an hour will be run in the central section—that is through the deep tunnel.[22] To the east that splits equally into 12 trains an hour to Abbey Wood and 12 trains an hour to Shenfield. The western section, which the Committee will remember, only has the one limb, the Great Western Line, with a branch off to Heathrow. This means that only a proportion of Crossrail trains will run west of Paddington; in the peak hour up to ten trains run west of Paddington, four of which run to Heathrow, four to Maidenhead and two to West Drayton.

  64. The Crossrail line to Abbey Wood will only take trains going through the central tunnel; but on the line to Shenfield Crossrail services will share the slow lines, or "E Lines", with suburban passenger services, some of which are not subsumed into Crossrail and which are designed to be complementary to the Crossrail service. The longer distance passenger trains and freight trains which use the fast lines will continue to do so during normal operation.

  65. On the Great Western Mail Line Crossrail services will share the slow or so-called "relief" lines with freight and again with complementary passenger services going on to Reading. The InterCity lines, that is the Great Western lines going out to south Wales and to Bristol, run on the fast lines and they will continue to use those lines uninterrupted, unaffected by Crossrail during normal operation.

  66. Greater capacity on the existing network, both west and east, is achieved by means of longer trains and fitting more trains through investment into the infrastructure, which is part of the Crossrail project, and also through further design work on the timetable.

  67. At this point, my Lords, I hand over to Mr Mould to speak to you about the delivery mechanism.

  68. MR MOULD: My Lord Chairman, my Lady, my Lords, I am going to say a very few words indeed about delivery, covering the basic funding components and the briefest outline of the proposals to the management of the project through construction.[23]

  69. Most of these matters, of course, are strictly outside the scope of the Bill in legislative terms but it may be of assistance to the Committee just to have a brief understanding of how we intend that the project should be successfully delivered.

  70. The total project cost of Crossrail is expected to be about £16 billion in cash terms—in other words, in "money of the day" over the period of construction of the railway. That figure of £16 billion includes a prudent allowance for inflation during construction, and for the risk of other cost escalation; it is fully inclusive of all project costs, such as land acquisition, compulsory purchase and contingencies. This figure has been subject to external, independent review.

  71. The package of funding for the project was announced on 5 October of last year by the Prime Minister, and indeed is set out in the 2007 Comprehensive Spending Review published in November of last year. In the briefest terms, funding of the project will be shared equitably between central government, the private sector and future Crossrail fare payers and, indeed, Transport for London as the transport authority for the capital.

  72. As regards management, the position is that the Department for Transport and Transport for London have a 50:50 joint ownership of the company Crossrail London Rail Links Limited, which is the company established for the development and planning of the railway project. The Department and Transport for London are co-sponsors of the project, and the proposal is that CLRL is to become a subsidiary of Transport for London in order to take the project forward once powers have been granted, but with the necessary degree of independence to enable proper procurement and provision to be made for the efficient construction of the railway.

  73. Turning then to summarise the position as regards consultation and information.[24] There has been very extensive consultation and exchange of information with statutory bodies, commercial occupiers and individuals affected by the project, both before the deposit of the Bill and continuing through the parliamentary process where there have been changes to the project. I just set out on the slide the main categories of bodies consulted with: local authorities, key environmental and other statutory bodies, railway industry bodies, other government departments, the business community and, indeed, landowners and occupiers.

  74. In the course of the parliamentary proceedings in relation to the Bill the Promoter has sought to inform those affected by the Crossrail scheme about the proposals and how they will be affected.[25] We have produced over 70 Information Papers on a wide variety of subjects, such as compensation rights, environmental protection and Bill powers; and these Information Papers have been updated as matters have changed, and indeed have been republished in up-to-date form for the benefit of proceedings before your Lordships' House. Your Lordships I believe have been provided with copies of those documents. They have been made available on the scheme website and, indeed, updated. We also have written to every property owner or occupier who petitioned in the other Place, drawing attention to the various generic undertakings and assurances that have been given and which relate to their petition, as we were asked to do by the Committee in the other Place. We have also written to all petitioners in your Lordships' House setting out the key information sources for the project.

  75. The project has a website, and this is a copy of the homepage.[26] All the Information Papers are to be found there, together with all other relevant documents such as, for example, the background technical reports to the scheme. The website has been operating since the deposit of the Bill in February 2005, so well before the hearings in the select committee proceedings in the other Place which of course started in January 2006. The documents shown on the website have been added to as they have been produced and updated where necessary. Further information about the consultation arrangements and information rounds can be found in the F series in the Information Papers, which you have in front of you.

  76. I turn to the Bill provisions, and a short summary of the main provisions of the Bill.[27] First of all, we make it clear that in drawing up the Bill, and the concepts set out within it, we have taken a great deal from the experience with the Channel Tunnel Rail Link Act which, as my Lord Chairman mentioned in his opening remarks, I think was the last hybrid bill process that went through Parliament. That experience has proved valuable in drawing up the current proposals.

  77. The Bill seeks a range of powers to build and operate the railway. Amongst other matters the Bill, if enacted, will have the effect of: firstly, conferring power to construct and maintain Crossrail and associated and enabling works; secondly, the Bill will grant deemed planning permission for the construction of the railway and associated and enabling works; thirdly, as you would expect, the Bill would confer powers of compulsory purchase or temporary possession of land where such land is needed in order to construct the railway and for other associated and enabling works; fourthly, the Bill removes the need to obtain specific listed building consent or conservation area consent for demolition, alteration or extension of listed buildings and other structures specified in the Bill, and an alternative arrangement is laid out for those matters in conjunction with English Heritage and the local authorities; fifthly, the Bill authorises the stopping up or closure of highways and other public thoroughfares.

  78. An important point to draw to the Committee's attention is the role of local authorities under the Bill scheme.[28] The Bill confers on local authorities along the route a significant number of local planning, highways and environmental controls over the detailed design and construction of Crossrail. By way of example, I mention that the Bill would provide for the deeming of planning permission for the scheme, but within Schedule 7 of the Bill are a substantial number of detailed controls which are conferred upon planning authorities in relation, for example, to detailed design matters for the control of lorry routing and other matters of that kind which will therefore be the subject of local consideration and approval under the Bill scheme. The provisions of Schedule 7 therefore contain conditions requiring various matters of detail to be subject to the approval of the relevant qualifying local planning authority; that is to say, one that has given an undertaking to the Secretary of State about the way in which it will handle applications for approval of details. Plans, specifications and detailed construction arrangements are an example of that.

  79. Where the works affect highways the Bill provisions also provide for certain matters to be subject to the approval of the highway authority, including for example seeking to minimise the disruption, detailed access arrangements and the process for stopping up of highways where that is required.



21   Crossrail Ref: P1, Aerial view of proposed site for a station at Woolwich (LINEWD-OPN1-018) Back

22   Crossrail Ref: P1, Service Pattern (LINEWD-OPN1-019) Back

23   Crossrail Ref: P1, The Delivery Mechanism (LINEWD-OPN1-020) Back

24   Crossrail Ref: P1, Consultation and Information (LINEWD-OPN1-021) Back

25   Crossrail Ref: P1, Information to Public (LINEWD-OPN1-022) Back

26   http://www.crossrail.co.uk Back

27   Crossrail Ref: P1, Bill Provisions (LINEWD-OPN1-024) Back

28   Crossrail Ref: P1, Role of Local Authorities (LINEWD-OPN1-025) Back


 