Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 40 - 59)

  40. Although the increase in demand, which the table shows, will in part be met by additional capacity on the underground and Network Rail networks, future levels of overcrowding will exceed those experienced today, particularly within Central London and the underground network, again, as your Lordships will be well aware, suffers from overcrowding on a daily basis.

  41. As you have seen from the table, Crossrail will play a significant role in reducing levels of overcrowding. The figures you see here and the figures I have just mentioned, of course, are just the headline figures. Other sections of the tube which are not classed as overcrowded but which are busy with at least 80 per cent of capacity used will also experience major reductions in passenger flows as a result of the benefits of Crossrail.

  42. Crossrail will take trains out of Paddington and Liverpool Street reducing congestion within those busy stations. The freeing up of platforms also creates the potential for additional services to other areas subject to investment as necessary in additional network capacity.

  43. The focus is on achieving good reliability generally on the network and not just for Crossrail services. In addition to providing relief from overcrowding, Crossrail will also provide significant savings on journey times. Again, a table is put up just to give your Lordships a feel for the sort of savings that Crossrail will bring.[12] Take, for example, Abbey Wood to the Isle of Dogs, before Crossrail a 30-minute journey; Crossrail will save approximately 21 minutes from that journey, reducing the overall journey to nine minutes rather than 30.

  44. In short, my Lords and Lady, London and the South East cannot afford for Crossrail not to happen. The Mayor's London Plan identifies it as critical to supporting the growth of the financial and business services sector in Central London and the Isle of Dogs.

  45. In terms of regeneration, Crossrail will support national policy objectives aimed at reducing social exclusion and bringing about regeneration. It will directly serve the Thames Gateway, a national and regional priority for regeneration and growth. Growth in the area can only be realised if there are substantial improvements to the transport system.

  46. Turning then to the scheme, Crossrail achieves the benefits of adding to the tube network and increasing the commuter capacity of the suburban rail network but without overloading the London terminals. It is different from any other railway in London, save for Thameslink. The RER in Paris is a good example of a similar solution bringing passengers into and through the heart of a capital city.

  47. My Lords, before I hand over to the Ms Lieven for the next section, can I draw to your Lordships' attention, we have made available to your Lordships, and you may find this helpful, the Quick Guide to Crossrail which contains the overall route map in rather more legible format than the Powerpoint slides and some of the basic details which will give you rapid overview of the project. Ms Lieven is now going to take you through a slightly more detailed account of the elements of the projects.

  48. MS LIEVEN: My Lords, my Lady, I am going to take you through the various route sections starting with the central section running between the portals at Paddington to the west, Pudding Mill Lane and just east of the Isle of Dogs on the east side. The central section of the route represents the largest engineering component of the project.[13] If we just turn to the tunnels, the route, this central section comprises 6m diameter twin-bore tunnels running under central London which connects the railways from east to west. We have put up a slide to show the largest scale of the Crossrail tunnels as compared to something like the Jubilee Line extension tunnels at the moment.[14]

  49. New Crossrail central section stations, and I hope the Committee can see on the screens in front of you reasonably clearly, will be provided at Paddington, Bond Street, Tottenham Court Road, Farringdon, Liverpool Street, Whitechapel and the Isle of Dogs, all deep-level underground stations. The tunnels will be generally at a depth of between 20m and 40m, and at a point beneath Stepney Green, which lies to the east of Whitechapel, the tunnels will divide with the northeast section going up to the Pudding Mill Lane portal and on to Shenfield, and the southeast section going down to Abbey Wood, and I will turn to those two sections in a moment.

  50. With the exception of Whitechapel, all the central section stations have two entrances and ticket halls to provide access at both the eastern and western ends of the stations. We have put up what is called an axonometric to show you one illustrative position of a station.[15] You can see the two Crossrail tunnels with cross tunnels going between them, between the platforms, and then a central escalator rises up to a ticket hall above. We will be looking at those in more detail where there are particular petitions around a particular station.

  51. At the east and west ends of the central section we have the portals. This is a computer-generated image of the western portal at Westbourne Park, west of Paddington.[16] There will be eastern portals at Pudding Mill Lane on the southeast route to the east of the Isle of Dogs.

  52. At particular locations along the railway there are shafts connecting the tunnels with the surface that provide both emergency access and ventilation, depending on the particular shafts. Some of these shafts are incorporated within the new stations and some of them, such as for example the one at Park Lane, are freestanding structures which are simply these emergency and ventilation shafts. The central section tunnels will be excavated using tunnel-boring machines which we are about to show a slide of, and which Professor Mair, who is going to give the settlement presentation tomorrow, will explain to you in more detail.[17]

  53. I turn then to the western section of the route which runs between Maidenhead in the west and the Westbourne Park portal just outside Paddington.[18] On this side the tracks run from Maidenhead to what is called Portobello Junction at Westbourne Park; and there is a branch at Stockley Junction which runs down to Heathrow where I am indicating.

  54. The western section of the route mainly uses the existing Great Western relief lines, as the pair of slow lines are called on the main line. Crossrail however will require the addition of new track or track alignment at some locations. For example, a new line is to be constructed over about 1km between Langley and West Drayton in order to ease the operation of freight services on that part of the route and to increase the overall track capacity to enable the planned Crossrail services to run.

  55. In addition to the new elements I have already mentioned, Crossrail's major new structures and facilities along the western section include a new rail underpass at Acton in order to avoid conflicts between Crossrail and freight trains, and new or remodelled sidings at three locations. The project also requires platform extensions or new platforms in order to accommodate Crossrail's 200m long trains. At nine stations on the western section improved facilities, including new or modified ticket halls, will be provided to accommodate the increased number of passengers from Crossrail.

  56. There will also be a new depot on the line at Old Oak Common with stabling for trains, and a major new electrification west from Stockley Junction, because east of Stockley Junction has already been electrified. West of Stockley Junction the route will be electrified to Maidenhead.

  57. I turn then to the northeastern section which runs from the Pudding Mill Lane portal up to Shenfield.[19] The trains on this line will run on the existing electric suburban tracks of the Great Eastern line. There will be little new rail alignment on this section of the route, although there is some new track for a freight loop between Goodmayes and Chadwell Heath, again to facilitate freight and to replace an existing loop at Manor Park.

  58. Again, similarly to the west, Crossrail will require station platform extensions or, in some places, new platforms to accommodate the longer trains. There will be new or remodelled sidings at Ilford, Gidea Park and Shenfield. Also an existing depot at Clacton is to be reopened in order to allow us to commission the trains before the full operation commences, and this is not on the map.

  59. On the final route map the southeastern section runs from a point to the east of the Isle of Dogs, down to Custom House, under the Thames, through Woolwich and to Abbey Wood.[20] Crossrail will operate underground in the twin-bore tunnels in a section between the Isle of Dogs and the Victoria Dock portal, at which point the line emerges, and this is a slightly unusual section of the line, and operates at surface level. Crossrail will serve a new remodelled station at Custom House which serves the ExCel Exhibition Centre and the route will follow the existing alignment previously used by the North London Line. Some members of the Committee may know that the easternmost section of the North London Line has recently been closed. It runs through a refurbished Connaught Tunnel to Silvertown, and at that point descends down a ramp under the river to Woolwich, and comes out again at the Plumstead portal east of Woolwich.



12   Crossrail Ref: P1, Illustrative Journey Times and Time Savings with Crossrail (in minutes) (LINEWD-OPN1-009) Back

13   Crossrail Ref: P1, Crossrail Line 1-Central Route (LINEWD-OPN1-010) Back

14   Crossrail Ref: P1, Crossrail tunnel compared to Jubilee Line extension tunnel (LINEWD-OPN1-011) Back

15   Crossrail Ref: P1, Bond Street-3d Axonometric View-Eastern Ticket Hall (LINEWD-OPN1-012) Back

16   Crossrail Ref: P1, Computer-generated image of the western portal at Westbourne Park (LINEWD-OPN1-013) Back

17   Crossrail Ref: P1, Tunnel-boring machine (LINEWD-OPN1-014) Back

18   Crossrail Ref: P1, Crossrail Line 1-Western Route (LINEWD-OPN1-015) Back

19   Crossrail Ref: P1, Crossrail Line 1-Northeastern Route (LINEWD-OPN1-016) Back

20   Crossrail Ref: P1, Crossrail Line 1-Southeastern Route (LINEWD-OPN1-017) Back


 
previous page contents next page